Nothing Special   »   [go: up one dir, main page]

CN102270261A - Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration - Google Patents

Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration Download PDF

Info

Publication number
CN102270261A
CN102270261A CN2011102271979A CN201110227197A CN102270261A CN 102270261 A CN102270261 A CN 102270261A CN 2011102271979 A CN2011102271979 A CN 2011102271979A CN 201110227197 A CN201110227197 A CN 201110227197A CN 102270261 A CN102270261 A CN 102270261A
Authority
CN
China
Prior art keywords
model
design
transformer station
iec61850
model object
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102271979A
Other languages
Chinese (zh)
Other versions
CN102270261B (en
Inventor
信珂
李如振
黄德斌
唐毅
丁希亮
殷博超
王东伟
黄萍
高秀荣
韩文庆
孙中尉
王雷
周崇泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Electric Power Engineering Consulting Institute Corp Ltd
Original Assignee
JINAN RONGFU TECHNOLOGY Co Ltd
Shandong Electric Power Engineering Consulting Institute Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN RONGFU TECHNOLOGY Co Ltd, Shandong Electric Power Engineering Consulting Institute Corp Ltd filed Critical JINAN RONGFU TECHNOLOGY Co Ltd
Priority to CN201110227197A priority Critical patent/CN102270261B/en
Publication of CN102270261A publication Critical patent/CN102270261A/en
Application granted granted Critical
Publication of CN102270261B publication Critical patent/CN102270261B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a design method for an intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration. According to the method, the design of a secondary loop and the generation of a model file of the intelligent transformer station are synchronously completed; a data object corresponds to the back of each entity, and the model can be operated by a graph, therefore, the consistency of the design of the secondary loop and the model file is ensured, and the problem that the traditional intelligent transformer station is not deep enough is solved; and synchronously the design of the transformer station model can be finished by designers not familiar with 61850 design details, the role and the function of a design organization are strengthened in the establishing of the intelligent transformer station, and the visibility in operation and maintenance of the transformer station is increased; furthermore, the method is combined with the habits of traditional designers and is used for performing graphical loop design based on an AutoCAD platform so that the operation of the designers is convenient; an IEC61970CIM model is used in a primary system to describe the model, therefore, the data supporting other applications can be exported, and the openness of the method is increased.

Description

Based on the incorporate intelligent substation modelling of CAD artwork method
Technical field
The present invention relates to a kind of based on the incorporate intelligent substation modelling of CAD artwork method.
Background technology
The modeling tool aspect of intelligent substation is mainly paid close attention in intelligent substation design at present, is main task with modeling results such as input, the SCD, the ICD that export IEC61850, CID only.These files mainly use for the engineering staff of IED producer, both do not consider to provide comprehensive intelligent substation engineering design result, do not consider design drawing and combining of IEC61850-SCL etc. again.Because designing unit does not have suitable or available design means, engineering design only limits to finish the degree of hardwire design, needed intelligent apparatus functional configuration of engineering construction stage, communicate configuration and relevant design data can not be provided, consequently cause to participate in, to decide through consultation voluntarily the function communicate configuration of logic aspect by a large amount of research and development personnel and constantly revise software code at the scene and debugging repeatedly that in the engineering construction stage of intelligent substation process of construction is very lack of standardization and the cycle is very long at present; Because logical layer function communicate configuration is definition voluntarily between the producer, its standardization and semantic consistance also can not get guaranteeing, have limited the interoperability performance of secondary device greatly, have increased the cost of intelligent substation operation maintenance and reorganization and expansion work.
In sum, the engineering design technology of conventional substation can not satisfy the needs of intelligent substation, and the design system and the solution of intelligent substation are also very immature at present.Publication number is that the patent " based on the graphical intelligent substation modelling method of CAD " of CN101989312A need propose a kind of graphical model method for designing based on CAD at intelligent substation design, this method is described the model of IEC61850 by pel piece attribute, and the pel piece that has an IEC61850 extended attribute by drafting is finished the design of intelligent substation system; Then, generate the XML database of describing the IEC61850 model, from the XML database, derive IEC61850 model description file SCD by pel piece attribute.
Publication number is the subject matter that the patent of CN101989312A exists: because pel piece attribute has bidimensionality, and the IEC61850 model has the multidimensional characteristic, as describe the IEC61850 model of multi-dimensional nature with the pel piece of two-dimensional characteristics, must earlier the IEC61850 model be divided into the pel piece that several have two-dimensional characteristics, and needs are expressed the mutual relationship between these pel pieces, this expression causes the figure line complicated unusually, and being the designer mostly, these complicated lines do not need to be concerned about, therefore cause whole design operation inconvenience, thereby reduced designer's operating efficiency.
Summary of the invention
For remedying the deficiencies in the prior art, the present invention proposes a kind of based on the incorporate intelligent substation modelling of CAD artwork method, this method directly use W3C's " generic resource describing framework RDF " the IEC61850 model is described, set up the mapping relations between pel and the rdf model, pass through graphing, realization is to the synchronous operation in rdf model storehouse, to finish the design of intelligent substation system.Then, generate IEC61850 model description file SCD by the rdf model storehouse.The incorporate realization design of this artwork is to be core with the model, and figure is represented for model in visibleization, so just can guarantee the consistance of figure and model.
For achieving the above object, the present invention adopts following technical scheme:
Based on the incorporate intelligent substation modelling of CAD artwork method, the performing step of this method is as follows:
A. define model RDF Schema: adopt the form identical to describe the IEC61850 model with RDF with IEC61970 CIM, provide the RDF Schema of IEC61850 model, to determine the structure of IEC61850 model object, the structure of described IEC61850 model object comprises model class, the incidence relation between model class attribute and the model class;
B. define primitive types in AutoCAD: by increase attribute in primitive types, the mapping relations of description and rdf model are to set up the one-to-one relationship of primitive types and model class;
C. graphical modeling: draw the example of each primitive types, set up incidence relation between its model object, generate the model object data at full station when finishing the design of whole transformer station by the line between each primitive types example;
D. according to IEC61850-6 to SCL syntax and semantics regulation, generate SCD, CID model file and be used to the form of the logical relation of constructing, debugging according to the model object data at full station.
In the described steps A, among the described step C, the performing step of graphical modeling is as follows:
1) on the AutoCAD drawing, draws the pel of primary equipment correspondence, generate the model object of primary equipment correspondence simultaneously, by drawing the modification that a time main wiring diagram is finished the primary system model object synchronously;
2) import the ICD file and set up corresponding different types of IED model data;
3) draw the IED pel on the AutoCAD drawing, system sets up the synchronized relation of IED model data and IED pel automatically; Draw the annexation between the IED pel simultaneously, obtain network service figure of transformer station and virtual secondary circuit figure, finish the synchronous modification of electrical secondary system model object automatically;
4) finish the design of whole transformer station, generate the model object data at full station simultaneously.
Beneficial effect of the present invention:
1) the present invention is based on the integrated secondary circuit design of finishing intelligent substation synchronously of artwork generates with model file, each pel is corresponding data object behind, by the graphic operation model, guaranteed the consistance of secondary circuit design, solved the not enough problem of current intelligent substation projected depth with model file.
2) finish and reach the designer who does not understand 61850 ins and outs and can finish transformer station model design.The designer need not be concerned about the model file interior details when the design secondary circuit, only need finish the secondary circuit design according to the design of traditional transformer station and can finish the model file generation synchronously.
3) role of designing unit in the intelligent substation building-up work and function have been strengthened: provide secondary communicate by letter integrated ability and the means of getting involved to design department, from the source, the secondary communication process of transformer station is controlled, be beneficial to the standardization and the standardization of the integrated work of transformer station secondary system, also be beneficial to the coordination that mode work is installed, be more conducive to the renewal of enlarging, transformation and the equipment of substation project from now on.
4) increased the visuality that substation operation is safeguarded: the SCD file that integrator provides has comprised the integrated information of total system, but relevant information is not simple and clear, for equipment installation and operation maintainer, the information of Network Transmission is opaque, the Installation and Debugging and the operation maintenance of the equipment of giving have brought great inconvenience, and the empty secondary circuit design of graphical design can be expressed the information transmission between the equipment in traditional secondary circuit mode.
5) in conjunction with traditional design personnel's custom, the graphical loop design of carrying out under based on the AutoCAD platform designer's operation of being more convenient for.
6) because primary system uses IEC61970 CIM model description model, can derive the data of supporting other application, increase the opening of method.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 describes for model Schema definition;
Fig. 3 is that figure metaclass and model class corresponding relation are described.
Embodiment
The invention will be further described below in conjunction with drawings and Examples:
Be realization flow figure of the present invention as shown in Figure 1, comprise following several steps:
1, definition model logical organization Schema: adopt the form identical RDF(Resource Description Framework with IEC61970 CIM, resource description framework) the IEC61850 model is described, provide the RDF Schema of IEC 61850 models, to determine the structure (attribute of model class, model class, the association between the model class) of model object.Model class comprises isolating switch, disconnector, mutual inductor, transformer, intelligent apparatus IED(protective device, measure and control device, merge cells, intelligent terminal etc.), LD(Logical Device; logical device), LN(Logical Node; logic node), DO(Data Object; data object), DA(Data Attribute, data attribute), data set, empty terminal, virtual secondary circuit etc.
2, define primitive types in AutoCAD, set up the one-to-one relationship of primitive types and model class: concrete primitive types comprises primary equipment (isolating switch, disconnector, mutual inductor, transformer etc.), intelligent apparatus IED(protective device, measure and control device, merge cells, intelligent terminal etc.), empty terminal, virtual secondary circuit etc.
3, graphical modeling: by the visual establishment of finishing model object synchronously of the one-to-one relationship of pel and model object.When creating the IED figure, import the ICD file and set up IED and inner model object (comprising LD, LN, DO, DA, data set, empty terminal) thereof.Set up description interoperation relation correlation model object by drawing virtual secondary circuit (line between the empty terminal).
4, generate the SCD file: to SCL syntax and semantics regulation, model object is generated the SCD model file according to IEC61850-6.
5, derive the CID document that is used to dispose intelligent apparatus.
6, derive the form be used to the logical relation of constructing, debugging, comprise IED title and allocation tables, the empty terminal arrangement table of device, the empty terminal arrangement table of function, device multicast address allocation table etc. at interval.
With transformer station of complete design is that the example explanation the present invention is based on the integrated method of finishing the intelligent substation modelling of CAD artwork.
Concrete implementation step is as follows:
A. at first define the model class that meets the IEC61850 standard, and defined model class is loaded in the AutoCAD platform;
B. define primitive types in AutoCAD: by increase attribute in primitive types, the mapping relations of description and rdf model are to set up the one-to-one relationship of primitive types and model class;
C. start the AutoCAD platform, on the AutoCAD drawing, finish the instantiation of the corresponding model class of primary equipment in the pel of drafting primary equipment correspondence, promptly generate the model object of primary equipment correspondence; Finish the modeling of primary system model object synchronously by drawing a main wiring diagram.
D. import the ICD file and finish the modeling of IED model class and internal model class (LD, LN, DO, DA, data set, empty terminal etc.) thereof, generation model object.
E. on the AutoCAD drawing, draw the modeling that network service figure of transformer station and virtual secondary circuit figure etc. finish the electrical secondary system model object:
1) from the model object to the pel.The model object of IED and internal model class thereof is to generate corresponding pel from object, and based on the model object that generates among the step D, pel one to one draws in drawing.
2) from the pel to the model object.Virtual secondary circuit is generating corresponding virtual secondary circuit model object to liking based on draw virtual secondary circuit connecting line in drawing.
F. the data that write down in the model object are generated the SCD model file.
G. derive the CID file that is used to dispose intelligent apparatus.
H. derive the form be used to the logical relation of constructing, debugging, comprise IED title and allocation tables, the empty terminal arrangement table of device, the empty terminal arrangement table of function, device multicast address allocation table etc. at interval.
Though above-mentionedly in conjunction with the accompanying drawings the specific embodiment of the present invention is described; but be not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection scope of the present invention.
  

Claims (2)

1. based on the incorporate intelligent substation modelling of CAD artwork method, it is characterized in that the performing step of this method is as follows:
A. define model RDF Schema: adopt the form identical to describe the IEC61850 model with RDF with IEC61970 CIM, provide the RDF Schema of IEC61850 model, to determine the structure of IEC61850 model object, the structure of described IEC61850 model object comprises: the incidence relation between model class, model class attribute and the model class;
B. define primitive types in AutoCAD: by increase attribute in primitive types, the mapping relations of description and rdf model are to set up the one-to-one relationship of primitive types and model class;
C. graphical modeling: draw the example of each primitive types, set up incidence relation between its model object, generate the model object data at full station when finishing the design of whole transformer station by the line between each primitive types example;
D. according to IEC61850-6 to SCL syntax and semantics regulation, generate SCD, CID model file and be used to the form of the logical relation of constructing, debugging according to the model object data at full station.
2. as claimed in claim 1ly it is characterized in that based on the incorporate intelligent substation modelling of CAD artwork method among the described step C, the performing step of graphical modeling is as follows:
1) on the AutoCAD drawing, draws the pel of primary equipment correspondence, generate the model object of primary equipment correspondence simultaneously, by drawing the modification that a time main wiring diagram is finished the primary system model object synchronously;
2) import the ICD file and set up corresponding different types of IED model data;
3) draw the IED pel on the AutoCAD drawing, system sets up the synchronized relation of IED model data and IED pel automatically; Draw the annexation between the IED pel simultaneously, obtain network service figure of transformer station and virtual secondary circuit figure, finish the synchronous modification of electrical secondary system model object automatically;
4) finish the design of whole transformer station, generate the model object data at full station simultaneously.
CN201110227197A 2011-08-09 2011-08-09 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration Active CN102270261B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110227197A CN102270261B (en) 2011-08-09 2011-08-09 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110227197A CN102270261B (en) 2011-08-09 2011-08-09 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration

Publications (2)

Publication Number Publication Date
CN102270261A true CN102270261A (en) 2011-12-07
CN102270261B CN102270261B (en) 2012-10-03

Family

ID=45052565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110227197A Active CN102270261B (en) 2011-08-09 2011-08-09 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration

Country Status (1)

Country Link
CN (1) CN102270261B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567021A (en) * 2011-12-27 2012-07-11 浙江省电力公司 Information operating maintenance management method
CN102622463A (en) * 2012-01-05 2012-08-01 山东电力工程咨询院有限公司 Drawing-model uniformity based method for automatic check of design drawings
CN102968536A (en) * 2012-11-30 2013-03-13 绍兴电力局 Secondary circuit model automatic generating method for early warning application
CN102982702A (en) * 2012-11-30 2013-03-20 江苏省电力公司洪泽县供电公司 Visual regulation-control simulation training and accident rehearsal interaction module
CN103077445A (en) * 2013-01-14 2013-05-01 山东电力集团公司 SCD (Substation Configuration Description) iteration control-based integration method of intelligent substation secondary system
CN103543509A (en) * 2013-10-12 2014-01-29 广东电网公司电力科学研究院 Method and system for laying optical cables in intelligent transformer substation
CN104699886A (en) * 2013-12-10 2015-06-10 达索系统公司 Laser scan re-engineering of 3D CAD models
CN108599103A (en) * 2018-04-13 2018-09-28 南京南瑞继保电气有限公司 A kind of tranformer protection visual configuration method
CN108595727A (en) * 2018-01-04 2018-09-28 青岛特锐德电气股份有限公司 Design method, device and the realization device that case becomes
CN110414761A (en) * 2018-04-28 2019-11-05 广东电网有限责任公司 A kind of low pressure CAD diagram shelves management and data quality monitoring system
CN110766567A (en) * 2019-10-28 2020-02-07 国网新疆电力有限公司经济技术研究院 Intelligent substation secondary object primitive library design method
CN111428322A (en) * 2020-04-07 2020-07-17 国电南瑞科技股份有限公司 Transformer substation main wiring diagram interoperation method and system based on expansion

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002259462A (en) * 2001-03-06 2002-09-13 Ncn:Kk Device and method for displaying strength of building construction
CN101354702A (en) * 2008-05-05 2009-01-28 国网南京自动化研究院 Interactive implementing method of electrical power system pattern based on IEC61970 standard
CN101706773A (en) * 2009-11-19 2010-05-12 北京四方继保自动化股份有限公司 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination
CN101989312A (en) * 2010-11-18 2011-03-23 江苏省电力设计院 Graphical intelligent transformer substation model design method based on computer-aided design (CAD)

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002259462A (en) * 2001-03-06 2002-09-13 Ncn:Kk Device and method for displaying strength of building construction
CN101354702A (en) * 2008-05-05 2009-01-28 国网南京自动化研究院 Interactive implementing method of electrical power system pattern based on IEC61970 standard
CN101706773A (en) * 2009-11-19 2010-05-12 北京四方继保自动化股份有限公司 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination
CN101989312A (en) * 2010-11-18 2011-03-23 江苏省电力设计院 Graphical intelligent transformer substation model design method based on computer-aided design (CAD)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《云南电力技术》 20080630 唐啟民 CAD三维制图在变电站设计的应用 第42,51页 1-2 第36卷, *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567021B (en) * 2011-12-27 2016-05-11 浙江省电力公司 Information operating maintenance management method
CN102567021A (en) * 2011-12-27 2012-07-11 浙江省电力公司 Information operating maintenance management method
CN102622463A (en) * 2012-01-05 2012-08-01 山东电力工程咨询院有限公司 Drawing-model uniformity based method for automatic check of design drawings
CN102968536B (en) * 2012-11-30 2015-06-17 绍兴电力局 Secondary circuit model automatic generating method for early warning application
CN102968536A (en) * 2012-11-30 2013-03-13 绍兴电力局 Secondary circuit model automatic generating method for early warning application
CN102982702A (en) * 2012-11-30 2013-03-20 江苏省电力公司洪泽县供电公司 Visual regulation-control simulation training and accident rehearsal interaction module
CN103077445A (en) * 2013-01-14 2013-05-01 山东电力集团公司 SCD (Substation Configuration Description) iteration control-based integration method of intelligent substation secondary system
CN103543509B (en) * 2013-10-12 2015-12-23 广东电网公司电力科学研究院 The method and system of laying optical cable in intelligent substation
CN103543509A (en) * 2013-10-12 2014-01-29 广东电网公司电力科学研究院 Method and system for laying optical cables in intelligent transformer substation
CN104699886A (en) * 2013-12-10 2015-06-10 达索系统公司 Laser scan re-engineering of 3D CAD models
CN108595727A (en) * 2018-01-04 2018-09-28 青岛特锐德电气股份有限公司 Design method, device and the realization device that case becomes
CN108599103A (en) * 2018-04-13 2018-09-28 南京南瑞继保电气有限公司 A kind of tranformer protection visual configuration method
CN110414761A (en) * 2018-04-28 2019-11-05 广东电网有限责任公司 A kind of low pressure CAD diagram shelves management and data quality monitoring system
CN110766567A (en) * 2019-10-28 2020-02-07 国网新疆电力有限公司经济技术研究院 Intelligent substation secondary object primitive library design method
CN111428322A (en) * 2020-04-07 2020-07-17 国电南瑞科技股份有限公司 Transformer substation main wiring diagram interoperation method and system based on expansion
CN111428322B (en) * 2020-04-07 2022-09-30 国电南瑞科技股份有限公司 Transformer substation main wiring diagram interoperation method and system based on expansion

Also Published As

Publication number Publication date
CN102270261B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102270261B (en) Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN105095600B (en) A kind of intelligent substation and regulation and control center cooperative modeling method
CN101989312B (en) Graphical intelligent transformer substation model design method based on computer-aided design (CAD)
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN102508989B (en) Dynamic power grid panorama display system on basis of virtual reality
CN102779156B (en) Configuration method for database of communication device in digital substation
CN102411649B (en) Method for interchanging designs by using general model of intelligent device
CN103455554B (en) A kind of intelligent power distribution network model base system
CN104133953A (en) Secondary design system of intelligent substation
CN102184280A (en) Drawing and model integrated visual integration design method
CN102832703A (en) Transformer substation based on model converter and quick scheduling master station converting method
CN102209108A (en) Method and system for realizing seamless communication between master scheduling station and substation of power grid
CN102693129A (en) Model transformation method of IEC61850 to IEC61970 and apparatus thereof
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
CN111368363A (en) Lightweight display method based on 3DTiles power transmission and transformation GIM model
CN109783886A (en) Emerging system and method for GIM model and IFC model
CN101964542A (en) Method for accessing IEC61970 dispatching EMS system to IEC61850 digital transformer substation
CN107515741A (en) The lightweight transmission method and device of data between a kind of transformer station and main website
CN103150623A (en) Cloud manufacture capacity service modeling method based on meta-model
CN106452887A (en) Electric power communication system visual display system based on diagram-model-data integration
CN102262703B (en) Method for constructing figure and RDF (Radio Direction Finder) model for designing intelligent transformer substation
WO2019056564A1 (en) Power distribution network fault repair system data sharing method for information exchange bus based on iec 61968 standards
CN113407172B (en) Distribution cloud master station-based automatic platform area graph display system and method
Liu et al. Research on key technology of 3D digitization for secondary system of power grid based on model application analysis
Yang et al. Research on the application of BIM-based green construction management in the whole life cycle of hydraulic engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151211

Address after: 250014 Shandong Province, Lixia District of Ji'nan city Min Zi Qian Road No. 106

Patentee after: Shandong Electric Power Engineering Consulting Institute Co., Ltd.

Patentee after: SHANDONG ROOF NEW INFORMATION TECHNOLOGY CO., LTD.

Address before: 250014 Shandong Province, Lixia District of Ji'nan city Min Zi Qian Road No. 106

Patentee before: Shandong Electric Power Engineering Consulting Institute Co., Ltd.

Patentee before: Jinan Rongfu Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190626

Address after: 250014 No. 106 Minziqian Road, Lixia District, Jinan City, Shandong Province

Patentee after: Shandong Electric Power Engineering Consulting Institute Co., Ltd.

Address before: 250014 No. 106 Minziqian Road, Lixia District, Jinan City, Shandong Province

Co-patentee before: SHANDONG ROOF NEW INFORMATION TECHNOLOGY CO., LTD.

Patentee before: Shandong Electric Power Engineering Consulting Institute Co., Ltd.