CN113585642A
CN113585642A CN202110727946.8A CN202110727946A CN113585642A CN 113585642 A CN113585642 A CN 113585642A CN 202110727946 A CN202110727946 A CN 202110727946A CN 113585642 A CN113585642 A CN 113585642A
Authority
CN
China
Prior art keywords
metal roof
roof
panel
ultra
cable bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110727946.8A
Other languages
Chinese (zh)
Inventor
李建全
朱培亮
陈正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202110727946.8A priority Critical patent/CN113585642A/en
Publication of CN113585642A publication Critical patent/CN113585642A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D15/00Apparatus or tools for roof working
    • E04D15/04Apparatus or tools for roof working for roof coverings comprising slabs, sheets or flexible material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a super-long metal roof plate cableway transportation device and a construction method for rotary positioning of a roof, which comprise a winch, a plurality of portal frames, a steel wire rope, a cable bridge and a panel bracket, wherein the portal frames are arranged at the eave of the roof, two ends of the cable bridge are arranged at the portal frames and the ground, the panel bracket is placed on the cable bridge, one end of the steel wire rope is connected with the middle of the panel bracket, and the other end of the steel wire rope is connected with the winch after bypassing the middle of the top of the portal frames.

Description

Overlong metal roof panel cableway transportation device and construction method for rotary positioning of roof
Technical Field
The invention is suitable for rolling and transporting the ultra-long metal roof plate which is rolled by a movable high-altitude platform and cannot be adopted under limited construction conditions, and particularly relates to a cableway transporting device for the ultra-long metal roof plate and a construction method for rotatably positioning a roof.
Background
The vertical and horizontal transportation of the ultra-long metal roof board is very difficult, and the whole metal panel can be deformed or even broken by carelessness, so that the appearance and the use function of the metal roof board are directly influenced. The vertical and horizontal transportation of the conventional ultra-long metal roof panel adopts the mode that a movable high-altitude tile pressing platform is arranged on the outer side of the lower side of a metal roof eave to roll the metal roof panel at high altitude.
For the ultra-long metal roof with the construction condition limited on the outer side of the lower side of the cornice of the metal roof, the conventional movable high-altitude tile pressing platform cannot meet the construction requirement.
Disclosure of Invention
The invention discloses a cableway conveying device for an ultra-long metal roof panel, which aims to solve the difficult problems of rolling, vertical and horizontal conveying of the ultra-long metal roof panel of a metal roof with limited construction conditions.
The cableway transportation device for the overlong metal roof boards is characterized in that the cable bridge is obliquely arranged, the ground anchor is arranged on the ground, and the cable bridge is fixedly connected with the ground anchor.
In the cableway transporting device for the overlong metal roof boards, the elevation angle of the cable bridge is 30 degrees.
The overlong metal roof plate cableway transportation device is characterized in that the number of the portal frames is 4, and the intervals of the portal frames are equal.
The overlong metal roof panel cableway transportation device is characterized in that the portal frame is arranged at a steel structure on one side of the top of the roof cornice.
The cableway transporting device for the ultra-long metal roof boards is characterized in that the number of the cable bridge, the number of the portal frames, the number of the steel wire ropes, the number of the winches and the number of the panel brackets are equal.
In the cableway transportation device for the ultra-long metal roof boards, the cable bridge is composed of 2 parallel steel wire ropes I.
The overlong metal roof panel cableway transportation device is characterized in that the panel bracket consists of a support bottom and a stop block, the support bottom is positioned on the cable bridge, and the stop block is vertical to the support bottom.
The invention also discloses a construction method for the rotation and positioning of the roof, which comprises the following steps:
rolling and molding the ultra-long metal roof board on the ground, and then flatly placing a plurality of metal roof boards on a panel bracket to be bound and fixed;
starting a winch, synchronously obliquely pulling the metal roof panel to the roof, stopping the machine, and lifting and stacking the metal roof panel on the roof;
the metal roof board on the roof is horizontally rotated by 90 degrees through manpower, so that the metal roof board is consistent with the installation direction;
and horizontally transporting the metal roof plate to an installation position for installation.
When the panel rotates, every 3m sets up a set of people, and the quantity of every group people is 2.
The invention has the following advantages or beneficial effects:
the invention solves the difficult problems of vertical transportation and horizontal transportation construction of the ultra-long metal roof panel under the condition of limited construction conditions, and greatly improves the construction efficiency, the construction quality and the construction safety.
Drawings
The invention and its features, aspects and advantages will become more apparent from reading the following detailed description of non-limiting embodiments with reference to the accompanying drawings. Like reference symbols in the various drawings indicate like elements. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
FIG. 1 is a front view of a cableway transport device for ultra-long metal roof panels in an embodiment of the present invention;
fig. 2 is a right side view of the cableway transporting device for the ultra-long metal roof panels in the embodiment of the invention.
Detailed Description
The structure of the present invention will be further described with reference to the accompanying drawings and specific examples, but the present invention is not limited thereto.
As shown in the figure, the invention discloses an ultralong metal roof panel cableway transportation device which comprises a winch, a plurality of portal frames 1, a steel wire rope 2, a cable bridge 3 and a panel bracket 4, wherein the portal frames 1 are installed at the eave part of a roof 6, two ends of the cable bridge 3 are installed at the portal frames 1 and the ground, the panel bracket 4 is placed on the cable bridge 3, one end of the steel wire rope 2 is connected with the middle part of the panel bracket 4, and the other end of the steel wire rope 2 bypasses the middle part of the top of the portal frames 1 and then is connected with the winch 5.
The invention changes the ground processing of the metal roof board into the high-altitude processing, cancels the vertical and horizontal transportation of the roof board, integrates the processing, stacking and installation of the metal roof board into a whole, is in place once, and is pressed along with the installation, thereby not only overcoming the difficulties of site limitation, hoisting and the like, but also reliably ensuring the construction quality and the safety of personnel. The difficulty of vertical and horizontal transportation of the ultra-long metal roof plate under the condition of limited construction conditions is well solved.
In an embodiment of the present invention, the cable bridge 3 is obliquely arranged, the ground anchor is arranged on the ground, and the cable bridge is fixedly connected with the ground anchor.
In one embodiment of the present invention, the cable bridge has an elevation angle of 30 °.
In an embodiment of the present invention, the number of the gantry 1 is 4, and the intervals between the gantry 1 are equal.
In one embodiment of the invention, the portal frame 1 is installed at a steel structure on one side of the top of the roof cornice.
In one embodiment of the invention, the number of the cable bridge, the gantry, the wire rope, the winch and the panel bracket is equal.
In one embodiment of the present invention, the bridge is composed of 2 parallel steel cables one 7.
In an embodiment of the present invention, the panel bracket 4 is composed of a bottom bracket 41 and a stop 42, the bottom bracket 41 is located on the cable bridge, and the stop 42 is perpendicular to the bottom bracket. The stopper 42 serves to block the panel 8.
The invention also discloses a construction method for the rotation and positioning of the roof, which comprises the following steps:
rolling and molding the ultra-long metal roof board on the ground, and then flatly placing a plurality of metal roof boards on a panel bracket to be bound and fixed;
starting a winch, synchronously obliquely pulling the metal roof panel to the roof, stopping the machine, and lifting and stacking the metal roof panel on the roof;
the metal roof board on the roof is horizontally rotated by 90 degrees through manpower, so that the metal roof board is consistent with the installation direction;
and horizontally transporting the metal roof plate to an installation position for installation.
When the panel rotates, every 3m sets up a set of people, and the quantity of every group people is 2.
Those skilled in the art will appreciate that variations may be implemented by those skilled in the art in combination with the prior art and the above-described embodiments, and will not be described herein in detail. Such variations do not affect the essence of the present invention and are not described herein.
The above description is of the preferred embodiment of the invention. It is to be understood that the invention is not limited to the particular embodiments described above, in that devices and structures not described in detail are understood to be implemented in a manner common in the art; those skilled in the art can make many possible variations and modifications to the disclosed embodiments, or modify equivalent embodiments to equivalent variations, without departing from the spirit of the invention, using the methods and techniques disclosed above. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention are still within the scope of the protection of the technical solution of the present invention, unless the contents of the technical solution of the present invention are departed.

Claims (10)

1. Overlength metal roof boarding cableway conveyer, its characterized in that: including hoist engine, a plurality of portal frame, wire rope, cable bridge and panel bracket, the portal frame is installed in roofing eaves mouth department, and portal frame and ground department are installed at the both ends of cable bridge, and the panel bracket is placed on the cable bridge, and wire rope's one end is connected with the centre department of panel bracket, and wire rope's the other end is connected with the hoist engine after bypassing portal frame top centre department.
2. The cableway transport device for ultra-long metal roof panels according to claim 1, wherein the cable bridge is disposed obliquely, and the ground anchor is disposed on the ground, and the cable bridge is fixedly connected to the ground anchor.
3. A super long metal roofing plate cableway transport device according to claim 2, wherein the angle of elevation of the bridge is 30 °.
4. The ropeway conveyor of ultra-long metal roof panels of claim 1, wherein the number of gantries is 4, the spacing of the gantries being equal.
5. The ropeway transportation device for ultra-long metal roof panels of claim 1, wherein the gantry is installed at the steel structure on the top side of the roof cornice.
6. The ropeway transportation unit of ultralong metal roofing panels of claim 1, wherein the number of cable bridges, gantry, wire rope, hoist, and panel brackets is equal.
7. A cableway transport device for ultra-long metal roof panels according to claim 1, characterized in that the bridge consists of 2 parallel steel cables.
8. A cableway transport device for ultra-long metal roof panels according to claim 7, characterized in that the panel carriers are composed of a tray base on the bridge and a stop block perpendicular to the tray base.
9. The construction method for the rotation and positioning of the roof is characterized by comprising the following steps:
rolling and molding the ultra-long metal roof board on the ground, and then flatly placing a plurality of metal roof boards on a panel bracket to be bound and fixed;
starting a winch, synchronously obliquely pulling the metal roof panel to the roof, stopping the machine, and lifting and stacking the metal roof panel on the roof;
the metal roof board on the roof is horizontally rotated by 90 degrees through manpower, so that the metal roof board is consistent with the installation direction;
and horizontally transporting the metal roof plate to an installation position for installation.
10. A method of rotary roof construction according to claim 9 wherein a group of people is provided every 3m as the panels are rotated, the number of people in each group being 2.
CN202110727946.8A 2021-06-29 2021-06-29 Overlong metal roof panel cableway transportation device and construction method for rotary positioning of roof Pending CN113585642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110727946.8A CN113585642A (en) 2021-06-29 2021-06-29 Overlong metal roof panel cableway transportation device and construction method for rotary positioning of roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110727946.8A CN113585642A (en) 2021-06-29 2021-06-29 Overlong metal roof panel cableway transportation device and construction method for rotary positioning of roof

Publications (1)

Publication Number Publication Date
CN113585642A true CN113585642A (en) 2021-11-02

Family

ID=78245125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110727946.8A Pending CN113585642A (en) 2021-06-29 2021-06-29 Overlong metal roof panel cableway transportation device and construction method for rotary positioning of roof

Country Status (1)

Country Link
CN (1) CN113585642A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201377184Y (en) * 2008-12-04 2010-01-06 中国二十冶建设有限公司 Ultra-long roofing contour plate vertical lifting transporting device
WO2013164806A1 (en) * 2012-05-03 2013-11-07 Utomo Darmawan Corrugated roof mobile production and installation system
CN107366393A (en) * 2017-07-17 2017-11-21 中国三冶集团有限公司 A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method
CN107792790A (en) * 2017-10-16 2018-03-13 中国化学工程第十四建设有限公司 Installation and application for the aerial cableway of mountain region construction material transport
CN111021740A (en) * 2019-12-05 2020-04-17 北京市第五建筑工程集团有限公司 Construction method of daylighting roof combined hoisting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201377184Y (en) * 2008-12-04 2010-01-06 中国二十冶建设有限公司 Ultra-long roofing contour plate vertical lifting transporting device
WO2013164806A1 (en) * 2012-05-03 2013-11-07 Utomo Darmawan Corrugated roof mobile production and installation system
CN107366393A (en) * 2017-07-17 2017-11-21 中国三冶集团有限公司 A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method
CN107792790A (en) * 2017-10-16 2018-03-13 中国化学工程第十四建设有限公司 Installation and application for the aerial cableway of mountain region construction material transport
CN111021740A (en) * 2019-12-05 2020-04-17 北京市第五建筑工程集团有限公司 Construction method of daylighting roof combined hoisting system

Similar Documents

Publication Publication Date Title
CN105113803B (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN109372243A (en) A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN113585642A (en) Overlong metal roof panel cableway transportation device and construction method for rotary positioning of roof
CN206903339U (en) A kind of windproof is easy to the communication steel tower of maintenance
CN204983693U (en) Hoist device slides in mountain area corridor truss high altitude
CN109267500A (en) Bridge maintaining lift truss work platform
CN213087488U (en) Portable high elasticity construction safety protection network of supporting
CN212249126U (en) Sliding platform for large-size cornice aluminum plate construction
CN102733644A (en) Super-altitude roof super-long antenna hoisting construction method and system
CN212452317U (en) Bridge deck rotating system
CN211366784U (en) Integral hoisting system in narrow space
CN212126525U (en) Adhesive tape laying device for conveyer
CN210313389U (en) Hanging flower basket system that transversely slides
CN103452043B (en) Maintenance system of cable-stayed bridge solid pylon and application of maintenance system
CN218021621U (en) Special novel prestressing force bow member of railway gondola car tarpaulin
CN208830687U (en) Slip rope formula high-altitude operation platform
CN219839952U (en) Pier body hangs rail installation operation combination formula removal lift platform device
CN217323142U (en) Glass unit hoisting system
CN209972442U (en) Railway tunnel drilling operation platform
CN215484533U (en) Telescopic tower crane escape way
CN216974227U (en) Gantry stirrup platform of unloading
CN220926024U (en) High-rise building floor hoisting assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination