A kind of filling mining method, system and the terminal device of electricity consumption data
Technical field
The invention belongs to filling mining method, system and the ends of computer application technology more particularly to a kind of electricity consumption data
End equipment.
Background technique
With the propulsion of national smart grid, the manual meter reading mode of gradually abandoning tradition is adopted in the acquisition of electricity consumption data
Meter reading method is controlled with remote terminal, and meter reading data is transmitted to electricity by modes such as GPRS, CDMA, 230M, optical fiber and is adopted
Collecting system is analyzed and is applied.Due to some (for example, network environment is unstable), coulomb collection system can not succeed remote
Journey collects the electricity consumption data of electric energy meter record, needs to carry out filling mining, that is, needs to be acquired the use of electric energy meter record again
Electric data.
In the prior art, when carrying out filling mining to electric energy meter, the filling mining of finite number of time is only carried out to the electric energy meter, for example,
3 filling minings are only carried out, if also no longer carrying out filling mining, but automatic filling is false still without the electricity consumption data for collecting the electric energy meter
Number, the accuracy of data acquisition and success rate are lower, therefore, exist in such a way that finite number of time carries out filling mining electricity consumption data
The lower problem of the accuracy and success rate that data acquire.
Summary of the invention
In view of this, the embodiment of the invention provides filling mining method, system and the terminal device of a kind of electricity consumption data, with solution
Certainly in the prior art finite number of time carry out filling mining electricity consumption data by way of there are data acquisition accuracy and success rate compared with
Low problem
The first aspect of the embodiment of the present invention provides a kind of filling mining method of electricity consumption data, is applied to terminal device, packet
It includes:
Filling mining information table is obtained, the filling mining information table includes several electric energy meter information.
According to the electric energy meter information, the test Connection Time of each electric energy meter is determined, and obtain test connection failure
The number of electric energy meter.
Obtain the load threshold value of the terminal device.
According to current time, the load threshold value, the number of the electric energy meter for testing connection failure and each electric energy meter
The test Connection Time calculate the weighted value of each electric energy meter.
Obtain the current loads value of the terminal device.
If the current loads value is less than or equal to the load threshold value, according to descending suitable of the weighted value
Sequence successively sends electricity consumption data acquisition instructions to corresponding electric energy meter.
The second aspect of the embodiment of the present invention provides a kind of filling mining system of electricity consumption data, is applied to terminal device, packet
It includes:
Filling mining data obtaining module, for obtaining filling mining information table, the filling mining information table is believed comprising several electric energy meters
Breath.
Data obtaining module is tested, for determining the test Connection Time of each electric energy meter according to the electric energy meter information,
And obtain the number of the electric energy meter of test connection failure.
Load threshold value obtains module, for obtaining the load threshold value of the terminal device.
Weight value calculation module, for according to current time, the load threshold value, the electric energy meter for testing connection failure
Number and test Connection Time of each electric energy meter calculate the weighted value of each electric energy meter.
Current loads obtain module, for obtaining the current loads value of the terminal device.
Acquisition instructions sending module, if being less than or equal to the load threshold value for the current loads value, according to
The descending sequence of the weighted value successively sends electricity consumption data acquisition instructions to corresponding electric energy meter.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in
In the memory and the computer program that can run on the processor, when the processor executes the computer program
The step of realizing the filling mining method of electricity consumption data as described above.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage
Media storage has computer program, and the computer program realizes the filling mining of electricity consumption data as described above when being executed by processor
The step of method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the embodiment of the present invention is obtained comprising electric energy meter
The filling mining information table of information, and according to filling mining information table determine the corresponding electric energy meter of each electric energy meter information test connect when
Between and determine test connection failure electric energy meter number, according to test the Connection Time and test connection failure electric energy meter
Number and other information calculate the weighted value of each electric energy meter, by the current loads value of terminal device and load threshold value into
Row compares, and when current loads value is less than or equal to load threshold value, then according to the sequence of the weighted value of electric energy meter, electricity consumption is adopted
Collection instruction is sent to electric energy meter, carries out filling mining, is only the time difference that electric energy meter carries out filling mining, finally can all collect electric energy meter
True electricity consumption data, there is no the limitations of filling mining number, there are no that need to fill mantissa automatically, improve the accuracy of data acquisition
And success rate.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process schematic diagram of the filling mining method of electricity consumption data provided by one embodiment of the present invention;
Fig. 2 is the specific implementation flow schematic diagram of step S102 in Fig. 1 provided by one embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the filling mining system of electricity consumption data provided by one embodiment of the present invention;
Fig. 4 is the concrete structure schematic diagram of the test data obtaining module in Fig. 3 provided by one embodiment of the present invention;
Fig. 5 is the schematic diagram of terminal device provided by one embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Embodiment 1:
Fig. 1 shows the implementation process of the filling mining method of the electricity consumption data of one embodiment of the present of invention offer, this implementation
The process executing subject of example is terminal device, and details are as follows for process:
In step s101, filling mining information table is taken, filling mining information table includes several electric energy meter information.
In one embodiment, before step S101, comprising:
1) electric energy meter information corresponding electric energy meter of the electricity consumption data acquisition instructions into terminal control queue is successively sent.
If 2) receive the electricity consumption data of electric energy meter feedback, the electricity consumption data of electric energy meter feedback is saved.
If 3) do not receive the electricity consumption data of electric energy meter feedback, the corresponding electric energy of electric energy meter that will not feed back electricity consumption data
Table information is added to filling mining information table.
In the present embodiment, the electric energy meter information in terminal control queue is the corresponding electricity of electric energy meter of terminal device control
It can table information.
In the present embodiment, the number for obtaining terminal device obtains whole electric energy meter information, if in electric energy meter information
Terminal number is consistent with the number of the terminal device, then the electric energy meter information is added in terminal control queue.
In the present embodiment, terminal device daily requirement obtains the electricity consumption data for the electric energy meter record that it is controlled, terminal
Equipment daily requirement sends the electric energy meter that electricity consumption data acquisition instructions are controlled to the terminal unit remote, electricity consumption data acquisition instructions
It is used to indicate electric energy meter and the electricity consumption data of record is fed back into terminal device.If terminal device receives the electricity consumption of electric energy meter feedback
Data then need to only record the electricity consumption data of the electric energy meter, if the electricity consumption data of electric energy meter feedback is not received, by the electric energy meter
For corresponding electric energy meter information preservation to filling mining information table, the electric energy meter information that filling mining information table saves is in terminal device first time
After sending electricity consumption data acquisition instructions, the information of the electric energy meter of feedback electricity consumption data is not carried out.
In the present embodiment, electric energy meter information further includes electric energy meter address and electric energy meter table number.
In the present embodiment, it is based on electric energy meter mailing address, terminal device can be established with electric energy meter and be communicated.Electric energy meter is
Intelligent electric energy meter.For example, communication mode is gsm communication, then electric energy meter address is the card number of SIM card.
In the present embodiment, electric energy meter table number is for distinguishing electric energy meter.
In step s 102, it according to electric energy meter information, determines the test Connection Time of each electric energy meter, and obtains test and connect
Connect the number of the electric energy meter of failure.
In the present embodiment, it obtains the test Connection Time of each electric energy meter and obtains whole test connection failures
The number of electric energy meter.
In step s 103, the load threshold value of terminal device is obtained.
In one embodiment of the invention, step S103 includes:
1) corresponding peak load value every day in the continuous preset number of days before acquisition current time.
2) basisCalculated load threshold value, wherein V is load threshold value, and S is preset ratio, LiFor
I-th day corresponding peak load value, t is preset number of days.
In the present embodiment, peak load value is CPU (central processing unit, the Central Processing of terminal device
Unit) the maximum value of utilization rate.
By taking a concrete application scene as an example, preset number of days be 3 days, obtain current time before in 3 days daily most
Big load value then obtains April 9, April 8 and corresponding terminal device on April 7 for example, current time is April 10 respectively
CPU usage maximum value.
In step S104, according to current time, load threshold value, test connection failure electric energy meter number and each electricity
The test Connection Time of energy table calculates the weighted value of each electric energy meter.
In one embodiment of the invention, according to W=(1-V) * [M- (T-T1)*M*N1/ n] calculate electric energy meter weight
Value, wherein W is the weighted value of electric energy meter, and V is load threshold value, and M is the second default value, N1For third default value, T is to work as
Preceding moment, T1For the test Connection Time of electric energy meter, n is the number for testing the electric energy meter of connection failure.
In the present embodiment, the second default value can be 10, and third default value is 60.
In the present embodiment, current time is obtained, and current time is subtracted to the test Connection Time of electric energy meter.When current
It carves and the representation of test Connection Time is Hour Minute Second, for example, 1 dividing 1 second when 140101,14.
In the present embodiment, terminal device is sending default test information, and records the test connection of each electric energy meter
After time, the weighted value of the corresponding electric energy meter of each electric energy meter information in filling mining information table is calculated.
In step s105, the current loads value of terminal device is obtained.
In the present embodiment, the current loads value of terminal device is the CPU usage at terminal device current time.
In step s 106, descending according to weighted value if current loads value is less than or equal to load threshold value
Sequentially, electricity consumption data acquisition instructions are successively sent to corresponding electric energy meter.
In the present embodiment, if current loads value is less than or equal to load threshold value, indicate that the current CPU of terminal device is used
Rate is lower, and the current speed of service of terminal device is very fast and can preferably be responded, therefore, descending according to weighted value
Sequence, successively send electricity consumption data acquisition instructions to corresponding electric energy meter, that is, first send electricity consumption data acquisition instructions to weight
It is worth big electric energy meter, then retransmits the electricity consumption data acquisition instructions electric energy meter small to weighted value.
In one embodiment, if current loads value be greater than load threshold value, indicate the current CPU usage of terminal device compared with
Height, cpu load is excessive, leads to aggravate cpu load in order to avoid there is increase new task, makes the speed of service of terminal device more
Add slowly, or even the case where crashing and new task is caused to execute failure occur, at this point, terminal device is not led to electric energy meter
Letter, terminal device need to only reacquire current time, be updated to the weighted value of electric energy meter.
In the present embodiment, by the way that the current CPU usage of terminal device to be compared with load threshold value, if currently
CPU usage is less than load threshold value, then can carry out filling mining, avoids the occurrence of and causes filling mining task since terminal device load is larger
The case where executing failure improves the success rate of data acquisition.
In one embodiment of the invention, after step s 106, comprising:
If receiving the electricity consumption data of electric energy meter feedback, the electric energy meter of feedback electricity consumption data is deleted from filling mining information table
Corresponding electric energy meter information.
In the present embodiment, if receiving the electricity consumption data of electric energy feedback, without retransmiting electricity consumption data acquisition instructions
To the electric energy meter for having fed back electricity consumption data, therefore, the electric energy meter information that filling mining information table saves is deleted.
In one embodiment of the invention, after step s 106, further includes:
If 1) do not receive the electricity consumption data of electric energy meter feedback, the electric energy meter of electricity consumption data will not be fed back as target electricity
Energy table, the corresponding feedback data frequency of failure of more fresh target electric energy meter;
2) connected according to current time, load threshold value, the number of electric energy meter for testing connection failure, the test of target electric energy meter
The feedback data frequency of failure for connecing time and target electric energy meter recalculates the weighted value of target electric energy meter.
In one embodiment, the corresponding feedback data frequency of failure of more fresh target electric energy meter is in feedback data failure time
Cumulative 1 on number.
In the present embodiment, in the filling mining stage, if terminal device has sent electricity consumption data acquisition instructions to target electric energy
Table, but presetting the electricity consumption data for not receiving target electric energy meter feedback in acquisition time, it is determined that feedback data failure, target
The feedback data frequency of failure of electric energy meter adds 1.
In the present embodiment, the feedback data frequency of failure for obtaining current time, target electric energy meter, recalculates electric energy meter
Weighted value, and sequence again descending according to weighted value retransmits electricity consumption data acquisition instructions to corresponding electric energy
Table.
In one embodiment of the invention, according to W1=(1-V) * [M- (T-T1)*M*N1/n]*(1-S/N2) count again
The weighted value for calculating target electric energy meter, obtains the new weighted value of target electric energy meter, wherein W1For the new weight of target electric energy meter
Value, V are load threshold value, and M is the second default value, and T is current time, T1For the test Connection Time of target electric energy meter, N1It is
Three default values, n are the number for testing the electric energy meter of connection failure, and S is the feedback data frequency of failure of target electric energy meter, N2For
4th default value.
In the present embodiment, the second default value, third default value and the 4th default value are all that related personnel is preparatory
The value of preservation, for example, the second default value is 10, third default value is 60, and the 4th default value is 3.
In the present embodiment, the filling mining information table comprising electric energy meter information is obtained, and is determined often according to filling mining information table
The test Connection Time of the corresponding electric energy meter of a electric energy meter information and determine test connection failure electric energy meter number, root
The weight of each electric energy meter is calculated according to the number and other information of test Connection Time and the electric energy meter for testing connection failure
Value, the current loads value of terminal device is compared with load threshold value, when current loads value is less than or equal to load threshold value
When, then according to the sequence of the weighted value of electric energy meter, electricity consumption acquisition instructions are sent to electric energy meter, filling mining is carried out, is only electric energy meter
The time for carrying out filling mining is different, finally can all collect the true electricity consumption data of electric energy meter, there is no the limitations of filling mining number, more
Without filling mantissa automatically, the accuracy and success rate of data acquisition are improved.
The specific implementation flow of the step S102 in Fig. 1 provided Fig. 2 shows one embodiment of the present of invention, process
Details are as follows:
In step s 201, an electric energy meter information is chosen from filling mining information table, and default test information is sent to
The electric energy meter of selection.
In the present embodiment, in the filling mining stage, terminal device needs before sending electricity consumption data acquisition instructions to electric energy meter
Test connection is first carried out, that is, sends test information to electric energy meter, sees whether electric energy meter can be successful anti-in default receiving time
The first information is presented, to judge whether the signal of electric energy meter local environment is good, if can be successfully established with terminal device
Communication, realizes the detection of communication channel.
In one embodiment, since a region may be that there are multiple electric energy meters, if the region is at a time
Signal it is not so good, then the region whole electric energy meters possibly can not be properly received terminal device transmission default test information or
Person can not successfully feed back the first information to terminal device, cause to test connection failure, therefore, according to arbitrary width, believe from filling mining
It ceases and chooses electric energy meter information in table, i.e., be spaced between the electric energy meter information currently chosen and the last electric energy meter information chosen
The number of electric energy meter information is random, rather than fixed, for example, the electric energy meter information chosen for the first time is filling mining information table
In the 5th electric energy meter information, the second electric energy meter information chosen is the 7th electric energy meter information in filling mining information table, that is, step-length is
2, the electric energy meter information that third time is chosen is the 10th electric energy meter information in filling mining information table, i.e. step-length is 3 again.
In step S202, if receive selection electric energy meter feedback the first information, by receive the first information when
Between test Connection Time as corresponding electric energy meter.
In the present embodiment, if receiving the first information of the electric energy meter feedback of selection, table in default receiving time
Show the electric energy meter test successful connection of terminal device and selection, the channel open between terminal device and the electric energy meter, record connects
Receive the time of the first information of the electric energy meter feedback of selection, and the test Connection Time of the electric energy meter as selection.
In step S203, if not receiving the first information of the electric energy meter feedback of selection, the first default value is made
For the test Connection Time of electric energy meter.
In the present embodiment, if not receiving the first information of electric energy meter feedback, terminal device in default receiving time
Channel signal between the electric energy meter is poor, in order to avoid due to sending test information always to the electric energy meter chosen and waiting
The waste that resource is caused to the electric energy meter feedback first information, when directly connecting the first default value as the test of electric energy meter
Between, the first default value is 0.
In step S204, statistics does not feed back the number of the electric energy meter of the first information, obtains the electric energy of test connection failure
The number of table.
In the present embodiment, the number for not feeding back the electric energy meter of the first information all is obtained, and as test connection failure
Electric energy meter number.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Embodiment 2:
Fig. 3 shows the filling mining system 100 of the electricity consumption data of one embodiment of the present of invention offer, for executing Fig. 1 institute
Method and step in corresponding embodiment is applied to terminal device comprising:
Filling mining data obtaining module 110, for obtaining filling mining information table, filling mining information table is believed comprising several electric energy meters
Breath.
Data obtaining module 120 is tested, for determining the test Connection Time of each electric energy meter according to electric energy meter information,
And obtain the number of the electric energy meter of test connection failure.
Load threshold value obtains module 130, for obtaining the load threshold value of terminal device.
Weight value calculation module 140, for according to current time, load threshold value, test connection failure electric energy meter number
The test Connection Time of mesh and each electric energy meter calculates the weighted value of each electric energy meter.
Current loads obtain module 150, for obtaining the current loads value of terminal device.
Acquisition instructions sending module 160, if being less than or equal to load threshold value for current loads value, according to weighted value
Descending sequence successively sends electricity consumption data acquisition instructions to corresponding electric energy meter.
In one embodiment of the invention, load threshold value acquisition module 130 includes:
Peak load value acquiring unit, it is corresponding for every day in the continuous preset number of days before obtaining current time
Peak load value;
Load threshold value computing unit is used for basisCalculated load threshold value, wherein V is load threshold
Value, S is preset ratio, LiFor i-th day corresponding peak load value, t was preset number of days.
In one embodiment of the invention, weight value calculation module 140 is used for:
According to W=(1-V) * [M- (T-T1)*M*N1/ n] calculate electric energy meter weighted value, wherein W be electric energy meter weight
Value, V are load threshold value, and M is the second default value, and T is current time, T1For the test Connection Time of electric energy meter, N1It is pre- for third
If numerical value, n is the number for testing the electric energy meter of connection failure.
In one embodiment of the invention, acquisition instructions sending module 160 further include:
First processing units are deleted anti-if the electricity consumption data for receiving electric energy meter feedback from filling mining information table
Present the corresponding electric energy meter information of electric energy meter of electricity consumption data.
In one embodiment of the invention, acquisition instructions sending module 160 further include:
The second processing unit, if the electricity consumption data for not receiving electric energy meter feedback, will not feed back electricity consumption data
Electric energy meter is as target electric energy meter, the corresponding feedback data frequency of failure of more fresh target electric energy meter.
Weight recalculates unit, for according to current time, load threshold value, test connection failure electric energy meter number
The feedback data frequency of failure of mesh, the test Connection Time of target electric energy meter and target electric energy meter recalculates target electric energy meter
Weighted value.
In one embodiment of the invention, weight recalculates unit and is used for:
According to W1=(1-V) * [M- (T-T1)*M*N1/n]*(1-S/N2) weighted value that recalculates target electric energy meter, it obtains
To the new weighted value of target electric energy meter.
Wherein, W1For the new weighted value of target electric energy meter, V is load threshold value, and M is the second default value, when T is current
It carves, T1For the test Connection Time of target electric energy meter, N1For third default value, n is the number for testing the electric energy meter of connection failure
Mesh, S are the feedback data frequency of failure of target electric energy meter, N2For the 4th default value.
As shown in figure 4, in one embodiment of the invention, data obtaining module 120 is tested, it is right for executing Fig. 3 institute
The method and step in embodiment answered comprising:
Electric energy meter selection unit 121 is believed for choosing an electric energy meter information from filling mining information table, and by default test
Breath is sent to the electric energy meter of selection.
First Connection Time determination unit 122, if the first information that the electric energy meter for receiving selection is fed back, will connect
Receive test Connection Time of the time of the first information as corresponding electric energy meter.
Second Connection Time determination unit 123 will if the first information that the electric energy meter for not receiving selection is fed back
Test Connection Time of first default value as electric energy meter.
Failure number decision unit 124 obtains test connection for counting the number for not feeding back the electric energy meter of the first information
The number of the electric energy meter of failure.
In one embodiment, the filling mining system 100 of electricity consumption data further includes other function module/unit, for realizing
Method and step in embodiment 1 in each embodiment.
Embodiment 3:
Fig. 5 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 5, the terminal of the embodiment is set
Standby 5 include: processor 50, memory 51 and are stored in the meter that can be run in the memory 51 and on the processor 50
Calculation machine program 52.The processor 50 realizes each embodiment as described in example 1 above when executing the computer program 52
Step, such as step S101 shown in FIG. 1 to step S106.Alternatively, when the processor 50 executes the computer program 52
Realize the function of each module/unit in each system embodiment as described in example 2 above, for example, module 110 shown in Fig. 3 to
160 function.
Illustratively, the computer program 52 can be divided into one or more module/units, it is one or
Multiple module/units are stored in the memory 51, and are executed by the processor 50, to complete the present invention.Described one
A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for
Implementation procedure of the computer program 52 in the terminal device 5 is described.For example, the computer program 52 can be divided
It is cut into target demand data obtaining module, target demand information segmentation module, set of words fuzzy matching module and the first processing
Module.Each module concrete function is as follows:
Filling mining data obtaining module, for obtaining filling mining information table, filling mining information table includes several electric energy meter information.
Data obtaining module is tested, for determining the test Connection Time of each electric energy meter, and obtain according to electric energy meter information
Take the number of the electric energy meter of test connection failure.
Load threshold value obtains module, for obtaining the load threshold value of terminal device.
Weight value calculation module, for according to current time, load threshold value, test connection failure electric energy meter number and
The test Connection Time of each electric energy meter calculates the weighted value of each electric energy meter.
Current loads obtain module, for obtaining the current loads value of terminal device.
Acquisition instructions sending module, if for current loads value be less than or equal to load threshold value, according to weighted value by
Small sequence is arrived greatly, successively sends electricity consumption data acquisition instructions to corresponding electric energy meter.
The terminal device 5 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device 5 may include, but be not limited only to, processor 50, memory 51.It will be understood by those skilled in the art that figure
5 be only the example of terminal device 5, does not constitute the restriction to terminal device 5, may include than illustrating more or fewer portions
Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net
Network access device, bus etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), field programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 51 can be the internal storage unit of the terminal device 5, such as the hard disk or interior of terminal device 5
It deposits.The memory 51 is also possible to the External memory equipment of the terminal device 5, such as be equipped on the terminal device 5
Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge
Deposit card (Flash Card) etc..Further, the memory 51 can also both include the storage inside list of the terminal device 5
Member also includes External memory equipment.The memory 51 is for storing needed for the computer program and the terminal device
Other programs and data.The memory 51 can be also used for temporarily storing the data that has exported or will export.
Embodiment 4:
The embodiment of the invention also provides a kind of computer readable storage medium, computer-readable recording medium storage has meter
Calculation machine program is realized the step in each embodiment as described in example 1 above, such as is schemed when computer program is executed by processor
Step S101 shown in 1 to step S106.Alternatively, realizing when the computer program is executed by processor such as institute in embodiment 2
The function of each module/unit in each system embodiment stated, such as the function of module 110 to 160 shown in Fig. 3.
The computer program can be stored in a computer readable storage medium, and the computer program is by processor
When execution, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code,
The computer program code can be source code form, object identification code form, executable file or certain intermediate forms etc..Institute
State computer-readable medium may include: can carry the computer program code any entity or device, recording medium,
USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), arbitrary access
Memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, embodiment 1 to 4 can in any combination, group
The new embodiment formed after conjunction is also within the scope of protection of this application.There is no the portion for being described in detail or recording in some embodiment
Point, it may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed terminal device and method can pass through it
Its mode is realized.For example, system described above/terminal device embodiment is only schematical, for example, the module
Or the division of unit, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple lists
Member or component can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point,
Shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device or unit
INDIRECT COUPLING or communication connection, can be electrical property, mechanical or other forms.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.