Nothing Special   »   [go: up one dir, main page]

CN113404484B - Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum - Google Patents

Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum Download PDF

Info

Publication number
CN113404484B
CN113404484B CN202110847174.1A CN202110847174A CN113404484B CN 113404484 B CN113404484 B CN 113404484B CN 202110847174 A CN202110847174 A CN 202110847174A CN 113404484 B CN113404484 B CN 113404484B
Authority
CN
China
Prior art keywords
hole
monitoring
water
bare
rock stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110847174.1A
Other languages
Chinese (zh)
Other versions
CN113404484A (en
Inventor
王晓振
许家林
谢建林
朱卫兵
鞠金峰
胡国忠
王克凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN202110847174.1A priority Critical patent/CN113404484B/en
Publication of CN113404484A publication Critical patent/CN113404484A/en
Application granted granted Critical
Publication of CN113404484B publication Critical patent/CN113404484B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/08Measuring diameters or related dimensions at the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

A ground double-naked-hole joint monitoring method for the movement of the inner part of a mined rock stratum of a water-rich stratum includes constructing two adjacent naked holes on the ground according to the height range of a water-guiding fractured zone predicted to be formed after a coal seam is mined, mainly monitoring the movement condition of the rock stratum above the water-guiding fractured zone without drilling and water proofing, mainly monitoring the movement of the rock stratum within the water-guiding fractured zone, isolating a water-bearing layer of a water-rich layer section in a casing hole protection mode until the lower part reaches the deepest monitoring point, connecting a joint monitoring collector of a hole opening through a steel wire rope after an in-hole monitoring instrument is placed, realizing the joint monitoring of measuring points in the two naked holes, and reflecting the movement rule of the inner part of the rock stratum. The monitoring method solves the problem that the condition of the water-rich stratum is difficult to safely implement rock stratum movement monitoring in the same drilling hole, and expands the applicability of rock stratum movement bare hole monitoring.

Description

Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum
Technical Field
The invention relates to a method for monitoring movement inside a mining rock stratum, which is particularly suitable for monitoring movement of an overlying rock stratum after mining of a water-rich stratum.
Background
The moving damage of overburden strata or rock mass after mining of mines is the root cause of a series of mine disasters and environmental problems such as underground severe mine pressure, water inrush, surface subsidence and the like. The overburden moving monitoring after mining is developed, and the method is the basis for mastering the rock moving rule and solving a series of mining damage problems caused by mining. The development of engineering actual monitoring of rock stratum movement is an important means for verifying theoretical correctness and improving disaster prevention effect.
The actual engineering monitoring of rock stratum movement usually adopts ground construction drilling, anchor fluke measuring points are installed at different rock stratum positions in the drilling, and the anchor fluke measuring points are fixed on the wall of the drilling hole, connected to the hole opening through a steel wire rope and connected with a collecting instrument to realize the monitoring of the internal movement. The existing monitoring methods all need to construct a bare hole, namely a hollow borehole with no hole sealed inside. The bare hole mainly provides free movement space for conveying the steel wire rope. Therefore, formation mobility monitoring using open holes in the ground is an important mode. However, after the coal seam is mined, the overburden may move and break, forming fractures and varying degrees of fracture in the formation. According to the difference of stratum fracture degrees, in the field of mining engineering, an overlying rock stratum is divided into an caving zone, a fracture zone and a bending subsidence zone from bottom to top. The caving zone and the fissure zone are also called as water flowing fissure zones together, and are main areas for movement and flowing of water and gas on the top plate after coal seam mining. If the stratum contains a water-bearing layer with stronger water-rich property and the water-bearing layer is communicated with the water flowing fractured zone, the obvious water outlet phenomenon of the working surface can be caused. Therefore, in the rock stratum movement monitoring, the particularity of the water-rich layer condition needs to be considered, and the key of rock stratum movement monitoring under the water-rich layer condition is to prevent the monitoring borehole from becoming a channel for communicating a water-flowing fractured zone with the water-containing layer.
After the conventional rock stratum movement monitoring drilling hole is constructed, a monitoring instrument is usually installed on the wall of a bare hole, and hole sealing treatment is not carried out. For shallow coal seams, a water-conducting fractured zone may develop directly to the ground, and the fractured zone is necessarily communicated with a water-bearing stratum, so that monitoring has a large risk of water damage to a roof, and the monitoring is usually not recommended. However, for the condition that the stratum has a water-rich aquifer and is higher than the height of the water-flowing fractured zone, a drilling and non-hole-sealing bare hole monitoring mode is adopted, so that the great potential safety hazard that the water-rich aquifer is communicated with the water-flowing fractured zone through a hollow drilling hole to cause water inrush in the well inevitably exists. Therefore, the internal movement monitoring of the rock stratum is carried out under the condition of the aquifer with strong water-rich property, so that the monitoring purpose is considered, and the safety problem caused by the fact that the monitoring drill hole is communicated with the aquifer on the working surface is guaranteed.
Disclosure of Invention
Aiming at the problems and the defects of the existing method, the ground drilling monitoring method for mining rock stratum movement when the aquifer with strong water-rich property exists in the stratum is provided, on the basis of meeting the monitoring target, the safety monitoring in the bare hole is realized through the smallest aperture and hole depth, the secondary flood problem is avoided, and the application range of rock stratum movement monitoring in the drilling hole is expanded.
In order to achieve the technical purpose, the invention discloses a ground double-bare-hole combined monitoring method for internal movement of a water-rich stratum mining rock stratum, which comprises the following steps:
a. selecting a rock stratum movement monitoring position on the earth surface above a working surface to be recovered, and arranging 2 adjacent vertical monitoring drill holes which are bare holes and are numbered as a bare hole A and a bare hole B;
preferably, in step a, the linear separation distance S between two adjacent vertical monitoring borehole apertures is greater than 5m but less than or equal to 10 m; the monitored borehole aperture elevation difference is less than 0.3 m.
Preferably, in the step a, in the drilling construction process of the monitoring drilling hole, the deviation of the monitoring drilling hole is corrected once every 50m of drilling, and the deviation of the monitoring drilling hole per hundred meters is controlled to be not more than 0.3 degrees.
b. Determining the development height Hd of a water flowing fractured zone according to the thickness M of a coal seam at the monitoring drilling position, the burial depth Hc of the coal seam, the depth Hs of a bottom boundary of a water-rich layer needing to be prevented and controlled and lithology; the method comprises the following steps that a bare hole A is a monitoring borehole for rock stratum movement of a bending subsidence zone above a water-flowing fractured zone, the construction depth Ha of the bare hole A is determined as the coal seam burial depth Hc minus the development height Hd of a water-flowing fracture, and then the thickness h of a protection section for isolating the water-flowing fractured zone from the bottom boundary of a water-rich layer is subtracted, wherein h can be 20m generally, namely Ha is Hc-Hd-h; determining the bare hole B as a monitoring borehole of rock stratum movement in the range of the water-flowing fractured zone, wherein the maximum depth can reach the deepest rock stratum buried depth Hz required to be monitored, generally the bottom interface buried depth of the water-flowing fractured zone, placing a casing on the rock stratum above the water-flowing fractured zone to block a water-rich layer, and not setting a monitoring point;
c. the diameter of the bare hole section of the monitoring drilling hole is determined according to the outer diameter D of a placed in-hole monitoring instrument, D is generally 30-40mm, the diameter D of the bare hole section is determined to be more than or equal to 2.5 times of the outer diameter D of the in-hole monitoring instrument, but the diameter D of the bare hole section of the monitoring drilling hole is generally not more than 120 mm;
d. the naked hole A is a whole-section naked hole; a rock stratum movement monitoring drilling hole in the range of the water flowing fractured zone, namely a naked hole B, is divided into I, II two sections, the section from the drilling of an orifice to the depth Hs of a bottom boundary which needs to be prevented and controlled and is rich in a water layer is taken as the section I with the range of 10m deep, a sleeve is placed in the section I drilling hole to isolate a water-containing layer, and the section II is taken from the bottom of the hole to the bottom of the hole;
preferably, in step D, the diameter of the section I drilled hole is DLSelecting the sleeve with the inner diameter Dt0 equal to the diameter D of the bare hole of the section II, and the outer diameter Dt1 equal to the inner diameter Dt0 plus the wall thickness b, DLGreater than Dt1 by at least 50 mm; and (3) adopting cement paste to solidify an annular space between the outer wall of the casing and the drilled hole, and constructing a bare hole II section with the diameter of D downwards to the depth Hz after the cement paste is solidified for 72 hours.
Preferably, in the step d, the cement slurry used for sealing the casing is formed by mixing loose dry cement and water, wherein the loose dry cement is ordinary portland cement, the strength grade is 42.5R, and the water cement ratio of the cement slurry is 0.55: 1.
e. Installing a plurality of in-hole monitoring instruments on the bare hole sections in the bare hole A and the bare hole B respectively, guiding a steel wire rope of the monitoring instrument in the connecting hole to each monitoring drilling hole opening, guiding the steel wire rope to the hole opening combined collection box through a guide pulley and a guide groove with a support at the hole opening, connecting a collection encoder in the hole opening combined collection box, and connecting the collection encoder with a data storage and display screen through a data line;
f. and in the working face recovery process, carrying out rock stratum movement monitoring.
The data in the drill hole are collected in the mode, and the double-bare-hole combined monitoring of the rock stratum movement information is realized.
The beneficial technical effects of the invention are as follows: the method can realize the purpose of monitoring the movement of the interior of the mining rock stratum of the water-rich stratum, and realize the monitoring target of different layers of the whole stratum by respectively monitoring the rock stratum movement modes of different sections through double bare holes. Meanwhile, the condition that the stratum is rich in water which often occurs at present can be used for monitoring the movement of terranes in different depths, the problems of large aperture, long construction time and high drilling cost in single open hole monitoring are avoided, more importantly, the problem that the water inrush safety risk of the underground working face is increased due to rock migration monitoring can be avoided, and the unification of economy and safety is realized.
Drawings
FIG. 1 is a vertical dual-bare hole layout (cross-sectional view);
FIG. 2 is an enlarged view of a portion of the vertical dual bare hole of FIG. 1;
FIG. 3 is a combined mobile data monitoring device for the interior of a double-openhole rock formation;
in the figure, (a) a top view; (b) a sectional view;
in the figure, 1-naked hole A; 2-bare well B; 3-a water-flowing fractured zone; 4-a fracture zone; 5-bending the sinking strip; 6-rich water layer; 7-in-hole monitoring instruments (i.e., in-hole monitoring points); 8-cement slurry solidified body; 9-a steel wire rope; 10-orifice joint collection box; 11-a guide pulley with a bracket; 12-a guide groove; 13-acquisition encoder; 14-a data line; 15-data storage, display screen.
Detailed Description
Specific drilling examples are further described below with reference to the accompanying drawings:
a ground double-bare-hole combined monitoring method for internal movement of a water-rich stratum mining rock stratum comprises the following steps:
as shown in fig. 1-2, a, selecting a monitoring drilling hole position above a working face to be recovered, wherein the monitoring drilling hole comprises a vertical bare hole A1 and a bare hole B2 which are adjacent to each other; the linear spacing distance S of two adjacent vertical monitoring drilling holes is more than 5m but less than or equal to 10 m; monitoring that the elevation difference of the drill hole orifices is less than 0.3 m; and in the drilling construction process of the monitoring drilling hole, the deviation of the drilling hole is corrected once every 50m of drilling, and the deviation of the monitoring drilling hole per hundred meters is controlled to be not more than 0.3 degrees.
b. Assuming that the thickness M of the coal seam at the monitoring drilling position is 4M, the burial depth Hc of the coal seam is 500M, the depth Hs of the bottom boundary of the water-rich layer 6 needing to be prevented and controlled is 300M, and the lithology is a medium-hard rock stratum, and determining the development height Hd of the water flowing fractured zone 3 to be 45.6M. The open hole A is a monitoring borehole for rock stratum movement of a bending subsidence zone 5 above a water diversion fractured zone 3, the construction depth Ha of the open hole A is the thickness of a protection section for isolating the water diversion fractured zone 3 from the bottom boundary of a water-rich layer 6 by subtracting the development height Hd of the water diversion fractured from the coal bed burial depth Hc and subtracting the thickness of the protection section from the bottom boundary of the water diversion fractured zone 3, and the thickness of the protection section is 20m, so that Ha is 500-45.6-20 is 434.4 m. The bare hole B is a monitoring borehole for rock stratum movement in the range of the water-flowing fractured zone 3, the maximum depth can reach the deepest rock stratum buried depth Hz of 480m which needs to be monitored, generally the bottom interface buried depth of the fractured zone 4, the water-rich layer 6 above the water-flowing fractured zone 3 is influenced by the protection of a casing, and a monitoring point is not arranged.
c. Monitoring the outer diameter of an in-hole monitoring instrument 7 placed in a drill hole to be about 40mm, wherein the diameter D of a naked hole section is more than or equal to 2.5 times of the outer diameter D of the in-hole monitoring instrument 7, namely at least 100mm, but the diameter D of the naked hole section is not more than 120mm generally;
d. monitoring the construction of the drilling, wherein the bare hole A is a full-section bare hole; the monitoring drilling of the rock stratum movement in the range of the water flowing fractured zone 3, namely the bare hole B, needs to be divided into I, II two sections, from the beginning of the hole drilling, the bottom boundary depth of the water-rich layer 6 is 300m, the range section with the depth of 10m is the I section, namely the depth of the hole in the I section is 310m, and the section from the bottom of the hole to the bottom of the hole is the II section. Diameter of section I borehole is DLAnd placing a sleeve in the section I drilling hole to isolate an aquifer, wherein the inner diameter Dt0 of the sleeve is consistent with the diameter of the section II naked hole and is 100 mm. The outer diameter Dt1 of the sleeve is equal to the inner diameter Dt0 plus the wall thickness b of the sleeve, generally the wall thickness of the sleeve is 8mm, and Dt1 is equal to 116mm, DLGreater than Dt1 by at least 50mm, and then at least 166 mm. Adopting cement slurry to solidify an annular space between the outer wall of the casing and the drill hole, forming a cement slurry solidified body 8 after the cement slurry in the hole is solidified for 72 hours, so that the casing is stable, and then downwards constructing a naked hole II section with the diameter of 100mm, namely a section with the hole depth of 434.4m to 480 m; the cement paste used for sealing the casing is formed by mixing loose dry cement and water, wherein the loose dry cement is ordinary portland cement, the strength grade is 42.5R, and the water-cement ratio of the cement paste is 0.55: 1;
as shown in fig. 1-3, e. installing a plurality of in-hole monitoring instruments 7 on the bare hole sections in the bare hole a and the bare hole B respectively, guiding the steel wire ropes 9 of the in-hole monitoring instruments 7 to each monitoring drilling hole, guiding the steel wire ropes 9 to the hole combined collection box 10 through the guide pulleys 11 and the guide grooves 12 with the supports at the holes, connecting the collection encoders 13 in the hole combined collection box 10, and connecting the collection encoders 13 with the data storage and display screen 15 through the data lines 14;
f. and in the working face recovery process, carrying out rock stratum movement monitoring.
The data in the drill hole are collected in the mode, and the double-bare-hole combined monitoring of the rock stratum movement information is realized.

Claims (7)

1. A ground double-open-hole combined monitoring method for internal movement of a water-rich stratum mining rock stratum is characterized by comprising the following steps:
a. selecting a rock stratum movement monitoring position on the earth surface above a working surface to be recovered, and arranging two adjacent vertical monitoring drill holes which are bare holes and are numbered as a bare hole A and a bare hole B;
b. determining the development height Hd of a water flowing fractured zone according to the thickness M of a coal seam at the position of a monitored drilling hole, the burial depth Hc of the coal seam, the depth HS of a bottom boundary of a water-rich layer needing to be prevented and controlled and lithology; the method comprises the following steps that a bare hole A is a monitoring borehole for rock stratum movement of a bending subsidence zone above a water-flowing fractured zone, the construction depth HA of the bare hole A is determined as the coal seam burial depth Hc minus the development height Hd of a water-flowing fracture, and then the thickness h of a protection section for isolating the water-flowing fractured zone from the bottom boundary of a water-rich layer is subtracted, namely HA is Hc-Hd-h; determining the bare hole B as a monitoring borehole of rock stratum movement in the range of the water-flowing fractured zone, wherein the maximum depth can reach the deepest rock stratum burial depth Hz needing to be monitored, namely the bottom interface burial depth of the water-flowing fractured zone, placing a casing on the rock stratum above the water-flowing fractured zone to block a water-rich layer, and not setting a monitoring point;
c. determining the diameter of the bare hole section of the monitoring drilling hole according to the outer diameter D of a placed in-hole monitoring instrument, and determining that the diameter D of the bare hole section is more than or equal to 2.5 times of the outer diameter D of the in-hole monitoring instrument, but the diameter D of the bare hole section of the monitoring drilling hole is not more than 120 mm;
d. the naked hole A is a whole-section naked hole; the open hole B is divided into I, II two sections, from the beginning of drilling at the orifice, the section with the depth of 10m as the section I to the depth HS of the bottom boundary of the water-rich layer to be prevented and controlled, a sleeve is put into the drilling hole of the section I to isolate the water-containing layer, and the section II is from the bottom of the hole;
e. installing a plurality of in-hole monitoring instruments on the bare hole sections in the bare hole A and the bare hole B respectively, guiding a steel wire rope of the monitoring instrument in the connecting hole to each monitoring drilling hole opening, guiding the steel wire rope to the hole opening combined collection box through a guide pulley and a guide groove with a support at the hole opening, connecting a collection encoder in the hole opening combined collection box, and connecting the collection encoder with a data storage and display screen through a data line;
f. and in the working face recovery process, carrying out rock stratum movement monitoring.
2. The monitoring method according to claim 1, wherein: in the step a, the linear spacing distance S between two adjacent vertical monitoring drilling holes is more than 5m but less than or equal to 10 m; the monitored borehole aperture elevation difference is less than 0.3 m.
3. The monitoring method according to claim 1, wherein: in the step a, in the drilling construction process of the monitoring drilling hole, the deviation of the monitoring drilling hole is corrected once every 50m drilling, and the deviation of the monitoring drilling hole per hundred meters is controlled to be not more than 0.3 degrees.
4. The monitoring method according to claim 1, wherein: in step b, h takes the value of 20 m.
5. The monitoring method according to claim 1, wherein: in step c, d is 30-40 mm.
6. The monitoring method according to claim 1, wherein: in the step D, the diameter of the section I drilled hole is DL, the inner diameter Dt0 of the sleeve is equal to the diameter D of the section II naked hole, the outer diameter Dt1 of the sleeve is the inner diameter Dt0 of the sleeve plus the wall thickness b, and DL is larger than Dt1 by at least 50 mm; and (3) adopting cement paste to solidify an annular space between the outer wall of the casing and the drilled hole, and constructing a bare hole II section with the diameter of D downwards to the depth HZ after the cement paste is solidified for 72 hours.
7. The monitoring method according to claim 6, wherein: in the step d, the cement slurry for setting the annular space between the casing and the hole wall is formed by mixing loose dry cement and water, wherein the loose dry cement is ordinary portland cement, the strength grade is 42.5R, and the water-cement ratio of the cement slurry is 0.55: 1.
CN202110847174.1A 2021-07-27 2021-07-27 Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum Active CN113404484B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110847174.1A CN113404484B (en) 2021-07-27 2021-07-27 Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110847174.1A CN113404484B (en) 2021-07-27 2021-07-27 Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum

Publications (2)

Publication Number Publication Date
CN113404484A CN113404484A (en) 2021-09-17
CN113404484B true CN113404484B (en) 2022-06-07

Family

ID=77687707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110847174.1A Active CN113404484B (en) 2021-07-27 2021-07-27 Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum

Country Status (1)

Country Link
CN (1) CN113404484B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118390971B (en) * 2024-06-28 2024-08-27 中国地质科学院探矿工艺研究所 Landslide same-hole depth displacement and groundwater level monitoring equipment and monitoring method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481587B (en) * 2014-11-10 2018-09-14 西安科技大学 The comprehensive coal working face top plate sandstone fissure water of putting of large mining depth, large span visits anti-method
CN106405678B (en) * 2016-11-22 2018-10-12 临沂大学 A kind of mining overburden height of water flowing fractured zone detection method based on stress monitoring
CN107044289B (en) * 2017-06-22 2019-09-03 中国矿业大学 A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel
CN107165676B (en) * 2017-06-26 2019-02-22 中国矿业大学 The Trinity monitoring method of CONTROL OF STRATA MOVEMENT
CN107165626A (en) * 2017-06-30 2017-09-15 徐州市耐力高分子科技有限公司 A kind of coal-face floods prevention method with cranny development country rock top plate
CN108590717B (en) * 2018-05-10 2019-11-26 中国矿业大学 The water-retaining method of chemical tendering carbonate rock promotion mining induced fissure selfreparing
CN108894727B (en) * 2018-07-05 2021-01-19 中国矿业大学 Water retention method for plugging main channel of overburden rock water flowing fracture by grouting in ground horizontal directional drilling
CN110735629B (en) * 2019-09-26 2023-08-29 天地科技股份有限公司 Water guide fracture zone height judging method based on upward drilling speed
CN110761814B (en) * 2019-10-30 2021-05-04 中煤科工集团西安研究院有限公司 Roof water control method based on presplitting and grouting modification
CN111456723B (en) * 2020-04-08 2021-07-09 中国矿业大学 One-hole dual-purpose method for overburden three-zone detection and rock stratum movement monitoring

Also Published As

Publication number Publication date
CN113404484A (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN109209293B (en) Comprehensive outburst prevention construction method for rock cross-cut outburst coal seam
CN103835651B (en) A kind of single hole directional drilling local slip casting mine shaft rising boring technique
CN111456723B (en) One-hole dual-purpose method for overburden three-zone detection and rock stratum movement monitoring
CN109611146B (en) Separation layer water drainage grouting method
CN111206933A (en) Tunnel construction method for traversing karst water-rich section
CN106917637B (en) Borehole type rock stratum settlement monitoring system and monitoring method
CN106089296B (en) A kind of prevention and treatment method of roof absciss layer water
CN113685132B (en) Ground double-hole combined water inrush prevention method for overburden movement monitoring and separation layer water drainage
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
CN112879011B (en) Method for controlling height of water guide crack zone by hard overburden rock pre-cracking weakening under aquifer
CN113175325A (en) Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection
WO2023160471A1 (en) Pre-grouting treatment method for water hazards in shaft construction
CN108331573A (en) The abandoned well administering method of bank
CN113279808B (en) Intelligent gas extraction system and method based on double-layer directional long drill hole
CN103216264A (en) Method for controlling deformation of surrounding rock of basic rimrock layer on presplitting blasting mining roadway
CN113404484B (en) Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process
CN113622907A (en) Single-hole synchronous monitoring method for movement and fracture distribution in coal seam mining overburden rock
CN117231293A (en) Mining overburden composite curtain and overburden multi-separation layer horizon accurate grouting and subsidence reducing method
RU2382166C1 (en) Method of drilling-in
CN113482600B (en) One-hole dual-purpose method for coal field geological detection and mining rock stratum movement monitoring
CN213980780U (en) Coal face ground gas drilling hole diameter structure
CN114483163A (en) Gas extraction method
CN114444266A (en) Feasibility evaluation method for improving recovery upper limit safety mining of coal seam under near unconsolidated formation
CN114575791B (en) Structure and process for extracting gas from lower protective layer of high-level high-drainage roadway and downward drilling hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant