CN110080528A - The construction method of outer builder's jack I-steel - Google Patents

The construction method of outer builder's jack I-steel Download PDF

Info

Publication number
CN110080528A
CN110080528A CN201910358910.XA CN201910358910A CN110080528A CN 110080528 A CN110080528 A CN 110080528A CN 201910358910 A CN201910358910 A CN 201910358910A CN 110080528 A CN110080528 A CN 110080528A
Authority
CN
China
Prior art keywords
steel
construction
overhanging
steel pipe
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910358910.XA
Other languages
Chinese (zh)
Inventor
董雅廷
崔芳
王小宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201910358910.XA priority Critical patent/CN110080528A/en
Publication of CN110080528A publication Critical patent/CN110080528A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of construction methods of outer builder's jack I-steel, including step 1: production overhanging I-steel telescopic mounting, step 2: the pre-buried anchor bolt before overhang layer structural slab concreting, and wooden box is placed in the concrete walls position of lap-joint, step 3: the outer of I-steel in overhanging I-steel telescopic mounting is adjusted by arrangement and method for construction and chooses length, and limiting device is formed in such a way that the limit hole in rectangular steel pipe long side and I-steel web is inserted into lock, then overhang on I-steel outside and sets up external scaffolding;Step 4: after outer builder's jack is removed, first limiting device is opened and is contracted to I-steel in rectangular steel pipe, pre-buried fixing bolt is then dismantled, step 5: inspecting for acceptance;The present invention guarantees construction safety, and flexible operation is easy, accelerates construction progress, facilitates turnover, save the cost.

Description

The construction method of outer builder's jack I-steel
Technical field
Of the invention and a kind of construction method of outer builder's jack I-steel.
Background technique
Builder's jack is as technical equipment indispensable in high-building construction and construction means, in builder's jack It is generallyd use in construction and sets up builder's jack in such a way that code requirement computational length fashioned iron and anchoring piece are fixed.Due to fashioned iron The length of overhanging determines building interior anchorage length, so that overhang layer fashioned iron needed length multiplicity, virtually increases compared with multiplexing Work amount and cost, cumbersome and fashioned iron, which is anchored in floor, to bring inconvenience to construction in building, when in addition fashioned iron is removed due to Interior construction spacing limitation needs tower crane to cooperate to pull out outside building, and secure context increases more risk and uncertainty.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of construction method of outer builder's jack I-steel is provided, is protected Construction safety is demonstrate,proved, flexible operation is easy, accelerates construction progress, facilitates turnover, save the cost.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of construction method of outer builder's jack I-steel, it is characterised in that it includes the following steps:
Step 1: production overhanging I-steel telescopic mounting, telescopic mounting by rectangular steel pipe inner sleeve I-steel processing and fabricating and At wherein rectangular steel pipe is net long, tall and big in I-steel length, high 10mm, and the wall thickness of rectangular steel pipe cannot be less than I-steel abdomen Plate thickness;
Step 2: then the pre-buried anchor bolt before overhang layer structural slab concreting will overhang I-steel telescopic mounting Wooden box is placed with cast-in fixing bolt fixed structure plate face, and in the concrete walls position of lap-joint, being wrapped in overhanging I-steel outside can stretch On the outside of compression apparatus rectangular steel pipe, and there are the gaps 30mm;
Step 3: the outer of I-steel in overhanging I-steel telescopic mounting is adjusted by arrangement and method for construction and chooses length, choosing length outside must not Greater than the 2/3 of I-steel overall length, and the group in such a way that the limit hole in rectangular steel pipe long side and I-steel web is inserted into lock At limiting device, it is ensured that I-steel is difficult to slide, is then overhang on I-steel outside and sets up external scaffolding;
Step 4: after outer builder's jack is removed, first limiting device is opened and is contracted to I-steel in rectangular steel pipe, then Pre-buried fixing bolt is dismantled, it can be by recycling and reusing one by one in building;
Step 5: inspecting for acceptance, and the construction of setting and connection of rod piece etc. should meet the requirement of specification and scheme;Such as overhang foot hand Frame scaffolding height is more than limit value, is proved by the stringent organizes expert of related request.
The beneficial effects of the present invention are: being hanged for the fixed suitable profile complex building that is difficult of market overhanging steel I-beam length The challenges such as layer I-steel arrangement, calculating, selection are chosen, can more be had using overhanging I-steel telescopic mounting and construction method The solution of effect.Cantilever Beams flexible arrangement under different operating conditions is realized by the method, and overhanging I-steel can be stretched after outrigger dismounting Compression apparatus can recycle after shortening from building interior, substantially reduce overhanging I-steel and remove security risk.The construction method is guaranteeing Construction safety, flexible operation is easy, accelerates construction progress, facilitates turnover, save the cost.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the side view that I-steel telescopic mounting is overhang in Fig. 1.
Specific embodiment
As shown in Figure 1, 2: a kind of construction method of outer builder's jack I-steel includes the following steps:
Step 1: production overhanging I-steel telescopic mounting, telescopic mounting is by 2 inner sleeve I-steel of rectangular steel pipe, 3 processing and fabricating It forms, wherein net long, the tall and big 10mm long, high in I-steel of rectangular steel pipe, and the wall thickness of rectangular steel pipe cannot be less than I-steel Web thickness;
Step 2: determine that overhanging I-steel telescopic mounting is specific according to builder's jack special construction plan floor plan Then position, the pre-buried anchor bolt 1 before 7 structural slab concreting 5 of overhang layer are used overhanging I-steel telescopic mounting in advance 1 fixed structure plate face of anchor bolt is buried, and places wooden box 6 in the concrete walls position of lap-joint, it is scalable to be wrapped in overhanging I-steel outside 2 outside of device rectangular steel pipe, and there are the gaps 30mm;
Step 3: the outer of I-steel 3 in overhanging I-steel telescopic mounting is adjusted by arrangement and method for construction and chooses length, choosing length outside must not Greater than the 2/3 of I-steel overall length, and in such a way that the limit hole on 3 web of 2 long side of rectangular steel pipe and I-steel is inserted into lock Form limiting device 4, it is ensured that I-steel 3 is difficult to slide, is then overhang on I-steel outside and sets up external scaffolding;
Step 4: after outer builder's jack is removed, first opening limiting device 4 and be contracted to I-steel 3 in rectangular steel pipe 2, Then pre-buried fixing bolt 1 is dismantled, it can be by recycling and reusing one by one in building;
Step 5: inspecting for acceptance, and the construction of setting and connection of rod piece etc. should meet the requirement of specification and scheme.Such as overhang foot hand Frame scaffolding height is more than limit value, is proved by the stringent organizes expert of related request.
Overhanging I-steel telescopic mounting is fixed on structure plate face with cast-in fixing bolt first by the present invention, and in lap-joint Wooden box is placed in concrete walls position, is wrapped on the outside of overhanging I-steel telescopic mounting rectangular steel pipe outside;Then arrangement and method for construction tune is pressed The outer of steel I-beam chooses length in section overhanging I-steel telescopic mounting, is fixed using limiting device.It is realized not by the method It can be returned from building interior with Cantilever Beams flexible arrangement under operating condition, and after overhanging I-steel telescopic mounting shortens after outrigger dismounting It receives, is greatly reduced overhanging I-steel and removes security risk.The construction method is guaranteeing construction safety, and flexible operation is easy, adds Fast construction speed facilitates turnover, save the cost.

Claims (1)

1. a kind of construction method of outer builder's jack I-steel, it is characterised in that it includes the following steps:
Step 1: production overhanging I-steel telescopic mounting, telescopic mounting by rectangular steel pipe inner sleeve I-steel processing and fabricating and At wherein rectangular steel pipe is net long, tall and big in I-steel length, high 10mm, and the wall thickness of rectangular steel pipe cannot be less than I-steel abdomen Plate thickness;
Step 2: then the pre-buried anchor bolt before overhang layer structural slab concreting will overhang I-steel telescopic mounting Wooden box is placed with cast-in fixing bolt fixed structure plate face, and in the concrete walls position of lap-joint, being wrapped in overhanging I-steel outside can stretch On the outside of compression apparatus rectangular steel pipe, and there are the gaps 30mm;
Step 3: the outer of I-steel in overhanging I-steel telescopic mounting is adjusted by arrangement and method for construction and chooses length, choosing length outside must not Greater than the 2/3 of I-steel overall length, and the group in such a way that the limit hole in rectangular steel pipe long side and I-steel web is inserted into lock At limiting device, it is ensured that I-steel is difficult to slide, is then overhang on I-steel outside and sets up external scaffolding;
Step 4: after outer builder's jack is removed, first limiting device is opened and is contracted to I-steel in rectangular steel pipe, then Pre-buried fixing bolt is dismantled, it can be by recycling and reusing one by one in building;
Step 5: inspecting for acceptance, and the construction of setting and connection of rod piece etc. should meet the requirement of specification and scheme;Such as overhang foot hand Frame scaffolding height is more than limit value, is proved by the stringent organizes expert of related request.
CN201910358910.XA 2019-04-30 2019-04-30 The construction method of outer builder's jack I-steel Pending CN110080528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910358910.XA CN110080528A (en) 2019-04-30 2019-04-30 The construction method of outer builder's jack I-steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910358910.XA CN110080528A (en) 2019-04-30 2019-04-30 The construction method of outer builder's jack I-steel

Publications (1)

Publication Number Publication Date
CN110080528A true CN110080528A (en) 2019-08-02

Family

ID=67418030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910358910.XA Pending CN110080528A (en) 2019-04-30 2019-04-30 The construction method of outer builder's jack I-steel

Country Status (1)

Country Link
CN (1) CN110080528A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279602A (en) * 2021-06-21 2021-08-20 中建四局第一建筑工程有限公司 I-steel platform connected with reinforced concrete main beam by post-adding steel structure
CN113719098A (en) * 2021-09-23 2021-11-30 河南省安装集团有限责任公司 Wall-through overhanging I-steel and use method thereof
CN113863642A (en) * 2021-09-24 2021-12-31 中国十七冶集团有限公司 Sectional hydraulic type outward-climbing frame combined cantilever device and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2671574B1 (en) * 1991-01-10 1993-04-30 Vidal Fernand SUSPENDED SCAFFOLDING BRACKET AND SCAFFOLDING MODULE COMPRISING SAID BRACKET.
CN105781089A (en) * 2016-03-08 2016-07-20 江苏南通二建集团有限公司 Construction method for outer wall socket type plate buckle steel pipe scaffold
CN205777425U (en) * 2016-07-07 2016-12-07 中建三局集团有限公司 A kind of scalable hanging basket support means
CN207776403U (en) * 2018-01-15 2018-08-28 湖南中力建筑设备租赁有限公司 The plug-in adjustable cantilever system of tool-type
CN207863430U (en) * 2017-10-19 2018-09-14 中铁建设集团有限公司 A kind of bearing bolt cable-stayed type level overhanging protection system
CN108547443A (en) * 2018-04-12 2018-09-18 中建四局第四建筑工程有限公司 The upright bar bearing adjusted and its construction method are moved on a kind of overhanging I-steel
CN108590147A (en) * 2018-06-08 2018-09-28 宁波建工工程集团有限公司 Assembling the shaped steel suspension scaffolding and its construction method
WO2018219758A1 (en) * 2017-06-02 2018-12-06 Inventio Ag Movable platform for assembling lift equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2671574B1 (en) * 1991-01-10 1993-04-30 Vidal Fernand SUSPENDED SCAFFOLDING BRACKET AND SCAFFOLDING MODULE COMPRISING SAID BRACKET.
CN105781089A (en) * 2016-03-08 2016-07-20 江苏南通二建集团有限公司 Construction method for outer wall socket type plate buckle steel pipe scaffold
CN205777425U (en) * 2016-07-07 2016-12-07 中建三局集团有限公司 A kind of scalable hanging basket support means
WO2018219758A1 (en) * 2017-06-02 2018-12-06 Inventio Ag Movable platform for assembling lift equipment
CN207863430U (en) * 2017-10-19 2018-09-14 中铁建设集团有限公司 A kind of bearing bolt cable-stayed type level overhanging protection system
CN207776403U (en) * 2018-01-15 2018-08-28 湖南中力建筑设备租赁有限公司 The plug-in adjustable cantilever system of tool-type
CN108547443A (en) * 2018-04-12 2018-09-18 中建四局第四建筑工程有限公司 The upright bar bearing adjusted and its construction method are moved on a kind of overhanging I-steel
CN108590147A (en) * 2018-06-08 2018-09-28 宁波建工工程集团有限公司 Assembling the shaped steel suspension scaffolding and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279602A (en) * 2021-06-21 2021-08-20 中建四局第一建筑工程有限公司 I-steel platform connected with reinforced concrete main beam by post-adding steel structure
CN113719098A (en) * 2021-09-23 2021-11-30 河南省安装集团有限责任公司 Wall-through overhanging I-steel and use method thereof
CN113719098B (en) * 2021-09-23 2023-08-22 河南省安装集团有限责任公司 Through-wall overhanging I-steel and use method thereof
CN113863642A (en) * 2021-09-24 2021-12-31 中国十七冶集团有限公司 Sectional hydraulic type outward-climbing frame combined cantilever device and construction method

Similar Documents

Publication Publication Date Title
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN102383628B (en) Construction device and construction method for post-construction decompression cone of silo structure
CN110080528A (en) The construction method of outer builder's jack I-steel
CN202090591U (en) Lift type climbing formwork of building operations
CN106120568A (en) Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN109577166B (en) Upper-span active highway door opening support and construction method
CN111119060A (en) Coastal environment high pier hydraulic self-creeping formwork construction method
CN114150766B (en) Prefabricated reinforced concrete column connecting node and construction method thereof
CN103711298A (en) Method for constructing anchoring system of structural steel overhanging scaffold
CN205976410U (en) Shaped steel is encorbelmented scaffold frame and can be dismantled type of falling U screw vacuum pump
CN107299773B (en) Load bearing wall reinforcing construction method
CN108999394B (en) Construction process of floor type scaffold rotary cantilever type scaffold
CN110017023A (en) Collar tie beam construction method based on tool-type regularization concrete collar tie beam formwork erecting structure
CN111074950B (en) Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN205894670U (en) Template structure for concrete joint construction between floors
CN101550724A (en) Construction method of large-span post-tensioned prestressed longitudinal and transverse frame beams
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN202577952U (en) Hydraulic automatic lifting template of vertical shaft
KR101471058B1 (en) Construction method of filling gap portion of earth retaining wall of temporary facility
CN102767378A (en) Double-column type tunnel portal method for bent frame construction tunnel
CN106284372A (en) The method for supporting of roof plate template during a kind of electric power ditch is integrated poured
CN206408924U (en) Reusable cantilever frame embedded ring
CN109736202A (en) Great cantilever bent cap Bracket method for construction method
CN110130280B (en) Cantilever bracket concrete lower template and support frame dismantling method
CN206667071U (en) Continuous beam end bay closing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802

RJ01 Rejection of invention patent application after publication