Nothing Special   »   [go: up one dir, main page]

CN102974633B - Swell-shrink drawing molding process and device for reducing pipes - Google Patents

Swell-shrink drawing molding process and device for reducing pipes Download PDF

Info

Publication number
CN102974633B
CN102974633B CN201210588572.7A CN201210588572A CN102974633B CN 102974633 B CN102974633 B CN 102974633B CN 201210588572 A CN201210588572 A CN 201210588572A CN 102974633 B CN102974633 B CN 102974633B
Authority
CN
China
Prior art keywords
tubing
dynamic model
fixed
seat
card lobe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210588572.7A
Other languages
Chinese (zh)
Other versions
CN102974633A (en
Inventor
刘选萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Xizhong Special Aluminum Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210588572.7A priority Critical patent/CN102974633B/en
Publication of CN102974633A publication Critical patent/CN102974633A/en
Application granted granted Critical
Publication of CN102974633B publication Critical patent/CN102974633B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

The invention relates to metal pipe processing, in particular to a swell-shrink drawing molding process and a device for reducing pipes. The process comprises the following steps: Step 1, necking: a pipe is installed on a rack; one end of the pipe is fixed through a pushing seat, the middle part of the pipe is supported through a protective sleeve installed on a supporting seat, and then the other one of the pipe is necked through a necking and pushing head; Step 2, annealing: the necked pipe is annealed through an annealing device; Step 3, drawing: the pipe treated by the step 2 is drawn through a drawing chuck to form a reducing pipe blank; Step 4, annealing: the reducing pipe blank is annealed through the annealing device; and Step 5, sizing, determining wall thickness and drawing: the reducing pipe blank treated by the Step 4 is subjected to the sizing, determining wall thickness and drawing treatment through the drawing chuck to form a reducing pipe finished-product. Due to the structure, the process and the device have the advantages that the processing quality and precision of the reducing pipe is increased, and the production of relatively long and thin reducing pipes is realized.

Description

Breathing drawing moulding process and the device of reduced pipe
Technical field
The present invention relates to metal pipe material processing, specifically a kind of reduced pipe quality precision and breathing drawing moulding process and the device that can produce relative elongated reduced pipe of improving.
Background technology
So-called reduced pipe, is commonly called as concentric reducer, is a kind of pipe fitting for pipeline reducing diameter place.Applying maximum is on the pipeline in chemical plant.Conventionally be divided into Concentric Reducers and eccentric reducer.The material of reduced pipe comprises stainless steel reduced pipe and steel alloy reduced pipe, No. 20 firm reduced pipes etc.
Reduced pipe has national standard, as < < steel butt seamless pipe > > GB/T12459-2005, < < steel plate butt-welding pipe fitting > processed > GB/T13401-2005 etc.
The caliber specification of reduced pipe is from 25(major part) * 15(microcephaly) to 1500(major part) * 1200(microcephaly), the length the shortest of reduced pipe is 51 millimeters, the longest 610 millimeters.
Reduced pipe adopts undergauge moulding process, hole enlargement moulding process, punch forming process conventionally.
The reducing formation technique of reduced pipe is that the pipe equating with reduced pipe outside diameter is put into finishing die, by the compacting along pipe axial direction, makes metal move and shrink shaping along die cavity.According to the size of reduced pipe reducing, be divided into once compressing or repeatedly compressing.
It is to adopt the pipe that is less than reduced pipe outside diameter that hole enlargement is shaped, and with interior punch die, along the hole enlargement of pipe internal diameter, is shaped.Expanding technology mainly solves reducing reduced pipe bigger than normal and is difficult for by the situation of reducing formation, sometimes according to material and product shaping needs, the method for hole enlargement and undergauge is merged and is used.
Except using steel pipe to produce reduced pipe for raw material, to the reduced pipe of part specification also available steel plate adopt process for stamping and forming to produce.Stretch the punch die shape use with reference to reduced pipe inner surface size design, with punch die by the steel plate punched stretch forming after blanking.
The cold drawing of prior art is a kind of traditional flow of metal processing technology, is widely used in the stretching of deformed bar, the drawing of iron and steel copper wires, bar, tubing etc.The object of this stretching drawing is to obtain high-precision metal material, as cold drawn aluminum pipe, can produce best bright finish, the high Precision Aluminium tubing of high dimensional accuracy; Obtain the diversified bar of shape specification, as produce six square steel rods, six side's aluminium bars, six copper square bars; Obtain high economic benefit, save process time, reduce machining expense, save metal material, as cold drawn tooth base etc.Conventionally the equivalent diameter of material that cold drawing draws can be very not large, and draw ratio is large especially.This cold-drawing process, when to tube-drawing, can only carry out the drawing of single bore, cannot realize the drawing of reduced pipe.
The process of prior art and equipment cannot be processed relatively elongated reduced pipe.
Summary of the invention
The object of this invention is to provide a kind of reduced pipe quality precision and the breathing drawing forming method that can produce relative elongated reduced pipe of improving.
For realizing the technical scheme that above-mentioned purpose of the present invention adopts, be: a kind of breathing drawing moulding process of reduced pipe, is characterized in that: this technique comprises
First step necking down: tubing is arranged in frame, and one end of tubing is fixing by pushing seat, and middle part is supported by the protective sleeve being arranged on supporting seat, then head is pushed to by necking down in other one end of tubing and carries out necking down;
Second step annealing: the tubing after necking down is annealed by annealing device;
The 3rd step drawing: the tubing after second step being processed by drawing chuck carries out drawing and forms reduced pipe blank;
The 4th step annealing: reduced pipe blank is annealed by annealing device;
The 5th step expander, sizing is determined wall thickness drawing: the reduced pipe blank after by drawing chuck, the 4th step annealing being processed carries out expander, and sizing is determined wall thickness drawing processing, forms reduced pipe finished product.
The crudy precision that has improved high reduced pipe by said method, has realized the production to relatively elongated reduced pipe, concrete and can say it is can manufacture in 150 millimeters of pipe diameters, and 4 meters of length are with interior tubing.
Another object of the present invention is to provide a kind of reduced pipe quality precision and the breathing drawing manufacturing installation that can produce relative elongated reduced pipe of improving.
For realizing the technical scheme that above-mentioned purpose of the present invention adopts, be: a kind of breathing drawing shaped device of reduced pipe, wherein this device comprises
Frame (1) and Hydraulic Station (2), what be fixed on frame (1) one end pushes baffle plate (3), is fixed on to push to push seat (4) on baffle plate (3), and one end of tubing (5) is fixed on pushes in seat (4);
The other end of frame (1) has dynamic model seat (6), dynamic model seat (6) moves to the termination of tubing (5) along guide pillar (8) under pipe box (7) promotes, guide pillar (8) is fixed on the both sides of frame (1), one end of this pipe box (7) is connected with dynamic model seat (6), and the other end of pipe box (7) is fixed on hydraulic cylinder piston rod (9) termination of being controlled by Hydraulic Station (2);
By being arranged on necking down on dynamic model seat (6), pushing head tubing (5) is carried out to necking down, this necking down is pushed head and is comprised the die sleeve (10) being fixed on dynamic model seat (6), be arranged on the necking down mould (11) in die sleeve (10), tubing (5) is through necking down mould (11), by pipe box (7), promote dynamic model seat (6), tubing (5) is pushed distortion in necking down mould (11), the other end diameter of tubing (5) is diminished and realize necking down;
Above-mentioned necking down is pushed and is arranged on after unloading on a driven die holder (6) fixedly on die holder (12), fixedly die holder (12) is positioned at the bottleneck of tubing (5), fixedly die holder (12) is fixed on frame (1) above, realizes and at tubing (5) bottleneck, tubing (5) being positioned, by being arranged on the necking down position of the drawing chuck clamping tubing (5) on dynamic model seat (6), carry out drawing, this drawing chuck comprises the core print I (13) being fixed as one with dynamic model seat (6), core print I (13) is outside equipped with dynamic model cover (14), dynamic model cover (14) is fixed on dynamic model seat (6), a pair of card lobe (15) is by symmetrical being arranged in dynamic model cover (14), this card lobe (15) outer wall has tapering, inwall has sharp annular tooth, card lobe (15) forms drawing mould with core print I (13), between card lobe (15) and core print I (13), there is the gap that the tube wall of confession tubing (5) penetrates, card lobe (15) is clamped in the tube wall of tubing (5) in this gap with core print I (13), at dynamic model cover (14) outer wall, be provided with the card lobe clutch (16) of a control card lobe (15) and tubing (5) clutch, after card lobe clutch (16) control card lobe (15) clamps the tube wall of tubing (23) with core print I (13), dynamic model seat (6) with pipe box (7) to moving away from tubing (5) necking down port end, the drawing deformation of realization to tubing (5), makes tubing (5) form reduced pipe blank,
The above-mentioned necking down being fixed on fixing die holder (12) is pushed to head and unloads, at the reducing place of reduced pipe blank by being fixed on sizing die (28) location on fixing die holder (12); Plug (17) is penetrated from the heavy caliber end of reduced pipe blank, one end of plug (17) is fixed on and pushes on baffle plate (3) from the small-caliber end of reduced pipe blank passes, the other end of plug (17) has core print II (29), and core print II (29) is limited on the inwall at tubing (5) reducing place; Change the drawing mould of above-mentioned drawing chuck, by the drawing mould after changing, reduced pipe blank heavy caliber end is clamped, dynamic model seat (6) with pipe box (7) to moving away from reduced pipe blank heavy caliber end, tubing (5) moves with the drawing chuck one being fixed on dynamic model seat (6), small-bore section of internal diameter of tubing (5) be expander under core print II (29) effect of plug (17), small-bore section of external diameter of tubing (5), by the spacing moulding of sizing die (28) being fixed on fixing die holder (12), realized the sizing of small-bore section of reduced pipe blank determined to wall thickness.
By said structure, the crudy precision that device shown in the present has improved high reduced pipe, has realized the production to relatively elongated reduced pipe, concrete and can say it is can manufacture in 150 millimeters of pipe diameters, and 4 meters of length are with interior tubing.
What said method and device were produced can be widely used in the demands such as light rail vehicle, railcar or high ferro vehicle
Accompanying drawing explanation
The non-limiting embodiment that the present invention can provide by accompanying drawing further illustrates.
Accompanying drawing 1 is structural representation of the present invention.
Accompanying drawing 2 for the present invention push seat structural representation.
Accompanying drawing 3 for necking down of the present invention push head structural representation.
Accompanying drawing 4 is the structural representation of drawing chuck of the present invention.
Accompanying drawing 5 be in accompanying drawing 4 A to structural representation.
Structural representation when accompanying drawing 6 is the drawing of apparatus of the present invention draw.
Accompanying drawing 7 is determined wall thickness drawing structure schematic diagram for apparatus of the present invention sizing.
In figure: 1, frame; 2, Hydraulic Station; 3, push baffle plate; 4, push seat; 5, tubing; 6, dynamic model seat; 7, pipe box; 8, guide pillar; 9, hydraulic cylinder piston rod; 10, die sleeve; 11, necking down mould; 12, fixing die holder; 13, core print I; 14, dynamic model cover; 15, card lobe; 16, card lobe clutch; 17, plug; 18, rotating shaft; 19, spring; 21, Long-distance Control bar; 22, set bolt; 23, clamp; 24, bolt; 25, supporting seat; 26, overcoat; 27, protective sleeve; 28, sizing die; 29, core print II.
The specific embodiment
Below in conjunction with drawings and Examples, the invention will be further described:
A breathing drawing forming method for reduced pipe, is characterized in that: this technique comprises
First step necking down: tubing is arranged in frame, and one end of tubing is fixing by pushing seat, and middle part is supported by the protective sleeve being arranged on supporting seat, then head is pushed to by necking down in other one end of tubing and carries out necking down;
Second step annealing: the tubing after necking down is annealed by annealing device;
The 3rd step drawing: the tubing after second step being processed by drawing chuck carries out drawing and forms reduced pipe blank;
The 4th step annealing: reduced pipe blank is annealed by annealing device;
The 5th step expander, sizing is determined wall thickness drawing: the reduced pipe blank after by drawing chuck, the 4th step annealing being processed carries out expander, and sizing is determined wall thickness drawing processing, forms reduced pipe finished product.The undergauge moulding process of prior art, hole enlargement moulding process and punch forming process cannot be processed into reduced pipe by relative tubing, yet relative tubing can be processed into reduced pipe by above-mentioned technique, and have improved the crudy precision of high reduced pipe.Concrete and can say it is can manufacture in 150 millimeters of pipe diameters, 4 meters of length are with interior tubing.
For further improving the quality of bottleneck, to improve the quality precision of reduced pipe, in above-described embodiment, preferably: described first step necking down and second step annealing alternately multi-pass are processed; In described first step necking down, the necking down mould that head is pushed in a necking down is once changed in every necking down.
Quality while determining wall thickness for further improving drawing and sizing, to improve the quality precision of reduced pipe, in above-described embodiment, preferably: described the 3rd step drawing and the 4th step annealing are alternately multi-pass processing; In described the 3rd step drawing, the drawing mould of a drawing chuck is once changed in every drawing; The drawing mould that last passage is used pulls to the internal diameter of tubing and external diameter to be less than design load.
In above-described embodiment, preferably: during described annealing, the temperature in annealing device stove is even, the temperature difference is no more than 2 ℃; The strict control heat time, guarantee burning, material structure changes evenly; Annealing finishes, and uses machine oil cleaning material, makes tubing surfaces externally and internally without the grains of sand.
Referring to accompanying drawing 1 to 7, the breathing drawing shaped device of the reduced pipe in accompanying drawing, wherein this device comprises
Frame 1 and Hydraulic Station 2, what be fixed on frame 1 one end pushes baffle plate 3, is fixed on to push to push seat 4 on baffle plate 3, and one end of tubing 5 is fixed on pushes in seat 4;
The other end of frame 1 has dynamic model seat 6, dynamic model seat 6 moves to the termination of tubing 5 along guide pillar 8 under pipe box 7 promotes, guide pillar 8 is fixed on the both sides of frame 1, and one end of this pipe box 7 is connected with dynamic model seat 6, and the other end of pipe box 7 is fixed on hydraulic cylinder piston rod 9 terminations of being controlled by Hydraulic Station 2;
By being arranged on necking down on dynamic model seat 6, pushing head tubing 5 is carried out to necking down, this necking down is pushed head and is comprised the die sleeve 10 being fixed on dynamic model seat 6, be arranged on the necking down mould 11 in die sleeve 10, tubing 5 is through necking down mould 11, by pipe box 7, promote dynamic model seat 6, tubing 5 is pushed distortion in necking down mould 11, the other end diameter of tubing 5 is diminished and realize necking down; (necking down of above-mentioned technical process just adopts this structure to realize).
Above-mentioned necking down is pushed and is arranged on after unloading on a driven die holder 6 fixedly on die holder 12, and fixedly die holder 12 is positioned at the bottleneck of tubing 5, and fixedly die holder 12 is fixed in frame 1, realizes and at tubing 5 bottlenecks, tubing 5 being positioned, by being arranged on the necking down position of the drawing chuck clamping tubing 5 on dynamic model seat 6, carry out drawing, this drawing chuck comprises the core print I 13 being fixed as one with dynamic model seat 6, core print I 13 is outside equipped with dynamic model cover 14, dynamic model cover 14 is fixed on dynamic model seat 6, a pair of card lobe 15 is by symmetrical being arranged in dynamic model cover 14, these card lobe 15 outer walls have tapering, inwall has sharp annular tooth, card lobe 15 forms drawing mould with core print I 13, between card lobe 15 and core print I 13, there is the gap that the tube wall of confession tubing 5 penetrates, card lobe 15 is clamped in the tube wall of tubing 5 in this gap with core print I 13, at dynamic model, overlap the card lobe clutch 16 that 14 outer walls are provided with a control card lobe 15 and tubing 5 clutches, after card lobe clutch 16 control card lobes 15 clamp the tube wall of tubing 5 with core print I 13, dynamic model seat 6 to moving away from tubing 5 necking down port end, is realized the drawing deformation to tubing 5 with pipe box 7, makes tubing 5 form reduced pipe blank, (above-mentioned technical process from reducing drawing, be exactly to realize by this structure).
The above-mentioned necking down being fixed on fixing die holder 12 is pushed to head and unload, at the reducing place of reduced pipe blank, by the sizing die 28 being fixed on fixing die holder 12, locate; Plug 17 is penetrated from the heavy caliber end of reduced pipe blank, and one end of plug 17 is fixed on and pushes on baffle plate 3 from the small-caliber end of reduced pipe blank passes, and the other end of plug 17 has core print II 29, and core print II 29 is limited on the inwall at tubing 5 reducing places; Change the drawing mould of above-mentioned drawing chuck, by the drawing mould after changing, reduced pipe blank heavy caliber end is clamped, dynamic model seat 6 with pipe box 7 to moving away from reduced pipe blank heavy caliber end, tubing 5 moves with the drawing chuck one being fixed on dynamic model seat 6, small-bore section of internal diameter of tubing 5 be expander under core print II 29 effects of plug 17, small-bore section of external diameter of tubing 5, by the spacing moulding of sizing die 28 being fixed on fixing die holder 12, realized the sizing of small-bore section of reduced pipe blank determined to wall thickness.In this embodiment, tubing 5 by steady pin be fixed on push seat 4 in, necking down push head the necking down mould 11 that adopts according to the design amount of pushing, there are a plurality of necking down moulds 11, every necking down is pushed and is changed successively a necking down mould 11; The card lobe 15 of drawing chuck is used as drawing mould with the drawing mould structure that core print 15 forms, this mould structure is also determined the drawing mould use of wall thickness as sizing simultaneously, according to design drawing amount and sizing, determine the design drawing amount of wall thickness and determine drawing mould number, according to drawing mould number, carry out the drawing of multi-pass, to realize quality and the precision that improves reduced pipe finished product.In this embodiment, actual is by necking down, to push head, drawing chuck and plug 17 cooperations to realize tubing 5 necking downs, drawing and expander formation moulding reduced pipe.(the 5th step expander of above-mentioned technical process, sizing is determined wall thickness drawing and realized by this structure).
For ease of the control operation that tubing 5 is firmly grasped, in above-described embodiment, preferably: described card lobe clutch 16 comprises the rotating shaft 18 being arranged on card lobe clutch 16 and penetrates the driving lever in spring 19, this spring 19 is positioned at card lobe clutch 16 outer walls, by adjusting driving lever, stir the clutch of card lobe 15 and tubing 5, when card lobe clutch 16 pushes away to the right, card lobe is just toward moving left, at this moment, piston rod 9 traction pipe boxes 7 drive dynamic model seat 6 to move right, dynamic model seat 6 drives dynamic model cover 14 to move right, dynamic model cover 14 gives card lobe 15 1 radial pressures, card lobe 15 is along with dynamic model seat 6 moves right, dynamic model overlaps the outer wall that 14 inwalls block card lobe 15 inflexibly, the annular tooth of blocking lobe 15 gets one's teeth into tubing 5, in tubing 5, there is again core print I 13 to head on, tubing 5 is capable, by the pull-up to the right of drawing chuck, carried out drawing deformation.
For ease of Long-distance Control card lobe clutch 16, in above-described embodiment, preferably: described card lobe clutch 16 tops are provided with Long-distance Control bar 21.
For ease of assembling, in above-described embodiment, preferably:, will push seat 4 and push baffle plate 3 and be fixed as one successively through pushing seat 4, pushing baffle plate 3 and clamp 23 by set bolt 22.
For ease of assembling, in above-described embodiment, preferably: described core print I 13 is fixed as one by bolt 24 and dynamic model seat 6.
Because tubing 5 is relatively long; under powerful hydraulic thrust; pipe can be pressed and collapsed or bend bent; the middle part of pipe is weak link, therefore, and in above-described embodiment; preferably: at the middle part of tubing 5, be provided with the supporting seat 25 that prevents tubing 5 distortion; supporting seat 25 is fixed in frame 1, and overcoat 26 is installed on supporting seat 25, and protective sleeve 27 is housed in overcoat 26.By this structure, effectively prevent that tubing 5 from forming in moulding reduced pipe process and being out of shape at necking down, drawing and expander, reduce scrappage, reduce production costs.In this embodiment, supporting seat 25 can fixedly installed overcoat 26 on die holder 12 by fixedly die holder 12 is alternative, and in overcoat 26 built-in protectives cover 27 protections that realize at tubing 5, in actual use, supporting seat 25 is a plurality of, is distributed on the middle part of tubing 5.
In said structure, the breathing drawing shaped device of same reduced pipe, tubing 5 is made in reduced pipe process, has effectively been realized necking down, drawing and expander, simultaneously by above-mentioned five step formula techniques, realize the processing to tubing 5, improved quality and the precision of reduced pipe finished product.
Referring to accompanying drawing 7, tubing 5 shown in accompanying drawing 7 is exactly the reduced pipe of moulding, will after small-bore section of expander, be just moulding reduced pipe.
Obviously, all embodiment of foregoing description are a part of embodiment of the present invention, rather than whole embodiment.Based on embodiments of the invention, those of ordinary skills are not making all other embodiment that obtain under creative work prerequisite, all belong to the category of the present invention's protection.
In sum, the present invention has improved the crudy precision of reduced pipe, has realized the production to relatively elongated reduced pipe.

Claims (6)

1. a breathing drawing shaped device for reduced pipe, is characterized in that: this device comprises
Frame (1) and Hydraulic Station (2), what be fixed on frame (1) one end pushes baffle plate (3), is fixed on to push to push seat (4) on baffle plate (3), and one end of tubing (5) is fixed on pushes in seat (4);
The other end of frame (1) has dynamic model seat (6), dynamic model seat (6) moves to the termination of tubing (5) along guide pillar (8) under pipe box (7) promotes, guide pillar (8) is fixed on the both sides of frame (1), one end of this pipe box (7) is connected with dynamic model seat (6), and the other end of pipe box (7) is fixed on hydraulic cylinder piston rod (9) termination of being controlled by Hydraulic Station (2);
By being arranged on necking down on dynamic model seat (6), pushing head tubing (5) is carried out to necking down, this necking down is pushed head and is comprised the die sleeve (10) being fixed on dynamic model seat (6), be arranged on the necking down mould (11) in die sleeve (10), tubing (5) is through necking down mould (11), by pipe box (7), promote dynamic model seat (6), tubing (5) is pushed distortion in necking down mould (11), the other end diameter of tubing (5) is diminished and realize necking down;
Above-mentioned necking down is pushed and is arranged on after unloading on a driven die holder (6) fixedly on die holder (12), fixedly die holder (12) is positioned at the bottleneck of tubing (5), fixedly die holder (12) is fixed on frame (1) above, realizes and at tubing (5) bottleneck, tubing (5) being positioned, by being arranged on the necking down position of the drawing chuck clamping tubing (5) on dynamic model seat (6), carry out drawing, this drawing chuck comprises the core print I (13) being fixed as one with dynamic model seat (6), core print I (13) is outside equipped with dynamic model cover (14), dynamic model cover (14) is fixed on dynamic model seat (6), a pair of card lobe (15) is by symmetrical being arranged in dynamic model cover (14), this card lobe (15) outer wall has tapering, inwall has sharp annular tooth, card lobe (15) forms drawing mould with core print I (13), between card lobe (15) and core print I (13), there is the gap that the tube wall of confession tubing (5) penetrates, card lobe (15) is clamped in the tube wall of tubing (5) in this gap with core print I (13), at dynamic model cover (14) outer wall, be provided with the card lobe clutch (16) of a control card lobe (15) and tubing (5) clutch, after card lobe clutch (16) control card lobe (15) clamps the tube wall of tubing (5) with core print I (13), dynamic model seat (6) with pipe box (7) to moving away from tubing (5) necking down port end, the drawing deformation of realization to tubing (5), makes tubing (5) form reduced pipe blank,
The above-mentioned necking down being fixed on fixing die holder (12) is pushed to head and unloads, at the reducing place of reduced pipe blank by being fixed on sizing die (28) location on fixing die holder (12); Plug (17) is penetrated from the heavy caliber end of reduced pipe blank, one end of plug (17) is fixed on and pushes on baffle plate (3) from the small-caliber end of reduced pipe blank passes, the other end of plug (17) has core print II (29), and core print II (29) is limited on the inwall at tubing (5) reducing place; Change the drawing mould of above-mentioned drawing chuck, by the drawing mould after changing, reduced pipe blank heavy caliber end is clamped, dynamic model seat (6) with pipe box (7) to moving away from reduced pipe blank heavy caliber end, tubing (5) moves with the drawing chuck one being fixed on dynamic model seat (6), small-bore section of internal diameter of tubing (5) be expander under core print II (29) effect of plug (17), small-bore section of external diameter of tubing (5), by the spacing moulding of sizing die (28) being fixed on fixing die holder (12), realized the sizing of small-bore section of reduced pipe blank determined to wall thickness.
2. the breathing drawing shaped device of reduced pipe according to claim 1, it is characterized in that: described card lobe clutch (16) comprises the rotating shaft (18) being arranged on card lobe clutch (16) and penetrates the driving lever in spring (19), this spring (19) is positioned at card lobe clutch (16) outer wall, by adjusting driving lever, stir the clutch of card lobe (15) and tubing (5), when card lobe clutch (16) pushes away to the right, card lobe is just toward moving left, at this moment, piston rod (9) traction pipe box (7) drives dynamic model seat (6) to move right, dynamic model seat (6) drives dynamic model cover (14) to move right, dynamic model cover (14) gives card lobe (15) radial pressures, card lobe (15) is along with dynamic model seat (6) moves right, dynamic model cover (14) inwall blocks the outer wall of card lobe (15) inflexibly, the annular tooth of blocking lobe (15) gets one's teeth into tubing (5), in tubing (5), there is again core print I (13) to head on, tubing (5) is capable, by the pull-up to the right of drawing chuck, carried out drawing deformation.
3. according to the breathing drawing shaped device of reduced pipe described in claim 1 or 2, it is characterized in that: described card lobe clutch (16) top is provided with Long-distance Control bar (21).
4. the breathing drawing shaped device of reduced pipe according to claim 1, it is characterized in that: by set bolt (22), successively through pushing seat (4), pushing baffle plate (3) and clamp (23), will push (4) and push baffle plate (3) and be fixed as one.
5. the breathing drawing shaped device of reduced pipe according to claim 1, is characterized in that: described core print I (13) is fixed as one by bolt (24) and dynamic model seat (6).
6. the breathing drawing shaped device of reduced pipe according to claim 1; it is characterized in that: at the middle part of tubing (5), be provided with the supporting seat (25) that prevents tubing (5) distortion; supporting seat (25) is fixed in frame (1); overcoat (26) is installed on supporting seat (25), protective sleeve (27) is housed in overcoat (26).
CN201210588572.7A 2012-12-31 2012-12-31 Swell-shrink drawing molding process and device for reducing pipes Active CN102974633B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210588572.7A CN102974633B (en) 2012-12-31 2012-12-31 Swell-shrink drawing molding process and device for reducing pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210588572.7A CN102974633B (en) 2012-12-31 2012-12-31 Swell-shrink drawing molding process and device for reducing pipes

Publications (2)

Publication Number Publication Date
CN102974633A CN102974633A (en) 2013-03-20
CN102974633B true CN102974633B (en) 2014-08-20

Family

ID=47849143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210588572.7A Active CN102974633B (en) 2012-12-31 2012-12-31 Swell-shrink drawing molding process and device for reducing pipes

Country Status (1)

Country Link
CN (1) CN102974633B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114505394B (en) * 2022-03-08 2023-12-22 深圳市吉百顺科技有限公司 Production and processing technology of high-precision inner wall reducing pipe
CN118144344B (en) * 2024-05-11 2024-07-30 南京中鸿易工程科技有限公司 Method for preparing isostatic pressing steel lining Polytetrafluoroethylene (PTFE) pipeline

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2134242Y (en) * 1991-08-10 1993-05-26 李晓琳 Hydraulic automatic machine for drawing inequal wall thickness tube
CN1347772A (en) * 2001-02-26 2002-05-08 陈拇丁 Making process of pipe with unequal wall thickness
CN1234480C (en) * 2003-10-20 2006-01-04 广州冠华金属精工制造有限公司 Method and apparatus for manufacturing reducing pipe
US7114362B2 (en) * 2004-03-27 2006-10-03 George A. Mitchell Company Method of making metal workpiece
US7290424B2 (en) * 2004-09-16 2007-11-06 Lone Star Steel Company, L.P. Push bench method for manufacturing small diameter tubing
JP5430159B2 (en) * 2009-01-28 2014-02-26 日新製鋼株式会社 Manufacturing method of different diameter steel pipe
CN101537436A (en) * 2009-04-14 2009-09-23 四川泛华航空仪表电器厂 Method for processing reducer pipe by integral cold drawing molding
CN203030656U (en) * 2012-12-31 2013-07-03 刘选萍 Reducing pipe expansion drawing forming device

Also Published As

Publication number Publication date
CN102974633A (en) 2013-03-20

Similar Documents

Publication Publication Date Title
CN101823096B (en) Semi-sliding hydraulic bulging technology of automobile axle housing part and die thereof
CN200945499Y (en) High-accuracy hydraulic cold pipe-moving machine
CN102371288A (en) Preparation method of high-precision and high-strength titanium alloy seamless tube
CN202045287U (en) Pipe pushing type pipe expanding drawing head-making device
CN101332489B (en) Cold-forging precise forming technique of gear sleeve
CN103331582A (en) Method for preparing metal thin-wall microtubes
CN102019303A (en) Device and method for preparing aluminum alloy drill rod tube body
CN101224475A (en) Spiral flat tube chilling press
CN102974633B (en) Swell-shrink drawing molding process and device for reducing pipes
CN102632093B (en) Steel pipe cold-drawing mould with twice-reducing and twice-shaping functions
KR20070094448A (en) Method and apparatus for plastic working of hollow rack and hollow rack
CN203030656U (en) Reducing pipe expansion drawing forming device
CN204817503U (en) Steel pipe cold drawing device
CN114178452A (en) Seamless steel tube radial forging equipment and forging method thereof
RU2474485C2 (en) Method of combined pipe end upsetting
CN104259331A (en) Production method of phi 512 mm*37 mm high-grade steel coupling blanks
CN104174807A (en) Manufacturing method of large-caliber thick-walled titanium tube block
CN103962403B (en) Heavy caliber pipe squeezes to pull out and subtracts wall method
CN102357627A (en) Method for machining valve spring retainer by continuous cold heading once near net shape forming
CN102240696A (en) Method for preparing copper and copper alloy pipes
CN101712108A (en) Method for manufacturing conical riser of direction column of motorcycle by adopting cold extrusion process
CN102029313A (en) Manufacture method of downward drawing of metal manifold
CN213103822U (en) Cold-drawing forming die for arc-shaped pipe
CN201552220U (en) Deformation-tracking bending die for rectangular thin-wall tube
CN202398639U (en) Mould for drawing pipes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHONGQING XIZHONG SPECIAL ALUMINUM CO., LTD.

Free format text: FORMER OWNER: LIU XUANPING

Effective date: 20141201

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141201

Address after: 401326 Chongqing Jiulongpo Shi Xi Peng Zhen Bao six Kaifong No. 1-4-4

Patentee after: CHONGQING XIZHONG SPECIAL ALUMINUM CO., LTD.

Address before: Jiulongpo TAO town of Wenfeng village 401326 three Chongqing city agency

Patentee before: Liu Xuanping