CN101839061A - Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof - Google Patents
Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof Download PDFInfo
- Publication number
- CN101839061A CN101839061A CN 201010164456 CN201010164456A CN101839061A CN 101839061 A CN101839061 A CN 101839061A CN 201010164456 CN201010164456 CN 201010164456 CN 201010164456 A CN201010164456 A CN 201010164456A CN 101839061 A CN101839061 A CN 101839061A
- Authority
- CN
- China
- Prior art keywords
- circular arc
- component support
- unilateral
- rib
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 33
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 238000009434 installation Methods 0.000 claims description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 239000004575 stone Substances 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 6
- 239000011120 plywood Substances 0.000 claims description 6
- 239000002023 wood Substances 0.000 claims description 6
- 238000010009 beating Methods 0.000 claims description 3
- 238000005452 bending Methods 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A single-side formwork system for a cast-in-place concrete arc outer wall and a construction method thereof are disclosed, wherein the construction method comprises the following steps: step 1, arranging embedded parts on a concrete floor below an arc wall which is not yet poured; step 2, pre-splicing arc wall templates; step 3, pre-splicing and installing a single-side support frame on site, and fastening the single-side support frame with an embedded part; step 4, connecting the single-side support frame with the arc wall formwork; step 5, erecting a scaffold required by the single-side support frame; step 6, adjusting, reinforcing and checking each part; step 7, pouring circular arc wall concrete between the circular arc wall template and the circular arc outer wall of the adjacent building; and 8, after the strength of the concrete reaches the standard requirement, carrying out formwork dismantling construction. The invention greatly shortens the construction period, saves labor force, reduces construction cost, can meet the requirement of structure construction quality, and is particularly suitable for the wall construction of large public buildings with car ramps, stadiums and other arc-shaped structures.
Description
Technical field
The present invention relates to a kind of exterior wall formwork system and job practices thereof of concrete construction.
Background technology
In the construction of construction work, it is big that underground construction cast-in-place concrete exterior wall structure has a thickness of wall body, the high characteristics of building floor height.One-sided circular arc body of wall is more common in the underground garage part.Owing to limited by field condition, when outer wall of basement and adjacent architectural engineering exterior wall do not have the construction operation face, can't construct according to traditional two-sided formwork way, the lateral pressure of form bracing system and buoyancy problem are difficult to solution.The circulation material that traditional two-sided formwork not only drops into is many, and effect is low, and less stable can not satisfy workmanship and schedule requirement.Particularly adjacent architectural engineering exterior wall is under the situation of circular arc, and there is big difficulty in installing of template, as adopts traditional formwork way, can increase difficulty of construction and cost undoubtedly.
Summary of the invention
The invention provides a kind of unilateral formwork erecting system of cast-in-site concrete arc outer wall body and job practices thereof, in the time of solving outer wall of basement and adjacent architectural engineering exterior wall and not having the construction operation face, the technical problem that traditional formwork way is difficult to implement.
The technical solution adopted for the present invention to solve the technical problems is:
This unilateral formwork erecting system of cast-in-site concrete arc outer wall body, comprise built-in fitting, circular arc wall form and bracing frame, described built-in fitting is one-sided to be embedded in as yet the not concrete building intralamellar part of the circular arc body of wall of cast below in advance, and the circular arc wall form is fixed in as yet not around the circular arc body of wall of cast by built-in fitting and unilateral component support again;
Described built-in fitting is made of stone bolt, attaching nut, pressure beam, outside connecting rod and outer nut, and the stone bolt lower horizontal is embedded in concrete floor inside in advance, and its top becomes the bending obliquely of 45 degree and stretches out concrete floor; Linked to each other with outside connecting rod by the attaching nut in stone bolt upper end, the outside connecting rod both sides are provided with the pressure beam that fixing unilateral component support is used, and outside connecting rod is equipped with outer nut above the pressure beam;
Described circular arc wall form is the assembled structure that is made of panel, perpendicular rib, hyphen rib, vertical edges rib and radian adjuster; Back side of panel is connected by tap bolt with perpendicular rib, the hyphen rib is connected between the adjacent perpendicular rib, and the hyphen rib is spaced apart in the horizontal direction, is connected with the radian adjuster between the hyphen rib, the vertical edges rib is connected in the panel dual-side, is connected with the radian adjuster between vertical edges rib and the hyphen rib;
Described unilateral component support is a triangular structure, the montant of unilateral component support is fixed by the hyphen rib of gib headed bolt and formwork with fastener-style and template, the place, right angle, bottom of unilateral component support is connected with short brace, the outside connecting rod of built-in fitting passes short brace, to press beam and short brace to compress by outer nut again, the relief angle place of unilateral component support is connected with the adjusting base, regulates the base lower support on scaffold.
Described built-in fitting distance each other is not more than 300mm, at the Origin And Destination place near one section circular arc body of wall a built-in fitting is set respectively.
Described circular arc wall form is a splicing construction, vertically is distributed with slotted hole on the vertical edges rib, and the vertical edges rib of two circular arc wall forms is connected by bolt.
The panel of described circular arc wall form adopts wood plywood, and perpendicular rib adopts a few word beams, and cross rib adopts short double flute steel, and the vertical edges rib adopts angle steel.
Between the montant and brace of described unilateral component support, all be connected with bracing piece between bottom bar and the brace, montant top is equipped with builder's jack.
Described unilateral component support distance each other is not more than 800mm.
This cast-in-site concrete arc outer wall body single side formwork job practices, construction sequence is as follows:
Step 5, scene are set up the required scaffold of unilateral component support, and scaffold by pre-buried earth anchorage on steel pipe diagonal brace and the concrete floor, is fixed the adjusting base and the scaffold of unilateral component support again;
Step 6, treat that circular arc wall form, unilateral component support all are in place after, each several part is adjusted, reinforces, is checked;
Step 8, treat that concrete strength reaches code requirement after, carry out mould bases and remove construction.
The assembling method of circular arc wall form is in the described step 2: hole → snap the line of beating dress vertical edges rib on snap the line → blanking on the panel → slab → panel is installed vertical edges rib → snap the line and is installed after perpendicular rib → installations adjuster and the good template of shackle → assembly unit by drawing, regulates template and meet the requirements of radian → template and hang liter and lean against on the piling bin.
The pre-assembly of unilateral component support with mounting method is in the described step 3: brace → be connected with built-in fitting → regulate unilateral component support verticality → installation builder's jack is lacked in the unilateral component support lifting unilateral component support main body → installation bracing piece → installation that puts in place → installs.
After the unilateral component support of described step 5 is in place, regulate base, suitable for reading until the circular arc wall form to the 5mm that inclines within the walls.
Beneficial effect of the present invention is as follows: single side formwork system of the present invention is made up of built-in fitting, circular arc wall form and unilateral component support three parts.Form surfacing adopts wood plywood, and because of wood plywood has certain toughness, generation is out of shape but can not be destroyed after applying suitable external force.Utilize this characteristic of wood plywood,, make panel curve needed radian, and the radian adjuster can make the edge joint position of two templates stressed moderate by the radian adjuster by geometry principle.Have slotted hole on the vertical edges rib, the vertical edges rib of two templates is interconnected by bolt, and this piece connected mode can guarantee the concordant and faulting of slab ends not of piece.The unilateral component support can adopt steel pipe to set up, and according to the requirement of engineering floor height, selects one-sided support body height.With gib headed bolt and formwork with fastener-style template back arris and one-sided holder part are linked to be integral body.Three parts are all hung the scope of operation then by pre-assembly unit and are assembled, and can guarantee the reliability and the efficiency of construction of constructing.
The present invention adopts adjustable circle curve body of wall single surface formwork job practices, and as the opposite side template, cast circular arc walls concrete has successfully solved the difficult problem that outer wall of basement and adjacent architectural engineering do not have the construction operation face between the two with the arc outer wall of adjacent architectural.Simultaneously, when the body of wall concreting, this single side formwork mode has all obtained successfully solving to the lateral pressure and the buoyancy problem of form bracing system.
The present invention has also shortened the construction period greatly, has saved the labour, has reduced construction cost, also can satisfy the requirement of structure construction quality, is particularly useful for the wall construction of the large public building of car ramp, stadiums and other arc structure.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the enlarged drawing of built-in fitting.
Fig. 3 is the perspective view of circular arc wall form.
Fig. 4 is the structural representation of edge joint position between the circular arc wall form.
Reference numeral: 1-built-in fitting, 1.1-stone bolt, 1.2-attaching nut, 1.3-press beam, 1.4-outside connecting rod, 1.5-outer nut; 2-circular arc wall form, 2.1-panel, the perpendicular rib of 2.2-, 2.3-hyphen rib, 2.4-vertical edges rib, 2.5-radian adjuster; 3-unilateral component support, 3.1-montant, 3.2-bottom bar, 3.3-brace, the short brace of 3.4-, 3.5-bracing piece; 4-gib headed bolt, 5-formwork with fastener-style, 6-regulate the arc outer wall of base, 7-concrete floor, 8-circular arc walls concrete, 9-scaffold, 10-builder's jack, 11-earth anchor, 12-steel pipe diagonal brace, 13-adjacent architectural.
The specific embodiment
Embodiment is referring to shown in Figure 1, this unilateral formwork erecting system of cast-in-site concrete arc outer wall body, comprise built-in fitting, circular arc wall form and bracing frame, described built-in fitting 1 one-sided not concrete floor 7 inside of the circular arc body of wall of cast below that are embedded in advance as yet, circular arc wall form 2 are fixed in as yet not around the circular arc body of wall of cast by built-in fitting 1 and unilateral component support 3 again.
Referring to shown in Figure 2, described built-in fitting 1 is made of stone bolt 1.1, attaching nut 1.2, pressure beam 1.3, outside connecting rod 1.4 and outer nut 1.5, the stone bolt lower horizontal is embedded in concrete floor inside in advance, and its top becomes the bending obliquely of 45 degree and stretches out concrete floor; Linked to each other with outside connecting rod 1.4 by attaching nut 1.2 in stone bolt upper end, the outside connecting rod both sides are provided with the pressure beam 1.3 that fixing unilateral component support is used, and outside connecting rod 1.4 is equipped with outer nut 1.5 above pressure beam 1.3.
Referring to shown in Figure 3, described circular arc wall form 2 is the assembled structures that are made of panel 2.1, perpendicular rib 2.2, hyphen rib 2.3, vertical edges rib 2.4 and radian adjuster 2.5; Panel 2.1 back sides and perpendicular rib 2.2 are connected by tap bolt, hyphen rib 2.3 is connected between the adjacent perpendicular rib 2.2, the hyphen rib is spaced apart in the horizontal direction, be connected with radian adjuster 2.5 between the hyphen rib, vertical edges rib 2.4 is connected in the panel dual-side, is connected with the radian adjuster between vertical edges rib and the hyphen rib.
The panel 2.1 of described circular arc wall form 2 adopts wood plywood, and perpendicular rib 2.2 adopts a few word beams, and cross rib 2.3 adopts short double flute steel, and vertical edges rib 2.4 adopts angle steel.
Referring to shown in Figure 4, described circular arc wall form 2 is a splicing construction, vertically is distributed with slotted hole on the vertical edges rib 2.4, and the vertical edges rib of two circular arc wall forms is connected by bolt.
Referring to shown in Figure 1, described unilateral component support 3 is a triangular structure, the montant 3.1 of unilateral component support is fixed with the hyphen rib of template by gib headed bolt 4 and formwork with fastener-style 5, the place, right angle, bottom of unilateral component support 3 is connected with short brace 3.4, the outside connecting rod 1.4 of built-in fitting passes short brace, to press beam 3 and short brace 3.4 to compress by outer nut 1.5 again, the relief angle place of unilateral component support 3 is connected with and regulates base 6, regulates the base lower support on scaffold 9.
Between the montant 3.1 and brace 3.3 of described unilateral component support 3, all be connected with bracing piece 3.4 between bottom bar 3.2 and the brace 3.3, montant top is equipped with builder's jack 10.
Referring to shown in Figure 1, this cast-in-site concrete arc outer wall body single side formwork job practices, construction sequence is as follows:
The assembling method of circular arc wall form 2 is: hole → snap the line of beating dress vertical edges rib on snap the line → blanking on the panel → slab → panel is installed vertical edges rib → snap the line and is installed after perpendicular rib → installations adjuster and the good template of shackle → assembly unit by drawing, regulates template and meet the requirements of radian → template and hang liter and lean against on the piling bin.
The pre-assembly of unilateral component support 3 with mounting method is: brace → be connected with built-in fitting → regulate unilateral component support verticality → installation builder's jack is lacked in the unilateral component support lifting unilateral component support main body → installation bracing piece → installation that puts in place → installs.
Step 5, the scene is set up the required scaffold 9(scaffold of unilateral component support and is adopted ∮ 48 * 3.5 steel pipes to set up, this scaffold is reinforced by adding the steel pipe diagonal brace, is stablized by earth anchor pre-buried on floor (∮ 25)), the adjusting base 6 of unilateral component support is fixed with scaffold, after unilateral component support 3 is in place, regulate base 6, suitable for reading until circular arc wall form (2) to the 5mm that inclines within the walls.
Step 6, treat that circular arc wall form, unilateral component support all are in place after, each several part is adjusted, reinforces, is checked;
Step 8, treat that concrete strength reaches code requirement after, carry out mould bases and remove construction.During decentering, earlier loosening support rear support, the loosening embedded part part in back.Hang away one-sided support unilateral component support then, template continues to abut on the metope, temporarily with in the steel pipe support.
Claims (10)
1. unilateral formwork erecting system of cast-in-site concrete arc outer wall body, comprise built-in fitting, circular arc wall form and bracing frame, it is characterized in that: described built-in fitting (1) is one-sided to be embedded in as yet not concrete floor (7) inside of the circular arc body of wall of cast below in advance, and circular arc wall form (2) is fixed in around the circular arc body of wall of not pouring into a mould as yet by built-in fitting (1) and unilateral component support (3) again;
Described built-in fitting (1) is made of stone bolt (1.1), attaching nut (1.2), pressure beam (1.3), outside connecting rod (1.4) and outer nut (1.5), the stone bolt lower horizontal is embedded in concrete floor inside in advance, and its top becomes the bending obliquely of 45 degree and stretches out concrete floor; Linked to each other with outside connecting rod (1.4) by attaching nut (1.2) in stone bolt upper end, the outside connecting rod both sides are provided with the pressure beam (1.3) that fixing unilateral component support is used, and outside connecting rod (1.4) is equipped with outer nut (1.5) in the top of pressure beam (1.3);
Described circular arc wall form (2) is the assembled structure that is made of panel (2.1), perpendicular rib (2.2), hyphen rib (2.3), vertical edges rib (2.4) and radian adjuster (2.5); Panel (2.1) back side is connected by tap bolt with perpendicular rib (2.2), hyphen rib (2.3) is connected between the adjacent perpendicular rib (2.2), the hyphen rib is spaced apart in the horizontal direction, be connected with radian adjuster (2.5) between the hyphen rib, vertical edges rib (2.4) is connected in the panel dual-side, is connected with the radian adjuster between vertical edges rib and the hyphen rib;
Described unilateral component support (3) is a triangular structure, the montant of unilateral component support (3.1) is fixed with the hyphen rib of template by gib headed bolt (4) and formwork with fastener-style (5), the place, right angle, bottom of unilateral component support (3) is connected with short brace (3.4), the outside connecting rod of built-in fitting (1.4) passes short brace, to press beam (3) and short brace (3.4) to compress by outer nut (1.5) again, the relief angle place of unilateral component support (3) is connected with and regulates base (6), regulates the base lower support on scaffold (9).
2. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 1 is characterized in that: described built-in fitting (1) distance each other is not more than 300mm, at the Origin And Destination place near one section circular arc body of wall a built-in fitting is set respectively.
3. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 1, it is characterized in that: described circular arc wall form (2) is a splicing construction, the vertical edges rib vertically is distributed with slotted hole on (2.4), and the vertical edges rib of two circular arc wall forms is connected by bolt.
4. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 3, it is characterized in that: the panel (2.1) of described circular arc wall form (2) adopts wood plywood, perpendicular rib (2.2) adopts a few word beams, cross rib (2.3) adopts short double flute steel, and vertical edges rib (2.4) adopts angle steel.
5. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 1, it is characterized in that: between the montant (3.1) and brace (3.3) of described unilateral component support (3), all be connected with bracing piece (3.4) between bottom bar (3.2) and the brace (3.3), montant top is equipped with builder's jack (10).
6. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 5 is characterized in that: described unilateral component support (3) distance each other is not more than 800mm.
7. any cast-in-site concrete arc outer wall body single side formwork job practices of claim 1-6 is characterized in that construction sequence is as follows:
Step 1 is provided with built-in fitting (1) on the concrete floor (7) below the circular arc body of wall of not pouring into a mould as yet;
Step 2 is pieced together circular arc wall form (2) in advance;
Step 3, on-the-spot pre-the assembly and installation unilateral component support (3), unilateral component support and built-in fitting is fastening, thus the bottom and the concrete floor of unilateral component support (3) are fixed,
Step 4 is connected unilateral component support (3) with circular arc wall form (2);
Step 5, scene are set up the required scaffold of unilateral component support (9), and scaffold is fixing by earth anchor (11) pre-buried on steel pipe diagonal brace (12) and the concrete floor, the adjusting base (6) of unilateral component support are fixed with scaffold again;
Step 6, treat that circular arc wall form, unilateral component support all are in place after, each several part is adjusted, reinforces, is checked;
Step 7 is built circular arc walls concrete (8) between the arc outer wall (13) of circular arc wall form and adjacent architectural;
Step 8, treat that concrete strength reaches code requirement after, carry out mould bases and remove construction.
8. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 7 is characterized in that: the assembling method of circular arc wall form (2) is in the described step 2: hole → snap the line of beating dress vertical edges rib on snap the line → blanking on the panel → slab → panel is installed vertical edges rib → snap the line and is installed after perpendicular rib → installations adjuster and the good template of shackle → assembly unit by drawing, regulates template and meet the requirements of radian → template and hang liter and lean against on the piling bin.
9. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 7 is characterized in that: the pre-assembly of unilateral component support (3) with mounting method is in the described step 3: brace → be connected with built-in fitting → regulate unilateral component support verticality → installation builder's jack is lacked in the unilateral component support lifting unilateral component support main body → installation bracing piece → installation that puts in place → installs.
10. unilateral formwork erecting system of cast-in-site concrete arc outer wall body according to claim 7, it is characterized in that: after the unilateral component support (3) of described step 5 is in place, regulate base (6), suitable for reading until circular arc wall form (2) to the 5mm that inclines within the walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010164456 CN101839061A (en) | 2010-05-06 | 2010-05-06 | Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010164456 CN101839061A (en) | 2010-05-06 | 2010-05-06 | Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101839061A true CN101839061A (en) | 2010-09-22 |
Family
ID=42742702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010164456 Pending CN101839061A (en) | 2010-05-06 | 2010-05-06 | Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101839061A (en) |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505635A (en) * | 2011-10-18 | 2012-06-20 | 中铁大桥局股份有限公司 | Cast-in-situ formwork for bridge construction |
CN102650164A (en) * | 2012-04-24 | 2012-08-29 | 中天建设集团有限公司 | Foot supporting and size control device of aluminium alloy shear wall formwork |
CN102797357A (en) * | 2012-09-11 | 2012-11-28 | 江西省发达建筑集团有限公司 | Construction method of single-side mould supporting system |
CN103061503A (en) * | 2013-01-15 | 2013-04-24 | 中国石油天然气股份有限公司 | Ring beam template |
CN103243907A (en) * | 2013-05-10 | 2013-08-14 | 江苏南通二建集团有限公司 | Novel shear wall template reinforcing system |
CN103334581A (en) * | 2013-07-12 | 2013-10-02 | 中国建筑股份有限公司 | Vertical form board scaffold device |
CN103912008A (en) * | 2014-04-02 | 2014-07-09 | 中国建筑第八工程局有限公司 | Unilateral formwork structure and construction method thereof |
CN104213708A (en) * | 2014-10-09 | 2014-12-17 | 国家电网公司 | Integral construction method of anchor bolt-free fireproof wall |
CN104452812A (en) * | 2014-12-04 | 2015-03-25 | 上海建工五建集团有限公司 | Construction method of basement outer wall |
CN104806015A (en) * | 2015-02-17 | 2015-07-29 | 中交一航局第四工程有限公司 | Single-side wall formwork support construction method |
CN104895321A (en) * | 2015-03-23 | 2015-09-09 | 保定市北市区青江建筑机械制造厂 | Support frame for rapid installation of wall formworks |
CN105569330A (en) * | 2015-12-18 | 2016-05-11 | 中国建筑第二工程局有限公司 | Building outer frame large-section special-shaped column reinforced formwork and construction method thereof |
CN105781099A (en) * | 2016-03-09 | 2016-07-20 | 上海市基础工程集团有限公司 | Movable combined type one-sided large template structure and construction method thereof |
CN105781100A (en) * | 2016-04-28 | 2016-07-20 | 中国水利水电第八工程局有限公司 | Template component for sidewall of subway station |
CN107013033A (en) * | 2017-04-26 | 2017-08-04 | 中铁十八局集团有限公司 | A kind of concrete side wall formwork for placing and its construction method |
CN108166750A (en) * | 2018-02-01 | 2018-06-15 | 齐齐哈尔大学 | A kind of manpower-free's vibrated concrete wall construction template and implementing process |
CN108590165A (en) * | 2018-05-04 | 2018-09-28 | 江苏扬州建工建设集团有限公司 | A kind of construction method of deep basal pit concrete of basement exterior wall |
CN108951840A (en) * | 2018-08-08 | 2018-12-07 | 杭州江润科技有限公司 | Based on setting bracket single side formwork basement arc external wall construction method |
CN109056737A (en) * | 2018-06-22 | 2018-12-21 | 中建五局华东建设有限公司 | Deep basal pit outer wall of basement integrates the construction method of one side formwork support system |
CN109162296A (en) * | 2018-08-29 | 2019-01-08 | 中建局集团建设发展有限公司 | Single side formwork system and the construction method poured using system progress exterior wall |
CN109339825A (en) * | 2018-12-04 | 2019-02-15 | 中铁六局集团有限公司 | Tunnel sidewalls template construction support device and construction method |
CN110645022A (en) * | 2019-10-29 | 2020-01-03 | 中建八局轨道交通建设有限公司 | Self-anchored formwork support system for connecting channel and construction method |
CN110847445A (en) * | 2019-11-25 | 2020-02-28 | 苏州二建建筑集团有限公司 | Construction method for integrally forming outer wall and bottom plate of cast-in-place concrete structure of structure |
CN111236626A (en) * | 2020-03-11 | 2020-06-05 | 中铁二局第一工程有限公司 | Side wall unilateral template support system combining composite fiber template and steel truss |
CN111305262A (en) * | 2020-02-24 | 2020-06-19 | 中国建筑第二工程局有限公司 | Construction method for tool type formwork on single side of comprehensive pipe gallery |
CN112112422A (en) * | 2020-09-18 | 2020-12-22 | 中铁济南工程建设监理有限公司 | Template support assembly for subway station side wall and supervision method thereof |
CN112359872A (en) * | 2020-11-14 | 2021-02-12 | 江苏省华建建设股份有限公司 | Construction method for single-side formwork erection of underground outer wall of constructional engineering |
CN112523258A (en) * | 2020-11-27 | 2021-03-19 | 中国建筑第二工程局有限公司 | Portable single-side formwork supporting system and construction method thereof |
CN113107189A (en) * | 2021-04-16 | 2021-07-13 | 李鑫 | Aluminum template structure |
CN114086758A (en) * | 2021-11-25 | 2022-02-25 | 北京住总集团有限责任公司工程总承包二部 | Loose-spliced bare concrete arc wall formwork and installation method thereof |
CN117266243A (en) * | 2023-11-23 | 2023-12-22 | 北京建工集团有限责任公司 | Unilateral formwork construction method for special-shaped cross section well-shaped underground building |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4463926A (en) * | 1981-10-19 | 1984-08-07 | GIBA AG Gesellschaft fur Industrialisierung in Bauwesen | Assembly of casing elements for pouring of concrete |
EP1870537A1 (en) * | 2005-04-11 | 2007-12-26 | Sistemas Técnicos de Encofrados, S.A. | Formwork panel for walls and columns |
CN201635388U (en) * | 2010-05-06 | 2010-11-17 | 中国建筑第二工程局有限公司 | Cast-in-place concrete arc outer wall body unilateral formwork system |
-
2010
- 2010-05-06 CN CN 201010164456 patent/CN101839061A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4463926A (en) * | 1981-10-19 | 1984-08-07 | GIBA AG Gesellschaft fur Industrialisierung in Bauwesen | Assembly of casing elements for pouring of concrete |
EP1870537A1 (en) * | 2005-04-11 | 2007-12-26 | Sistemas Técnicos de Encofrados, S.A. | Formwork panel for walls and columns |
CN201635388U (en) * | 2010-05-06 | 2010-11-17 | 中国建筑第二工程局有限公司 | Cast-in-place concrete arc outer wall body unilateral formwork system |
Non-Patent Citations (3)
Title |
---|
《建筑技术》 20040215 段劲松等 地下室弧形墙单侧模板施工技术 , 第02期 * |
《施工技术》 20080618 段春伟 安德大厦工程地下墙体单侧支模施工技术 41-43 第37卷, 第6期 * |
《第18届全国结构工程学术会议论文集第Ⅱ册》 20091128 李春安,杨凯明 地下室现浇混凝土圆弧外墙体单侧支模施工技术 62-65 * |
Cited By (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505635A (en) * | 2011-10-18 | 2012-06-20 | 中铁大桥局股份有限公司 | Cast-in-situ formwork for bridge construction |
CN102505635B (en) * | 2011-10-18 | 2014-01-15 | 中铁大桥局股份有限公司 | Cast-in-situ formwork for bridge construction |
CN102650164A (en) * | 2012-04-24 | 2012-08-29 | 中天建设集团有限公司 | Foot supporting and size control device of aluminium alloy shear wall formwork |
CN102797357A (en) * | 2012-09-11 | 2012-11-28 | 江西省发达建筑集团有限公司 | Construction method of single-side mould supporting system |
CN103061503A (en) * | 2013-01-15 | 2013-04-24 | 中国石油天然气股份有限公司 | Ring beam template |
CN103243907A (en) * | 2013-05-10 | 2013-08-14 | 江苏南通二建集团有限公司 | Novel shear wall template reinforcing system |
CN103334581A (en) * | 2013-07-12 | 2013-10-02 | 中国建筑股份有限公司 | Vertical form board scaffold device |
CN103912008A (en) * | 2014-04-02 | 2014-07-09 | 中国建筑第八工程局有限公司 | Unilateral formwork structure and construction method thereof |
CN104213708A (en) * | 2014-10-09 | 2014-12-17 | 国家电网公司 | Integral construction method of anchor bolt-free fireproof wall |
CN104452812A (en) * | 2014-12-04 | 2015-03-25 | 上海建工五建集团有限公司 | Construction method of basement outer wall |
CN104806015A (en) * | 2015-02-17 | 2015-07-29 | 中交一航局第四工程有限公司 | Single-side wall formwork support construction method |
CN104895321A (en) * | 2015-03-23 | 2015-09-09 | 保定市北市区青江建筑机械制造厂 | Support frame for rapid installation of wall formworks |
CN105569330A (en) * | 2015-12-18 | 2016-05-11 | 中国建筑第二工程局有限公司 | Building outer frame large-section special-shaped column reinforced formwork and construction method thereof |
CN105781099A (en) * | 2016-03-09 | 2016-07-20 | 上海市基础工程集团有限公司 | Movable combined type one-sided large template structure and construction method thereof |
CN105781100A (en) * | 2016-04-28 | 2016-07-20 | 中国水利水电第八工程局有限公司 | Template component for sidewall of subway station |
CN105781100B (en) * | 2016-04-28 | 2019-03-08 | 中国水利水电第八工程局有限公司 | Template component for subway station side wall |
CN107013033A (en) * | 2017-04-26 | 2017-08-04 | 中铁十八局集团有限公司 | A kind of concrete side wall formwork for placing and its construction method |
CN108166750A (en) * | 2018-02-01 | 2018-06-15 | 齐齐哈尔大学 | A kind of manpower-free's vibrated concrete wall construction template and implementing process |
CN108166750B (en) * | 2018-02-01 | 2024-02-02 | 齐齐哈尔大学 | Template for construction of concrete wall without manual vibration and implementation process |
CN108590165A (en) * | 2018-05-04 | 2018-09-28 | 江苏扬州建工建设集团有限公司 | A kind of construction method of deep basal pit concrete of basement exterior wall |
CN109056737A (en) * | 2018-06-22 | 2018-12-21 | 中建五局华东建设有限公司 | Deep basal pit outer wall of basement integrates the construction method of one side formwork support system |
CN108951840A (en) * | 2018-08-08 | 2018-12-07 | 杭州江润科技有限公司 | Based on setting bracket single side formwork basement arc external wall construction method |
CN109162296B (en) * | 2018-08-29 | 2023-10-24 | 中建一局集团建设发展有限公司 | Single-side formwork supporting system and construction method for pouring outer wall by utilizing same |
CN109162296A (en) * | 2018-08-29 | 2019-01-08 | 中建局集团建设发展有限公司 | Single side formwork system and the construction method poured using system progress exterior wall |
CN109339825A (en) * | 2018-12-04 | 2019-02-15 | 中铁六局集团有限公司 | Tunnel sidewalls template construction support device and construction method |
CN110645022A (en) * | 2019-10-29 | 2020-01-03 | 中建八局轨道交通建设有限公司 | Self-anchored formwork support system for connecting channel and construction method |
CN110847445A (en) * | 2019-11-25 | 2020-02-28 | 苏州二建建筑集团有限公司 | Construction method for integrally forming outer wall and bottom plate of cast-in-place concrete structure of structure |
CN111305262A (en) * | 2020-02-24 | 2020-06-19 | 中国建筑第二工程局有限公司 | Construction method for tool type formwork on single side of comprehensive pipe gallery |
CN111236626A (en) * | 2020-03-11 | 2020-06-05 | 中铁二局第一工程有限公司 | Side wall unilateral template support system combining composite fiber template and steel truss |
CN112112422A (en) * | 2020-09-18 | 2020-12-22 | 中铁济南工程建设监理有限公司 | Template support assembly for subway station side wall and supervision method thereof |
CN112359872A (en) * | 2020-11-14 | 2021-02-12 | 江苏省华建建设股份有限公司 | Construction method for single-side formwork erection of underground outer wall of constructional engineering |
CN112523258B (en) * | 2020-11-27 | 2022-05-24 | 中国建筑第二工程局有限公司 | Portable single-side formwork supporting system and construction method thereof |
CN112523258A (en) * | 2020-11-27 | 2021-03-19 | 中国建筑第二工程局有限公司 | Portable single-side formwork supporting system and construction method thereof |
CN113107189A (en) * | 2021-04-16 | 2021-07-13 | 李鑫 | Aluminum template structure |
CN114086758A (en) * | 2021-11-25 | 2022-02-25 | 北京住总集团有限责任公司工程总承包二部 | Loose-spliced bare concrete arc wall formwork and installation method thereof |
CN117266243A (en) * | 2023-11-23 | 2023-12-22 | 北京建工集团有限责任公司 | Unilateral formwork construction method for special-shaped cross section well-shaped underground building |
CN117266243B (en) * | 2023-11-23 | 2024-03-01 | 北京建工集团有限责任公司 | Unilateral formwork construction method for special-shaped cross section well-shaped underground building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101839061A (en) | Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof | |
CN201635388U (en) | Cast-in-place concrete arc outer wall body unilateral formwork system | |
US6134861A (en) | Foundation construction method | |
KR101432260B1 (en) | Steel-exposed type steel framed reinforced concrete pillar | |
KR101327388B1 (en) | The pc wall for water-storage tank of assembly type and method for constructing thereof | |
KR20180072968A (en) | Permanent form for pier and construction method using the same | |
KR101844344B1 (en) | the rigid connection structure between precast concrete column and precast concrete beam, the construction method of rigid connection structure using the same | |
KR101277751B1 (en) | Precast Concrete Blocks and Remodeling Reinforcing Construction Methods for Low and Middle-rise Beam-column Buildings by Using that Blocks | |
CN111877546A (en) | Fabricated frame beam-column wet joint with buckling restrained brace and construction method | |
KR20080100740A (en) | Strut system of temporary plate with opening supporting temporary retaining wall and subgrade external wall construction method utilizing the same | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN213359004U (en) | Stably-spliced lifting wall | |
CN211421637U (en) | Connecting structure of prefabricated gutter | |
EP1561874A1 (en) | Connecting device and node for buildings with prefabricated elements | |
KR101836896B1 (en) | the rigid connection structure between precast concrete column and precast concrete beam, the construction method of rigid connection structure using the same | |
KR100860592B1 (en) | Temporary system for vertical structure using precast concreat block | |
JP5130137B2 (en) | Renovation method for existing foundation of wooden construction | |
CN212336729U (en) | Formwork supporting system | |
CN209040478U (en) | A kind of out-hung panel fixed structure | |
KR101143553B1 (en) | Construction method for building remodeling by using pc panel for building remodeling, and connecting structure for remodeling pc panel | |
CN111364758A (en) | Formwork supporting system | |
KR20190123408A (en) | Mounting Apparatus For Supporting Frames | |
CN218148907U (en) | Full-assembly full-turnover assembly type building capable of being built quickly | |
KR101617713B1 (en) | Seismic Reinforcement Method of Unreinforced Masonry Structure using Masonry-Joint Embedded Reinforcement Steel and its Reinforcing Structure | |
CN214725092U (en) | Quick-release floor formwork structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100922 |