Nothing Special   »   [go: up one dir, main page]

CN107762140B - External template of pipe gallery guide wall and erection method thereof - Google Patents

External template of pipe gallery guide wall and erection method thereof Download PDF

Info

Publication number
CN107762140B
CN107762140B CN201710993054.6A CN201710993054A CN107762140B CN 107762140 B CN107762140 B CN 107762140B CN 201710993054 A CN201710993054 A CN 201710993054A CN 107762140 B CN107762140 B CN 107762140B
Authority
CN
China
Prior art keywords
external mold
plate unit
mold plate
wheel
exterior sheathing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710993054.6A
Other languages
Chinese (zh)
Other versions
CN107762140A (en
Inventor
李吉
田海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201710993054.6A priority Critical patent/CN107762140B/en
Publication of CN107762140A publication Critical patent/CN107762140A/en
Application granted granted Critical
Publication of CN107762140B publication Critical patent/CN107762140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses an external template of a guide wall of a pipe gallery, belongs to the field of pipe gallery construction, and aims to provide the external template of the guide wall of the pipe gallery, which is convenient to disassemble and assemble, reduces the labor cost, improves the turnover efficiency, shortens the construction period and ensures the construction quality, and a building method with short die-filling time. The outer template of the guide wall of the pipe gallery comprises a plurality of steel outer template units which are distributed along the longitudinal direction of the pipe gallery and a connecting piece which is used for butting two adjacent outer template units together; the connecting piece is detachably connected with the outer template unit; a supporting system for supporting the outer template unit is arranged on the outer side of each outer template unit; and a walking system is arranged at the bottom of the outer side of each outer template unit. The pipe gallery guide wall external template facilitates the disassembly and the assembly of the pipe gallery guide wall external template; the phenomena of slurry leakage, mold expansion, water leakage and water seepage are relieved; the turnover efficiency of the template is improved. The method for erecting the outer formwork of the guide wall of the pipe gallery saves constructors, improves the transfer rate of the outer formwork unit, and shortens the formwork installation time.

Description

Piping lane leads wall exterior sheathing and its erection method
Technical field
The invention belongs to piping lane construction fields, and particularly piping lane leads wall exterior sheathing and its erection method.
Background technique
Piping lane construction at present mostly uses two-step pouring, i.e., from bottom to up, first pour lower part leads wall part, then pours again Remainder.When leading wall and pouring, external mold mostly uses plank sheathing, aluminum alloy pattern plate and Wood-plastic formwork etc..Wherein, what plank sheathing needed is more Supporting member;Formwork, demoulding are time-consuming long, have enough to meet the need low efficiency;The setting up, shift and dismantle etc. of template is required to more artificial Cost;The number of turnover is few;And plank sheathing easily there is spillage when pouring, rise mould phenomena such as, cause molding effect after demoulding poor, easily There are the common quality defects such as faulting of slab ends, honeycomb, pitted skin.Aluminum alloy pattern plate also needs more artificial;Turnaround speed is slightly faster than plank sheathing, but whole Body is inefficient;Since aluminum alloy pattern plate is divided into the block of very little, splicing is more, spillage phenomenon is easy to appear when pouring, demoulding is followed by Faulting of slab ends is easy to appear at seam, molding effect is general.Wood moulding mould also needs more cost of labor, supporting member;All transfer efficients compared with It is low;And its rigidity is poor, easily occurs the mould phenomenon that rises when pouring, molding effect is general.
Summary of the invention
Technical problem to be solved by the invention is to provide it is a kind of it is convenient for disassembly and assembly, reduce cost of labor, improve all transfer efficients, It shortens the construction period and guarantees that the piping lane of construction quality leads wall exterior sheathing and which shorten the piping lanes of die-filling time to lead taking for wall exterior sheathing Equipment, method.
The technical solution adopted by the present invention is that: piping lane leads wall exterior sheathing, including outside the muti-piece steel of piping lane genesis analysis Modular unit and the connector that adjacent two pieces of external mold plate units are docking together;The connector and external mold plate unit are detachable Connection;The support system of support external mold plate unit is provided on the outside of every piece of external mold plate unit;Outside every piece of external mold plate unit The bottom of side is provided with running gear.
Further, the support system includes that the support plate one of piping lane bed course, the branch are anchored in by rear anchor piece Fagging one and exterior sheathing unit bottom are hinged.
Further, the support system includes telescopic diagonal brace and is anchored in the branch of piping lane bed course by rear anchor piece Fagging two, described diagonal brace one end and external mold plate unit are hinged, and the other end and support plate two are hinged.
Further, the running gear includes wheel, wheel shank, limited block one and spring;The wheel shank passes through rotation axis It is connect with exterior sheathing unit rotational, the wheel shank is divided into construction section and handle section by rotation axis along its length;The wheel It is installed on the end of construction section, the rotation shaft centre line is less than the length and wheel of construction section to the distance of external mold plate unit bottom end The sum of sub- radius;The spring one end is fixed on external mold plate unit, and the other end is connected with construction section;The limited block one is fixed on External mold plate unit is for stopping wheel shank;
When wheel is in walking states, using the straight line by wheel spindle central and spring fixed end as line of demarcation, institute It states wheel and is located at the ipsilateral of line of demarcation with limited block one;And the preceding line direction of wheel is referred to by the side in one place line of demarcation of limited block To the other side in line of demarcation.
Further, the spring is fixedly connected with the end of construction section.
Further, the limited block one is installed on the bottom of external mold plate unit, and the fixing end of spring is located at limited block one Top.
Further, including the limited block two being fixed on the outside of external mold plate unit, the limited block two is located at limited block one Top.
Piping lane leads the erection method of wall exterior sheathing, comprising the following steps:
Step 1: production external mold plate unit, and the bottom on the outside of outer modular unit is provided with running gear, the walking System includes wheel, wheel shank, limited block one and spring;The wheel shank is connect by rotation axis with exterior sheathing unit rotational, described Wheel shank is divided into construction section and handle section by rotation axis along its length;The wheel is installed on the end of construction section, and described turn The distance of moving axis center line to external mold plate unit bottom end is less than the sum of length and the wheel radius of construction section;The spring one end is solid Due to external mold plate unit, the other end is connected with construction section;The limited block one is fixed on external mold plate unit for stopping wheel shank;
When wheel is in walking states, to be boundary by the straight line of wheel spindle central and spring fixed end center Line, the wheel are located at the ipsilateral of line of demarcation with limited block one;And the preceding line direction of wheel is by one place line of demarcation of limited block The other side in side direction line of demarcation;
Step 2: according to the piping lane of the good line of bullet lead wall displacement will be moved to the external mold plate unit lower end of corresponding position into Row positioning;And adjust the verticality of external mold plate unit;
Wall exterior sheathing is led Step 3: external mold plate unit is docking together to be formed by connector;
Wall exterior sheathing is led Step 4: reinforcing again, checks its verticality, makes to lead wall exterior sheathing and integrally fix;
Step 5: leading wall exterior sheathing using the certain positioning fastener connection of spacing and leading template within the walls;
Step 6: wait lead wall concreting complete reach curing period after, dismounting lead wall exterior sheathing and lead within the walls template it Between positioning fastener, the connection between connector and external mold plate unit and bed course between adjacent external mold plate unit;
Step 7: rotation wheel shank is located at external mold plate unit bottom end to wheel and construction section is against limited block one, external mold is pushed Plate unit is to next construction section;Rotation wheel shank resets wheel;
Step 8: repeat step 2 to step 7, until piping lane is led wall and is poured and finishes.
Further, in step 2, external mold plate unit lower end is positioned using lower end positioning mechanism;Utilize verticality The verticality of regulating mechanism adjusting external mold plate unit;
The lower end positioning mechanism includes being anchored in the support plate one of piping lane bed course by rear anchor piece and being parallel to external mold The connecting plate one of plate unit setting;The connecting plate one is fixed on external mold plate unit, and its bottom end and the support plate one are close One end of external mold plate unit is hinged;
The verticality regulating mechanism includes telescopic diagonal brace and is anchored in the support of piping lane bed course by rear anchor piece Plate two, described diagonal brace one end and external mold plate unit are hinged, and the other end and support plate two are hinged.
Further, the positioning fastener includes being set to lead wall exterior sheathing and lead the connecting plate two above template within the walls, Described two one end of connecting plate is connected by vertically arranged pin shaft with wall exterior sheathing is led, the other end pass through vertically arranged pin shaft and Template within the walls is led to be connected.
The beneficial effects of the present invention are: piping lane leads wall exterior sheathing, external mold plate unit is steel form, and larger area can be used Steel plate block be made, i.e., compared with prior art, reduce and constitute piping lane and lead the unit plate of wall exterior sheathing, accordingly reduce phase Connector between adjacent unit plate reduces the die-filling and demoulding time to facilitate the dismounting that piping lane leads wall exterior sheathing; Exactly because also unit plate quantity is reduced, correspondingly the seam between unit plate is reduced, thus reduce easy spillage site, The overall stiffness that the piping lane being formed simultaneously leads wall exterior sheathing is improved, the alleviation that the mould phenomenon that rises obtains;
The support system of support external mold plate unit is set to the outside of every piece of external mold plate unit, avoids and is leading wall exterior sheathing Screw arbor with nut at both-ends is set between template within the walls with leading, avoids the phenomenon that pouring leak at rear Screw arbor with nut at both-ends position, infiltration;
Every piece of exterior sheathing unit bottom is provided with running gear, it is only necessary to which two construction personnel can push away external mold plate unit To next construction section, all transfer efficients of template are improved.
Piping lane leads the erection method of wall exterior sheathing, due to the setting of running gear, so that every piece of external mold plate unit only needs Two people can be pushed into next construction section, save construction personnel, improve the transport velocity of external mold plate unit;External mold plate unit After verticality is adjusted, wall exterior sheathing is led by the certain positioning fastener connection of spacing and leads template within the walls, without measurement It leads wall exterior sheathing and leads the spacing between template within the walls, shorten the die-filling time.
Detailed description of the invention
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is support system schematic diagram of the invention;
Fig. 3 is running gear schematic diagram of the present invention;
Two states when Fig. 4 is not applicable running gear and use;
In figure, external mold plate unit 1, support system 2, support plate 1, diagonal brace 22, support plate 2 23, connecting plate 1, row Walking system 3, wheel 31, wheel shank 32, construction section 320, handle section 321, limited block 1, spring 34, limited block 2 35, line of demarcation 36, connecting plate 24, pin shaft 5.
Specific embodiment
It is as follows that the present invention is described further with reference to the accompanying drawings and examples:
Piping lane leads wall exterior sheathing, as shown in Figure 1, including the muti-piece steel external mold plate unit 1 along piping lane genesis analysis and general The connector that adjacent two pieces of external mold plate units 1 are docking together;The connector is detachably connected with external mold plate unit 1;Every The outside of block external mold plate unit 1 is provided with the support system 2 of support external mold plate unit 1;At the bottom in every piece of 1 outside of external mold plate unit Portion is provided with running gear 3.
And the prior art present invention, external mold plate unit 1 are steel form, and the steel plate block that larger area can be used is made, i.e., It compares, reduces and constitute the unit plate that piping lane leads wall exterior sheathing, accordingly reduce the connector between adjacent cells plate, from And the dismounting that piping lane leads wall exterior sheathing is facilitated, reduce the die-filling and demoulding time;Exactly because also unit plate quantity subtracts Few, correspondingly the seam between unit plate is reduced, to reduce easy spillage site, the piping lane being formed simultaneously leads wall exterior sheathing Overall stiffness be improved, the alleviation that the mould phenomenon that rises obtains;
The support system 2 of support external mold plate unit 1 is set to the outside of every piece of external mold plate unit 1, avoids and is leading outside wall It template and leads Screw arbor with nut at both-ends is set between template within the walls, avoid the phenomenon that pouring leak at rear Screw arbor with nut at both-ends position, infiltration;
Every piece of 1 bottom of external mold plate unit is provided with running gear 3, it is only necessary to which two construction personnel can be by external mold plate unit 1 is pushed into next construction section, improves all transfer efficients of template.
Preferably, as shown in Fig. 2, the support system 2 includes being anchored in the support plate of piping lane bed course by rear anchor piece One 21, the support plate 1 and 1 bottom of external mold plate unit are hinged.Support plate 1 is determined in the external modular unit 1 in bottom Position, it is hinged with 1 bottom of external mold plate unit, to adapt to the adjusting of 1 verticality of external mold plate unit.
For the ease of adjusting the verticality of external mold plate unit 1, it is preferred that the support system 2 includes telescopic diagonal brace 22 and the support plate 2 23 of piping lane bed course is anchored in by rear anchor piece, described 22 one end of diagonal brace and external mold plate unit 1 are hinged, separately One end and support plate 2 23 are hinged.Diagonal brace 22 not only acts as the effect for adjusting the verticality of external mold plate unit 1, also acts as support The effect of external mold plate unit 1, diagonal brace 22 reduce external mold plate unit 1 in the outside-supporting external mold plate unit 1 of outer modular unit 1 Rising under the active force of casting concrete on the inside of it risk of mould occur.
Running gear 3 can be to be installed on the train of 1 bottom of external mold plate unit, still, pour needs to meet, train Bottom end necessarily be greater than the bottom end of external mold plate unit 1, so must be provided with rail system compatible with train, increase construction Amount and cost, it is preferred that as Figure 3-Figure 4, the running gear 3 includes wheel 31, wheel shank 32, limited block 1 and spring 34;The wheel shank 32 is rotatablely connected by rotation axis and external mold plate unit 1, and the wheel shank 32 is along its length by rotation axis point For construction section 320 and handle section 321;The wheel 31 is installed on the end of construction section 320, the rotation shaft centre line to external mold The distance of 1 bottom end of plate unit is less than or equal to the sum of length and 31 radius of wheel of construction section 320;Described 34 one end of spring is solid Due to external mold plate unit 1, the other end is connected with construction section 320;The limited block 1 is fixed on external mold plate unit 1 for stopping Wheel shank 32;
When wheel 31 is in walking states, to be boundary by the straight line of 31 spindle central of wheel and 34 fixing end of spring Line 36, the wheel 31 are located at the ipsilateral of line of demarcation 36 with limited block 1;And the preceding line direction of wheel 31 is by limited block 1 It is directed toward the other side in line of demarcation 36 in the side in place line of demarcation 36.
Running gear 3 disclosed by the invention, wheel 31 are installed on one end of wheel shank 32, by wheel shank 32 around external mold plate unit Rotation axis rotation on 1, makes wheel 31 that the relative position of itself and external mold plate unit 1 can be changed.Through rotation shaft centre line outside The distance of 1 bottom end of modular unit is less than the sum of length and 31 radius of wheel of construction section 320, so that, outside wheel 31 is moved to When the lower end of modular unit 1, external mold plate unit 1 can be supported on bed course by wheel 31, and wheel 31 can move on bed course.And The construction section 320 of wheel shank 32 is fixed on external mold plate unit 1 by spring 34, and with one 33 collective effect of limited block, play restriction The effect of 320 position of construction section.When wheel 31 is in walking states, the wheel 31 is located at line of demarcation 36 with limited block 1 It is ipsilateral;And the preceding line direction of wheel 31 is directed toward the other side in line of demarcation 36 by the side in one 33 place line of demarcation 36 of limited block, In this way, position when wheel 31 to be just locked in walking states, after external mold plate unit 1 is moved to required position or in pouring When building state, wheel shank 32 is rotated, wheel 31 is made to be in the top of 1 low side of external mold plate unit.
In order to improve 34 elastic force of spring to the torque of rotation axis, it is preferred that the end of the spring 34 and construction section 320 is solid Fixed connection.
Limited block 1 is remoter apart from rotation axis, better to the blocking effect of construction section 320, therefore, it is preferred that the limit Position block 1 is installed on the bottom of external mold plate unit 1, and the fixing end of spring 34 is located at one 33 top of limited block.
When external mold plate unit 1 does not need walking, in order to which wheel 31 to be limited to specified region, it is preferred that including solid Due to the limited block 2 35 in 1 outside of external mold plate unit, the limited block 2 35 is located at one 33 top of limited block.
Piping lane leads the erection method of wall exterior sheathing, comprising the following steps:
Step 1: production external mold plate unit 1, and the bottom in outer 1 outside of modular unit is provided with running gear 3, it is described Running gear 3 includes wheel 31, wheel shank 32, limited block 1 and spring 34;The wheel shank 32 passes through rotation axis and exterior sheathing list Member 1 is rotatablely connected, and the wheel shank 32 is divided into construction section 320 and handle section 321 by rotation axis along its length;The wheel 31 It is installed on the end of construction section 320, the distance of the rotation shaft centre line to 1 bottom end of external mold plate unit is less than construction section 320 The sum of length and 31 radius of wheel;External mold plate unit 1 is fixed in described 34 one end of spring, and the other end is connected with construction section 320;Institute It states limited block 1 and is fixed on external mold plate unit 1 for stopping wheel shank 32;
When wheel 31 is in walking states, to be by 31 spindle central of wheel and the straight line at 34 fixing end center of spring Line of demarcation 36, the wheel 31 are located at the ipsilateral of line of demarcation 36 with limited block 1;And the preceding line direction of wheel 31 is by limited block It is directed toward the other side in line of demarcation 36 in the side at one 33 places line of demarcation 36;
Step 2: leading wall displacement according to the piping lane of the good line of bullet will be moved to 1 lower end of external mold plate unit of corresponding position It is positioned;And adjust the verticality of external mold plate unit 1;
Wall exterior sheathing is led Step 3: external mold plate unit 1 is docking together to be formed by connector;
Wall exterior sheathing is led Step 4: reinforcing again, checks its verticality, makes to lead wall exterior sheathing and integrally fix;
Step 5: leading wall exterior sheathing using the certain positioning fastener connection of spacing and leading template within the walls;
Step 6: wait lead wall concreting complete reach curing period after, dismounting lead wall exterior sheathing and lead within the walls template it Between positioning fastener, the connection between connector and external mold plate unit 1 and bed course between adjacent external mold plate unit 1;
Step 7: rotation wheel shank 32 to wheel 31 is located at 1 bottom end of external mold plate unit and construction section 320 against limited block one 33, push external mold plate unit 1 to next construction section;Rotation wheel shank 32 resets wheel 31;
Step 8: repeat step 2 to step 7, until piping lane is led wall and is poured and finishes.
This piping lane leads the erection method of wall exterior sheathing, due to the setting of running gear 3, so that every piece of external mold plate unit 1 is only It needs two people that can be pushed into next construction section, has saved construction personnel, improve the transport velocity of external mold plate unit 1;External mold After 1 verticality of plate unit is adjusted, wall exterior sheathing is led by the certain positioning fastener connection of spacing and leads template within the walls, nothing It need to measure and lead wall exterior sheathing and lead the spacing between template within the walls, shorten the die-filling time.
Preferably, in step 2,1 lower end of external mold plate unit is positioned using lower end positioning mechanism;Utilize verticality The verticality of regulating mechanism adjusting external mold plate unit 1;
The lower end positioning mechanism includes being anchored in the support plate 1 of piping lane bed course by rear anchor piece and being parallel to outer The connecting plate 1 that modular unit 1 is arranged;The connecting plate 1 is fixed on external mold plate unit 1, and its bottom end and the support Plate 1 is hinged close to one end of external mold plate unit 1.
The verticality regulating mechanism includes telescopic diagonal brace 22 and is anchored in the branch of piping lane bed course by rear anchor piece Fagging 2 23, described 22 one end of diagonal brace and external mold plate unit 1 are hinged, and the other end and support plate 2 23 are hinged.
Preferably, the positioning fastener includes being set to lead wall exterior sheathing and lead the connecting plate 24 above template within the walls, institute It states 24 one end of connecting plate to be connected by vertically arranged pin shaft 5 with wall exterior sheathing is led, the other end passes through vertically arranged pin shaft 5 It is connected with template within the walls is led.Cooperated by connecting plate 24 and pin shaft 5, improves the assembly efficiency of connecting plate 24 and facilitate and tear open It unloads.

Claims (9)

1. piping lane leads wall exterior sheathing, it is characterised in that: including the muti-piece steel external mold plate unit (1) along piping lane genesis analysis and incite somebody to action The connector that adjacent two pieces of external mold plate units (1) are docking together;The connector is detachably connected with external mold plate unit (1); The support system (2) of support external mold plate unit (1) is provided on the outside of every piece of external mold plate unit (1);In every piece of exterior sheathing list Bottom on the outside of first (1) is provided with running gear (3);The running gear (3) includes wheel (31), wheel shank (32), limited block One (33) and spring (34);The wheel shank (32) is rotatablely connected by rotation axis and external mold plate unit (1), wheel shank (32) edge Its length direction is divided into construction section (320) and handle section (321) by rotation axis;The wheel (31) is installed on construction section (320) End, it is described rotation shaft centre line to external mold plate unit (1) bottom end distance less than construction section (320) length and wheel (31) the sum of radius;External mold plate unit (1) is fixed in described spring (34) one end, and the other end is connected with construction section (320);It is described Limited block one (33) is fixed on external mold plate unit (1) for stopping wheel shank (32);
When wheel (31) is in walking states, to pass through the straight line of wheel (31) spindle central and spring (34) fixing end center For line of demarcation (36), the wheel (31) is located at the ipsilateral of line of demarcation (36) with limited block one (33);And wheel (31) is forward It is directed toward the other side of line of demarcation (36) in direction side of line of demarcation (36) where limited block one (33).
2. piping lane as described in claim 1 leads wall exterior sheathing, it is characterised in that: the support system (2) includes passing through rear anchor Firmware is anchored in the support plate one (21) of piping lane bed course, and the support plate one (21) and external mold plate unit (1) bottom are hinged.
3. piping lane as claimed in claim 1 or 2 leads wall exterior sheathing, it is characterised in that: the support system (2) includes scalable Diagonal brace (22) and the support plate two (23) of piping lane bed course is anchored in by rear anchor piece, described diagonal brace (22) one end and exterior sheathing Hingedly, the other end and support plate two (23) are hinged for unit (1).
4. piping lane as described in claim 1 leads wall exterior sheathing, it is characterised in that: the spring (34) and construction section (320) End is fixedly connected.
5. piping lane as described in claim 1 leads wall exterior sheathing, it is characterised in that: the limited block one (33) is installed on exterior sheathing The bottom of unit (1), the fixing end of spring (34) are located above limited block one (33).
6. piping lane as claimed in claim 4 leads wall exterior sheathing, it is characterised in that: including being fixed on the outside of external mold plate unit (1) Limited block two (35), the limited block two (35) is located above limited block one (33).
7. the erection method that piping lane leads wall exterior sheathing, it is characterised in that: the following steps are included:
Step 1: production external mold plate unit (1), and the bottom on the outside of outer modular unit (1) is provided with running gear (3), institute Stating running gear includes wheel (31), wheel shank (32), limited block one (33) and spring (34);The wheel shank (32) passes through rotation axis It is rotatablely connected with external mold plate unit (1), the wheel shank (32) is divided into construction section (320) and handle by rotation axis along its length Section (321);The wheel (31) is installed on the end of construction section (320), the rotation shaft centre line to external mold plate unit (1) bottom The distance at end is less than the sum of length and wheel (31) radius of construction section (320);Exterior sheathing is fixed in described spring (34) one end Unit (1), the other end are connected with construction section (320);The limited block one (33) be fixed on external mold plate unit (1) for stop wheel Handle (32);
When wheel (31) is in walking states, to pass through the straight line of wheel (31) spindle central and spring (34) fixing end center For line of demarcation (36), the wheel (31) is located at the ipsilateral of line of demarcation (36) with limited block one (33);And wheel (31) is forward It is directed toward the other side of line of demarcation (36) in direction side of line of demarcation (36) where limited block one (33);
Step 2: according to the piping lane of the good line of bullet lead wall displacement will be moved to external mold plate unit (1) lower end of corresponding position into Row positioning;And adjust the verticality of external mold plate unit (1);
Wall exterior sheathing is led Step 3: external mold plate unit (1) is docking together to be formed by connector;
Wall exterior sheathing is led Step 4: reinforcing again, checks its verticality, makes to lead wall exterior sheathing and integrally fix;
Step 5: leading wall exterior sheathing using the certain positioning fastener connection of spacing and leading template within the walls;
Step 6: dismounting is led wall exterior sheathing and is led between template within the walls after leading wall concreting and completing to reach curing period Position the connection between the connector and external mold plate unit (1) and bed course between fastener, adjacent external mold plate unit (1);
Step 7: rotation wheel shank (32) to wheel (31) is located at external mold plate unit (1) bottom end and construction section (320) against limited block One (33) push external mold plate unit (1) to next construction section;Rotation wheel shank (32) resets wheel (31);
Step 8: repeat step 2 to step 7, until piping lane is led wall and is poured and finishes.
8. the erection method that piping lane as claimed in claim 7 leads wall exterior sheathing, it is characterised in that: in step 2, utilize lower end Positioning mechanism positions external mold plate unit (1) lower end;The vertical of external mold plate unit (1) is adjusted using verticality regulating mechanism Degree;
The lower end positioning mechanism includes being anchored in the support plate one (21) of piping lane bed course by rear anchor piece and being parallel to external mold The connecting plate one (24) of plate unit (1) setting;The connecting plate one (24) is fixed on external mold plate unit (1), and its bottom end and institute One end that support plate one (21) is stated close to external mold plate unit (1) is hinged;
The verticality regulating mechanism includes telescopic diagonal brace (22) and is anchored in the support of piping lane bed course by rear anchor piece Plate two (23), hingedly, the other end and support plate two (23) are hinged for described diagonal brace (22) one end and external mold plate unit (1).
9. the erection method that piping lane as claimed in claim 7 leads wall exterior sheathing, it is characterised in that: the positioning fastener includes setting It is placed in and leads wall exterior sheathing and lead the connecting plate two (4) above template within the walls, described connecting plate two (4) one end passes through vertically arranged Pin shaft (5) is connected with wall exterior sheathing is led, and the other end is connected by vertically arranged pin shaft (5) with template within the walls is led.
CN201710993054.6A 2017-10-23 2017-10-23 External template of pipe gallery guide wall and erection method thereof Active CN107762140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710993054.6A CN107762140B (en) 2017-10-23 2017-10-23 External template of pipe gallery guide wall and erection method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710993054.6A CN107762140B (en) 2017-10-23 2017-10-23 External template of pipe gallery guide wall and erection method thereof

Publications (2)

Publication Number Publication Date
CN107762140A CN107762140A (en) 2018-03-06
CN107762140B true CN107762140B (en) 2019-10-25

Family

ID=61269906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710993054.6A Active CN107762140B (en) 2017-10-23 2017-10-23 External template of pipe gallery guide wall and erection method thereof

Country Status (1)

Country Link
CN (1) CN107762140B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798014B (en) * 2018-05-21 2021-02-02 黄素兰 Supporting and stabilizing device for building
CN108661307A (en) * 2018-06-22 2018-10-16 中国五冶集团有限公司 A kind of concrete wall template location structure and method
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN111270703A (en) * 2019-12-24 2020-06-12 北京市政路桥股份有限公司 Template structure of comprehensive pipe gallery guide wall and building method
CN111364505B (en) * 2019-12-27 2024-10-11 北京市政路桥股份有限公司 Aluminum template supporting system for comprehensive pipe rack
CN112523089B (en) * 2020-11-06 2022-07-08 江苏镇江路桥工程有限公司 Template is pour to disconnect-type bridge central authorities rail guard
CN112339078A (en) * 2020-11-27 2021-02-09 云南城投中民昆建科技有限公司 A do not have reinforcing apparatus that draws for aluminum alloy pipe gallery mould

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202810870U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Combined type template trolley for box culvert lining
KR20140122103A (en) * 2013-04-09 2014-10-17 장영미 In-site Concrete Culverts with assembled Partial Precast Concrete and In-Site Molding Apparatus for manufacturing it
JP2015025253A (en) * 2013-07-25 2015-02-05 日本興業株式会社 Tsunami evacuation stage
CN106382007A (en) * 2016-11-10 2017-02-08 湖北森峰铝模科技有限公司 Template supporting system for construction
CN107119715A (en) * 2017-04-28 2017-09-01 东北大学 A kind of overall mould bases of pipe gallery and its application method
CN206538787U (en) * 2017-01-24 2017-10-03 中国建筑第二工程局有限公司 Early-dismantling assembly type pipe gallery aluminum mould trolley system for integrally pouring wall and top plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202810870U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Combined type template trolley for box culvert lining
KR20140122103A (en) * 2013-04-09 2014-10-17 장영미 In-site Concrete Culverts with assembled Partial Precast Concrete and In-Site Molding Apparatus for manufacturing it
JP2015025253A (en) * 2013-07-25 2015-02-05 日本興業株式会社 Tsunami evacuation stage
CN106382007A (en) * 2016-11-10 2017-02-08 湖北森峰铝模科技有限公司 Template supporting system for construction
CN206538787U (en) * 2017-01-24 2017-10-03 中国建筑第二工程局有限公司 Early-dismantling assembly type pipe gallery aluminum mould trolley system for integrally pouring wall and top plate
CN107119715A (en) * 2017-04-28 2017-09-01 东北大学 A kind of overall mould bases of pipe gallery and its application method

Also Published As

Publication number Publication date
CN107762140A (en) 2018-03-06

Similar Documents

Publication Publication Date Title
CN107762140B (en) External template of pipe gallery guide wall and erection method thereof
CN109487814A (en) Cast-in-place piping lane integrated moveable formwork jumbo construction method
CN105544397B (en) High concrete pier construction formwork device
CN106884541B (en) Positioning assembly, positioning device and positioning method for reserved dowel bars in shear wall
CN107599149B (en) Template method of adjustment when a kind of curved section is immersed tube prefabricated
CN215358998U (en) Internal mold for casting precast concrete box girder
CN109972655A (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form and installation method open
CN109853946A (en) A kind of structure and its installation method of column template
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN105970830B (en) A kind of girder end bay closure construction method being used for reference to girder stayed-cable bridge
CN104018675A (en) Construction method for shear wall concrete formworks and pillar concrete formworks
CN110605780A (en) Integral type assembly stair prefabricated template
CN207314852U (en) Outer wall of basement one side steel form support system
CN205999854U (en) Lining canal thin-wall construction concrete Fast Modular builds device
CN110777659A (en) Construction method of box culvert template system
CN111270703A (en) Template structure of comprehensive pipe gallery guide wall and building method
CN203905472U (en) Adjustable stand column support
CN106013234B (en) The construction method of underground pipe gallery
CN209082555U (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form open
CN218894452U (en) Novel supporting structure for sealing post-cast strip of top plate
CN108951699B (en) Festival segmentation removal centre form and support of utility tunnel
CN111195978A (en) Novel pull type internal mold for prefabricated highway concrete plate beam
CN106089256A (en) Ditch cable trench construction trolley and construction method, tunnel cable die set device
CN114012866B (en) Adjustable polygonal mixed tower barrel template and tower barrel segment manufacturing method
CN116277417A (en) Vertical segment beam prefabrication template system and prefabrication method based on unmatched beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant