Nothing Special   »   [go: up one dir, main page]

CN206539079U - One kind energy-conservation communication base station room - Google Patents

One kind energy-conservation communication base station room Download PDF

Info

Publication number
CN206539079U
CN206539079U CN201621423175.4U CN201621423175U CN206539079U CN 206539079 U CN206539079 U CN 206539079U CN 201621423175 U CN201621423175 U CN 201621423175U CN 206539079 U CN206539079 U CN 206539079U
Authority
CN
China
Prior art keywords
unit
base station
communication base
energy
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621423175.4U
Other languages
Chinese (zh)
Inventor
任宝双
刘然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Tsinghua University
Original Assignee
Architectural Design and Research Institute of Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Tsinghua University filed Critical Architectural Design and Research Institute of Tsinghua University
Priority to CN201621423175.4U priority Critical patent/CN206539079U/en
Application granted granted Critical
Publication of CN206539079U publication Critical patent/CN206539079U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)
  • Air Conditioning Control Device (AREA)
  • Secondary Cells (AREA)

Abstract

One kind energy-conservation communication base station room, the region of two varying environment demands is separated provided with heat-insulated partition wall:(control temperature range is larger) and cell compartments between unit (control temperature range is smaller).It is used for the communication base station special equipments such as placed comprehensive rack between unit, is usually located at computer room sunny side, sets ventilation unit (including blowing and discharging fan with filtering) to be used for the cooling of heat-producing device;Cell compartments are used to place batteries, are usually located at the computer room back, set air-conditioning device to ensure the normal working temperature of battery.Two sects are set on partition wall, play a part of overheating between isolation unit during closing;Two room connections during unlatching, achievable heat is shared, environment integrally controls and (especially can effectively utilize unit waste heat in the winter time).The operation of air conditioner equipment can be adjusted according to weather conditions.The utility model can effectively reduce the operation energy consumption of computer room, and computer room construction is reasonable, operation is flexible, cost is relatively low, is easy to promote, is adapted to communication base station room construction.

Description

One kind energy-conservation communication base station room
Technical field
The utility model is related to building energy saving field, more particularly to a kind of energy-saving machine room of communication base station.
Background technology
With the development of communication network technology, in particular with the high speed development of wireless communication technique, the network coverage and appearance Amount demand is continuously increased, and the base station number of current Communication in China industry more than 3,000,000 and is distributed wide, ships more bases Station build remote countryside, the both sides of highway in, on the top of high mountain, and its power supply capacity and quality can not all ensure so that base station Operation maintenance faces enormous pressure.Communication base station is the important component of GSM, in order to maintain communication base station Run well, each communication base station is required for consuming substantial amounts of electric energy every year so that communication base station operation cost remains high.
Causing traditional communication base station room to run the reason for energy consumption is too high mainly includes:1) traditional machine room air conditioner refrigerating is set Fixed random big and single area setting value, to meet the environment temperature of batteries needs, whole computer room refrigeration design temperature It is all relatively low, cause very big energy consumption;2) traditional machine room energy-saving heat-insulating effect is poor, and summer station exterior wall temperature is too high, wall heat transfer amount Greatly, and computer room airtight space, heat can not be arranged outside, cause heat in computer room larger;3) traditional machine room air-conditioning heat exchanger effectiveness is relatively low And location arrangements are unreasonable.
The too high method of communication base station operation energy consumption is solved at present is mainly the following aspects, 1) use battery constant temperature Case, but presence causes the problem of casing on-site consolidation is not closed tight because battery size differs, and insulating box excludes waste heat Into computer room, secondary refrigeration energy consumption is caused;2) improve computer room air current composition, but exist because the technical requirements are higher, cause Actual implementation result is undesirable;3) remote control intelligent air-conditioning system is used, but cost increase can be made more.
The content of the invention
For above-mentioned the deficiencies in the prior art, the utility model provides a kind of communication base station room of energy-conservation, logical to realize Believe the reduction of base station machine room operation cost.
In order to solve the above technical problems, the utility model is adopted the following technical scheme that:
Batteries are provided with one kind energy-conservation communication base station room, computer room, two are separated out not with heat-insulated partition wall together With the region of environmental demand:(control temperature range is larger) and cell compartments between unit (control temperature range is smaller).Integrated machine The communication base station special equipment such as cabinet is placed between unit, and the intelligent aeration equipment for setting one group of band to filter is used for computer room internal heat generation The cooling of equipment;Batteries are separately positioned at cell compartments, provided with energy conservation air conditioning equipment to ensure the normal work of battery Environment.Two sects are set on described heat-insulated partition wall.Play a part of overheating between isolation unit during closing;Two rooms during unlatching Between connect, can be achieved that heat is shared, environment is integrally controlled, particularly effectively can save computer room energy using unit waste heat in the winter time Consumption.
According to a kind of embodiment of the present invention, the energy-conservation communication base station room is provided with heat insulating function Partition wall, the partition wall is divided the region of varying environment demand in the computer room, is divided between unit and cell compartments, Wherein, the partition wall is provided with partition door, and the partition door plays a part of when closing between the isolation unit, during unlatching from To the effect between the connection unit with the cell compartments, and in the computer room, configuration air conditioner is set as needed It is standby, so as to obtain synthesis energy saving effect.
Preferably, in described computer room, cell compartments may be provided between the north side (back) of computer room, unit and may be provided at machine Room southern side (sunny side), is so easy to cell compartments to be maintained at the indoor temperature lower than between unit.
Preferably, dust removal by filtration function need to be possessed by being used to exclude the ventilation equipment of room residual heat in the computer room, between unit, And start-up and shut-down control and the blowing and discharging fan setting linkage of blower fan can be carried out according to indoor/outdoor temperature-difference between unit.Cell compartments are used to control Environment required for batteries processed and the energy conservation air conditioning equipment that sets can be controlled according to temperature intelligent in compartment.
The invention has the advantages that:
1st, computer room sets the good partition wall of one of heat-proof quality, special equipment and batteries are placed between unit respectively and Cooled between cell compartments, unit by ventilation equipment, cell compartments pass through air-conditioning equipment temperature control, it is to avoid single space is only by sky Transfer in the high energy consumption that row temperature-controlling zone comes.The closing and unlatching distinguished by partition wall door comprehensive intelligent control can realize overall tune Control, reaches the purpose of synthesis energy saving, and technology is easy, operation is flexible.
2nd, only set the ventilation equipment with dust removal by filtration function to be used to cool to heat-producing device in unit, work as temperature Due to equipment heating when relatively low, self-heating amount can just meet requirement, therefore can ensure the normal work demand of equipment, it is to avoid Using high energy consumption caused by air-conditioning.
3rd, cell compartments are exclusively used in placing the batteries stricter to temperature control, that is, the space for needing air-conditioning to ensure is obtained To reduce, and then reduce air conditioning energy consumption.On this basis, it can be introduced when room temperature is too low by opening partition door between unit Waste heat, saves air-conditioning heating energy consumption.
4th, conservation measures of the present invention can be refined according to computer room location weather conditions and power conservation requirement etc., Different climate area of China is applicable to, application is wider, without geographical restrictions.
While the utility model has above advantage, required cost is low.Ensuring communication base station using the utility model On the basis of normal operation, the energy consumption of communication base station room can be effectively reduced, so that machine room energy-saving is realized, operation maintenance cost Reduction.
Brief description of the drawings
Fig. 1 is the energy-conservation communication base station room floor map according to a kind of embodiment of the present utility model.
Embodiment
Preferred embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings.
As shown in figure 1, the communication base station room include (2, for putting communication unit equipment) between two rooms, unit, Cell compartments (3, for putting batteries).Because in the communication base station, only cell apparatus is strict with environment temperature not 30 DEG C can be higher than, be not less than 0 DEG C, and battery is used as stand-by power supply when there was only power-off.And the communication apparatus in computer room is Allow higher indoor environment temperature, and communication apparatus needs long-term continuous service, and can continue to radiate in operation.Therefore will Accumulator plant is arranged apart with other equipment, separates the insulation partition wall 1 together between unit 2 use of cell compartments 3. So by the way of measure by door, 2 indoor design maximum temperature limit value can be respectively adopted 30 DEG C between cell compartments 3 and unit With 40 DEG C.Therefore can reduce because battery requirement temperature is relatively low, the computer room integral air conditioner design temperature caused is too low;Increase thermal insulation separation After disconnected wall 1, that is, reduce air-conditioning cold flow demand.Air-conditioning equipment is provided with cell compartments 3, it is in the shade that air-conditioning equipment need to be arranged on computer room On the exterior wall of face side, and power consumption can be reduced according to the indoor temperature intelligent control air-conditioning equipment of cell compartments 3.
Batteries are put into after cell compartments 3, the problem of waste heat amount between unit is excessive need to be only solved.2 between unit The Intelligent ventilating apparatus (including pressure fan 6 and exhaust blower 7) of one group of band filtering is set one high and one lowly on the exterior wall of both sides, by machine 2 indoor temperatures and air inlet outdoor temperature control the start and stop of Intelligent ventilating apparatus between group, and are set between pressure fan 6, exhaust blower 7 Linkage.It after it make use of the Intelligent ventilating apparatus, can suitably increase the thermal inertia of 2 exterior walls between unit, so be beneficial to reduction by outer The solar irradiation that wall heat transfer is introduced obtains heat.
Twice partition door 9 is set on partition wall 1,2 overheats between isolation unit can be played a part of during closing;Two during unlatching Room is connected, and achievable heat is shared, environment is integrally controlled, and particularly effectively can save computer room energy using unit waste heat in the winter time Consumption.On the other hand the maintenance of equipment is also allowed for.
The method of operation and partition door 9 for determining air conditioner equipment according to computer room location weather conditions are properly opened Or the period closed, make the computer room by the way that the normal operation circumstances of communication apparatus and batteries 5 just can be met compared with low energy consumption It is required that.
For example:
1) when between unit 2 indoor temperatures it is higher, and air inlet outdoor temperature is when meeting air-conditioning requirement, such as 2 between unit Temperature is close to 40 DEG C, when air inlet outdoor temperature is less than 35 DEG C, and 2 ventilating systems are automatically turned between unit.
2) when 2 temperature are less than setting value between unit, at such as 35 DEG C, cooling target reaches that ventilating system is closed automatically.
3) when the temperature of cell compartments 3 is higher, at such as 30 DEG C, air conditioner refrigerating is opened, when temperature is less than setting value, such as 25 DEG C When, close air-conditioning.
4) when temperature is higher, partition door 9 is closed, prevents the heat that communication special equipment is distributed from being led into cell compartments 3 Cause the temperature of batteries 5 too high, subregion temperature control now is carried out unit 2 and cell compartments 3.
5) when temperature is relatively low, open partition door 9 together or twice, allow 2 equipment heating amount between unit to enter battery Compartment 3, improves the indoor temperature of cell compartments 3, on this basis, when as little as 0 DEG C of the indoor temperature of cell compartments 3, opens air-conditioning Equipment carries out entirety to computer room and heated, and when temperature is higher than setting value, at such as 5 DEG C, closes air-conditioning.
6) when there is thermal extremes weather, 2 when being unable to reach cooling only with ventilating system and requiring between unit, then open One of partition door 9 or twice, carry out integrally cooling, by the normal of batteries 5 using the air-conditioning of cell compartments 3 to full computer room Job requirement controls computer room bulk temperature.
By initial theory analysis, it can draw when computer room is located at the representative city in Different climate area of China, phase of the present invention Than the energy-saving effect that can be reached in traditional machine room, it see the table below.During calculating, traditional machine room refers to thick without insulation brick wall using 240mm With 120mm thickness without insulation roof slab, and only with the computer room of air-conditioning temperature control.This energy-saving machine room building enclosure is provided with heat-insulation layer, protects Warm layer both sides concrete layer thickness takes 60mm, and solid prefabricated panel plate thickness takes 140mm, and solid prepared roofing plate thickness takes 120mm.The power consumption calculated is that theoretical lowest energy consumption value, i.e. indoor temperature can just meet indoor temperature requirement (0 between battery ~30 DEG C, 0~40 DEG C between unit) when equipment power consumption.Power saving rate refers to the air conditioner equipment power consumption and tradition of this energy-saving machine room The air-conditioning power consumption of computer room is compared to the annual percentage for saving power consumption.
During practical application, should be determined according to computer room location weather conditions air conditioner equipment the method for operation and every In the period that disconnected door is properly turned on and off, make the computer room by the way that communication apparatus and batteries just can be being met just compared with low energy consumption Normal operating environment requirements.
The energy-conservation communication base station room provided above the embodiment of the present invention is described in detail, for this area Those skilled in the art, according to the thought of the utility model embodiment, have change in specific embodiments and applications Part, in summary, this specification content should not be construed as to limitation of the present utility model, all according to the utility model design philosophy Any change made is all within protection domain of the present utility model.

Claims (6)

1. one kind energy-conservation communication base station room, there is provided the partition wall (1) with heat insulating function, the partition wall (1) will be described The region of varying environment demand is divided in computer room, is divided into (2) and cell compartments (3) between unit, wherein, the partition wall (1) partition door (9) is provided with, the partition door (9) plays a part of between the isolation unit (2), playing during unlatching when closing The effect of (2) and institute's cell compartments (3) between the unit is connected, wherein, the partition door (9) can be opened by intelligent control Or close, so as to realize that heat is shared, environment is integrally controlled, and the configuration air conditioner as needed in the computer room Equipment, the air-conditioning equipment can carry out intelligent control according to temperature in compartment, so as to obtain synthesis energy saving effect.
2. energy-conservation communication base station room according to claim 1, it is characterised in that:(2) are used to place and wrapped between the unit The communication base station special equipment of integrated machine cabinet (4) is included, the cell compartments (3) are used to place batteries (5).
3. energy-conservation communication base station room according to claim 2, it is characterised in that:(2) are located at the machine between the unit The sunny side in room, sets ventilation equipment (6,7) to be used for the cooling of communication cabinet heat-producing device between unit, wherein the ventilation equipment (6,7) possess dust removal by filtration function, and the start-up and shut-down control of blower fan can be carried out according to (2) indoor/outdoor temperature-difference between unit.
4. energy-conservation communication base station room according to claim 2, it is characterised in that:The cell compartments (3) are located at described The back of computer room, sets normal working temperature of the energy conservation air conditioning equipment (8) to ensure the batteries (5), wherein described Air-conditioning equipment can be controlled according to temperature intelligent in compartment.
5. energy-conservation communication base station room according to claim 1, it is characterised in that:Twice are set on the partition wall (1) Partition door (9), wherein, (2) are overheated the partition door (9) plays a part of the isolation unit when closing between, described in during unlatching (2) are connected with institute's cell compartments (3) between unit, wherein, the twice partition door (9) can respectively be opened by intelligent control or Close, so as to realize that heat is shared, environment is integrally controlled.
6. energy-conservation communication base station room according to claim 1, it is characterised in that:Can be according to computer room location gas Time condition determines the period that the method for operation and the partition door (9) of the air conditioner equipment are properly turned on and off, and makes The computer room is by that just can meet the normal operation circumstances requirement of communication apparatus and batteries (5) compared with low energy consumption.
CN201621423175.4U 2016-12-22 2016-12-22 One kind energy-conservation communication base station room Active CN206539079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621423175.4U CN206539079U (en) 2016-12-22 2016-12-22 One kind energy-conservation communication base station room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621423175.4U CN206539079U (en) 2016-12-22 2016-12-22 One kind energy-conservation communication base station room

Publications (1)

Publication Number Publication Date
CN206539079U true CN206539079U (en) 2017-10-03

Family

ID=59937394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621423175.4U Active CN206539079U (en) 2016-12-22 2016-12-22 One kind energy-conservation communication base station room

Country Status (1)

Country Link
CN (1) CN206539079U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111427401A (en) * 2020-02-21 2020-07-17 固安华电天仁控制设备有限公司 Temperature control system and method for energy storage container
CN112804858A (en) * 2020-12-30 2021-05-14 北京合力光桥智能网络有限公司 Data center machine room air conditioner control system and control method
CN114809740A (en) * 2021-12-16 2022-07-29 江苏镇安电力设备有限公司 Self-heating thermal insulation device based on power distribution equipment
CN115419304A (en) * 2022-08-25 2022-12-02 上海绿筑住宅系统科技有限公司 Novel temperature-control energy-saving equipment room and temperature control method
CN115629641A (en) * 2022-10-10 2023-01-20 广东美电国创科技有限公司 Energy-saving base station and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111427401A (en) * 2020-02-21 2020-07-17 固安华电天仁控制设备有限公司 Temperature control system and method for energy storage container
CN111427401B (en) * 2020-02-21 2021-10-12 国能信控互联技术(河北)有限公司 Temperature control system and method for energy storage container
CN112804858A (en) * 2020-12-30 2021-05-14 北京合力光桥智能网络有限公司 Data center machine room air conditioner control system and control method
CN112804858B (en) * 2020-12-30 2022-03-25 北京合力光桥智能网络有限公司 Data center machine room air conditioner control system and control method
CN114809740A (en) * 2021-12-16 2022-07-29 江苏镇安电力设备有限公司 Self-heating thermal insulation device based on power distribution equipment
CN115419304A (en) * 2022-08-25 2022-12-02 上海绿筑住宅系统科技有限公司 Novel temperature-control energy-saving equipment room and temperature control method
CN115629641A (en) * 2022-10-10 2023-01-20 广东美电国创科技有限公司 Energy-saving base station and construction method thereof
CN115629641B (en) * 2022-10-10 2023-11-14 广东美电国创科技有限公司 Energy-saving base station and construction method thereof

Similar Documents

Publication Publication Date Title
CN206539079U (en) One kind energy-conservation communication base station room
CN103925635B (en) A kind of all-weather solar energy supplying system
CN103912947B (en) For fan coil and the heat pump of heat recovery fresh air conditioning group
CN101373087B (en) Fresh air integral energy-saving air conditioner unit special for machinery room
CN209341472U (en) Fresh air reheating type heat pump recuperation of heat air-conditioner set
CN101603713A (en) Semiconductor air-freshening air conditioner
CN104101040B (en) Efficient and energy-saving water-electricity air-conditioning system and control method thereof
CN203837109U (en) Integrated and combined type machine room air conditioner unit
CN106288075A (en) Air quality induced intelligent constant temperature ecological curtain wall system and temperature control method
CN107575976A (en) The cooling system in relative closure space
CN103904568A (en) Control cabinet ventilation and dehumidification system and method thereof
CN206648221U (en) Communication base station environment protection-type computer room
CN209263231U (en) The air-conditioning cooling device of multichannel whole year operation
CN106088426A (en) Integrated air qualitative perception answers intelligent constant-temperature ecological curtain wall system and temperature control method
CN102573425B (en) Energy-saving double-circulation system of machine room
CN206337712U (en) Ventilated energy-saving wall and air-conditioned room
CN210482640U (en) Multi-working-condition energy-saving wall
CN203747269U (en) Ventilating and dehumidifying system for control cabinet
CN115419304B (en) Novel temperature control energy-saving equipment room and temperature control method
CN2352861Y (en) Inner wind blowing apparatus for phase transformation cold storage chamber
CN201944959U (en) Dual-system air conditioning device
CN201740331U (en) Multi-purpose split type refrigerator
CN201926064U (en) Indoor environment adjusting device
CN201242229Y (en) Special-purpose air-conditioning unit for new wind integral energy-saving machinery room
CN204186098U (en) Building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant