Nothing Special   »   [go: up one dir, main page]

CN101892738A - Embedded scaffold connecting tube and construction method thereof - Google Patents

Embedded scaffold connecting tube and construction method thereof Download PDF

Info

Publication number
CN101892738A
CN101892738A CN 201010258505 CN201010258505A CN101892738A CN 101892738 A CN101892738 A CN 101892738A CN 201010258505 CN201010258505 CN 201010258505 CN 201010258505 A CN201010258505 A CN 201010258505A CN 101892738 A CN101892738 A CN 101892738A
Authority
CN
China
Prior art keywords
wall
bar
sleeve
embedded
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010258505
Other languages
Chinese (zh)
Other versions
CN101892738B (en
Inventor
谢良波
周全顺
闫建薇
谢孟霖
马素瑞
张心忠
张国栋
张明礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGTAI CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHONGTAI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGTAI CONSTRUCTION GROUP CO Ltd filed Critical ZHONGTAI CONSTRUCTION GROUP CO Ltd
Priority to CN 201010258505 priority Critical patent/CN101892738B/en
Publication of CN101892738A publication Critical patent/CN101892738A/en
Application granted granted Critical
Publication of CN101892738B publication Critical patent/CN101892738B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a connecting piece used in building construction, in particular to a connecting tube for connecting and fixing an external wall scaffold and a wall in building construction, which comprises an embedded steel bar, a sleeve, a pulling rod, a gasket, a nut and a connecting rod, wherein one end of the embedded steel bar extends out from the wall, the part, extending out from the wall, has straight threads; the two ends of the pulling rod have straight threads; the sleeve has internal straight threads; the end, extending out from the wall, of the embedded steel bar and one end of the pulling rod are inserted into the sleeve to be fastened; the pulling rod is inserted into the connecting rod; and the other end of the pulling rod is provided with the gasket, and the connecting rod through which the pulling rod passes is fastened by the nut and the pulling rod. In the novel scaffold connecting tube, the sleeve and the embedded steel bar are tightly connected by screw threads and are easy to detach, so risks of overhead work for building a scaffold welded connecting tube on site, the construction speed is improved, the civil construction level is improved and safety is ensured; the thermal-insulation layer of the external wall is guaranteed; and the arrangement of scaffold holes is avoided, and the maintenance problem that the external wall scaffold holes leak after completion and commissioning is solved radically.

Description

A kind of embedded scaffold connecting tube and job practices thereof
Technical field
The present invention relates to the connector that uses in a kind of building operations, particularly, relate to the wall-connecting piece that exterior wall scaffold and body of wall are connected and fixed in a kind of building operations, in order to guarantee the stable of external scaffolding and to facilitate for the back construction working.
Background technology
Along with development of times, builing industry is advanced by leaps and bounds, and people are in order to save the area, and highrise building is more and more, and shear wall structure is widely used in the builing industry design, and is more and more higher to low-carbon energy-saving, environmental protection that builing industry requires.In recent years in the concrete structure of the construction building, its insulation layer and reinforced concrete structure layer are built simultaneously and are constructed, and this has brought inconvenience for the setting of scaffold connecting spare, and this just needs new technology and new technology to solve.
Summary of the invention
The purpose of this invention is to provide a kind of new type scaffold wall-connecting piece, the new type scaffold wall-connecting piece is simple, convenient, and the joint worker saves time, and construction quality is good.
For achieving the above object, the present invention by the following technical solutions:
Embedded scaffold connecting tube, comprise embedded bar, sleeve, pull bar, wall connecting rod, pad, nut, embedded bar one end stretches out body of wall, and stretch out wall part band straight thread, pull bar two ends band straight thread, sleeve has interior straight thread, and the end that embedded bar stretches out body of wall end and pull bar is fit in the sleeve to be tightened; Drag link sleeve is in wall connecting rod; At the pull bar other end pad is installed, tightens the wall connecting rod that passes with nut and pull bar;
Preferably, embedded bar adopts round steel or the indented bars of diameter 25mm; When concrete is C30, adopt the pre-buried round steel anchorage length of diameter 25mm to be not less than 25 times of bar diameters, adopt its anchorage length of indented bars of diameter 25mm to be not less than 30 times of bar diameters;
Preferably, pad is processed into diameter 100mm plectane with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter;
Preferably, embedded bar is imbedded a concrete end and is had quarter bend;
Preferably, pull bar adopts reinforcing bar, and pull bar is than the long 100mm of wall connecting rod;
Preferably, sleeve one end shutoff plastic cap;
Preferably, pull bar brush oil when making adds protection plastic sheath (18 in the schematic diagram) and packages;
The job practices of embedded scaffold connecting tube may further comprise the steps:
(1), the preparation before the construction: an end of embedded bar is packaged the straight thread silk and installs sleeve, and processing simultaneously is crooked good, sleeve one end shutoff plastic cap; Adopt the reinforcement fabrication pull bar, the pull bar two ends are packaged the straight thread silk, brush oil adds the protection plastic sheath and packages; The preparation pad is just brought and can be installed and used during with installation.
(2), the construction of built-in fitting: behind building structure main body construction colligation body of wall reinforcing bar, external wall insulation is installed; Carry out the reinforcement installation of pre-buried cover straight thread band sleeve on the body of wall, one of the band sleeve is inserted in the heat-insulation plate for external; Per step support body wall connecting rod should be consistent with the embedded bar absolute altitude, uses the level gauge levelling when pre-buried, guarantees that embedded bar 1 is on same horizontal plane; Install the installation great wall template, position according to its embedded bar, on the side fascia of shear wall large template, beat the eye of φ 6mm with electric drill, tighten with self-tapping screw and sleeve shutoff plastic cap then, the reinforcing bar spot welding of embedded bar other end and wall or plate firmly comes to determine the accuracy of the position of pre-wall-connecting piece; After reinforcing finishes, carry out the walls concrete pouring, remove wall form.
(3), the installation of wall connecting rod: the plastic cap that stops up in the pre-buried sleeve is removed, pull bar and sleeve are installed are tightened, again the scaffold connecting rod tube is entangled band silk reinforcing bar, pad is installed, tighten with screw shell at last, buckle with cross buckle and support body vertical rod or horizontal leger at last and link into an integrated entity.
Preferably, the preparation method of pad is: be processed into the plectane of diameter 100mm with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter.
Preferably, embedded bar adopts round steel or the indented bars of diameter 25mm, when concrete is C30, adopt its anchorage length of round steel of diameter 25mm to be not less than 25d, adopt its anchorage length of screw-thread steel of diameter 25mm to be not less than 30d, wherein, d is the embedded bar diameter.
The present invention adopts straight thread to be different from the past, and the benefit of regular screw threads is: the screw thread line of straight thread is thick, and the regular screw threads line is thin; The screw thread of straight screw sleeve long (about its cover tube length 60mm), the length that is screwed into is all wrapped up by silk, plain nut screw thread short (about its nut thickness 20mm), the length that is screwed into can not all be wrapped up by silk; It is little influenced by vibration force after straight thread and mantle fiber reinforcing bar are tightened, and is difficult for becoming flexible, and influenced greatly by vibration force after regular screw threads and mantle fiber reinforcing bar are tightened, loosening easily; The straight thread material is good, and the tensile strength height is not easy-to-draw bad, and the regular screw threads material is inferior, and tensile strength is low, draws bad easily.
New type scaffold wall-connecting piece of the present invention has the following advantages: this external scaffolding wall-connecting piece takes the reinforcing bar offal of pre-buried band screw thread to be connected with the sleeve steel bar rod interior with penetrating short steel pipes, the splicing position adopt sleeve, nut and embedded bar with screw thread closely be connected simply firm, be easy to dismounting, constructing for scaffold connecting spare provides new construction technology; Avoided the scene to set up scaffold welding wall-connecting piece and exceeded operating risk, all the node employing is hinged, has accelerated construction speed, has improved the civilized construction level, has guaranteed safety; Ensured that insulating layer of external wall is not damaged; Do not need to carry out the setting of scaffold eye, having stopped is completed pays the maintenance difficult problem of the outer foundation trick seepage in back.
Description of drawings
Fig. 1 is the scheme of installation of embedded scaffold connecting tube;
Fig. 2 is that embedded scaffold connecting tube is at floor place scheme of installation;
Fig. 3 is that embedded scaffold connecting tube is at shear wall place scheme of installation;
Fig. 4 is that scaffold connecting spare facade is arranged schematic diagram;
Fig. 5 is an embedded bar localization method schematic diagram in the construction;
Fig. 6 is the pull bar schematic diagram of band plastic protective sleeve pipe;
Among the figure: 1, embedded bar; 2, sleeve; 3, pull bar; 4, pad; 5, nut; 6, wall connecting rod; 7, leger; 8, vertical rod; 9, little cross bar; 10, concrete floor; 11, concrete shear force wall; 12, external wall insulation; 13, cross buckle; 14, bridging; 15 sleeve shutoff plastic caps; 16, self-tapping screw; 17, large form; 18, protection plastic sheath.
The specific embodiment
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
The new type scaffold wall-connecting piece comprises embedded bar 1, sleeve 2, pull bar 3, pad 4, nut 5, wall connecting rod 6, embedded bar 1 one ends stretch out body of wall, and stretch out wall part band straight thread, pull bar 3 two ends band straight threads, sleeve 2 has interior straight thread, and the end that embedded bar 1 stretches out body of wall end and pull bar 3 is fit in the sleeve 2 to be tightened; Pull bar 3 is enclosed within the wall connecting rod 6; At the pull bar other end pad 4 is installed, tightens the wall connecting rod 6 that passes with nut 5 and pull bar 3.Wall connecting rod 6 is tightened with leger 7 or vertical rod 8 usefulness cross buckles 13 and is buckled during construction, thereby constitute one with pull bar and sleeve stressed structural system, embedded bar 1 adopts the plum blossom shape to arrange, as shown in Figure 4, this has just guaranteed the evenly stressed of stress system, provides assurance for external scaffolding stability better.Embedded bar adopts round steel or the indented bars of diameter 25mm, and when concrete was C30, adopting its anchorage length of round steel of diameter 25mm was 25 times of bar diameters, and adopting its anchorage length of screw-thread steel of diameter 25mm is 30 times of bar diameters.Pad is processed into diameter 100mm plectane with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter; Embedded bar is imbedded a concrete end and is had quarter bend; Pull bar adopts reinforcing bar, and pull bar is than the long 100mm of wall connecting rod; Sleeve 2 one end shutoff plastic caps 15; Pull bar brush oil when making adds protection plastic sheath 14 and packages.
The job practices of embedded scaffold connecting tube of the present invention is as follows:
(1), the preparation before the construction: before support body is set up use, embedded bar 1 is round steel or the indented bars of diameter 25mm, when concrete is C30, adopt its anchorage length of round steel of diameter 25mm to be not less than 25d, adopt its anchorage length of screw-thread steel of diameter 25mm to be not less than 30d, wherein, d is the embedded bar diameter; One end of embedded bar 1 is packaged the straight thread silk and installs sleeve, and processing simultaneously is crooked good, sleeve one end shutoff plastic cap 15; Adopt the reinforcement fabrication pull bar, the pull bar two ends are packaged the straight thread silk, brush oil adds protection plastic sheath 18 and packages; Be processed into the plectane of diameter 100mm with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter, make pad 4, just bring and can install and use when installing;
(2), the construction of built-in fitting: behind building structure main body construction colligation body of wall reinforcing bar, external wall insulation 12 is installed; Carry out the reinforcing bar 1 of pre-buried cover straight thread band sleeve on the body of wall and install, one of band sleeve 2 is inserted in the heat-insulation plate for external 12; Per step support body wall connecting rod 6 should be answered consistent with embedded bar 1 absolute altitude, uses the level gauge levelling when pre-buried, guarantees that embedded bar 1 is on same horizontal plane; Install great wall template 17 is installed, position according to its embedded bar, on the side fascia of shear wall large template 17, beat the eye of φ 6mm with electric drill, tighten with self-tapping screw 16 and sleeve shutoff plastic cap 15 then, the reinforcing bar spot welding of embedded bar other end and wall or plate is firm, should guarantee the accuracy of the position of embedded bar during spot welding; After reinforcing finishes, carry out the walls concrete pouring, after waiting to reach the intensity of form removal requirement, remove wall form.
(3), the installation of wall connecting rod: the plastic cap that stops up in the pre-buried sleeve 2 is gone with screwdriver is stubborn, pull bar 3 is installed to be tightened with sleeve 2, again scaffold connecting rod tube 6 is entangled band silk reinforcing bar 3, pad 4 is installed, tighten with nut 5 then, buckle with support body vertical rod 8 or horizontal leger 7 with cross buckle 13 at last and link into an integrated entity.

Claims (10)

1. embedded scaffold connecting tube, comprise embedded bar, sleeve, pull bar, wall connecting rod, pad, nut, it is characterized in that: embedded bar one end stretches out body of wall, and stretch out wall part band straight thread, pull bar two ends band straight thread, sleeve has interior straight thread, and the end that embedded bar stretches out body of wall end and pull bar is fit in the sleeve to be tightened; Drag link sleeve is in wall connecting rod; At the pull bar other end pad is installed, tightens the wall connecting rod that passes with nut and pull bar.
2. embedded scaffold connecting tube according to claim 1 is characterized in that: embedded bar adopts round steel or the indented bars of diameter 25mm; When concrete is C30, adopt the round steel of diameter 25mm, its anchorage length is not less than 25 times of bar diameters, adopts its anchorage length of screw-thread steel of diameter 25mm to be not less than 30 times of bar diameters.
3. according to the described embedded scaffold connecting tube of claim 1-2, it is characterized in that: pad is processed into diameter 100mm plectane with the 6mm steel plate, and at the center according to the perforate of pull bar diameter.
4. according to the described embedded scaffold connecting tube of claim 1-3, it is characterized in that: embedded bar is imbedded a concrete end and is had quarter bend.
5. according to the described embedded scaffold connecting tube of claim 1-4, it is characterized in that: pull bar adopts reinforcing bar, and pull bar is than the long 100mm of wall connecting rod, and opens straight thread 70mm respectively at two ends.
6. according to the described embedded scaffold connecting tube of claim 1-5, it is characterized in that: sleeve one end shutoff plastic cap.
7. according to the described embedded scaffold connecting tube of claim 1-6, it is characterized in that: pull bar brush oil when making adds the protection plastic sheath and packages.
8. according to the job practices of the described embedded scaffold connecting tube of claim 1-7, it is characterized in that may further comprise the steps:
(1), the preparation before the construction: an end of embedded bar is packaged the straight thread silk and installs sleeve, and processing simultaneously is crooked good, sleeve one end shutoff plastic cap; Adopt the reinforcement fabrication pull bar, the pull bar two ends are packaged the straight thread silk, brush oil adds the protection plastic sheath and packages; The preparation pad is just brought and can be installed and used during with installation;
(2), the construction of built-in fitting: behind building structure main body construction colligation body of wall reinforcing bar, external wall insulation is installed; Carry out the reinforcement installation of pre-buried cover straight thread band sleeve on the body of wall, an end of band sleeve inserts in the heat-insulation plate for external; Per step support body wall connecting rod should be consistent with the embedded bar absolute altitude, uses the level gauge levelling when pre-buried, guarantees that embedded bar is on same horizontal plane; Install the installation great wall template, position according to its embedded bar, on the side fascia of shear wall large template, beat the eye of φ 6mm with electric drill, tighten with self-tapping screw and sleeve shutoff plastic cap then, the reinforcing bar spot welding of the embedded bar other end and wall or plate firmly comes to determine the accuracy of the position of pre-wall-connecting piece; After reinforcing finishes, carry out the walls concrete pouring, when treating that concrete strength reaches requirement, remove wall form.
(3), the installation of wall connecting rod: the plastic cap that stops up in the pre-buried sleeve is removed, pull bar and sleeve are installed are tightened, again the scaffold connecting rod tube is entangled pull bar, pad is installed, tighten with screw shell at last, buckle with cross buckle and support body vertical rod or horizontal leger at last and link into an integrated entity.
9. the job practices of embedded scaffold connecting tube according to claim 8, it is characterized in that: the preparation method of pad is: be processed into the plectane of diameter 100mm with the 6mm steel plate, and at the center according to the perforate of pull bar diameter.
10. the job practices of described embedded scaffold connecting tube according to Claim 8-9, it is characterized in that: embedded bar adopts round steel or the indented bars of diameter 25mm, when concrete is C30, adopt its anchorage length of round steel of diameter 25mm to be not less than 25d, adopt its anchorage length of screw-thread steel of diameter 25mm to be not less than 30d, wherein, d is the embedded bar diameter.
CN 201010258505 2010-08-20 2010-08-20 Embedded scaffold connecting tube and construction method thereof Expired - Fee Related CN101892738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010258505 CN101892738B (en) 2010-08-20 2010-08-20 Embedded scaffold connecting tube and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010258505 CN101892738B (en) 2010-08-20 2010-08-20 Embedded scaffold connecting tube and construction method thereof

Publications (2)

Publication Number Publication Date
CN101892738A true CN101892738A (en) 2010-11-24
CN101892738B CN101892738B (en) 2011-12-07

Family

ID=43102071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010258505 Expired - Fee Related CN101892738B (en) 2010-08-20 2010-08-20 Embedded scaffold connecting tube and construction method thereof

Country Status (1)

Country Link
CN (1) CN101892738B (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182300A (en) * 2011-03-28 2011-09-14 刘群 Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame
CN102182310A (en) * 2011-03-28 2011-09-14 刘群 Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame
CN102182311A (en) * 2011-03-28 2011-09-14 刘群 Method for increasing wall connecting piece and improving and determining bearing capacity of support frame
CN102383601A (en) * 2011-08-24 2012-03-21 中国葛洲坝集团股份有限公司 Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN102677881A (en) * 2012-06-07 2012-09-19 刘群 Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame
CN102704667A (en) * 2012-06-08 2012-10-03 四汇建设集团有限公司 Scaffold pre-buried assembled connecting wall device
CN103015735A (en) * 2012-12-16 2013-04-03 中建六局土木工程有限公司 Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN103046731A (en) * 2013-01-18 2013-04-17 中城建第六工程局集团有限公司 Attaching method for outer wall scaffold and attaching bracing part used in method
CN103174218A (en) * 2013-01-16 2013-06-26 北京工业大学 Extensible double-layer cylindrical surface latticed shell structure
CN103184767A (en) * 2013-01-22 2013-07-03 北京工业大学 Detachable and integrated cylindrical shell structure
CN104675101A (en) * 2015-02-11 2015-06-03 浙江省二建建设集团有限公司 Wall-linking element of scaffold and construction method of wall-linking element
CN104895279A (en) * 2015-06-26 2015-09-09 长沙远大住宅工业集团有限公司 Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN104912231A (en) * 2015-06-26 2015-09-16 长沙远大住宅工业集团有限公司 Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN105654995A (en) * 2014-12-04 2016-06-08 中国核工业二四建设有限公司 Nuclear power plant curved-surface high-precision pre-embedded sleeve fixing device
CN106013762A (en) * 2016-07-07 2016-10-12 广西桂林地建建设有限公司 Scaffold wall connecting element and construction method using wall connecting element
CN106121063A (en) * 2016-06-30 2016-11-16 吉林科龙建筑节能科技股份有限公司 A kind of construction method for the outside clad of building and construction system
CN106337556A (en) * 2015-07-10 2017-01-18 华北冶建工程建设有限公司 Construction method for wall connecting element assembly
CN106437149A (en) * 2015-08-10 2017-02-22 广西建工集团第四建筑工程有限责任公司 Simple claw type wall connecting part
CN107268977A (en) * 2017-07-31 2017-10-20 中国冶集团有限公司 Circular high pier stud constructor row cat ladder assembled sustaining wall fixing device and construction method
CN107268976A (en) * 2017-07-31 2017-10-20 中国冶集团有限公司 Towering structure constructor row safety climbing ladder assembled sustaining wall fixing device and construction method
CN108396955A (en) * 2018-04-17 2018-08-14 江苏九如建设有限公司 Tool-type wall-connecting piece and its construction technology
CN108868106A (en) * 2018-07-05 2018-11-23 上海建工七建集团有限公司 Prefabrication construction external scaffolding connects wall mechanism and construction method
CN109296204A (en) * 2018-11-13 2019-02-01 中国二十冶集团有限公司 Shear wall steel structural embedded parts exempt to pick chisel construction method
CN110821142A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Prefabricated structure outer frame drawknot structure and construction method
CN110886482A (en) * 2019-10-23 2020-03-17 上海建工四建集团有限公司 Scaffold pulling-connecting device and method
CN111119495A (en) * 2020-01-20 2020-05-08 中铁十二局集团建筑安装工程有限公司 PCF plate construction method for fabricated building
CN111411768A (en) * 2020-04-30 2020-07-14 中国建筑第四工程局有限公司 Pre-buried formula climbs a support fixed knot and constructs
CN111636674A (en) * 2020-07-02 2020-09-08 中建四局第五建筑工程有限公司 Building concrete outer wall scaffold wall connecting piece and construction method thereof
CN114737744A (en) * 2022-03-18 2022-07-12 五冶集团上海有限公司 Novel wall connecting piece setting method
CN114892952A (en) * 2022-05-24 2022-08-12 北京城建五建设集团有限公司 Wall connecting structure of wall connecting rod for avoiding heat insulation layer

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2646282Y (en) * 2003-09-06 2004-10-06 江苏金土木建设集团有限公司第七分公司 Wall connecting member of scaffold
JP2005002747A (en) * 2003-06-16 2005-01-06 Nice Corp External heat insulation wall construction
JP2007056594A (en) * 2005-08-25 2007-03-08 Daiwa House Ind Co Ltd External wall structure and its construction method
JP2007126829A (en) * 2005-11-01 2007-05-24 Takashi Hashiguchi Scaffold support tool
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN101275432A (en) * 2008-05-23 2008-10-01 北京城建建设工程有限公司 Construction method for building postposition pre-buried wall connecting parts
CN101368442A (en) * 2008-04-30 2009-02-18 中建七局第二建筑有限公司 Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold
CN201254830Y (en) * 2008-09-22 2009-06-10 崔恒均 Convenient wall joint
CN201339313Y (en) * 2008-12-31 2009-11-04 内蒙古巨华集团大华建筑安装有限公司 Scaffold wall connecting piece

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002747A (en) * 2003-06-16 2005-01-06 Nice Corp External heat insulation wall construction
CN2646282Y (en) * 2003-09-06 2004-10-06 江苏金土木建设集团有限公司第七分公司 Wall connecting member of scaffold
JP2007056594A (en) * 2005-08-25 2007-03-08 Daiwa House Ind Co Ltd External wall structure and its construction method
JP2007126829A (en) * 2005-11-01 2007-05-24 Takashi Hashiguchi Scaffold support tool
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN101368442A (en) * 2008-04-30 2009-02-18 中建七局第二建筑有限公司 Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold
CN101275432A (en) * 2008-05-23 2008-10-01 北京城建建设工程有限公司 Construction method for building postposition pre-buried wall connecting parts
CN201254830Y (en) * 2008-09-22 2009-06-10 崔恒均 Convenient wall joint
CN201339313Y (en) * 2008-12-31 2009-11-04 内蒙古巨华集团大华建筑安装有限公司 Scaffold wall connecting piece

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182310A (en) * 2011-03-28 2011-09-14 刘群 Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame
CN102182311A (en) * 2011-03-28 2011-09-14 刘群 Method for increasing wall connecting piece and improving and determining bearing capacity of support frame
CN102182310B (en) * 2011-03-28 2012-07-18 浙江大华建设集团有限公司 Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame
CN102182311B (en) * 2011-03-28 2012-07-18 中太建设集团股份有限公司 Method for increasing wall connecting piece and improving and determining bearing capacity of support frame
CN102182300A (en) * 2011-03-28 2011-09-14 刘群 Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame
CN102383601B (en) * 2011-08-24 2013-12-04 中国葛洲坝集团股份有限公司 Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN102383601A (en) * 2011-08-24 2012-03-21 中国葛洲坝集团股份有限公司 Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN102677881A (en) * 2012-06-07 2012-09-19 刘群 Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame
CN102704667A (en) * 2012-06-08 2012-10-03 四汇建设集团有限公司 Scaffold pre-buried assembled connecting wall device
CN103015735A (en) * 2012-12-16 2013-04-03 中建六局土木工程有限公司 Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN103174218A (en) * 2013-01-16 2013-06-26 北京工业大学 Extensible double-layer cylindrical surface latticed shell structure
CN103174218B (en) * 2013-01-16 2015-06-10 北京工业大学 Extensible double-layer cylindrical surface latticed shell structure
CN103046731A (en) * 2013-01-18 2013-04-17 中城建第六工程局集团有限公司 Attaching method for outer wall scaffold and attaching bracing part used in method
CN103184767A (en) * 2013-01-22 2013-07-03 北京工业大学 Detachable and integrated cylindrical shell structure
CN105654995A (en) * 2014-12-04 2016-06-08 中国核工业二四建设有限公司 Nuclear power plant curved-surface high-precision pre-embedded sleeve fixing device
CN105654995B (en) * 2014-12-04 2017-12-15 中国核工业二四建设有限公司 A kind of nuclear power station curved surface high accuracy embedded sleeve barrel fixing device
CN104675101A (en) * 2015-02-11 2015-06-03 浙江省二建建设集团有限公司 Wall-linking element of scaffold and construction method of wall-linking element
CN104895279A (en) * 2015-06-26 2015-09-09 长沙远大住宅工业集团有限公司 Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN104912231A (en) * 2015-06-26 2015-09-16 长沙远大住宅工业集团有限公司 Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN106337556A (en) * 2015-07-10 2017-01-18 华北冶建工程建设有限公司 Construction method for wall connecting element assembly
CN106437149B (en) * 2015-08-10 2019-01-08 广西建工集团第四建筑工程有限责任公司 A kind of easy claw wall-connecting piece
CN106437149A (en) * 2015-08-10 2017-02-22 广西建工集团第四建筑工程有限责任公司 Simple claw type wall connecting part
CN106121063A (en) * 2016-06-30 2016-11-16 吉林科龙建筑节能科技股份有限公司 A kind of construction method for the outside clad of building and construction system
CN106013762A (en) * 2016-07-07 2016-10-12 广西桂林地建建设有限公司 Scaffold wall connecting element and construction method using wall connecting element
CN107268977B (en) * 2017-07-31 2019-04-23 中国一冶集团有限公司 Round high pier stud constructor row ladder assembled sustaining wall fixes device and construction method
CN107268977A (en) * 2017-07-31 2017-10-20 中国冶集团有限公司 Circular high pier stud constructor row cat ladder assembled sustaining wall fixing device and construction method
CN107268976A (en) * 2017-07-31 2017-10-20 中国冶集团有限公司 Towering structure constructor row safety climbing ladder assembled sustaining wall fixing device and construction method
CN107268976B (en) * 2017-07-31 2019-08-23 中国一冶集团有限公司 The fixed device of towering structure constructor's row safety climbing ladder assembled sustaining wall and construction method
CN108396955A (en) * 2018-04-17 2018-08-14 江苏九如建设有限公司 Tool-type wall-connecting piece and its construction technology
CN108868106A (en) * 2018-07-05 2018-11-23 上海建工七建集团有限公司 Prefabrication construction external scaffolding connects wall mechanism and construction method
CN109296204A (en) * 2018-11-13 2019-02-01 中国二十冶集团有限公司 Shear wall steel structural embedded parts exempt to pick chisel construction method
CN110886482A (en) * 2019-10-23 2020-03-17 上海建工四建集团有限公司 Scaffold pulling-connecting device and method
CN110821142A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Prefabricated structure outer frame drawknot structure and construction method
CN111119495A (en) * 2020-01-20 2020-05-08 中铁十二局集团建筑安装工程有限公司 PCF plate construction method for fabricated building
CN111411768A (en) * 2020-04-30 2020-07-14 中国建筑第四工程局有限公司 Pre-buried formula climbs a support fixed knot and constructs
CN111636674A (en) * 2020-07-02 2020-09-08 中建四局第五建筑工程有限公司 Building concrete outer wall scaffold wall connecting piece and construction method thereof
CN114737744A (en) * 2022-03-18 2022-07-12 五冶集团上海有限公司 Novel wall connecting piece setting method
CN114892952A (en) * 2022-05-24 2022-08-12 北京城建五建设集团有限公司 Wall connecting structure of wall connecting rod for avoiding heat insulation layer
CN114892952B (en) * 2022-05-24 2023-07-11 北京城建五建设集团有限公司 Wall connecting structure of wall connecting rod for avoiding heat preservation layer

Also Published As

Publication number Publication date
CN101892738B (en) 2011-12-07

Similar Documents

Publication Publication Date Title
CN101892738B (en) Embedded scaffold connecting tube and construction method thereof
CN204850414U (en) Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side
CN201254830Y (en) Convenient wall joint
CN202913682U (en) Embedded wall connecting piece
KR20110111907A (en) Saddle assembly
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN106245899A (en) A kind of to drawing wall-connecting piece
CN103452304B (en) Exempt from foot trick plug-in type outrigger L-type steel wall-connecting piece structure and construction method thereof
CN109577636A (en) Anchoring assembly, builder's jack fashioned iron anchor structure and construction method
CN206220465U (en) One kind is to drawing wall-connecting piece
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN203795825U (en) Scaffold and wall connector and scaffold and wall connecting structure
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN209799022U (en) semicircular bolt clamping ring component
CN201704954U (en) Formwork opposite-pulling device for pouring waterproof walls
CN206800981U (en) A kind of detachable builder's jack retainer ring
CN205134546U (en) But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization
CN206707255U (en) Combined type wall attaching parts for external scaffolding
CN206571135U (en) It is a kind of not influence the outer scaffold wall connector of construction
CN210421889U (en) Wall-attached support mounting structure of attached lifting scaffold
CN205259572U (en) Builder's jack hangs and draws wire rope internal force monitoring devices
CN204252513U (en) The disassembled anchor device of a kind of common builder's jack shaped steel end
CN209339585U (en) High-intensitive outrigger drawknot mechanism can be recycled in one kind
CN204402004U (en) A kind of Simple general type outer scaffold wall connector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20161128

Granted publication date: 20111207

PD01 Discharge of preservation of patent

Date of cancellation: 20170528

Granted publication date: 20111207

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111207

Termination date: 20160820