CN107999829A - Bar planting drilling aid at the top of a kind of building secondary structure constructional column - Google Patents
Bar planting drilling aid at the top of a kind of building secondary structure constructional column Download PDFInfo
- Publication number
- CN107999829A CN107999829A CN201710992106.8A CN201710992106A CN107999829A CN 107999829 A CN107999829 A CN 107999829A CN 201710992106 A CN201710992106 A CN 201710992106A CN 107999829 A CN107999829 A CN 107999829A
- Authority
- CN
- China
- Prior art keywords
- supporting rod
- working beam
- bar
- operation lever
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/0021—Stands, supports or guiding devices for positioning portable tools or for securing them to the work
- B25H1/0035—Extensible supports, e.g. telescopic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/0021—Stands, supports or guiding devices for positioning portable tools or for securing them to the work
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses bar planting drilling aid at the top of a kind of building secondary structure constructional column, including working beam, operation lever, balancing pole and supporting rod, the working beam and supporting rod are the montant being arranged in parallel, the balancing pole and operation lever are the cross bar being arranged in parallel, the working beam lower end is hinged with operation lever one end, it is hinged in the middle part of the working beam with balancing pole one end, the balancing pole other end is hinged with supporting bar top, it is hinged in the middle part of the operation lever with supporting rod, the working beam, operation lever, balancing pole forms a parallelogram after being connected with supporting rod, the working beam top is connected with electric drill, the one end of the operation lever away from working beam is equipped with operation handle, the bottom of the supporting rod is equipped with backing plate.
Description
Technical field
The present invention relates to construction engineering technical field, is specially bar planting drilling at the top of a kind of building secondary structure constructional column
Auxiliary device.
Background technology
At the top of building secondary structure constructional column during bar planting drilling construction, due to being influenced by height, bar planting drilling worker
It must come back and drill.And since the dust drilled out during drilling can be fallen into worker's eye, it is not only dangerous but also inconvenient, and apply
Work difficulty is larger, during construction must hand lift electric drill and construct, often due to worker is short of physical strength, easily trigger safe thing
Therefore.
The content of the invention
The technical problem to be solved in the present invention is overcome the defects of existing, there is provided a kind of building secondary structure constructs capital
Portion's bar planting drilling aid, according to lever principle, other end working beam bar stress withstands electric drill upwards when being pressed downward operation lever
Drill, can effectively solve the problems, such as in background technology.
To achieve the above object, the present invention provides following technical solution:Planted at the top of a kind of building secondary structure constructional column
Muscle drilling aid, including working beam, operation lever, balancing pole and supporting rod, the working beam and supporting rod are to be arranged in parallel
Montant, the balancing pole and operation lever are the cross bar being arranged in parallel, and the working beam lower end is hinged with operation lever one end, described
Be hinged with balancing pole one end in the middle part of working beam, the balancing pole other end is hinged with supporting bar top, the operation lever middle part and
Supporting rod is hinged, and the working beam, operation lever, balancing pole form a parallelogram, the work after being connected with supporting rod
Bar top is connected with electric drill, and the one end of the operation lever away from working beam is equipped with operation handle, and the bottom of the supporting rod is equipped with
Backing plate.
As a preferred technical solution of the present invention, the supporting rod is telescopic rod, and said support bar, which is equipped with, to be fixed
Card.
As a preferred technical solution of the present invention, the supporting rod is equipped with observation bar, and the observation bar is equipped with
Peephole.
As a preferred technical solution of the present invention, the observation bar is located at supporting rod middle and lower part and hangs down with supporting rod
Directly.
As a preferred technical solution of the present invention, the peephole is speculum and the speculum adjustable angle.
As a preferred technical solution of the present invention, the working beam lower end and operation lever one end by movable bolt and
Gasket is hinged, and is hinged in the middle part of the working beam with balancing pole one end by movable bolt and gasket, the balancing pole other end and
Supporting bar top is hinged by movable bolt and gasket, is cut with scissors in the middle part of the operation lever with supporting rod by movable bolt and gasket
Connect.
As a preferred technical solution of the present invention, the working beam, operation lever, balancing pole and supporting rod are the lumps of wood
Bar..
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is made simply, working beam, operation lever, balance
Bar and supporting rod fix quadrangularly stent using movable bolt, can be up and down, and one end is directly fallen on floor, working beam one
End is effectively connected with electric drill, and when drilling holds operation lever and is pressed downward, and according to lever principle, is pressed downward other end montant during operation lever
Stress withstands electric drill and drills upwards.Dust was fallen into worker's eye but also time saving and energy saving when the device not only effectively prevent drilling,
Greatly improve work efficiency;Install peephole additional in preferable technical solution, more effectively ensure that the accuracy of operation,
Telescopic rod is made adjustable lever and ensure that the diversified suitability of construction environment.
Brief description of the drawings
Fig. 1 is the first structure front elevation of the invention.
Fig. 2 is the first texture edge figure of the invention.
Fig. 3 is movable screw node diagram.
Fig. 4 is the first structure diagram of supporting rod in the present invention.
Fig. 5 is second of structure front elevation of the invention.
Fig. 6 is second of texture edge figure of the invention.
Fig. 7 is second of structure diagram of supporting rod in the present invention.
In figure:1st, balancing pole, 2, operation lever, 21, handle, 3, supporting rod, 31, fixing card, 4, working beam, 5, movable screw
Bolt, 6, gasket, 7, observation bar, 8, backing plate, 9, electric drill, 10, peephole.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment, belongs to the scope of protection of the invention.
Embodiment one
~Fig. 4 is please referred to Fig.1, the present invention provides a kind of technical solution:Planted at the top of a kind of building secondary structure constructional column
Muscle drilling aid, including working beam 4, operation lever 2, balancing pole 1 and supporting rod 3, the working beam 4 and supporting rod 3 are flat
The montant that row is set, the balancing pole 1 and operation lever 2 are the cross bar being arranged in parallel, 4 lower end of working beam and operation lever 2 one
End is hinged, and the middle part of working beam 4 is hinged with 1 one end of balancing pole, and 1 other end of balancing pole is hinged with 3 top of supporting rod, institute
It is hinged with supporting rod 3 to state the middle part of operation lever 2, the working beam 4, operation lever 2, balancing pole 1 and supporting rod 3 form one after connecting
Parallelogram, 4 top of working beam are connected with electric drill 9, and the described one end of operation lever 2 away from working beam 4 is equipped with manipulator
Handle 21, the bottom of the supporting rod 3 are equipped with backing plate 8, and 4 lower end of working beam passes through movable bolt 5 and pad with 2 one end of operation lever
Piece 6 is hinged, and the middle part of working beam 4 is hinged by movable bolt 5 and gasket 6 with 1 one end of balancing pole, and the balancing pole 1 is another
End is hinged by movable bolt 5 and gasket 6 with 3 top of supporting rod, and the middle part of operation lever 2 passes through movable bolt 5 with supporting rod 3
It is hinged with gasket 6.
Embodiment two
Fig. 4~Fig. 7 is referred to, the present invention provides a kind of technical solution:Planted at the top of a kind of building secondary structure constructional column
Muscle drilling aid, including working beam 4, operation lever 2, balancing pole 1 and supporting rod 3, the working beam 4 and supporting rod 3 are flat
The montant that row is set, the balancing pole 1 and operation lever 2 are the cross bar being arranged in parallel, 4 lower end of working beam and operation lever 2 one
End is hinged, and the middle part of working beam 4 is hinged with 1 one end of balancing pole, and 1 other end of balancing pole is hinged with 3 top of supporting rod, institute
It is hinged with supporting rod 3 to state the middle part of operation lever 2, the working beam 4, operation lever 2, balancing pole 1 and supporting rod 3 form one after connecting
Parallelogram, 4 top of working beam are connected with electric drill 9, and the described one end of operation lever 2 away from working beam 4 is equipped with manipulator
Handle 21, the bottom of the supporting rod 3 are equipped with backing plate 8.
The supporting rod 3 is telescopic rod, and said support bar 3 is equipped with fixing card 31.
The supporting rod 3 is equipped with observation bar 7, and the observation bar 7 is equipped with peephole 10.
The observation bar 7 is located at 3 middle and lower part of supporting rod and vertical with supporting rod 3.
The peephole 10 is speculum and the speculum adjustable angle.
4 lower end of working beam is hinged by movable bolt 5 and gasket 6 with 2 one end of operation lever, the middle part of working beam 4
Hinged by movable bolt 5 and gasket 6 with 1 one end of balancing pole, 1 other end of balancing pole passes through activity with 3 top of supporting rod
Bolt 5 and gasket 6 are hinged, and the middle part of operation lever 2 is hinged by movable bolt 5 and gasket 6 with supporting rod 3.
The working beam 4, operation lever 2, balancing pole 1 and supporting rod 3 are lumps of wood bar.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of changes, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (7)
- A kind of 1. bar planting drilling aid at the top of building secondary structure constructional column, it is characterised in that:Including working beam, operation Bar, balancing pole and supporting rod, the working beam and supporting rod are the montant being arranged in parallel, and the balancing pole and operation lever are parallel The cross bar of setting, the working beam lower end are hinged with operation lever one end, are hinged in the middle part of the working beam with balancing pole one end, described The balancing pole other end is hinged with supporting bar top, is hinged in the middle part of the operation lever with supporting rod, and the working beam, operation lever, put down Weighing apparatus bar forms a parallelogram after being connected with supporting rod, and the working beam top is connected with electric drill, and the operation lever is remote One end of working beam is equipped with operation handle, and the bottom of the supporting rod is equipped with backing plate.
- 2. bar planting drilling aid, its feature exist at the top of a kind of building secondary structure constructional column according to claim 1 In:The supporting rod is telescopic rod, and said support bar is equipped with fixing card.
- 3. bar planting drilling aid, its feature exist at the top of a kind of building secondary structure constructional column according to claim 1 In:The supporting rod is equipped with observation bar, and the observation bar is equipped with peephole.
- 4. bar planting drilling aid, its feature exist at the top of a kind of building secondary structure constructional column according to claim 3 In:The observation bar is located at supporting rod middle and lower part and vertical with supporting rod.
- 5. bar planting drilling aid, its feature exist at the top of a kind of building secondary structure constructional column according to claim 3 In:The peephole is speculum and the speculum adjustable angle.
- 6. according to bar planting drilling aid at the top of a kind of any one of Claims 1 to 5 building secondary structure constructional column, It is characterized in that:The working beam lower end is hinged with operation lever one end by movable bolt and gasket, in the middle part of the working beam with Balancing pole one end is hinged by movable bolt and gasket, and the balancing pole other end passes through movable bolt and pad with supporting bar top Piece is hinged, and is hinged in the middle part of the operation lever with supporting rod by movable bolt and gasket.
- 7. bar planting drilling aid, its feature exist at the top of a kind of building secondary structure constructional column according to claim 6 In:The working beam, operation lever, balancing pole and supporting rod are lumps of wood bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710992106.8A CN107999829A (en) | 2017-10-23 | 2017-10-23 | Bar planting drilling aid at the top of a kind of building secondary structure constructional column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710992106.8A CN107999829A (en) | 2017-10-23 | 2017-10-23 | Bar planting drilling aid at the top of a kind of building secondary structure constructional column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107999829A true CN107999829A (en) | 2018-05-08 |
Family
ID=62051073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710992106.8A Pending CN107999829A (en) | 2017-10-23 | 2017-10-23 | Bar planting drilling aid at the top of a kind of building secondary structure constructional column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107999829A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108464224A (en) * | 2018-07-09 | 2018-08-31 | 盐城工业职业技术学院 | A kind of cherry plantation irrigation Illumination adjusting device |
CN110014521A (en) * | 2019-05-13 | 2019-07-16 | 中国二十二冶集团有限公司 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
CN110125883A (en) * | 2019-05-10 | 2019-08-16 | 中国建筑第六工程局有限公司 | A kind of fixed device of beam slab bar planting drilling machine |
CN115041730A (en) * | 2022-07-11 | 2022-09-13 | 中核华辰建筑工程有限公司 | Novel portable handheld auxiliary tool for drilling |
CN116084703A (en) * | 2022-11-25 | 2023-05-09 | 中国十七冶集团有限公司 | Roof top beam bar planting auxiliary device and use method thereof |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3015532A1 (en) * | 1980-04-23 | 1981-10-29 | Detlef Stach | Ceiling and floor panel installation accessory - is frame with lever attached for simultaneously operating electric drills at top and bottom |
JPH11104909A (en) * | 1997-10-01 | 1999-04-20 | Central Japan Railway Co | Working jig for power tool |
CN202578536U (en) * | 2012-05-21 | 2012-12-05 | 新疆兵团水利水电工程集团有限公司 | Adjustable support for perforating floor |
CN203248090U (en) * | 2013-05-14 | 2013-10-23 | 中国葛洲坝集团股份有限公司 | Adjustable supporting frame used for top drilling |
CN203835280U (en) * | 2014-04-28 | 2014-09-17 | 同济大学 | Electric hammer construction support structure |
CN204209169U (en) * | 2014-09-29 | 2015-03-18 | 中建三局集团有限公司 | A kind of tool-type ceiling drilling device |
CN104589285A (en) * | 2015-02-02 | 2015-05-06 | 中铁十七局集团电气化工程有限公司 | Auxiliary perforating device for self-made electrical hammer |
CN204877287U (en) * | 2015-07-03 | 2015-12-16 | 中建一局集团安装工程有限公司 | Height-adjustable removes assembled roof construction auxiliary device |
CN205464448U (en) * | 2016-01-29 | 2016-08-17 | 中铁城建集团第三工程有限公司 | Constructional column upper portion bar planting drilling equipment |
CN205673646U (en) * | 2016-06-01 | 2016-11-09 | 中国建筑一局(集团)有限公司 | Floor drilling tool with accurate drilling position |
CN205967520U (en) * | 2016-09-14 | 2017-02-22 | 国家电网公司 | Top drilling support appurtenance |
-
2017
- 2017-10-23 CN CN201710992106.8A patent/CN107999829A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3015532A1 (en) * | 1980-04-23 | 1981-10-29 | Detlef Stach | Ceiling and floor panel installation accessory - is frame with lever attached for simultaneously operating electric drills at top and bottom |
JPH11104909A (en) * | 1997-10-01 | 1999-04-20 | Central Japan Railway Co | Working jig for power tool |
CN202578536U (en) * | 2012-05-21 | 2012-12-05 | 新疆兵团水利水电工程集团有限公司 | Adjustable support for perforating floor |
CN203248090U (en) * | 2013-05-14 | 2013-10-23 | 中国葛洲坝集团股份有限公司 | Adjustable supporting frame used for top drilling |
CN203835280U (en) * | 2014-04-28 | 2014-09-17 | 同济大学 | Electric hammer construction support structure |
CN204209169U (en) * | 2014-09-29 | 2015-03-18 | 中建三局集团有限公司 | A kind of tool-type ceiling drilling device |
CN104589285A (en) * | 2015-02-02 | 2015-05-06 | 中铁十七局集团电气化工程有限公司 | Auxiliary perforating device for self-made electrical hammer |
CN204877287U (en) * | 2015-07-03 | 2015-12-16 | 中建一局集团安装工程有限公司 | Height-adjustable removes assembled roof construction auxiliary device |
CN205464448U (en) * | 2016-01-29 | 2016-08-17 | 中铁城建集团第三工程有限公司 | Constructional column upper portion bar planting drilling equipment |
CN205673646U (en) * | 2016-06-01 | 2016-11-09 | 中国建筑一局(集团)有限公司 | Floor drilling tool with accurate drilling position |
CN205967520U (en) * | 2016-09-14 | 2017-02-22 | 国家电网公司 | Top drilling support appurtenance |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108464224A (en) * | 2018-07-09 | 2018-08-31 | 盐城工业职业技术学院 | A kind of cherry plantation irrigation Illumination adjusting device |
CN110125883A (en) * | 2019-05-10 | 2019-08-16 | 中国建筑第六工程局有限公司 | A kind of fixed device of beam slab bar planting drilling machine |
CN110014521A (en) * | 2019-05-13 | 2019-07-16 | 中国二十二冶集团有限公司 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
CN115041730A (en) * | 2022-07-11 | 2022-09-13 | 中核华辰建筑工程有限公司 | Novel portable handheld auxiliary tool for drilling |
CN116084703A (en) * | 2022-11-25 | 2023-05-09 | 中国十七冶集团有限公司 | Roof top beam bar planting auxiliary device and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107999829A (en) | Bar planting drilling aid at the top of a kind of building secondary structure constructional column | |
CN103611967B (en) | A kind of elevation type percussion drill auxiliary support apparatus | |
CN204782062U (en) | Curtain crossbeam installation appurtenance | |
CN206140465U (en) | Civil engineering pipe fitting placing rack | |
CN107790787A (en) | The lengthening support that a kind of packaged type electric drill drills vertically upward | |
CN205173906U (en) | Surveying instrument bracket | |
CN201221365Y (en) | Front cantilever temporary support | |
CN201614726U (en) | Boring device of top plate | |
CN211891475U (en) | Improved simple top plate drilling device | |
CN203565916U (en) | Drilling tool with rear-mounted member | |
CN203541623U (en) | Novel punching frame | |
CN102051975A (en) | Lever type high-altitude borer | |
CN214064444U (en) | Engineering detector support frame for construction | |
CN209481105U (en) | It is a kind of large size ball screw assembly, assembly use device | |
CN203530866U (en) | Device with bidirectional hooks for adjusting levelness of bridge angle steel bracket | |
CN204700349U (en) | A kind of beam slab bar planting boring bar tool | |
CN203484704U (en) | Simple movable-arm-type drilling device | |
CN210500860U (en) | Secondary structure constructional column top bar planting assistor | |
CN203509120U (en) | Movable vertical-drilling support for building | |
CN110014521A (en) | Bar planting assistor and its construction method at the top of secondary structure constructional column | |
CN202825751U (en) | Movable accurate positioning hanging bar drilling device | |
CN208215704U (en) | A kind of concrete structure drilling aid | |
CN206816162U (en) | A kind of cat ladder for building | |
CN207448355U (en) | Hatchcover rubber mounting tool | |
CN204053009U (en) | A kind of vertical bar planting boring ease of Use frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180508 |
|
RJ01 | Rejection of invention patent application after publication |