Nothing Special   »   [go: up one dir, main page]

CN202050285U - Power system of high-power high-voltage diesel generator set of larger data storage center - Google Patents

Power system of high-power high-voltage diesel generator set of larger data storage center Download PDF

Info

Publication number
CN202050285U
CN202050285U CN2011201255739U CN201120125573U CN202050285U CN 202050285 U CN202050285 U CN 202050285U CN 2011201255739 U CN2011201255739 U CN 2011201255739U CN 201120125573 U CN201120125573 U CN 201120125573U CN 202050285 U CN202050285 U CN 202050285U
Authority
CN
China
Prior art keywords
power
center
diesel generating
generating set
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201255739U
Other languages
Chinese (zh)
Inventor
李群意
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG HONNY POWER TECHNOLOGY Co Ltd
Original Assignee
GUANGDONG HONNY POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HONNY POWER TECHNOLOGY Co Ltd filed Critical GUANGDONG HONNY POWER TECHNOLOGY Co Ltd
Priority to CN2011201255739U priority Critical patent/CN202050285U/en
Application granted granted Critical
Publication of CN202050285U publication Critical patent/CN202050285U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

The utility model discloses a power system of a high-power high-voltage diesel generator set of a larger data storage center, which comprises the high-power high-voltage diesel generator set, a transformer, a mains supply wire incoming device, a double-power control cabinet, a low-voltage distribution center, an emergent distribution cabinet, a parallel UPS (Uninterrupted Power Supply) system, a DC/AC (Direct Current/Alternating Current) distribution box, an IT (Internet) center, a fire-fighting system, an illuminating system and an elevator system, wherein a maintenance and protection system is arranged for the UPS system, a lighting protection and surge protection device is arranged for the high-power high-voltage diesel generator set, and the functional modules are matched to ensure that when the mains supply needs to be overhauled or cut off, the high-power high-voltage diesel generator set can be quickly started to output stable and reliable power, so that the conditions that the sensitive equipment in the IT center is damaged, data loss is caused, and the like because the power is cut off can be avoided, and the IT personnel have more time to orderly start a standby generator to ensure that the matched larger data storage center can stably operate.

Description

The electric power system of large data storage center high-power high-pressure diesel generating set
Technical field
The utility model relates to the field of power technology, refers in particular to a kind of large data storage center high-power high-pressure diesel generating set electric power system that is highly suitable for financial class industries such as bank, security, insurance.
Background technology
Financial class industries such as bank, security, insurance; the running of the whole actually data system of its operation; this whole data system generally divides memory module, database module, application module etc.; wherein; the memory module that is positioned at the rear end is a large data storage center; it is a most key part in the whole data system, and it requires usually to accomplish that application is not shut down, storage is upgraded and do not interrupted, so that effectively guarantee can recover as early as possible after its data are not lost or lost.We are fully aware of, and any reason causes loss of data all will bring the loss that can't estimate, because these data all relate to financial fund accounts etc.
At present, because special weather destroys power transmission system, people for breaking the electric wire cable, or the excess demand of electrical network causes putting on short allowance of electric power etc., causes power failure to cause the situation of loss of data in the hard disk or damage very common.Usually, the power failure of precognition is arranged, we can do generating in advance and prepare, perhaps, general mini electrical equipment, as minority computer etc., we can select to dispose also can in time have electric power to supply with power consumption equipment after uninterrupted power supply (ups) Unity satisfies power failure suddenly, and for the large data storage center, the power failure of reply burst is difficult satisfies its application need by common uninterrupted power supply, and the interruption of electric power brings damage and loss of data to apparatus sensitive often, and common uninterrupted power supply is difficult to also guarantee that the IT personnel have sufficient time to start standby system or generator etc., like this, be difficult to the safety of guarantee information resource.
By this, be badly in need of technical scheme that research makes new advances to solve above-mentioned deficiency.
The utility model content
In view of this, the utility model is at the disappearance of prior art existence, its main purpose provides the electric power system of a kind of large data storage center high-power high-pressure diesel generating set, its power supply in time and stability is high, system reliability is high and system maintainability is strong, makes its orderly startup standby system or generator for the IT personnel strive for time enough.
For achieving the above object, the utility model adopts following technical scheme:
The electric power system of a kind of large data storage center high-power high-pressure diesel generating set includes high-power high voltage diesel generating set, transformer, civil power line leading device, duplicate supply control cubicle, low-voltage distribution center, emergent power distribution cabinet, parallel UPS system, DC/AC distribution box, IT center, fire-fighting system, illuminator and elevator device;
Wherein, this civil power line leading device is connected in the duplicate supply control cubicle, and this high-power high voltage diesel generating set is connected in the duplicate supply control cubicle via transformer; This duplicate supply control cubicle output power is to the low-voltage distribution center, this low-voltage distribution center is connected to emergent power distribution cabinet and parallel UPS system, to aforementioned fire-fighting system, illuminator and elevator device, this parallel UPS system resupplies the IT center via the DC/AC distribution box after with power conversions via emergent power distribution cabinet output power for it;
At aforementioned parallel UPS system, be provided with the repair and maintenance system;
And, at aforementioned high-power high voltage diesel generating set, be provided with lightning protection, surge protective device.
As a kind of preferred version, described parallel UPS system includes two uninterruptable power supplies that are in parallel.
As a kind of preferred version, described high-power high voltage diesel generating set includes two high-power high voltage diesel generating sets.
After the utility model adopted technique scheme, its beneficial effect was:
One, the cooperation between aforementioned high-power high voltage diesel generating set, transformer, civil power line leading device, lightning protection, surge protective device and the duplicate supply control cubicle, when having guaranteed that civil power need overhaul or cut off the power supply, can enable the reliable and stable electric power of high-power high voltage diesel generating set output rapidly in time, bring damage and loss of data etc. to avoid giving the sensitive equipment at IT center, make the IT personnel have more time and start backup or generator in an orderly manner to guarantee supporting large data storage center stable operation because of power breakdown;
Two, the utility model system powers to the IT center through the DC/AC distribution box by being provided with parallel UPS system, two uninterruptable power supplies have been arranged in parallel in this parallel UPS system, like this, improved the reliabilty and availability of parallel UPS system power supply, and, be provided with the repair and maintenance system at this parallel UPS system, this repair and maintenance system has further increased the maintainability of aforementioned parallel UPS system;
Three, be provided with emergent power distribution cabinet, can in time power after the feasible outage to fire-fighting system, illuminator and elevator device etc., to keep the home of work and safety system.
For more clearly setting forth architectural feature of the present utility model and effect, come the utility model is elaborated below in conjunction with accompanying drawing and specific embodiment.
Description of drawings
Fig. 1 is the theory diagram of the utility model preferred embodiment.
The accompanying drawing identifier declaration:
10, high-power high voltage diesel generating set 11, lightning protection, surge protective device
20, transformer 30, civil power line leading device
40, duplicate supply control cubicle 50, low-voltage distribution center
60, emergent power distribution cabinet 70, DC/AC distribution box
80, UPS 81, repair and maintenance system
91, fire-fighting system 92, illuminator
93, elevator device 94, IT center.
Embodiment
See also shown in Figure 1, the concrete structure that it has demonstrated the preferred embodiment of the utility model includes high-power high voltage diesel generating set 10, transformer 20, civil power line leading device 30, duplicate supply control cubicle 40, low-voltage distribution center 50, emergent power distribution cabinet 60, parallel UPS system, DC/AC distribution box 70, fire-fighting system 91, illuminator 92, elevator device 93 and IT center 94;
Wherein, this civil power line leading device 30 is connected in duplicate supply control cubicle 40, and this high-power high voltage diesel generating set 10 is connected in duplicate supply control cubicle 40 via transformer 20; These duplicate supply control cubicle 40 output powers are to low-voltage distribution center 50, this low-voltage distribution center 50 is connected to emergent power distribution cabinet 60 and parallel UPS system, its via emergent power distribution cabinet 60 output powers to aforementioned fire-fighting system 91, illuminator 92 and elevator device 93, this parallel UPS system includes two uninterruptable power supplies (being UPS80) that are in parallel, and this parallel UPS system will resupply IT center 94 via DC/AC distribution box 70 after the power conversions;
At aforementioned parallel UPS system, be provided with the maintainability of repair and maintenance system 81 with power supply reliability, availability and the system of increase parallel UPS system;
And, at aforementioned high-power high voltage diesel generating set 10, be provided with lightning protection, surge protective device 11, to guarantee the electric power of the high-quality high stable of these high-power high voltage diesel generating set 10 outputs.
In present embodiment, aforementioned high-power high voltage diesel generating set 10 includes two high-power high voltage diesel generating sets, it is designed to the 1+1 pattern, like this, can start one of them high-power high voltage diesel generating set or enable two high-power high voltage diesel generating sets simultaneously.
The mode of operation of above-mentioned large data storage center high-power high-pressure diesel generating set electric power system is:
When aforementioned civil power need overhaul or the burst accident power failure, the electric power system of the utility model then starts large-scale high-power high voltage diesel generating set 10 generatings, these high-power high voltage diesel generating set 10 outputs are synchronous with startup, no pressure zone carries, guarantee that high-power high voltage diesel generating set 10 zero currents impact, aforementioned lightning protection simultaneously, surge protective device 11 has effectively guaranteed the electric power output of high-quality high stable, electric power outputs to duplicate supply control cubicle 40 behind transformer 20, this duplicate supply control cubicle 40 is automatically converted to aforementioned high-power high voltage diesel generating set 10 power supplies, conversion was transported to low-voltage distribution center 50 from the electric power of high-power high-pressure diesel generating set 10 afterwards, this low-voltage distribution center 50 gives fire-fighting system 91 for emergent power distribution cabinet 60 power supplies a part of distributing electric power, illuminator 92 and elevator device 93, and another part electric power delivered to parallel UPS system, this parallel UPS system is delivered to IT center 94 through DC/AC distribution box 70 with electric power;
After civil power was normal, aforementioned duplicate supply control cubicle 40 was automatically converted to mains-supplied, and time-delay stops high-power high voltage diesel generating set 10, is in stand-by state after high-power high voltage diesel generating set 10 stops.
And aforementioned UPS parallel system disposes repair and maintenance system 81, and this repair and maintenance system 81 has guaranteed higher power supply reliability and availability, also increases the maintainability of system simultaneously; In addition, the installation site of this parallel UPS system can be according to customer requirements, and the scene is designed, to guarantee the personalized power supply plan of user's machine room.
Above-mentioned electric power system is particularly useful for financial class industries such as bank, security, insurance, when municipal power failure or burst outage, its power supply is extremely rapid, guarantee the operation of supporting large data storage center stability well, avoid power breakdown to bring damage and loss of data, make its orderly startup standby system or generator for the IT personnel strive for more time to sensitive equipment.
Design focal point of the present utility model is:
One, the cooperation between aforementioned high-power high voltage diesel generating set, transformer, civil power line leading device, lightning protection, surge protective device and the duplicate supply control cubicle, when having guaranteed that civil power need overhaul or cut off the power supply, can enable the reliable and stable electric power of high-power high voltage diesel generating set output rapidly in time, bring damage and loss of data etc. to avoid giving the sensitive equipment at IT center, make the IT personnel have more time and start backup or generator in an orderly manner to guarantee supporting large data storage center stable operation because of power breakdown;
Two, the utility model system powers to the IT center through the DC/AC distribution box by being provided with parallel UPS system, two uninterruptable power supplies have been arranged in parallel in this parallel UPS system, like this, improved the reliabilty and availability of parallel UPS system power supply, and, be provided with the repair and maintenance system at this parallel UPS system, this repair and maintenance system has further increased the maintainability of aforementioned parallel UPS system;
Three, be provided with emergent power distribution cabinet, make the power supply in time of outage back give fire-fighting system, illuminator and elevator device etc., to keep the home of work and safety system.
The above, it only is preferred embodiment of the present utility model, be not that technical scope of the present utility model is imposed any restrictions, so every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any trickle modification, equivalent variations and modification that above embodiment did.

Claims (3)

1. large data storage center high-power high-pressure diesel generating set electric power system is characterized in that: include high-power high voltage diesel generating set, transformer, civil power line leading device, duplicate supply control cubicle, low-voltage distribution center, emergent power distribution cabinet, parallel UPS system, DC/AC distribution box, IT center, fire-fighting system, illuminator and elevator device;
Wherein, this civil power line leading device is connected in the duplicate supply control cubicle, and this high-power high voltage diesel generating set is connected in the duplicate supply control cubicle via transformer; This duplicate supply control cubicle output power is to the low-voltage distribution center, this low-voltage distribution center is connected to emergent power distribution cabinet and parallel UPS system, to aforementioned fire-fighting system, illuminator and elevator device, this parallel UPS system resupplies the IT center via the DC/AC distribution box after with power conversions via emergent power distribution cabinet output power for it;
At aforementioned parallel UPS system, be provided with the repair and maintenance system;
And, at aforementioned high-power high voltage diesel generating set, be provided with lightning protection, surge protective device.
2. large data storage center high-power high-pressure diesel generating set according to claim 1 electric power system, it is characterized in that: described parallel UPS system includes two uninterruptable power supplies that are in parallel.
3. large data storage center high-power high-pressure diesel generating set according to claim 1 electric power system, it is characterized in that: described high-power high voltage diesel generating set includes two high-power high voltage diesel generating sets.
CN2011201255739U 2011-04-26 2011-04-26 Power system of high-power high-voltage diesel generator set of larger data storage center Expired - Fee Related CN202050285U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201255739U CN202050285U (en) 2011-04-26 2011-04-26 Power system of high-power high-voltage diesel generator set of larger data storage center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201255739U CN202050285U (en) 2011-04-26 2011-04-26 Power system of high-power high-voltage diesel generator set of larger data storage center

Publications (1)

Publication Number Publication Date
CN202050285U true CN202050285U (en) 2011-11-23

Family

ID=44990577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201255739U Expired - Fee Related CN202050285U (en) 2011-04-26 2011-04-26 Power system of high-power high-voltage diesel generator set of larger data storage center

Country Status (1)

Country Link
CN (1) CN202050285U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163874A (en) * 2011-04-26 2011-08-24 广东康菱动力科技有限公司 Electrical power system with high-powered and high-voltage diesel generating set for large data memory center and power supplying method thereof
CN104134314A (en) * 2014-07-31 2014-11-05 国家电网公司 Safety access door
CN104362745A (en) * 2014-10-29 2015-02-18 常州思普锐电力科技有限公司 Important sensitive load power supply guarantee system for factory
CN111294296A (en) * 2014-03-25 2020-06-16 索尼公司 Transmitter and communication system
CN111509779A (en) * 2020-04-29 2020-08-07 合肥康尔信电力系统有限公司 Parallel bus multi-output power supply and switching control system of diesel generating set

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163874A (en) * 2011-04-26 2011-08-24 广东康菱动力科技有限公司 Electrical power system with high-powered and high-voltage diesel generating set for large data memory center and power supplying method thereof
CN111294296A (en) * 2014-03-25 2020-06-16 索尼公司 Transmitter and communication system
CN111294296B (en) * 2014-03-25 2022-10-11 索尼公司 Transmitter and communication system
US11606795B2 (en) 2014-03-25 2023-03-14 Sony Group Corporation Transmitter and communication system
CN104134314A (en) * 2014-07-31 2014-11-05 国家电网公司 Safety access door
CN104362745A (en) * 2014-10-29 2015-02-18 常州思普锐电力科技有限公司 Important sensitive load power supply guarantee system for factory
CN111509779A (en) * 2020-04-29 2020-08-07 合肥康尔信电力系统有限公司 Parallel bus multi-output power supply and switching control system of diesel generating set

Similar Documents

Publication Publication Date Title
CN102163874B (en) Power supplying method of electrical power system with high-powered and high-voltage diesel generating set for large data memory center
CN205231835U (en) Structure for large -scale thermal power factory unit high pressure service power each other is being equipped with
CN202050285U (en) Power system of high-power high-voltage diesel generator set of larger data storage center
Paquette et al. Providing improved power quality in microgrids: difficulties in competing with existing power-quality solutions
CN203504285U (en) UPS integrated power supply
CN102447298B (en) Mobile intelligent direct current power supply device
CN101599641B (en) System and method for supplying power to communication equipment through high voltage direct-current
CN103490492B (en) High voltage direct current electric power system
CN102035251A (en) Weak current comprehensive uninterrupted power supply (UPS) system for railway
CN204741339U (en) Control wiring structure of two public emergency power supplies of turbo generator set
CN103441567A (en) Emergency electrical power supply system and power supply method related to nuclear power station passive system
CN104242442A (en) Double-energy-source uninterruptible power supply device and method thereof
CN103532224B (en) A kind of UPS collocation method of marine wind electric field
CN105071527A (en) Small-power host modular fire-fighting emergency power supply
CN104123211A (en) Power transformation cabinet with fault self-checking function
CN102163873B (en) Spare electric system for precise manufacturing industry and power supply method thereof
CN202050284U (en) Spare power system for precision manufacturing industry
CN102522808A (en) Auxiliary power supply system and auxiliary power supply method of power electronic equipment
CN102629777A (en) Standby power system of DC power source
CN205123368U (en) Portable emergent direct current charging device
CN202049382U (en) Electric power system for pulp mill owned critical power plant black-start
CN102108527B (en) Method and system for supplying power to large aluminum electrolytic plant
CN206249235U (en) A kind of supply unit with redundant battery
Belsky et al. Analysis of UPS impact on power quality at point of common coupling of consumers
CN202488200U (en) Mobile intelligent DC power supply device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20130426