CN107577709A - A kind of graphically managing method of information system resources model - Google Patents
A kind of graphically managing method of information system resources model Download PDFInfo
- Publication number
- CN107577709A CN107577709A CN201710640553.7A CN201710640553A CN107577709A CN 107577709 A CN107577709 A CN 107577709A CN 201710640553 A CN201710640553 A CN 201710640553A CN 107577709 A CN107577709 A CN 107577709A
- Authority
- CN
- China
- Prior art keywords
- resource
- view
- pel
- model
- version
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Debugging And Monitoring (AREA)
- User Interface Of Digital Computer (AREA)
Abstract
The present invention discloses a kind of graphically managing method of information system resources model, comprises the following steps:S1, based on information system resources model, build the function structure of graphical services;S2, the function structure of analyzed pattern service, establish graphics management storehouse;S3, work out resource pel and resource view;S4, information system O&M stage, issue monitoring view;S5, resource model maintenance phase, the change of resource model is safeguarded with patterned way;The present invention establishes figure, resource model, KPI Key Performance Indicator(KPI)Association, alarm threshold configuration is provided, the graphically managing method of a kind of " What You See Is What You Get " is realized, solves the problems, such as that the maintenance cost of resource model in the prior art is high, monitoring means are single, allocating and transporting inspection service application for upper strata provides visual operation/maintenance data support.
Description
Technical field
The present invention relates to a kind of graphically managing method of information system resources model, belong to the visual of information system O&M
Change technical field.
Background technology
With the development and application of computer technology, network technology and the communication technology, State Grid Corporation of China's informationization scale
Constantly expand, allocation and transportation inspection service resources are more and more, relationship model becomes increasingly complex, the managerial ability requirement to resource model
More and more higher.
At present, maintenance of the resources manager to information system resources model is also changed with traditional data inputting, data
Based on, maintenance work amoun is cumbersome huge, and error-prone;Meanwhile the templated monitoring resource view of prior art can not meet institute
There is the demand of user, more can not the personalized monitoring demand of quick response.
The content of the invention
In order to solve prior art problem, the present invention provides a kind of graphically managing method of information system resources model,
Purpose is the association for establishing figure, resource model, KPI Key Performance Indicator (KPI), there is provided alarm threshold configures, and realizes a kind of
The graphically managing method of " What You See Is What You Get ", maintenance cost height, the monitoring means for solving resource model in the prior art are single
The problem of, allocate and transport inspection service application for upper strata and visual operation/maintenance data support is provided.
To achieve the above objectives, the present invention is realized using following technical scheme.
A kind of graphically managing method of information system resources model, comprises the following steps:
S1, based on information system resources model, build the function structure of graphical services;
Graphical services include figure from foreground displaying and release maintenance function is edited into from the background, specifically include pel editor clothes
Business, view editing service, pel version management service, view version management service and view displaying service;
S2, the function structure of analyzed pattern service, graphics management storehouse is established, graph data support is provided for graphical services;
Graphics management storehouse includes primitive control storehouse and view management storehouse;
S3, resource pel and resource view are worked out, establish figure, resource (resource in information system resources model) and close
The association of key performance indicators (KPI);
Information system resources model includes resource and Resource Dependence relation, establishes figure and resource and figure and key successively
The association of performance indicators (KPI), complete the establishment of resource pel and resource view;
S4, information system O&M stage, issue monitoring view, with the pass of patterned way supervisory information system resource model
Key performance indicators (KPI);
S5, resource model maintenance phase, the change of resource model is safeguarded with patterned way:
Safeguard that the renewal of resource model is with the graphically managing side of graphics edition driving model change with patterned way
Method, support the inquiry to resource model change and statistics.
Pel editing service includes graphical element model (fundamental figure, picture, resource pel), pel editor (pel read-write, figure
Member is drawn, meta graph recognition) and pel configuration (attribute configuration, resource distribution, KPI configurations), meet actual industry for User Defined
The resource pel of business demand provides patterned editing environment.
View editing service includes view model, and (application view, network view, inter-face views, computer room view, equipment regard
Figure, self-defined view), (attribute configuration, TIPS match somebody with somebody for view editor (view read-write, View Drawing, view layout) and view configuration
Put, act configuration), editor and the test environment of each class view are provided the user, simulates real network, business and computer room ring
Border, the structure monitoring view associated with information system resources model;
Pel version management service include version check, version search, version delete, version recovery, provide version for pel
This record and version management, improve the operating efficiency of pel editor;
View version management service include version check, version search, version delete, version recover and version issue, be
View provides colophon and version management, improves the operating efficiency of view editor;
View displaying service includes figure displaying (view preview, view control), data display (data loading, data brush
Newly) and alarm displaying (sound alarm, pop-up alert), preview and operation for view provide convenient operation.
Primitive control storehouse defines the management to primitive data, including the configuration of pel essential information, pel editor information, pel
Information, pel version information and pel state;Wherein, pel state includes four kinds of states, respectively pending, audited, treated
Abolish and abolished.
View management storehouse defines the management to viewdata, including view essential information, view editor information, view configuration
Information, view control information, view version information and viewstate.Wherein, viewstate includes six kinds of states, respectively pending
Core, audit, waited to abolish, abolished, do not issued, having issued.
More preferably, step S3 specifically includes following steps:
301) standard criterion drawn with reference to pel, uses pel editing service rendering resource pel;By in pel pipe
Li Ku records the unique relationships of resource pel and resource ID, establishes figure and resource (resource in information system resources model)
One-one relationship;
302) demand monitored according to operational indicator, the KPI that pel is carried out using pel editing service are configured, and are resource map
Member binds one or more KPI Key Performance Indicators (KPI), establishes the many-one relationship of figure and KPI Key Performance Indicator (KPI);
303) graphical element model is relied on, the resource view of description Resource Dependence relation, resource are worked out using view editing service
What application view, description system and inter-system data of the view including the deployment of description information system physical and logical architecture flowed to connects
Mouth view, the network view for describing some wide network layout scenarios etc..
The change type of resource model includes newly-increased resource, abolishes resource and modification Resource Dependence relation.
More preferably, it is with resource model drive pattern with patterned way supervisory information system resource model described in step S4
The graphically managing method of monitoring, the specific step that performs include:
401) with reference to professional standard and company's O&M standard, set resource KPI Key Performance Indicator (KPI) alarm threshold and
Alert exhibition method;
402) after preview test passes through, issue monitoring view, the Key Performance of Sis Based On Pi Database resource model refers to
Mark (KPI);
403) KPI Key Performance Indicator (KPI) of one or more resources is inquired about, compared by different dimensions in the form of chart etc.
Data or alarm data.
Compared with prior art, beneficial effect of the present invention includes:
The present invention discloses a kind of graphically managing method of information system resources model, by graphical services, establish figure,
The association of resource model and KPI Key Performance Indicator (KPI), with the Key Performance of patterned way supervisory information system resource model
Index (KPI), the renewal for safeguarding resource model.In actual applications, the graphically managing method makes information system resources model
More directly perceived, coverage becomes apparent from, monitor mode is more diversified, can identify risk as early as possible, find failure in time, carry
The O&M efficiency of high information system.
Pel editing service of the present invention, view editing service, pel version management service, view version management service and regard
Figure displaying classification of service service, and graphics management storehouse is established, the corresponding relation and Resource Dependence relation of figure and resource are established, is carried
High pel editor and view editorial efficiency, the preview and operation of view facilitate, and corresponding speed is fast.
The present invention establishes the association of figure, resource model, KPI Key Performance Indicator (KPI), there is provided alarm threshold configures, and realizes
The graphically managing method of a kind of " What You See Is What You Get ", solve maintenance cost height, the monitoring means of resource model in the prior art
The problem of single, allocate and transport inspection service application for upper strata and visual operation/maintenance data support is provided.
Brief description of the drawings
Fig. 1 is a kind of graphically managing method flow diagram of information system resources model;
Fig. 2 is graphical services functional frame composition of the present invention.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of graphically managing method of information system resources model, comprises the following steps:
S1, build the function structure of graphical services;
Based on information system resources model, the function structure of graphical services is built;
As shown in Fig. 2 graphical services include figure from foreground displaying and release maintenance function is edited into from the background, specifically include
Pel editing service, view editing service, pel version management service, view version management service and view displaying service;
Pel editing service includes graphical element model (fundamental figure, picture, resource pel), pel editor (pel read-write, figure
Member is drawn, meta graph recognition) and pel configuration (attribute configuration, resource distribution, KPI configurations), meet actual industry for User Defined
The resource pel of business demand provides patterned editing environment.
View editing service includes view model, and (application view, network view, inter-face views, computer room view, equipment regard
Figure, self-defined view), (attribute configuration, TIPS match somebody with somebody for view editor (view read-write, View Drawing, view layout) and view configuration
Put, act configuration), editor and the test environment of each class view are provided the user, simulates real network, business and computer room ring
Border, the structure monitoring view associated with resource.
Pel version management service include version check, version search, version delete, version recovery, provide version for pel
This record and version management, improve the operating efficiency of pel editor.
View version management service include version check, version search, version delete, version recover and version issue, be
View provides colophon and version management, improves the operating efficiency of view editor.
View displaying service includes figure displaying (view preview, view control), data display (data loading, data brush
Newly) and alarm displaying (sound alarm, pop-up alert), preview and operation for view provide convenient operation.
S2, graphics management storehouse is established, graph data support is provided for graphical services;
The function structure of analyzed pattern service, graphics management storehouse is established, graph data support is provided for graphical services;
Graphics management storehouse includes primitive control storehouse and view management storehouse.
Primitive control storehouse defines the management to primitive data, including the configuration of pel essential information, pel editor information, pel
Information, pel version information and pel state etc..Wherein, pel state includes four kinds of states, it is respectively pending, audited,
Wait to abolish and abolished.
View management storehouse defines the management to viewdata, including view essential information, view editor information, view configuration
Information, view control information, view version information and viewstate.Wherein, viewstate includes six kinds of states, respectively pending
Core, audit, waited to abolish, abolished, do not issued, having issued.
S3, work out resource pel and resource view, establish figure, resource (referring to the resource in information system resources model) and
The association of KPI Key Performance Indicator (KPI);
Information system resources model includes resource and Resource Dependence relation, establish successively figure and resource model and figure with
The association of KPI Key Performance Indicator (KPI), complete the establishment of resource pel and resource view;
Specifically include following steps:
301) standard criterion drawn with reference to pel, uses pel editing service rendering resource pel;By in pel pipe
Li Ku records the unique relationships of resource pel and resource ID, establishes figure and the one-one relationship of resource;
302) demand monitored according to operational indicator, the KPI that pel is carried out using pel editing service are configured, and are resource map
Member binds one or more KPI Key Performance Indicators (KPI), establishes the many-one relationship of figure and KPI Key Performance Indicator (KPI);
303) graphical element model is relied on, the resource view of description Resource Dependence relation is worked out using view editing service, such as:
Description information system physical dispose and logical architecture application view, description system and inter-system data flow direction inter-face views,
Network view of some wide network layout scenarios etc. is described.
S4, information system O&M stage, issue monitoring view, with the pass of patterned way supervisory information system resource model
Key performance indicators (KPI);
It is the graphical pipe monitored with resource model drive pattern with patterned way supervisory information system resource model
Reason method, specific execution step are as follows:
1) with reference to professional standard and company's O&M standard, the alarm threshold and announcement of setting resource KPI Key Performance Indicator (KPI)
Alert exhibition method;
2) after preview test passes through, issue monitoring view, the KPI Key Performance Indicator of Sis Based On Pi Database resource model
(KPI)。
3) KPI Key Performance Indicator (KPI) number of one or more resources is inquired about, compared by different dimensions in the form of chart etc.
According to or alarm data.
S5, resource model maintenance phase, the renewal of resource model is safeguarded with patterned way
Safeguard that the renewal of resource model is with the graphically managing side of graphics edition driving model change with patterned way
Method, support the inquiry to resource model change and statistics.
The change type of resource model includes newly-increased resource, abolishes resource and modification Resource Dependence relation, for three kinds of changes
More type, following different step is performed respectively:
Situation one:Newly-increased resource
511) resource pel is increased newly to describe the newly-increased situation of resource using pel editing service, forming pel state is
" pending " graphical model;
512) initiate resource modification application flow, submit resource model modification application, illustrate change type, change reason,
Changed content, change influence.Wherein, changed content add new resources graphical model link, click on the link can preview its
Model and its details, including pel essential information, pel editor information, pel configuration information etc..
513) resource model director audits resource model modification application, and examination & verification state produces the following two kinds situation:
51a) examination & verification passes through, and the pel state of the resource, is changed into " examination & verification " state, and redirect in change primitive control storehouse
To step 514);
51b) examination & verification is by the way that the pel state of the resource, is changed into " abolishment " state, and jump in change primitive control storehouse
Go to step 515);
514) resource model change, renewal resource model storehouse are performed;
515) resource model modification application is filed, and resource model changing process terminates.
Situation two:Abolish resource
521) it is " waiting to abolish " to describe the abolishment situation of resource to service modification pel state using pel version management;
522) initiate resource modification application flow, submit resource model modification application, illustrate change type, change reason,
Changed content, change influence.Wherein, changed content adds the graphical model link of resource to be abolished, and clicking on the link can be pre-
Look at its model and its details, including pel essential information, pel editor information and pel configuration information.
3) resource model director audits resource model modification application, and examination & verification state, which produces, includes two kinds of situations:
52a) examination & verification passes through, and the pel state of the resource, is changed into " abolishment " state in change primitive control storehouse, and automatically
The resource and the dependence in all views are deleted, jumps to step 524);
52b) examination & verification is by the way that the pel state of the resource, becomes " examination & verification " state again, and jump in change primitive control storehouse
Go to step 525);
524) resource model change, renewal resource model storehouse are performed;
525) resource model modification application is filed, and resource model changing process terminates.
Situation three:Change Resource Dependence relation
531) resource view is changed using view editing service to describe the change feelings of Resource Dependence relation in resource model
Resource, resource connecting line in condition, including newly-increased/deletion resource view, the viewstate for forming redaction are " pending "
Resource view model;
532) initiate resource modification application flow, submit resource model modification application, illustrate change type, change reason,
Changed content, change influence.Wherein, changed content is separately added into the chain of Current resource view model and new resources view model
Connect, click on corresponding link can its resource view of preview and its details, including view essential information, view editor information, regard
Figure configuration information etc..
533) resource model director audits resource model modification application, and examination & verification state produces following two situations:
53a) examination & verification passes through, and the viewstate of the resource view, is changed into " examination & verification " state in change view management storehouse, and
Jump to step 534);
53b) examination & verification not by, the viewstate of the resource view, is changed into " abolishment " state in change view management storehouse,
And jump to step 535);
534) resource model change, renewal resource model storehouse are performed;
535) resource model modification application is filed, and resource model changing process terminates.
Described above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (6)
- A kind of 1. graphically managing method of information system resources model, it is characterised in that comprise the following steps:S1, based on information system resources model, build the function structure of graphical services;Graphical services include figure from be edited into from the background foreground displaying and release maintenance function, specifically include pel editing service, View editing service, pel version management service, view version management service and view displaying service;S2, the function structure of analyzed pattern service, graphics management storehouse is established, graph data support is provided for graphical services;Graphics management storehouse includes primitive control storehouse and view management storehouse;S3, resource pel and resource view are worked out, establish the association of figure, resource and KPI Key Performance Indicator;Information system resources model includes resource and Resource Dependence relation, establishes figure and resource and figure and Key Performance successively The association of index, complete the establishment of resource pel and resource view;S4, information system O&M stage, issue monitoring view, with the crucial achievement of patterned way supervisory information system resource model Imitate index;S5, resource model maintenance phase, the change of resource model is safeguarded with patterned way:Safeguard that the renewal of resource model is with the graphically managing method of graphics edition driving model change, branch with patterned way Hold the inquiry to resource model change and statistics.
- A kind of 2. graphically managing method of information system resources model according to claim 1, it is characterised in thatPel editing service includes graphical element model, pel editor and pel configuration, meets practical business demand for User Defined Resource pel patterned editing environment is provided;View editing service includes view model, view editor and view configuration, provides the user editor and the survey of each class view Test ring border, simulate real network, business and building environment, the structure monitoring view associated with information system resources model;Pel version management service include version check, version search, version delete and version recover, for pel provide version remember Record and version management;View version management service include version check, version search, version delete, version recover and version issue, be view Colophon and version management are provided;View displaying service includes figure displaying, data display and alarm displaying, and the preview and operation for view provide convenient behaviour Make.
- A kind of 3. graphically managing method of information system resources model according to claim 1, it is characterised in thatPrimitive control storehouse defines the management to primitive data, including pel essential information, pel editor information, pel match somebody with somebody confidence Breath, pel version information and pel state;Wherein, pel state includes four kinds of states, respectively pending, audited, waited to give up Except with abolished;View management storehouse defines the management to viewdata, including view essential information, view editor information, view configuration letter Breath, view control information, view version information and viewstate;Wherein, viewstate includes six kinds of states, respectively pending Core, audit, waited to abolish, abolished, do not issued and issued.
- A kind of 4. graphically managing method of information system resources model according to claim 1, it is characterised in thatStep S3 specifically includes following steps:301) standard criterion drawn with reference to pel, uses pel editing service rendering resource pel;By in primitive control storehouse The unique relationships of resource pel and resource ID are recorded, establish figure and the one-one relationship of resource;302) demand monitored according to operational indicator, the KPI that pel is carried out using pel editing service are configured, tied up for resource pel Fixed one or more KPI Key Performance Indicators, establish the many-one relationship of figure and KPI Key Performance Indicator;303) graphical element model is relied on, the resource view of description Resource Dependence relation, resource view are worked out using view editing service The interface of application view, description system and inter-system data flow direction including the deployment of description information system physical and logical architecture regards Scheme, describe the network view of some wide network layout scenarios.
- A kind of 5. graphically managing method of information system resources model according to claim 1, it is characterised in thatThe change type of resource model includes newly-increased resource, abolishes resource and modification Resource Dependence relation.
- A kind of 6. graphically managing method of information system resources model according to claim 1, it is characterised in thatDescribed in step S4 with patterned way supervisory information system resource model be with resource model drive pattern monitor figure Change management method, the specific step that performs includes:401) with reference to professional standard and company's O&M standard, the alarm threshold of resource KPI Key Performance Indicator is set and alerts displaying side Formula;402) after preview test passes through, issue monitoring view, the KPI Key Performance Indicator of Sis Based On Pi Database resource model;403) KPI Key Performance Indicator data or the alarm of one or more resources are inquired about, compared by different dimensions in the form of chart etc. Data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710640553.7A CN107577709B (en) | 2017-07-31 | 2017-07-31 | Graphical management method of information system resource model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710640553.7A CN107577709B (en) | 2017-07-31 | 2017-07-31 | Graphical management method of information system resource model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107577709A true CN107577709A (en) | 2018-01-12 |
CN107577709B CN107577709B (en) | 2020-08-25 |
Family
ID=61034056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710640553.7A Active CN107577709B (en) | 2017-07-31 | 2017-07-31 | Graphical management method of information system resource model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107577709B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110727433A (en) * | 2019-10-13 | 2020-01-24 | 吉林大学 | Method for generating multi-channel three-dimensional user interface |
CN111756564A (en) * | 2019-03-29 | 2020-10-09 | 瞻博网络公司 | Supporting concurrency of graph-based advanced configuration models |
US11296954B2 (en) | 2019-03-29 | 2022-04-05 | Juniper Networks, Inc. | Supporting near real time service level agreements |
CN115809494A (en) * | 2023-01-30 | 2023-03-17 | 中交第四航务工程勘察设计院有限公司 | Shared primitive community management method, system and medium based on CAD primitives |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2058733A2 (en) * | 2007-11-09 | 2009-05-13 | Avro Computing Inc. | Multi-tier interface for management of operational structured data |
CN103632226A (en) * | 2013-11-29 | 2014-03-12 | 国家电网公司 | SVG (scalable vector graphics) imaging modeling-based method for realizing information resource monitoring and positioning |
CN104765843A (en) * | 2015-04-16 | 2015-07-08 | 国家电网公司 | Control method used for graphic interface of electric power real-time monitoring system |
-
2017
- 2017-07-31 CN CN201710640553.7A patent/CN107577709B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2058733A2 (en) * | 2007-11-09 | 2009-05-13 | Avro Computing Inc. | Multi-tier interface for management of operational structured data |
CN103632226A (en) * | 2013-11-29 | 2014-03-12 | 国家电网公司 | SVG (scalable vector graphics) imaging modeling-based method for realizing information resource monitoring and positioning |
CN104765843A (en) * | 2015-04-16 | 2015-07-08 | 国家电网公司 | Control method used for graphic interface of electric power real-time monitoring system |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111756564A (en) * | 2019-03-29 | 2020-10-09 | 瞻博网络公司 | Supporting concurrency of graph-based advanced configuration models |
CN111756564B (en) * | 2019-03-29 | 2021-10-08 | 瞻博网络公司 | Method for configuring network, controller device and storage medium |
US11296954B2 (en) | 2019-03-29 | 2022-04-05 | Juniper Networks, Inc. | Supporting near real time service level agreements |
US11689419B2 (en) | 2019-03-29 | 2023-06-27 | Juniper Networks, Inc. | Supporting concurrency for graph-based high level configuration models |
CN110727433A (en) * | 2019-10-13 | 2020-01-24 | 吉林大学 | Method for generating multi-channel three-dimensional user interface |
CN110727433B (en) * | 2019-10-13 | 2021-04-30 | 吉林大学 | Method for generating multi-channel three-dimensional user interface |
CN115809494A (en) * | 2023-01-30 | 2023-03-17 | 中交第四航务工程勘察设计院有限公司 | Shared primitive community management method, system and medium based on CAD primitives |
Also Published As
Publication number | Publication date |
---|---|
CN107577709B (en) | 2020-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107577709A (en) | A kind of graphically managing method of information system resources model | |
CN105700888A (en) | Visualization rapid developing platform based on jbpm workflow engine | |
CN107169611A (en) | A kind of patterned way planning AGV travel regions and the method for monitoring its operation | |
TWI519965B (en) | Flexible assembly system and method for cloud service service for telecommunication application | |
CN110086665A (en) | A kind of network topological diagram methods of exhibiting based on jTopo | |
CN104956381A (en) | Graphical user interface for monitoring and visualizing contact center routing strategies | |
CN111104622A (en) | WEBGL-based three-dimensional GIS intelligent monitoring method and device | |
CN114039856B (en) | Network topology structure display system and method | |
CN112000859A (en) | GIS system-based panoramic visual anti-misoperation system for power grid operation safety | |
CN106775729A (en) | A kind of mobile client business rendering method and system based on data description | |
CN201655244U (en) | Display control system based on network | |
CN110083664A (en) | The method for constructing topological model automatically based on CMDB model | |
CN113888126A (en) | Oil gas pipeline inspection management system | |
CN109684779A (en) | A kind of simulation model assembly method based on view | |
CN104160389B (en) | By having the method and system of the intelligent event dynamically aggregated content of non-illustration content | |
CN107819598A (en) | A kind of method and device for managing network function node | |
CN112422326A (en) | Automatic management and control method for network access quality of 5G-SPN equipment | |
CN106648280A (en) | Task management interaction method and device | |
CN110287387A (en) | A kind of novel data visualization cartographic editing system and method | |
JP2010205126A (en) | Service configuration management apparatus, service configuration management method and program | |
Villanueva et al. | Crowded event management in smart cities using a digital twin approach | |
CN206282342U (en) | Digital urban management grid-based management platform | |
JP2024527510A (en) | Document processing method, device, equipment and medium | |
JP5300902B2 (en) | Screen control program and information processing apparatus | |
CN103150622A (en) | Security and protection network resource management method, device and system based on geographic information system (GIS) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |