CN101892738A - Embedded scaffold connecting tube and construction method thereof - Google Patents
Embedded scaffold connecting tube and construction method thereof Download PDFInfo
- Publication number
- CN101892738A CN101892738A CN 201010258505 CN201010258505A CN101892738A CN 101892738 A CN101892738 A CN 101892738A CN 201010258505 CN201010258505 CN 201010258505 CN 201010258505 A CN201010258505 A CN 201010258505A CN 101892738 A CN101892738 A CN 101892738A
- Authority
- CN
- China
- Prior art keywords
- wall
- bar
- sleeve
- embedded
- pull bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000009413 insulation Methods 0.000 claims abstract description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 18
- 239000004567 concrete Substances 0.000 claims description 16
- 238000009434 installation Methods 0.000 claims description 12
- 238000002360 preparation method Methods 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- 238000010079 rubber tapping Methods 0.000 claims description 4
- 210000003195 fascia Anatomy 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000009435 building construction Methods 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 239000000835 fiber Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000004807 localization Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/762—Exterior insulation of exterior walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention relates to a connecting piece used in building construction, in particular to a connecting tube for connecting and fixing an external wall scaffold and a wall in building construction, which comprises an embedded steel bar, a sleeve, a pulling rod, a gasket, a nut and a connecting rod, wherein one end of the embedded steel bar extends out from the wall, the part, extending out from the wall, has straight threads; the two ends of the pulling rod have straight threads; the sleeve has internal straight threads; the end, extending out from the wall, of the embedded steel bar and one end of the pulling rod are inserted into the sleeve to be fastened; the pulling rod is inserted into the connecting rod; and the other end of the pulling rod is provided with the gasket, and the connecting rod through which the pulling rod passes is fastened by the nut and the pulling rod. In the novel scaffold connecting tube, the sleeve and the embedded steel bar are tightly connected by screw threads and are easy to detach, so risks of overhead work for building a scaffold welded connecting tube on site, the construction speed is improved, the civil construction level is improved and safety is ensured; the thermal-insulation layer of the external wall is guaranteed; and the arrangement of scaffold holes is avoided, and the maintenance problem that the external wall scaffold holes leak after completion and commissioning is solved radically.
Description
Technical field
The present invention relates to the connector that uses in a kind of building operations, particularly, relate to the wall-connecting piece that exterior wall scaffold and body of wall are connected and fixed in a kind of building operations, in order to guarantee the stable of external scaffolding and to facilitate for the back construction working.
Background technology
Along with development of times, builing industry is advanced by leaps and bounds, and people are in order to save the area, and highrise building is more and more, and shear wall structure is widely used in the builing industry design, and is more and more higher to low-carbon energy-saving, environmental protection that builing industry requires.In recent years in the concrete structure of the construction building, its insulation layer and reinforced concrete structure layer are built simultaneously and are constructed, and this has brought inconvenience for the setting of scaffold connecting spare, and this just needs new technology and new technology to solve.
Summary of the invention
The purpose of this invention is to provide a kind of new type scaffold wall-connecting piece, the new type scaffold wall-connecting piece is simple, convenient, and the joint worker saves time, and construction quality is good.
For achieving the above object, the present invention by the following technical solutions:
Embedded scaffold connecting tube, comprise embedded bar, sleeve, pull bar, wall connecting rod, pad, nut, embedded bar one end stretches out body of wall, and stretch out wall part band straight thread, pull bar two ends band straight thread, sleeve has interior straight thread, and the end that embedded bar stretches out body of wall end and pull bar is fit in the sleeve to be tightened; Drag link sleeve is in wall connecting rod; At the pull bar other end pad is installed, tightens the wall connecting rod that passes with nut and pull bar;
Preferably, embedded bar adopts round steel or the indented bars of diameter 25mm; When concrete is C30, adopt the pre-buried round steel anchorage length of diameter 25mm to be not less than 25 times of bar diameters, adopt its anchorage length of indented bars of diameter 25mm to be not less than 30 times of bar diameters;
Preferably, pad is processed into diameter 100mm plectane with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter;
Preferably, embedded bar is imbedded a concrete end and is had quarter bend;
Preferably, pull bar adopts reinforcing bar, and pull bar is than the long 100mm of wall connecting rod;
Preferably, sleeve one end shutoff plastic cap;
Preferably, pull bar brush oil when making adds protection plastic sheath (18 in the schematic diagram) and packages;
The job practices of embedded scaffold connecting tube may further comprise the steps:
(1), the preparation before the construction: an end of embedded bar is packaged the straight thread silk and installs sleeve, and processing simultaneously is crooked good, sleeve one end shutoff plastic cap; Adopt the reinforcement fabrication pull bar, the pull bar two ends are packaged the straight thread silk, brush oil adds the protection plastic sheath and packages; The preparation pad is just brought and can be installed and used during with installation.
(2), the construction of built-in fitting: behind building structure main body construction colligation body of wall reinforcing bar, external wall insulation is installed; Carry out the reinforcement installation of pre-buried cover straight thread band sleeve on the body of wall, one of the band sleeve is inserted in the heat-insulation plate for external; Per step support body wall connecting rod should be consistent with the embedded bar absolute altitude, uses the level gauge levelling when pre-buried, guarantees that embedded bar 1 is on same horizontal plane; Install the installation great wall template, position according to its embedded bar, on the side fascia of shear wall large template, beat the eye of φ 6mm with electric drill, tighten with self-tapping screw and sleeve shutoff plastic cap then, the reinforcing bar spot welding of embedded bar other end and wall or plate firmly comes to determine the accuracy of the position of pre-wall-connecting piece; After reinforcing finishes, carry out the walls concrete pouring, remove wall form.
(3), the installation of wall connecting rod: the plastic cap that stops up in the pre-buried sleeve is removed, pull bar and sleeve are installed are tightened, again the scaffold connecting rod tube is entangled band silk reinforcing bar, pad is installed, tighten with screw shell at last, buckle with cross buckle and support body vertical rod or horizontal leger at last and link into an integrated entity.
Preferably, the preparation method of pad is: be processed into the plectane of diameter 100mm with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter.
Preferably, embedded bar adopts round steel or the indented bars of diameter 25mm, when concrete is C30, adopt its anchorage length of round steel of diameter 25mm to be not less than 25d, adopt its anchorage length of screw-thread steel of diameter 25mm to be not less than 30d, wherein, d is the embedded bar diameter.
The present invention adopts straight thread to be different from the past, and the benefit of regular screw threads is: the screw thread line of straight thread is thick, and the regular screw threads line is thin; The screw thread of straight screw sleeve long (about its cover tube length 60mm), the length that is screwed into is all wrapped up by silk, plain nut screw thread short (about its nut thickness 20mm), the length that is screwed into can not all be wrapped up by silk; It is little influenced by vibration force after straight thread and mantle fiber reinforcing bar are tightened, and is difficult for becoming flexible, and influenced greatly by vibration force after regular screw threads and mantle fiber reinforcing bar are tightened, loosening easily; The straight thread material is good, and the tensile strength height is not easy-to-draw bad, and the regular screw threads material is inferior, and tensile strength is low, draws bad easily.
New type scaffold wall-connecting piece of the present invention has the following advantages: this external scaffolding wall-connecting piece takes the reinforcing bar offal of pre-buried band screw thread to be connected with the sleeve steel bar rod interior with penetrating short steel pipes, the splicing position adopt sleeve, nut and embedded bar with screw thread closely be connected simply firm, be easy to dismounting, constructing for scaffold connecting spare provides new construction technology; Avoided the scene to set up scaffold welding wall-connecting piece and exceeded operating risk, all the node employing is hinged, has accelerated construction speed, has improved the civilized construction level, has guaranteed safety; Ensured that insulating layer of external wall is not damaged; Do not need to carry out the setting of scaffold eye, having stopped is completed pays the maintenance difficult problem of the outer foundation trick seepage in back.
Description of drawings
Fig. 1 is the scheme of installation of embedded scaffold connecting tube;
Fig. 2 is that embedded scaffold connecting tube is at floor place scheme of installation;
Fig. 3 is that embedded scaffold connecting tube is at shear wall place scheme of installation;
Fig. 4 is that scaffold connecting spare facade is arranged schematic diagram;
Fig. 5 is an embedded bar localization method schematic diagram in the construction;
Fig. 6 is the pull bar schematic diagram of band plastic protective sleeve pipe;
Among the figure: 1, embedded bar; 2, sleeve; 3, pull bar; 4, pad; 5, nut; 6, wall connecting rod; 7, leger; 8, vertical rod; 9, little cross bar; 10, concrete floor; 11, concrete shear force wall; 12, external wall insulation; 13, cross buckle; 14, bridging; 15 sleeve shutoff plastic caps; 16, self-tapping screw; 17, large form; 18, protection plastic sheath.
The specific embodiment
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
The new type scaffold wall-connecting piece comprises embedded bar 1, sleeve 2, pull bar 3, pad 4, nut 5, wall connecting rod 6, embedded bar 1 one ends stretch out body of wall, and stretch out wall part band straight thread, pull bar 3 two ends band straight threads, sleeve 2 has interior straight thread, and the end that embedded bar 1 stretches out body of wall end and pull bar 3 is fit in the sleeve 2 to be tightened; Pull bar 3 is enclosed within the wall connecting rod 6; At the pull bar other end pad 4 is installed, tightens the wall connecting rod 6 that passes with nut 5 and pull bar 3.Wall connecting rod 6 is tightened with leger 7 or vertical rod 8 usefulness cross buckles 13 and is buckled during construction, thereby constitute one with pull bar and sleeve stressed structural system, embedded bar 1 adopts the plum blossom shape to arrange, as shown in Figure 4, this has just guaranteed the evenly stressed of stress system, provides assurance for external scaffolding stability better.Embedded bar adopts round steel or the indented bars of diameter 25mm, and when concrete was C30, adopting its anchorage length of round steel of diameter 25mm was 25 times of bar diameters, and adopting its anchorage length of screw-thread steel of diameter 25mm is 30 times of bar diameters.Pad is processed into diameter 100mm plectane with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter; Embedded bar is imbedded a concrete end and is had quarter bend; Pull bar adopts reinforcing bar, and pull bar is than the long 100mm of wall connecting rod; Sleeve 2 one end shutoff plastic caps 15; Pull bar brush oil when making adds protection plastic sheath 14 and packages.
The job practices of embedded scaffold connecting tube of the present invention is as follows:
(1), the preparation before the construction: before support body is set up use, embedded bar 1 is round steel or the indented bars of diameter 25mm, when concrete is C30, adopt its anchorage length of round steel of diameter 25mm to be not less than 25d, adopt its anchorage length of screw-thread steel of diameter 25mm to be not less than 30d, wherein, d is the embedded bar diameter; One end of embedded bar 1 is packaged the straight thread silk and installs sleeve, and processing simultaneously is crooked good, sleeve one end shutoff plastic cap 15; Adopt the reinforcement fabrication pull bar, the pull bar two ends are packaged the straight thread silk, brush oil adds protection plastic sheath 18 and packages; Be processed into the plectane of diameter 100mm with the 6mm steel plate, and at the center according to the perforate of steel bar rod diameter, make pad 4, just bring and can install and use when installing;
(2), the construction of built-in fitting: behind building structure main body construction colligation body of wall reinforcing bar, external wall insulation 12 is installed; Carry out the reinforcing bar 1 of pre-buried cover straight thread band sleeve on the body of wall and install, one of band sleeve 2 is inserted in the heat-insulation plate for external 12; Per step support body wall connecting rod 6 should be answered consistent with embedded bar 1 absolute altitude, uses the level gauge levelling when pre-buried, guarantees that embedded bar 1 is on same horizontal plane; Install great wall template 17 is installed, position according to its embedded bar, on the side fascia of shear wall large template 17, beat the eye of φ 6mm with electric drill, tighten with self-tapping screw 16 and sleeve shutoff plastic cap 15 then, the reinforcing bar spot welding of embedded bar other end and wall or plate is firm, should guarantee the accuracy of the position of embedded bar during spot welding; After reinforcing finishes, carry out the walls concrete pouring, after waiting to reach the intensity of form removal requirement, remove wall form.
(3), the installation of wall connecting rod: the plastic cap that stops up in the pre-buried sleeve 2 is gone with screwdriver is stubborn, pull bar 3 is installed to be tightened with sleeve 2, again scaffold connecting rod tube 6 is entangled band silk reinforcing bar 3, pad 4 is installed, tighten with nut 5 then, buckle with support body vertical rod 8 or horizontal leger 7 with cross buckle 13 at last and link into an integrated entity.
Claims (10)
1. embedded scaffold connecting tube, comprise embedded bar, sleeve, pull bar, wall connecting rod, pad, nut, it is characterized in that: embedded bar one end stretches out body of wall, and stretch out wall part band straight thread, pull bar two ends band straight thread, sleeve has interior straight thread, and the end that embedded bar stretches out body of wall end and pull bar is fit in the sleeve to be tightened; Drag link sleeve is in wall connecting rod; At the pull bar other end pad is installed, tightens the wall connecting rod that passes with nut and pull bar.
2. embedded scaffold connecting tube according to claim 1 is characterized in that: embedded bar adopts round steel or the indented bars of diameter 25mm; When concrete is C30, adopt the round steel of diameter 25mm, its anchorage length is not less than 25 times of bar diameters, adopts its anchorage length of screw-thread steel of diameter 25mm to be not less than 30 times of bar diameters.
3. according to the described embedded scaffold connecting tube of claim 1-2, it is characterized in that: pad is processed into diameter 100mm plectane with the 6mm steel plate, and at the center according to the perforate of pull bar diameter.
4. according to the described embedded scaffold connecting tube of claim 1-3, it is characterized in that: embedded bar is imbedded a concrete end and is had quarter bend.
5. according to the described embedded scaffold connecting tube of claim 1-4, it is characterized in that: pull bar adopts reinforcing bar, and pull bar is than the long 100mm of wall connecting rod, and opens straight thread 70mm respectively at two ends.
6. according to the described embedded scaffold connecting tube of claim 1-5, it is characterized in that: sleeve one end shutoff plastic cap.
7. according to the described embedded scaffold connecting tube of claim 1-6, it is characterized in that: pull bar brush oil when making adds the protection plastic sheath and packages.
8. according to the job practices of the described embedded scaffold connecting tube of claim 1-7, it is characterized in that may further comprise the steps:
(1), the preparation before the construction: an end of embedded bar is packaged the straight thread silk and installs sleeve, and processing simultaneously is crooked good, sleeve one end shutoff plastic cap; Adopt the reinforcement fabrication pull bar, the pull bar two ends are packaged the straight thread silk, brush oil adds the protection plastic sheath and packages; The preparation pad is just brought and can be installed and used during with installation;
(2), the construction of built-in fitting: behind building structure main body construction colligation body of wall reinforcing bar, external wall insulation is installed; Carry out the reinforcement installation of pre-buried cover straight thread band sleeve on the body of wall, an end of band sleeve inserts in the heat-insulation plate for external; Per step support body wall connecting rod should be consistent with the embedded bar absolute altitude, uses the level gauge levelling when pre-buried, guarantees that embedded bar is on same horizontal plane; Install the installation great wall template, position according to its embedded bar, on the side fascia of shear wall large template, beat the eye of φ 6mm with electric drill, tighten with self-tapping screw and sleeve shutoff plastic cap then, the reinforcing bar spot welding of the embedded bar other end and wall or plate firmly comes to determine the accuracy of the position of pre-wall-connecting piece; After reinforcing finishes, carry out the walls concrete pouring, when treating that concrete strength reaches requirement, remove wall form.
(3), the installation of wall connecting rod: the plastic cap that stops up in the pre-buried sleeve is removed, pull bar and sleeve are installed are tightened, again the scaffold connecting rod tube is entangled pull bar, pad is installed, tighten with screw shell at last, buckle with cross buckle and support body vertical rod or horizontal leger at last and link into an integrated entity.
9. the job practices of embedded scaffold connecting tube according to claim 8, it is characterized in that: the preparation method of pad is: be processed into the plectane of diameter 100mm with the 6mm steel plate, and at the center according to the perforate of pull bar diameter.
10. the job practices of described embedded scaffold connecting tube according to Claim 8-9, it is characterized in that: embedded bar adopts round steel or the indented bars of diameter 25mm, when concrete is C30, adopt its anchorage length of round steel of diameter 25mm to be not less than 25d, adopt its anchorage length of screw-thread steel of diameter 25mm to be not less than 30d, wherein, d is the embedded bar diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010258505 CN101892738B (en) | 2010-08-20 | 2010-08-20 | Embedded scaffold connecting tube and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010258505 CN101892738B (en) | 2010-08-20 | 2010-08-20 | Embedded scaffold connecting tube and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101892738A true CN101892738A (en) | 2010-11-24 |
CN101892738B CN101892738B (en) | 2011-12-07 |
Family
ID=43102071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010258505 Expired - Fee Related CN101892738B (en) | 2010-08-20 | 2010-08-20 | Embedded scaffold connecting tube and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101892738B (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182300A (en) * | 2011-03-28 | 2011-09-14 | 刘群 | Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame |
CN102182310A (en) * | 2011-03-28 | 2011-09-14 | 刘群 | Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame |
CN102182311A (en) * | 2011-03-28 | 2011-09-14 | 刘群 | Method for increasing wall connecting piece and improving and determining bearing capacity of support frame |
CN102383601A (en) * | 2011-08-24 | 2012-03-21 | 中国葛洲坝集团股份有限公司 | Method and device for leading pre-embedded pipes in concrete out of side wall joints |
CN102677881A (en) * | 2012-06-07 | 2012-09-19 | 刘群 | Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame |
CN102704667A (en) * | 2012-06-08 | 2012-10-03 | 四汇建设集团有限公司 | Scaffold pre-buried assembled connecting wall device |
CN103015735A (en) * | 2012-12-16 | 2013-04-03 | 中建六局土木工程有限公司 | Construction method for planting wall lacing bars after pre-burying of sleeve assemblies |
CN103046731A (en) * | 2013-01-18 | 2013-04-17 | 中城建第六工程局集团有限公司 | Attaching method for outer wall scaffold and attaching bracing part used in method |
CN103174218A (en) * | 2013-01-16 | 2013-06-26 | 北京工业大学 | Extensible double-layer cylindrical surface latticed shell structure |
CN103184767A (en) * | 2013-01-22 | 2013-07-03 | 北京工业大学 | Detachable and integrated cylindrical shell structure |
CN104675101A (en) * | 2015-02-11 | 2015-06-03 | 浙江省二建建设集团有限公司 | Wall-linking element of scaffold and construction method of wall-linking element |
CN104895279A (en) * | 2015-06-26 | 2015-09-09 | 长沙远大住宅工业集团有限公司 | Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure |
CN104912231A (en) * | 2015-06-26 | 2015-09-16 | 长沙远大住宅工业集团有限公司 | Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same |
CN105654995A (en) * | 2014-12-04 | 2016-06-08 | 中国核工业二四建设有限公司 | Nuclear power plant curved-surface high-precision pre-embedded sleeve fixing device |
CN106013762A (en) * | 2016-07-07 | 2016-10-12 | 广西桂林地建建设有限公司 | Scaffold wall connecting element and construction method using wall connecting element |
CN106121063A (en) * | 2016-06-30 | 2016-11-16 | 吉林科龙建筑节能科技股份有限公司 | A kind of construction method for the outside clad of building and construction system |
CN106337556A (en) * | 2015-07-10 | 2017-01-18 | 华北冶建工程建设有限公司 | Construction method for wall connecting element assembly |
CN106437149A (en) * | 2015-08-10 | 2017-02-22 | 广西建工集团第四建筑工程有限责任公司 | Simple claw type wall connecting part |
CN107268977A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Circular high pier stud constructor row cat ladder assembled sustaining wall fixing device and construction method |
CN107268976A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Towering structure constructor row safety climbing ladder assembled sustaining wall fixing device and construction method |
CN108396955A (en) * | 2018-04-17 | 2018-08-14 | 江苏九如建设有限公司 | Tool-type wall-connecting piece and its construction technology |
CN108868106A (en) * | 2018-07-05 | 2018-11-23 | 上海建工七建集团有限公司 | Prefabrication construction external scaffolding connects wall mechanism and construction method |
CN109296204A (en) * | 2018-11-13 | 2019-02-01 | 中国二十冶集团有限公司 | Shear wall steel structural embedded parts exempt to pick chisel construction method |
CN110821142A (en) * | 2019-11-06 | 2020-02-21 | 上海建工七建集团有限公司 | Prefabricated structure outer frame drawknot structure and construction method |
CN110886482A (en) * | 2019-10-23 | 2020-03-17 | 上海建工四建集团有限公司 | Scaffold pulling-connecting device and method |
CN111119495A (en) * | 2020-01-20 | 2020-05-08 | 中铁十二局集团建筑安装工程有限公司 | PCF plate construction method for fabricated building |
CN111411768A (en) * | 2020-04-30 | 2020-07-14 | 中国建筑第四工程局有限公司 | Pre-buried formula climbs a support fixed knot and constructs |
CN111636674A (en) * | 2020-07-02 | 2020-09-08 | 中建四局第五建筑工程有限公司 | Building concrete outer wall scaffold wall connecting piece and construction method thereof |
CN114737744A (en) * | 2022-03-18 | 2022-07-12 | 五冶集团上海有限公司 | Novel wall connecting piece setting method |
CN114892952A (en) * | 2022-05-24 | 2022-08-12 | 北京城建五建设集团有限公司 | Wall connecting structure of wall connecting rod for avoiding heat insulation layer |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2646282Y (en) * | 2003-09-06 | 2004-10-06 | 江苏金土木建设集团有限公司第七分公司 | Wall connecting member of scaffold |
JP2005002747A (en) * | 2003-06-16 | 2005-01-06 | Nice Corp | External heat insulation wall construction |
JP2007056594A (en) * | 2005-08-25 | 2007-03-08 | Daiwa House Ind Co Ltd | External wall structure and its construction method |
JP2007126829A (en) * | 2005-11-01 | 2007-05-24 | Takashi Hashiguchi | Scaffold support tool |
CN201103235Y (en) * | 2007-10-26 | 2008-08-20 | 长业建设集团有限公司 | Connection device between wall and scaffold |
CN101275432A (en) * | 2008-05-23 | 2008-10-01 | 北京城建建设工程有限公司 | Construction method for building postposition pre-buried wall connecting parts |
CN101368442A (en) * | 2008-04-30 | 2009-02-18 | 中建七局第二建筑有限公司 | Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold |
CN201254830Y (en) * | 2008-09-22 | 2009-06-10 | 崔恒均 | Convenient wall joint |
CN201339313Y (en) * | 2008-12-31 | 2009-11-04 | 内蒙古巨华集团大华建筑安装有限公司 | Scaffold wall connecting piece |
-
2010
- 2010-08-20 CN CN 201010258505 patent/CN101892738B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005002747A (en) * | 2003-06-16 | 2005-01-06 | Nice Corp | External heat insulation wall construction |
CN2646282Y (en) * | 2003-09-06 | 2004-10-06 | 江苏金土木建设集团有限公司第七分公司 | Wall connecting member of scaffold |
JP2007056594A (en) * | 2005-08-25 | 2007-03-08 | Daiwa House Ind Co Ltd | External wall structure and its construction method |
JP2007126829A (en) * | 2005-11-01 | 2007-05-24 | Takashi Hashiguchi | Scaffold support tool |
CN201103235Y (en) * | 2007-10-26 | 2008-08-20 | 长业建设集团有限公司 | Connection device between wall and scaffold |
CN101368442A (en) * | 2008-04-30 | 2009-02-18 | 中建七局第二建筑有限公司 | Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold |
CN101275432A (en) * | 2008-05-23 | 2008-10-01 | 北京城建建设工程有限公司 | Construction method for building postposition pre-buried wall connecting parts |
CN201254830Y (en) * | 2008-09-22 | 2009-06-10 | 崔恒均 | Convenient wall joint |
CN201339313Y (en) * | 2008-12-31 | 2009-11-04 | 内蒙古巨华集团大华建筑安装有限公司 | Scaffold wall connecting piece |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182310A (en) * | 2011-03-28 | 2011-09-14 | 刘群 | Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame |
CN102182311A (en) * | 2011-03-28 | 2011-09-14 | 刘群 | Method for increasing wall connecting piece and improving and determining bearing capacity of support frame |
CN102182310B (en) * | 2011-03-28 | 2012-07-18 | 浙江大华建设集团有限公司 | Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame |
CN102182311B (en) * | 2011-03-28 | 2012-07-18 | 中太建设集团股份有限公司 | Method for increasing wall connecting piece and improving and determining bearing capacity of support frame |
CN102182300A (en) * | 2011-03-28 | 2011-09-14 | 刘群 | Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame |
CN102383601B (en) * | 2011-08-24 | 2013-12-04 | 中国葛洲坝集团股份有限公司 | Method and device for leading pre-embedded pipes in concrete out of side wall joints |
CN102383601A (en) * | 2011-08-24 | 2012-03-21 | 中国葛洲坝集团股份有限公司 | Method and device for leading pre-embedded pipes in concrete out of side wall joints |
CN102677881A (en) * | 2012-06-07 | 2012-09-19 | 刘群 | Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame |
CN102704667A (en) * | 2012-06-08 | 2012-10-03 | 四汇建设集团有限公司 | Scaffold pre-buried assembled connecting wall device |
CN103015735A (en) * | 2012-12-16 | 2013-04-03 | 中建六局土木工程有限公司 | Construction method for planting wall lacing bars after pre-burying of sleeve assemblies |
CN103174218A (en) * | 2013-01-16 | 2013-06-26 | 北京工业大学 | Extensible double-layer cylindrical surface latticed shell structure |
CN103174218B (en) * | 2013-01-16 | 2015-06-10 | 北京工业大学 | Extensible double-layer cylindrical surface latticed shell structure |
CN103046731A (en) * | 2013-01-18 | 2013-04-17 | 中城建第六工程局集团有限公司 | Attaching method for outer wall scaffold and attaching bracing part used in method |
CN103184767A (en) * | 2013-01-22 | 2013-07-03 | 北京工业大学 | Detachable and integrated cylindrical shell structure |
CN105654995A (en) * | 2014-12-04 | 2016-06-08 | 中国核工业二四建设有限公司 | Nuclear power plant curved-surface high-precision pre-embedded sleeve fixing device |
CN105654995B (en) * | 2014-12-04 | 2017-12-15 | 中国核工业二四建设有限公司 | A kind of nuclear power station curved surface high accuracy embedded sleeve barrel fixing device |
CN104675101A (en) * | 2015-02-11 | 2015-06-03 | 浙江省二建建设集团有限公司 | Wall-linking element of scaffold and construction method of wall-linking element |
CN104895279A (en) * | 2015-06-26 | 2015-09-09 | 长沙远大住宅工业集团有限公司 | Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure |
CN104912231A (en) * | 2015-06-26 | 2015-09-16 | 长沙远大住宅工业集团有限公司 | Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same |
CN106337556A (en) * | 2015-07-10 | 2017-01-18 | 华北冶建工程建设有限公司 | Construction method for wall connecting element assembly |
CN106437149B (en) * | 2015-08-10 | 2019-01-08 | 广西建工集团第四建筑工程有限责任公司 | A kind of easy claw wall-connecting piece |
CN106437149A (en) * | 2015-08-10 | 2017-02-22 | 广西建工集团第四建筑工程有限责任公司 | Simple claw type wall connecting part |
CN106121063A (en) * | 2016-06-30 | 2016-11-16 | 吉林科龙建筑节能科技股份有限公司 | A kind of construction method for the outside clad of building and construction system |
CN106013762A (en) * | 2016-07-07 | 2016-10-12 | 广西桂林地建建设有限公司 | Scaffold wall connecting element and construction method using wall connecting element |
CN107268977B (en) * | 2017-07-31 | 2019-04-23 | 中国一冶集团有限公司 | Round high pier stud constructor row ladder assembled sustaining wall fixes device and construction method |
CN107268977A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Circular high pier stud constructor row cat ladder assembled sustaining wall fixing device and construction method |
CN107268976A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Towering structure constructor row safety climbing ladder assembled sustaining wall fixing device and construction method |
CN107268976B (en) * | 2017-07-31 | 2019-08-23 | 中国一冶集团有限公司 | The fixed device of towering structure constructor's row safety climbing ladder assembled sustaining wall and construction method |
CN108396955A (en) * | 2018-04-17 | 2018-08-14 | 江苏九如建设有限公司 | Tool-type wall-connecting piece and its construction technology |
CN108868106A (en) * | 2018-07-05 | 2018-11-23 | 上海建工七建集团有限公司 | Prefabrication construction external scaffolding connects wall mechanism and construction method |
CN109296204A (en) * | 2018-11-13 | 2019-02-01 | 中国二十冶集团有限公司 | Shear wall steel structural embedded parts exempt to pick chisel construction method |
CN110886482A (en) * | 2019-10-23 | 2020-03-17 | 上海建工四建集团有限公司 | Scaffold pulling-connecting device and method |
CN110821142A (en) * | 2019-11-06 | 2020-02-21 | 上海建工七建集团有限公司 | Prefabricated structure outer frame drawknot structure and construction method |
CN111119495A (en) * | 2020-01-20 | 2020-05-08 | 中铁十二局集团建筑安装工程有限公司 | PCF plate construction method for fabricated building |
CN111411768A (en) * | 2020-04-30 | 2020-07-14 | 中国建筑第四工程局有限公司 | Pre-buried formula climbs a support fixed knot and constructs |
CN111636674A (en) * | 2020-07-02 | 2020-09-08 | 中建四局第五建筑工程有限公司 | Building concrete outer wall scaffold wall connecting piece and construction method thereof |
CN114737744A (en) * | 2022-03-18 | 2022-07-12 | 五冶集团上海有限公司 | Novel wall connecting piece setting method |
CN114892952A (en) * | 2022-05-24 | 2022-08-12 | 北京城建五建设集团有限公司 | Wall connecting structure of wall connecting rod for avoiding heat insulation layer |
CN114892952B (en) * | 2022-05-24 | 2023-07-11 | 北京城建五建设集团有限公司 | Wall connecting structure of wall connecting rod for avoiding heat preservation layer |
Also Published As
Publication number | Publication date |
---|---|
CN101892738B (en) | 2011-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101892738B (en) | Embedded scaffold connecting tube and construction method thereof | |
CN204850414U (en) | Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side | |
CN201254830Y (en) | Convenient wall joint | |
CN202913682U (en) | Embedded wall connecting piece | |
KR20110111907A (en) | Saddle assembly | |
CN205935621U (en) | Simple and easy outer scaffold frame and shear force wall connecting device | |
CN106245899A (en) | A kind of to drawing wall-connecting piece | |
CN103452304B (en) | Exempt from foot trick plug-in type outrigger L-type steel wall-connecting piece structure and construction method thereof | |
CN109577636A (en) | Anchoring assembly, builder's jack fashioned iron anchor structure and construction method | |
CN206220465U (en) | One kind is to drawing wall-connecting piece | |
CN205348724U (en) | Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting | |
CN204299162U (en) | To encorbelment steel I-beam anchor structure | |
CN203795825U (en) | Scaffold and wall connector and scaffold and wall connecting structure | |
CN208966008U (en) | A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device | |
CN209799022U (en) | semicircular bolt clamping ring component | |
CN201704954U (en) | Formwork opposite-pulling device for pouring waterproof walls | |
CN206800981U (en) | A kind of detachable builder's jack retainer ring | |
CN205134546U (en) | But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization | |
CN206707255U (en) | Combined type wall attaching parts for external scaffolding | |
CN206571135U (en) | It is a kind of not influence the outer scaffold wall connector of construction | |
CN210421889U (en) | Wall-attached support mounting structure of attached lifting scaffold | |
CN205259572U (en) | Builder's jack hangs and draws wire rope internal force monitoring devices | |
CN204252513U (en) | The disassembled anchor device of a kind of common builder's jack shaped steel end | |
CN209339585U (en) | High-intensitive outrigger drawknot mechanism can be recycled in one kind | |
CN204402004U (en) | A kind of Simple general type outer scaffold wall connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20161128 Granted publication date: 20111207 |
|
PD01 | Discharge of preservation of patent |
Date of cancellation: 20170528 Granted publication date: 20111207 |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111207 Termination date: 20160820 |