CN118090593A - Testing arrangement is used in road construction - Google Patents
Testing arrangement is used in road construction Download PDFInfo
- Publication number
- CN118090593A CN118090593A CN202410481361.6A CN202410481361A CN118090593A CN 118090593 A CN118090593 A CN 118090593A CN 202410481361 A CN202410481361 A CN 202410481361A CN 118090593 A CN118090593 A CN 118090593A
- Authority
- CN
- China
- Prior art keywords
- extension
- pipe
- fixedly arranged
- road construction
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 64
- 238000010276 construction Methods 0.000 title claims abstract description 28
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 81
- 238000002347 injection Methods 0.000 claims abstract description 53
- 239000007924 injection Substances 0.000 claims abstract description 53
- 238000005507 spraying Methods 0.000 claims abstract description 39
- 238000005086 pumping Methods 0.000 claims abstract description 19
- 229910052751 metal Inorganic materials 0.000 claims description 23
- 239000002184 metal Substances 0.000 claims description 23
- 238000007664 blowing Methods 0.000 claims description 13
- 239000007921 spray Substances 0.000 claims description 13
- 230000001012 protector Effects 0.000 claims description 7
- 238000004140 cleaning Methods 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims 1
- 235000017491 Bambusa tulda Nutrition 0.000 claims 1
- 241001330002 Bambuseae Species 0.000 claims 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims 1
- 239000011425 bamboo Substances 0.000 claims 1
- 238000001514 detection method Methods 0.000 abstract description 17
- 230000000694 effects Effects 0.000 abstract description 9
- 239000000428 dust Substances 0.000 description 9
- 239000012535 impurity Substances 0.000 description 8
- 238000007493 shaping process Methods 0.000 description 7
- 238000011076 safety test Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 4
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 description 3
- 229910052744 lithium Inorganic materials 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000001678 irradiating effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000013522 software testing Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H1/00—Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
- E01H1/08—Pneumatically dislodging or taking-up undesirable matter or small objects; Drying by heat only or by streams of gas; Cleaning by projecting abrasive particles
- E01H1/0809—Loosening or dislodging by blowing ; Drying by means of gas streams
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N19/00—Investigating materials by mechanical methods
- G01N19/04—Measuring adhesive force between materials, e.g. of sealing tape, of coating
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
The invention relates to the technical field of road construction detection and discloses a road construction testing device, which comprises a supporting plate and a water tank, wherein an L-shaped extending plate with an L-shaped plate structure is fixedly arranged in the middle of the left end of the supporting plate, transverse plates are fixedly arranged at the front end and the rear end of the two sides of the supporting plate, a second moving assembly is arranged below the transverse plates, and a first moving assembly is distributed at the front and the rear of the left end of the extending plate; the water tank is fixedly arranged near the rear of the top of the supporting plate, the water pump is fixedly arranged near the rear of the left part of the top of the extension plate, and the water pumping pipe is connected with the right end of the water pump and the lower end of the side part of the water tank; the front end of the supporting plate is fixedly provided with a first spraying device, and the rear end of the supporting plate is fixedly provided with a second spraying device. The testing device for road construction automatically controls high-pressure injection to the road surface after water pumping so as to efficiently detect the service life of the road surface marking road sign, and the detection effect can be further enhanced through the two injection devices I and II.
Description
Technical Field
The invention relates to the technical field of road construction detection, in particular to a testing device for road construction.
Background
Road construction is a broad and complex field of engineering involving a number of considerations and operations. Base layer treatment is needed for pavement construction: paving broken stone or gravel as a base layer, so as to improve the bearing capacity of the pavement; and then asphalt paving: paving asphalt materials on the base layer to form a flat and wear-resistant pavement; scribing and marking: and marking and setting traffic signs on the pavement according to traffic rules.
In the prior art, the marking and the sign detection aiming at the pavement construction are not carried out, so that the marking and the sign of the pavement can possibly cause relatively poor engineering quality and can not be used for a long time, the heavy vehicle can be seriously damaged after being pressed, and the service life of the marking and the sign of the pavement construction is greatly reduced. For this purpose, a corresponding technical solution needs to be designed to solve.
Disclosure of Invention
(One) solving the technical problems
Aiming at the defects of the prior art, the invention provides a testing device for road construction, which solves the technical problems that the marking and marking of the existing road surface are relatively poor in engineering quality and can not be used for a long time without detection, the heavy vehicle is seriously damaged after being pressed, and the service life of the marking and marking of the road surface construction is greatly reduced.
(II) technical scheme
In order to achieve the above purpose, the invention is realized by the following technical scheme: the testing device for road construction comprises a supporting plate and a water tank, wherein an extending plate in an L-shaped plate structure is fixedly arranged in the middle of the left end of the supporting plate, transverse plates are fixedly arranged at the front end and the rear end of the two sides of the supporting plate, a moving assembly II is arranged below the transverse plates, and a moving assembly I is distributed at the front and the rear of the left end of the extending plate;
The water tank is fixedly arranged at the top of the supporting plate and is connected with a water tank cover at the top of the water tank, a water pump is fixedly arranged at the top of the extending plate and at the left of the extending plate, and a water suction pipe is connected with the right end of the water pump and the lower end of the side part of the water tank;
The front end of the supporting plate is fixedly provided with a first spraying device, the rear end of the supporting plate is fixedly provided with a second spraying device, the bottoms of the first spraying device and the second spraying device are provided with high-pressure spray heads, and the upper parts of the first spraying device and the second spraying device and the front end of the water pump are connected with a water pumping pipe;
the front of backup pad is connected with guiding mechanism, guiding mechanism's one end extends to be connected with ash removal mechanism backward, injection test protector is all installed to injection device one and injection device two's below.
Preferably, a first armrest rod frame is welded on the left side of the extension plate, a second armrest rod frame is welded on the rear side of the extension plate, and the second armrest rod frame and the first armrest rod frame are of an integrated structure; the side cart with the second handrail rack and the first handrail rack positioned on the extension board is beneficial for workers to see the front moving route, and the second handrail rack and the first handrail rack are high in integrated structural strength, firm and durable and convenient to manually push.
Preferably, the water suction pipe and the water pumping pipe are of metal multi-connecting pipe structures, and the power supply control device is electrically connected with the water pump and the ash cleaning mechanism through power supply wires; the pumping pipe and the pumping pipe with the metal multi-connecting pipe structure are arranged, so that the strength is higher, the pumping pipe can bear the water pressure of higher pressure, the power supply control device is convenient to manually control each device, and the lithium battery power supply can be used for supplying power for a long time.
Preferably, the guide mechanism comprises an extension rod I and an extension rod II, wherein the extension rod I and the extension rod II are fixedly arranged at the two ends of the front of the supporting plate, a supporting rod is fixedly arranged at the front ends of the extension rod I and the extension rod II, the supporting rod is of a forward inclined L-shaped tubular structure, a shaft collar is fixedly arranged at the inner side of the supporting rod, a guide roller is rotatably connected to the outer part of the shaft collar, the bottoms of the guide roller, the bottom of the moving assembly I and the bottom of the moving assembly II are positioned at the same horizontal plane, and the extension rod I and the extension rod II are of hollow tubular structures; the first extending rod and the second extending rod are used for extending the guide roller forward, so that the guide roller is convenient to roll along a route to assist in correctly pushing the direction of movement, the supporting rod and the shaft collar which are of the forward-inclined L-shaped tubular structure are used for stably supporting the guide roller to rotate, clamping is avoided, and the first extending rod and the second extending rod of the hollow tubular structure conveniently penetrate through a power line and a pipeline.
Preferably, the front ends of the support rods are provided with a plurality of laser irradiation lamp holders, the front ends of the laser irradiation lamp holders are of a downward-inclined structure, and the rear parts of the laser irradiation lamp holders pass through the first extension rod, the second extension rod, the support plate and the extension plate through wires and are electrically connected to the power supply control device; the laser irradiation lamp cap with the downward inclined structures can directly irradiate on two sides of a route, further assist in moving, reduce the risk of moving deflection, and enable the power supply control device to continuously supply power to the laser irradiation lamp cap, so that the operation is convenient.
Preferably, the ash cleaning mechanism comprises a fan, the fan is fixedly arranged in front of the top of the supporting plate, an air suction port is arranged in front of the fan, a metal filter screen plate is arranged at the outer end of the air suction port, the left end of the fan is connected with an air outlet pipe, the air outlet pipe is formed by combining a transverse pipe and a longitudinal pipe, a conveying pipe is connected in front of the air outlet pipe, and the conveying pipe is connected in the first extension rod; the fan is used for providing the wind regime through setting up, and the metal filter screen board of inlet scoop and outer end installation is used for filtering back air inlet, and the air-out pipe that horizontal pipe and vertical pipe combined together conveniently stabilizes the air-out, and the conveyer pipe is used for connecting air-out pipe and fixed pipe.
Preferably, the upper end of the outer part of the supporting rod is fixedly connected with a fixed pipe, the front end of the fixed pipe is connected with a metal shaping hose, the front end of the metal shaping hose is provided with a blowing head, and the blowing head faces the front lower end between the guide rollers; the fixing tube 412 through setting up is fixed in the centre department of branch 34 to the inside of fixing tube 412 is hollow structure, makes its inside communicate with each other behind metal design hose 41 and the fixing tube 412 fixed connection, and convenient air-out, metal design hose are used for buckling and adjust air-out angle and position, and the hair of blowing is used for blowing dust removal impurity removal to the place ahead lower extreme between the leading roller, improves test effect.
Preferably, the injection test protection device is of a downward flaring type structure, an extension pipe is fixedly arranged above the injection test protection device, a limiting cylinder is fixedly arranged at the top of the extension pipe, the extension pipe is of a straight cylindrical structure, the limiting cylinder is of an upward flaring type structure, the diameter of the lower end of the injection test protection device is larger than that of the upper end of the limiting cylinder, a mounting frame is welded at the rear of the outer side wall of the injection test protection device, and the mounting frame is of an inverted L-shaped plate structure and is mounted at the bottom of the supporting plate through a bolt; the spraying test protection device, the extension pipe and the limiting cylinder are used for safely limiting the spraying range, so that the pollution to the periphery or the injury to workers caused by high-pressure spraying on the route is avoided, the safety coefficient is high, and the mounting frame of the inverted L-shaped plate structure is convenient to assemble and disassemble to spray the test protection device, and the structure is simple.
Preferably, support columns are fixedly arranged at two ends of the bottom of the jet test protection device, a fixing frame is welded at the bottom of the support columns, pulleys are rotatably connected below the fixing frame, and the pulleys, the guide roller, the first moving assembly and the second moving assembly are all positioned on the same horizontal plane; the support column is used for supporting the fixing frame at two ends of the bottom of the injection test protection device, the fixing frame is used for stably supporting the pulley to rotate, and the pulley is used for contacting with the ground to support safety protection.
(III) beneficial effects
Compared with the prior art, the invention has the beneficial effects that: the movable assembly II and the movable assembly I are arranged below the support plate and the extending plate with the L-shaped plate-shaped structure, so that the movable assembly II and the movable assembly I are convenient for being stably supported on a road for construction and use, the water pump connected with the lower end of the side part of the water tank through the water suction pipe and the injection device I and the injection device II respectively connected with the water pump through the water pump pipe can be automatically controlled to pump water to the injection device I and the injection device II after pumping water, and then the high-pressure injection is carried out to the road surface for testing through the high-pressure nozzle, so that the service life of the road marking road sign is effectively detected, the detection effect can be further enhanced through the injection detection mechanism at the two parts of the injection device I and the injection device II, through the guiding mechanism who connects in the backup pad the place ahead, be convenient for accurate direction road marking line department removes, avoid the test position skew, and then improved efficiency of software testing greatly, the dust is clear away in road marking line department place ahead that will need detect to the deashing mechanism that sets up is convenient directly, further strengthen the detection effect, prevent road marking line department dust impurity and pile up influence test accuracy, and through the injection test protector of installing in injection device one with injection device two below, the effectual safety protection sprays test procedure, the piece that avoids spraying the test to produce splashes and pollutes the periphery, with the scope reduction that the piece impurity sprays and splashes, safe and reliable, convenient popularization and use.
Drawings
FIG. 1 is a schematic view of the overall front left upper perspective structure of the present invention;
FIG. 2 is a schematic view of the overall front upper right perspective structure of the present invention;
FIG. 3 is a schematic view of the overall rear upper right perspective of the present invention;
FIG. 4 is a schematic view of the overall front lower left perspective structure of the present invention;
FIG. 5 is a schematic view of the upper structure of the guiding mechanism and the ash removing mechanism of the present invention;
FIG. 6 is a schematic view of the lower structure of the guiding mechanism and ash removing mechanism of the present invention;
fig. 7 is a schematic structural view of the jet test protection device of the present invention.
In the figure, 1, a supporting plate; 11. an extension plate; 111. a first moving assembly; 112. a first armrest rod frame; 113. a second armrest rod frame; 12. a second moving assembly; 121. a cross plate; 13. a power supply control device; 2. a water tank; 201. a water tank cover; 21. a water pump; 211. a water pumping pipe; 22. a first spraying device; 221. a water pumping pipe; 23. a second spraying device; 24. a high pressure nozzle; 3. a guide mechanism; 31. an extension rod I; 32. an extension rod II; 33. a guide roller; 331. a collar; 34. a support rod; 35. irradiating the lamp cap with laser; 4. an ash removing mechanism; 41. a metal shaping hose; 411. a blowing head; 412. a fixed tube; 42. a blower; 421. an air suction port; 422. an air outlet pipe; 423. a delivery tube; 5. jetting test protection device; 51. an extension tube; 511. a limiting cylinder; 52. a mounting frame; 53. a support column; 531. a fixing frame; 532. and (3) a pulley.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1 to 7, the embodiment of the present invention provides a technical solution: the testing device for road construction comprises a supporting plate 1 and a water tank 2, wherein an extending plate 11 with an L-shaped plate-shaped structure is fixedly arranged in the middle of the left end of the supporting plate 1, transverse plates 121 are fixedly arranged at the front end and the rear end of the two sides of the supporting plate 1, a moving assembly II 12 is arranged below the transverse plates 121, and a moving assembly I111 is distributed at the front side and the rear side of the left end of the extending plate 11;
The power supply control device 13 is fixedly arranged in front of the left part of the top of the extension plate 11, the water tank 2 is fixedly arranged in front of the top of the support plate 1, the water tank cover 201 is connected to the front of the top of the water tank 2, the water pump 21 is fixedly arranged in front of the left part of the top of the extension plate 11, and the water pumping pipe 211 is connected to the right end of the water pump 21 and the lower end of the side part of the water tank 2;
The front end of the supporting plate 1 is fixedly provided with a first spraying device 22, the rear end of the supporting plate 1 is fixedly provided with a second spraying device 23, the bottoms of the first spraying device 22 and the second spraying device 23 are provided with a high-pressure spray head 24, and the upper parts of the first spraying device 22 and the second spraying device 23 and the front end of the water pump 21 are connected with a water pump pipe 221;
The front of the supporting plate 1 is connected with a guiding mechanism 3, one end of the guiding mechanism 3 is connected with an ash cleaning mechanism 4 in a backward extending mode, and a spraying test protection device 5 is arranged below the first spraying device 22 and the second spraying device 23.
Through the movable component two 12 and the movable component one 111 that are L-shaped plate structure extension board 11 below in backup pad 1, be convenient for stably support and use on the road, through the water pump 21 that is connected through the drinking water pipe 211 in water tank 2 side lower extreme and the injection device one 22 and the injection device two 23 that pump 21 is connected through pump water pipe 221 respectively, but the automated control draws water the back pump to injection device one 22 and injection device two 23, carry out the high-pressure injection to road surface test through high-pressure shower nozzle 24, so that the project quality of road surface marking road sign is convenient for the efficient detection road surface, can further strengthen the detection effect through the injection detection mechanism of injection device one 22 and injection device two 23 places, through the guiding mechanism 3 that is connected in backup pad 1 the place ahead, be convenient for accurate direction marking off, avoid testing position skew, and then improved test efficiency greatly, the place ahead with the road sign that needs to detect is convenient for direct through the ash removal mechanism 4 that sets up, further strengthen the detection effect, prevent road sign marking place impurity accumulation influence test precision, and through the test device that installs under injection device one 22 and injection device two 23, the safe and pollution control is avoided the safety test of the safety and the safety test that the safety is convenient, the safety test is sprayed, the safety and the safety test is convenient, and the safety test is used to spray the dust.
Further improved, a first armrest rod frame 112 is welded on the left side of the extension plate 11, a second armrest rod frame 113 is welded on the rear side of the extension plate 11, and the second armrest rod frame 113 and the first armrest rod frame 112 are of an integrated structure;
The side cart with the second handrail rack 113 and the first handrail rack 112 arranged on the extension plate 11 is beneficial for workers to see the front moving route, and the second handrail rack 113 and the first handrail rack 112 are high in integrated structural strength, firm and durable and convenient to push manually.
Further improved, the water suction pipe 211 and the water pumping pipe 221 are of metal multi-connecting pipe structures, and the power supply control device 13 is electrically connected to the water pump 21 and the ash cleaning mechanism 4 through power supply wires;
The pumping pipe 211 and the pumping pipe 221 with the metal multi-connecting pipe structure are arranged, so that the strength is higher, the pumping pipe can bear the water pressure of higher pressure, the power control device 13 is convenient to manually control each device, and the lithium battery power supply can be used for supplying power for a long time.
Further improved, the guiding mechanism 3 comprises a first extension rod 31 and a second extension rod 32, the first extension rod 31 and the second extension rod 32 are respectively and fixedly arranged at the two ends of the front of the supporting plate 1, a supporting rod 34 is fixedly arranged at the front ends of the first extension rod 31 and the second extension rod 32, the supporting rod 34 is of a forward inclined L-shaped tubular structure, a collar 331 is fixedly arranged at the inner side of the supporting rod 34, a guiding roller 33 is rotatably connected to the outer part of the collar 331, the bottom of the guiding roller 33, the bottom of the moving assembly 111 and the bottom of the moving assembly 12 are positioned at the same horizontal plane, and the first extension rod 31 and the second extension rod 32 are of hollow tubular structures;
The first extension rod 31 and the second extension rod 32 are used for extending the guide roller 33 forwards, so that the guide roller is convenient to roll along a route to assist in correctly pushing the moving direction, the support rod 34 and the shaft collar 331 which are of the forward inclined L-shaped tubular structure are used for stably supporting the guide roller 33 to rotate, clamping is avoided, and the first extension rod 31 and the second extension rod 32 of the hollow tubular structure conveniently penetrate through a power line and a pipeline.
Further improved, the front ends of the struts 34 are provided with a plurality of laser irradiation lamp holders 35, the front ends of the laser irradiation lamp holders 35 are of a downward inclined structure, and the rear parts of the laser irradiation lamp holders 35 pass through the first extension rod 31, the second extension rod 32, the support plate 1 and the extension plate 11 through wires to be electrically connected to the power supply control device 13;
The laser irradiation lamp cap 35 with the downward inclined structures can directly irradiate on two sides of a route, further assist in moving, reduce the risk of moving deflection, and enable the power supply control device 13 to continuously supply power to the laser irradiation lamp cap 35, so that the operation is convenient.
Further improved, the ash removing mechanism 4 comprises a fan 42, the fan 42 is fixedly arranged in front of the top of the supporting plate 1, an air suction port 421 is arranged in front of the fan 42, a metal filter screen plate is arranged at the outer end of the air suction port 421, an air outlet pipe 422 is connected to the left end of the fan 42, the air outlet pipe 422 is formed by combining a transverse pipe and a longitudinal pipe, a conveying pipe 423 is connected to the front of the air outlet pipe 422, and the conveying pipe 423 is connected to the inside of the first extension rod 31;
The fan 42 is used for providing a wind source, the air suction inlet 421 and the metal filter screen plate arranged at the outer end are used for filtering back air inlet, the air outlet pipe 422 combining the transverse pipe and the longitudinal pipe is convenient for stabilizing the air outlet, and the conveying pipe 423 is used for connecting the air outlet pipe 422 and the fixed pipe 412.
Further improved, the outer upper end of the supporting rod 34 is fixedly connected with a fixed pipe 412, the front end of the fixed pipe 412 is connected with a metal shaping hose 41, the front end of the metal shaping hose 41 is provided with a blowing head 411, and the blowing head 411 faces the front lower end between the guide rollers 33;
The fixing tube 412 through setting up is fixed in the centre department of branch 34 to the inside of fixing tube 412 is hollow structure, makes its inside communicate with each other behind metal design hose 41 and the fixing tube 412 fixed connection, and convenient air-out, metal design hose 41 are used for buckling and adjust air-out angle and position, and blowing head 411 is used for blowing dust removal impurity to the place ahead lower extreme between the guide roll 33, improves test effect.
Further improved, the injection test protection device 5 is of a downward flaring type structure, an extension pipe 51 is fixedly arranged above the injection test protection device 5, a limiting cylinder 511 is fixedly arranged at the top of the extension pipe 51, the extension pipe 51 is of a straight tubular structure, the limiting cylinder 511 is of an upward flaring type structure, the diameter of the lower end of the injection test protection device 5 is larger than that of the upper end of the limiting cylinder 511, a mounting frame 52 is welded at the rear of the outer side wall of the injection test protection device 5, and the mounting frame 52 is of an inverted L-shaped plate structure and is mounted at the bottom of the supporting plate 1 through bolts;
The spraying test protection device 5, the extension pipe 51 and the limiting cylinder 511 are used for safely limiting the spraying range, the route of high-pressure spraying is prevented from splashing to pollute the periphery or injure staff, the safety coefficient is high, and the mounting frame 52 of the inverted L-shaped plate-shaped structure is convenient to assemble and disassemble to spray the testing protection device 5, and the structure is simple.
Specifically, the two ends of the bottom of the jet testing protection device 5 are fixedly provided with support columns 53, the bottoms of the support columns 53 are welded with fixing frames 531, pulleys 532 are rotatably connected below the fixing frames 531, and the pulleys 532, the bottoms of the guide rollers 33, the first moving component 111 and the second moving component 12 are all positioned on the same horizontal plane;
The supporting columns 53 are used for supporting the fixing frames 531 at two ends of the bottom of the injection test protection device 5, the fixing frames 531 are used for stably supporting the pulleys 532 to rotate, and the pulleys 532 are used for supporting safety protection in contact with the ground.
Working principle: firstly, opening a water tank cover 201 to fill water into the water tank 2, and installing a lithium battery on the power supply control device 13 for supplying power;
firstly, a laser irradiation lamp cap 35 is started to irradiate the two sides of a marking and a marking on the ground through a power supply control device 13, a first hand-held handrail rod frame 112 or a second hand-held handrail rod frame 113 pushes a supporting plate 1 and an extension plate 11, then a plurality of groups of moving assemblies 111 and moving assemblies 12 at the bottom are used for supporting the movement on the ground, and meanwhile, the marking and the two sides of the marking supported on the ground through guide rollers 33 at the front ends of the first extension rod 31 and the second extension rod 32 are precisely guided to move;
meanwhile, the fan 42 of the ash removing mechanism 4 is started, air is filtered and fed through the air suction port 421, then air is discharged through the air outlet pipe 422 and the conveying pipe 423, the air is conveyed to the metal shaping hose 41, and finally air is blown to the position, which is in the middle of the front of the guide roller 33, accurately opposite to the air blowing head 411 for dust removal, so that the detection precision is improved;
The water pump 21 is started when the water pump moves to the marking and marking position, water in the water tank 2 is pumped out through the water pumping pipe 211 and then is conveyed to the first spraying device 22 and the second spraying device 23 through the water pumping pipe 221, finally, high-pressure water is sprayed to the marking position of the road surface through the high-pressure spray heads 24 below the first spraying device 22 and the second spraying device 23 successively, whether the marking is damaged by high-pressure water impact is observed, the adhesive strength of the marking is effectively detected, the engineering quality of the marking is further tested, and the construction quality of the marking is improved;
The injection test protection device 5, the extension pipe 51 and the limiting cylinder 511 always safely protect the injection process, so that the periphery is prevented from being polluted by the splashing of the scraps generated by the injection test, the range of the splashing of the scraps and impurities is reduced, and the safety and the reliability are realized.
The invention provides a support plate 1, an extension plate 11, a first moving component 111, a first handrail rod frame 112, a second handrail rod frame 113, a second moving component 12, a cross plate 121, a power supply control device 13, a water tank 2, a water tank cover 201, a water pump 21, a water suction pipe 211, a first spraying device 22, a water pump pipe 221, a second spraying device 23, a high-pressure spray head 24, a guide mechanism 3, a first extension rod 31, a second extension rod 32, a guide roller 33, a collar 331, a support rod 34, a laser irradiation lamp cap 35, a dust removing mechanism 4, a metal shaping hose 41, a blowing head 411, a fixed pipe 412, a fan 42, a suction inlet 421, a discharge pipe 422, a conveying pipe 423, a spray test protecting device 5, an extension pipe 51, a limiting cylinder 511, a mounting bracket 52, a support post 53, a fixing bracket 531, a pulley 532, all of which are common standard components or components known to a person skilled in the art, the structure and principle of the invention are known by the technical manual or the conventional experimental method, the problem solved by the invention is that the marking and marking of the road surface can cause relatively poor engineering quality without detection, the marking and marking can not be used for a long time, the marking and marking of the road surface construction can be seriously damaged after the heavy vehicle is pressed, the service life of the marking and marking of the road surface construction is greatly reduced. So that the efficient detects the life of road marking road sign, can further strengthen the detection effect through the injection detection mechanism of injection device one with injection device two places, through the guiding mechanism who connects in the backup pad the place ahead, be convenient for accurate direction road marking department removes, avoid the test position skew, and then improved test efficiency greatly, the dust is clear away to the road marking department place ahead that will detect through the deashing mechanism that sets up convenience, further strengthen the detection effect, prevent road marking department dust impurity accumulation influence test accuracy, and through the injection test protector at injection device one with injection device two below installations, the effectual safety protection sprays the test process, the piece that avoids spraying the test to produce splashes the pollution periphery, with the scope that piece impurity sprays the splashing reduction, and safety and reliability, convenient popularization and use.
While the fundamental and principal features of the invention and advantages of the invention have been shown and described, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.
Claims (9)
1. The utility model provides a testing arrangement is used in road construction, includes backup pad (1) and water tank (2), its characterized in that: an extending plate (11) with an L-shaped plate-shaped structure is fixedly arranged in the middle of the left end of the supporting plate (1), transverse plates (121) are fixedly arranged at the front end and the rear end of the two sides of the supporting plate (1), a moving assembly II (12) is arranged below the transverse plates (121), and a moving assembly I (111) is distributed at the front side and the rear side of the left end of the extending plate (11);
The water tank is characterized in that a power supply control device (13) is fixedly arranged in front of the left part of the top of the extension plate (11), the water tank (2) is fixedly arranged in front of the top of the support plate (1), a water tank cover (201) is connected to the front of the top of the water tank (2), a water pump (21) is fixedly arranged in front of the left part of the top of the extension plate (11), and a water suction pipe (211) is connected to the right end of the water pump (21) and the lower end of the side part of the water tank (2);
The front end of the supporting plate (1) is fixedly provided with a first spraying device (22), the rear end of the supporting plate (1) is fixedly provided with a second spraying device (23), the bottoms of the first spraying device (22) and the second spraying device (23) are provided with high-pressure spray heads (24), and the upper parts of the first spraying device (22) and the second spraying device (23) and the front end of the water pump (21) are connected with a water pumping pipe (221);
The front of backup pad (1) is connected with guiding mechanism (3), the one end of guiding mechanism (3) is connected with ash removal mechanism (4) to the rear extension, injection test protector (5) are all installed to injection device one (22) and injection device two (23) below.
2. The test device for road construction according to claim 1, wherein: the left side of extension board (11) welding has handrail pole frame one (112), the rear welding of extension board (11) has handrail pole frame two (113), handrail pole frame two (113) and handrail pole frame one (112) are integrated structure.
3. The test device for road construction according to claim 1, wherein: the water suction pipe (211) and the water pumping pipe (221) are of metal multi-connecting-pipe structures, and the power supply control device (13) is electrically connected to the water pump (21) and the ash cleaning mechanism (4) through power supply wires.
4. The test device for road construction according to claim 1, wherein: guiding mechanism (3) are including extension pole one (31) and extension pole two (32), the place ahead both ends of backup pad (1) are located respectively to extension pole one (31) and extension pole two (32), the front end of extension pole one (31) and extension pole two (32) is fixed to be equipped with branch (34), branch (34) are forward inclined L type tubular structure, the inboard department of branch (34) is fixed and is equipped with collar (331), the outside rotation of collar (331) is connected with direction running roller (33), the bottom of direction running roller (33) is located same horizontal plane with the bottom of moving component one (111), moving component two (12), extension pole one (31) and extension pole two (32) are hollow tubular structure.
5. The test device for road construction according to claim 4, wherein: the front end of branch (34) all installs laser irradiation lamp holder (35), the quantity of laser irradiation lamp holder (35) is a plurality of, the front end of laser irradiation lamp holder (35) is slope decurrent structure, just the rear of laser irradiation lamp holder (35) passes extension pole one (31), extension pole two (32), backup pad (1) and extension board (11) electric connection in power controlling means (13) through the wire.
6. The test device for road construction according to claim 5, wherein: the ash removal mechanism (4) comprises a fan (42), the top place ahead of backup pad (1) is located to fan (42) is fixed, the place ahead of fan (42) is equipped with inlet scoop (421), metal filter screen board is installed to the outer end of inlet scoop (421), the left end of fan (42) is connected with out tuber pipe (422), go out tuber pipe (422) and combine together for violently managing with indulging the pipe, the place ahead of play tuber pipe (422) is connected with conveyer pipe (423), conveyer pipe (423) are connected in the inside of extension rod one (31).
7. The test device for road construction according to claim 6, wherein: the outer upper end fixedly connected with fixed pipe (412) of branch (34), the front end of fixed pipe (412) is connected with metal design hose (41), blowing head (411) are installed to the front end of metal design hose (41), the place ahead lower extreme between blowing head (411) opposite direction guide running roller (33).
8. The test device for road construction according to claim 1, wherein: the injection test protection device (5) is of a downward flaring type structure, an extension tube (51) is fixedly arranged above the injection test protection device (5), a limit cylinder (511) is fixedly arranged at the top of the extension tube (51), the extension tube (51) is of a straight tubular structure, the limit cylinder (511) is of an upward flaring type structure, the lower extreme diameter of injection test protector (5) is greater than the upper end diameter of spacing section of thick bamboo (511), injection test protector (5) lateral wall rear welding has mounting bracket (52), mounting bracket (52) are the bottom of falling L template form structure and installing in backup pad (1) through the bolt.
9. The test device for road construction according to claim 8, wherein: the bottom both ends of injection test protector (5) are fixed and are equipped with support column (53), the bottom welding of support column (53) has mount (531), the below rotation of mount (531) is connected with pulley (532), pulley (532) and direction running roller (33), remove bottom that subassembly one (111), remove subassembly two (12) all are located same horizontal plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202410481361.6A CN118090593B (en) | 2024-04-22 | 2024-04-22 | Testing arrangement is used in road construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202410481361.6A CN118090593B (en) | 2024-04-22 | 2024-04-22 | Testing arrangement is used in road construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN118090593A true CN118090593A (en) | 2024-05-28 |
CN118090593B CN118090593B (en) | 2024-07-05 |
Family
ID=91144073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202410481361.6A Active CN118090593B (en) | 2024-04-22 | 2024-04-22 | Testing arrangement is used in road construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN118090593B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120088211A (en) * | 2011-01-31 | 2012-08-08 | (주)삼우아이엠씨 | Vehicle for chipping joint of concrete road |
CN111811478A (en) * | 2020-07-20 | 2020-10-23 | 陈希长 | Road surface slope detection device |
CN114508990A (en) * | 2022-02-22 | 2022-05-17 | 王伯霖 | Highway engineering quality automatic checkout device |
CN216663700U (en) * | 2022-01-12 | 2022-06-03 | 何宏旭 | Foundation structure curing means is used in road and bridge construction |
CN218813116U (en) * | 2022-11-24 | 2023-04-07 | 武汉新乐涂装饰工程有限公司 | Road surface marking device for road construction |
CN116716786A (en) * | 2023-06-15 | 2023-09-08 | 广东新粤交通投资有限公司 | Highway marking quality monitoring system and method |
CN220724817U (en) * | 2023-08-25 | 2024-04-05 | 沾化区公路事业发展中心 | Highway engineering marking device that possesses cleaning function |
-
2024
- 2024-04-22 CN CN202410481361.6A patent/CN118090593B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120088211A (en) * | 2011-01-31 | 2012-08-08 | (주)삼우아이엠씨 | Vehicle for chipping joint of concrete road |
CN111811478A (en) * | 2020-07-20 | 2020-10-23 | 陈希长 | Road surface slope detection device |
CN216663700U (en) * | 2022-01-12 | 2022-06-03 | 何宏旭 | Foundation structure curing means is used in road and bridge construction |
CN114508990A (en) * | 2022-02-22 | 2022-05-17 | 王伯霖 | Highway engineering quality automatic checkout device |
CN218813116U (en) * | 2022-11-24 | 2023-04-07 | 武汉新乐涂装饰工程有限公司 | Road surface marking device for road construction |
CN116716786A (en) * | 2023-06-15 | 2023-09-08 | 广东新粤交通投资有限公司 | Highway marking quality monitoring system and method |
CN220724817U (en) * | 2023-08-25 | 2024-04-05 | 沾化区公路事业发展中心 | Highway engineering marking device that possesses cleaning function |
Also Published As
Publication number | Publication date |
---|---|
CN118090593B (en) | 2024-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN118090593B (en) | Testing arrangement is used in road construction | |
CN215154607U (en) | Steel rail detection and maintenance device for railway engineering maintenance | |
CN212200011U (en) | Road marking device convenient to adjust | |
CN210766561U (en) | Road and bridge guardrail cleaning vehicle set | |
CN210334926U (en) | Tool structure for automatic welding machine | |
CN209443348U (en) | A kind of pavement maintenance truck | |
CN211937548U (en) | Automatic change spraying equipment | |
CN211621411U (en) | Urban road cleaning device | |
CN115671930A (en) | Water-saving dust collector for highway construction | |
CN213945323U (en) | Workbench for laser cutting machine | |
CN213409155U (en) | Color steel plate plastic coating equipment | |
CN210797407U (en) | Highway construction is with removing dust fall equipment | |
CN220812240U (en) | Wet concrete spraying trolley | |
CN114113306A (en) | Magnetic powder inspection infiltration washing tank | |
CN221288391U (en) | Paint spraying device for highway guardrail | |
CN209162714U (en) | A kind of cleaning device for road abnormity guardrail | |
CN213494380U (en) | Dust device is used at well drilling scene | |
CN110565561A (en) | Road and bridge guardrail cleaning vehicle set | |
CN215085817U (en) | Remove convenient fog gun machine | |
CN210614091U (en) | Automatic paint spraying device suitable for plank | |
CN219314840U (en) | Maintenance truck with monitoring mechanism for tunnel maintenance | |
CN117654820B (en) | Injection apparatus for environmental treatment and environmental treatment equipment comprising same | |
CN219665492U (en) | Cleaning device for solar cell series welding machine welding seat | |
CN216515040U (en) | Coating spraying device for highway maintenance | |
CN218982461U (en) | Contact net cleaning system and cleaning operation vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||