CN106640542A - Concrete tower cylinder module and bonding method thereof - Google Patents

Concrete tower cylinder module and bonding method thereof Download PDF

Info

Publication number
CN106640542A
CN106640542A CN201610883164.2A CN201610883164A CN106640542A CN 106640542 A CN106640542 A CN 106640542A CN 201610883164 A CN201610883164 A CN 201610883164A CN 106640542 A CN106640542 A CN 106640542A
Authority
CN
China
Prior art keywords
tower segments
tower
prestressing force
segments
cartridge module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610883164.2A
Other languages
Chinese (zh)
Inventor
郑家宁
李亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fengling new energy Co.,Ltd.
Original Assignee
Huoerguosi Amperex Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huoerguosi Amperex Technology Ltd filed Critical Huoerguosi Amperex Technology Ltd
Priority to CN201610883164.2A priority Critical patent/CN106640542A/en
Publication of CN106640542A publication Critical patent/CN106640542A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a concrete tower cylinder module and a bonding method thereof. The concrete tower cylinder module comprises a first tower cylinder section, a second tower cylinder section and prestressed sleeves. A positioning column is arranged at the top of the first tower cylinder section; a first positioning groove matched with the positioning column is formed in the bottom of the second tower cylinder section; a bonding layer is arranged between the first tower cylinder section and the second tower cylinder section; holes for penetrating through the heights are repsectively formed in the first tower cylinder section and the second tower cylinder section; the prestressed sleeves are respectively arranged in the holes; the upper end of each prestressed sleeve is higher than the upper end of the corresponding hole, and the lower end is lower than the lower end of the corresponding hole, so that the holes positioned at the lower parts of the prestressed sleeves form second positioning grooves; and the upper ends of the prestressed sleeves are matched in the corresponding second positioning grooves. According to the concrete tower cylinder module, when two adjacent tower cylinder sections are in horizontal butt joint, the butt joint is convenient and high in precision, so that the construction efficiency can be improved, the construction quality is guaranteed, and the horizontal butt joint procedure is simple.

Description

Concrete towers cartridge module and its adhering method
Technical field
The present invention relates to technical field of wind power generation, more particularly, to a kind of concrete towers cartridge module and its adhering method.
Background technology
With the increase of power generation efficiency, length of blade is increasingly longer, the height of matching blower fan tower barrel and cuts Face size is also continuously increased.Steel construction tower is due to relatively costly, transport difficult, therefore, it is difficult to meeting building for the high tower in heavy in section Make requirement.And precast concrete tower can economically build Large-scale Wind Turbines, therefore obtain extensive concern.Due to fortune Defeated condition and prefabricated processing conditions are limited, and complete concrete tower is often formed by multiple single tower Assemblings.
In correlation technique, during concrete towers cartridge module is assembled, the horizontal joint of single tower and other towers The problems such as connection faces merging precision difference, and complex procedures, low construction efficiency.
The content of the invention
It is contemplated that at least solving one of technical problem in correlation technique to a certain extent.For this purpose, the present invention is carried Go out a kind of concrete towers cartridge module, the concrete towers cartridge module has that horizontal merging precision is high, operation is simple, efficiency of construction is high Advantage.
The invention allows for a kind of adhering method of above-mentioned concrete towers cartridge module.
The concrete towers cartridge module of embodiment according to a first aspect of the present invention, including:First tower segments and positioned at described The second tower segments above one tower segments, are provided with locating dowel, the bottom of second tower segments at the top of first tower segments The first detent is provided with, the locating dowel coordinates with first detent, first tower segments and second tower Tack coat is provided between cylinder section, is equipped with through the duct of height in first tower segments and second tower segments;In advance should Power sleeve, the prestressing force sleeve is respectively provided in the duct of the duct of first tower segments and second tower segments, often Higher than the upper end in the corresponding duct, the lower end of each prestressing force sleeve is less than right for the upper end of the individual prestressing force sleeve The lower end in the duct answered so as to form the second detent positioned at the duct of the bottom of the prestressing force sleeve, positioned at described The upper end of the prestressing force sleeve in the first tower segments coordinates recessed in second positioning in second tower segments In groove.
Concrete towers cartridge module according to embodiments of the present invention, by leading between two tower segments of neighbouring connection The cooperation of locating dowel and the first locating slot is crossed, it is convenient to dock and merging precision when two neighboring tower segments carry out level docking Height, while coordinated by the upper end by the prestressing force being located in tower segments sleeve being positioned the second of the tower segments being positioned above In groove, such that it is able to make the prestressing force sleeve being located in each tower segments quickly and accurately be connected in the vertical direction, Ke Yijin One step ground improves merging precision when concrete towers cartridge module level is docked, and can improve efficiency of construction, it is ensured that construction matter Amount, and cause the operation of level docking simple.
Some embodiments of the invention, the tack coat is thixotroping mortar or epoxy resin.
Some embodiments of the invention, at the top of first tower segments multiple levelling pads, Duo Gesuo are additionally provided with State levelling pad and be spaced apart setting around the center of first tower segments.
Some embodiments of the invention, are provided with leveling groove, the levelling pad at the top of first tower segments Coordinate in the leveling groove.
Some embodiments of the invention, the upper surface of the upper surface of the levelling pad and first tower segments it Between height be not less than 10mm.
Some embodiments of the invention, the upper surface of the prestressing force sleeve is consistently higher than the upper table of the tack coat Face.
According to a second aspect of the present invention the adhering method of the above-mentioned concrete towers cartridge module of embodiment, comprises the steps:
S10, ring baffle is provided with the outside of the upper end of first tower segments, the upper end of the ring baffle exceedes described The upper end of the first tower segments;
S20, smear the tack coat in the upper surface of first tower segments, the upper surface of the tack coat is less than institute State the upper end of prestressing force sleeve;
S30, second tower segments are lifted on the upper end of first tower segments and using the tack coat to described First tower segments and second tower segments carry out bonding.
The adhering method of above-mentioned concrete towers cartridge module according to embodiments of the present invention, by the two of neighbouring connection Adhesive linkage is smeared at the horizontal joint of individual tower segments, so that stable connection between two tower segments of adjacent connection, and in water The outside of carvel joint arranges ring baffle, such that it is able to prevent the adhesive linkage at horizontal joint from outwards overflowing, it is ensured that concrete towers The Forming Quality and aesthetic property of cartridge module, while operation can be simplified, improves efficiency of construction.
Some embodiments of the invention, also include after step S30:S40, to first tower segments and described The tack coat overflow content of two tower segments internal faces is struck off.
The additional aspect and advantage of the present invention will be set forth in part in the description, and partly will become from the following description Obtain substantially, or recognized by the practice of the present invention.
Description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become from the description with reference to accompanying drawings below to embodiment It is substantially and easy to understand, wherein:
Fig. 1 is the schematic diagram of concrete towers cartridge module according to embodiments of the present invention;
Fig. 2 is the schematic diagram of the tower segments of concrete towers cartridge module according to embodiments of the present invention;
Fig. 3 is the enlarged diagram in Fig. 2 at A;
Fig. 4 is the enlarged diagram in Fig. 2 at B;
Fig. 5 is the part-structure schematic diagram of the tower segments of concrete towers cartridge module according to embodiments of the present invention, wherein fixed Position post coordinates in positioning screw, and levelling pad coordinates in leveling groove.
Reference:
Concrete towers cartridge module 100,
Basis 1,
Tower body 2, tower segments 21, prestressing force sleeve 22, locating dowel 23, positioning screw 24, head 241, bar portion 242, First detent 25, the second detent 26, leveling groove 27, levelling pad 28.
Adapter 3.
Specific embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from start to finish Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not considered as limiting the invention.
In describing the invention, it is to be understood that term " " center ", " length ", " width ", " thickness ", " on ", The orientation of the instruction such as D score, " vertical ", " level ", " top ", " bottom ", " interior ", " outward ", " clockwise ", " counterclockwise " or position are closed System is, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify description, rather than is indicated Or the device or element of hint indication with specific orientation, with specific azimuth configuration and operation, therefore must not be understood that For limitation of the present invention.Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or implying Relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first " is defined, the feature of " second " can To express or implicitly include one or more this feature.In describing the invention, " multiple " are meant that two Or two or more, unless otherwise expressly limited specifically.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals or the interaction relationship of two elements.For the ordinary skill in the art, can be with Above-mentioned term concrete meaning in the present invention is understood as the case may be.
Concrete towers cartridge module 100 according to embodiments of the present invention is described below with reference to Fig. 1-Fig. 5.
As Figure 1-Figure 5, the concrete towers cartridge module 100 of embodiment according to a first aspect of the present invention, including:First tower Cylinder section, the second tower segments and prestressing force sleeve 22.
Specifically, the second tower segments are located at the first tower segments top, and locating dowel 23 is provided with the top of the first tower segments, the The bottom of two tower segments is provided with the first detent 25, and locating dowel 23 coordinates with the first detent 25.Thus, by the first tower Cooperation between first locating slot of the tower segments of locating dowel 23 and second of cylinder section, can make the second tower segments accurately and rapidly The top of the first tower segments is positioned at, positioning precision and speed is significantly increased.Alternatively, the top of the first tower segments is arranged Locating dowel 23 can be for multiple, for example locating dowel 23 can be four, and multiple locating dowels 23 are equal along the ring of the first tower segments Even arrangement, correspondingly, the bottom of the second tower segments is provided with the first detent 25 of equal number, such that it is able to improve positioning Precision.
Alternatively, the shape of the first locating slot can be formed as cone barrel, and the cross section of the first locating slot from it is lower to On direction on be gradually reduced.Now, locating dowel 23 can be formed as cylinder, it is also possible to be formed as truncated cone-shaped.Thus, it is convenient The cooperation of the locating slot of locating dowel 23 and first, can improve locating speed and with sum velocity.
In one particular embodiment of the present invention, with reference to Fig. 3 and Fig. 5, positioning spiral shell is embedded with the top of the first tower segments Bar 24, positioning screw 24 includes head 241 and the bar portion 242 being connected with head 241, is provided with the head 241 of positioning screw 24 Internal thread, the lower end of locating dowel 23 is provided with external screw thread.By the internal thread on the external screw thread in locating dowel 23 and positioning screw 24 Engagement, can be by the reliable and stable top for being connected to the first tower segments of locating dowel 23, so as to facilitate locating dowel 23 and The connection of one tower segments.And the quantity of above-mentioned positioning screw 24 can be more than the quantity setting of locating dowel 23, positioning screw 24 can Use for lifting tower segments 21.Specifically, will can screw in positioning screw 24, so as to side with externally threaded suspension ring Just tower segments 21 are lifted into combination.
Tack coat is provided between first tower segments and the second tower segments, can be led between the first tower segments and the second tower segments Adhesive linkage connection is crossed, the horizontal joint between the first tower segments and the second tower segments uniformly, is densely filled in by adhesive linkage It is interior, it is ensured that the bonding strength between the first tower segments and the second tower segments, so as to ensure the whole of concrete towers cartridge module 100 Body intensity and quality.Alternatively, tack coat can be thixotroping mortar or epoxy resin.
It is equipped with first tower segments and the second tower segments through the duct of height, prestressing force sleeve 22 is respectively provided at first In the duct of the duct of tower segments and the second tower segments, prestressing force sleeve 22 is used to wear presstressed reinforcing steel, to improve the first tower Bonding strength between section and the second tower segments, it is possible to improve the structural strength of whole concrete towers cartridge module 100 and stablize Property.
For example, referring to Fig. 2, duct can be multiple (such as duct is 40), and multiple ducts are segmented into some groups (such as 40 ducts are segmented into ten groups), some groups of ducts can be arranged along the ring uniform intervals of tower segments 21, per group Duct can include multiple ducts (such as every group duct can include four) and the neighbouring setting in the plurality of duct.Correspondingly, in advance Stress sleeve 22 is identical with the quantity in duct and is located in corresponding duct.Thus, it is possible to further improve concrete tower The structural strength and stability of component 100.
Higher than the upper end in corresponding duct, the lower end of each prestressing force sleeve 22 is less than for the upper end of each prestressing force sleeve 22 The lower end in corresponding duct so as to form the second detent 26 positioned at the duct of the bottom of prestressing force sleeve 22, positioned at the first tower The upper end of the prestressing force sleeve 22 in cylinder section coordinates in the second detent 26 in the second tower segments.Thus, inciting somebody to action When second tower segments are lifted in the first tower segments, coordinated the by upper end by the prestressing force sleeve 22 in the first tower segments In the second detent 26 in two tower segments, the pre- of the tower segments of prestressing force sleeve 22 and second being easy in the first tower segments should Accurately and rapidly linking between power sleeve 22, it is ensured that later stage presstressed reinforcing steel wears smoothly and can ensure that concrete tower The final molding quality of component 100.
Wherein, the upper surface of prestressing force sleeve 22 is consistently higher than the upper surface of tack coat.Thus, it is possible to prevent adhesive linkage from blocking up The upper port of plug prestressing force sleeve 22, it is ensured that the smoothness connected between the first tower segments and the second tower segments.
Alternatively, the shape of the second locating slot can be formed as cone barrel, and the cross section of the second locating slot from it is lower to On direction on be gradually reduced.Thus, the upper end of prestressing force sleeve 22 and the cooperation of corresponding second locating slot, Ke Yiti are facilitated High locating speed and with sum velocity.
Need to illustrate here, the concrete towers cartridge module 100 of the present invention is in upper and lower by multiple tower segments 21 It is connected in sequence upwards, wherein, above-mentioned first tower segments can refer to underlying tower in neighbouring two tower segments 21 Cylinder section 21, above-mentioned second tower segments can refer to tower segments 21 above in neighbouring two tower segments 21.Alternatively, tower Cylinder section 21 can be formed by connecting by multiple arcs tower piece, and tower segments 21 can also be the annular column piece of an entirety.
Concrete towers cartridge module 100 according to embodiments of the present invention, by two tower segments 21 in neighbouring connection Between by the cooperation of the locating slot of locating dowel 23 and first, it is convenient to dock when two neighboring tower segments 21 carry out level and dock And merging precision is high, while being coordinated in the tower being positioned above by the upper end by the prestressing force being located in tower segments 21 sleeve 22 In second locating slot of cylinder section 21, such that it is able to make the prestressing force sleeve 22 being located in each tower segments 21 accurate in the vertical direction Really rapidly it is connected, can further improves the merging precision when level of concrete towers cartridge module 100 is docked, and can carries High efficiency of construction, it is ensured that construction quality, and cause the operation of level docking simple.
Concrete towers cartridge module 100 according to embodiments of the present invention is described in detail referring to Fig. 1-Fig. 5.
With reference to Fig. 1, concrete towers cartridge module 100 includes being suitable to being located at basis 1 below ground, the tower being located on basis 1 Cylinder body 2 and the adapter 3 being located at the top of tower body 2.Wherein, tower body 2 includes above-mentioned the first tower segments and the Two tower segments.The bottom of tower body 2 and the connection on basis 1 are referred to the connection between the first tower segments and the second tower segments Mode is attached.The attachment structure between the first tower segments and the second tower segments is further described below.
With reference to Fig. 2, Fig. 3 and Fig. 5, multiple levelling pads 28, multiple levelling pads 28 are additionally provided with the top of the first tower segments It is spaced apart around the center of the first tower segments and arranges.Thus, by the multiple levelling pads 28 for arranging, and by multiple levelling pads 28 upper surface is adjusted to same level height, when the second tower segments to be lifted the top to the first tower segments, can make the The bottom of two tower segments is supported directly on the upper surface of multiple levelling pads 28, thereby may be ensured that the second tower segments level is put Put, prevent the inclination of whole concrete towers cartridge module 100, improve the Forming Quality of concrete towers cartridge module 100.Alternatively, often Individual levelling pad 28 can be made up of different-thickness pad, to facilitate adjustment.The thickness of such as pad can for 0.5mm, 1mm, 2mm, 5mm, 10mm etc..Alternatively, levelling pad 28 is steel part.
Further, with reference to Fig. 2, Fig. 3 and Fig. 5, leveling groove 27 is provided with the top of the first tower segments, levelling pad 28 is matched somebody with somebody Close in leveling groove 27.Thus, facilitate the setting of levelling pad 28 and multiple levelling pads 28 can be made to be positioned at setting Position, can conveniently realize the leveling between adjacent tower segments 21.For example, four tune are provided with the top of the first tower segments Flat grooves 27, four leveling grooves 27 arrange that each leveling groove 27 may be located at along the ring uniform intervals of tower segments 21 State between two adjacent groups duct, so that concrete towers cartridge module 100 is rational in infrastructure.Alternatively, the depth of leveling groove 27 It can be 5mm to spend, the half of the wide upper surface width for being less than the first tower segments of leveling groove 27, the length of leveling groove 27 Can it be 1.5 times of the upper surface width of the first tower segments.Thus, levelling effect had both been can ensure that and levelling pad can have been increased 28 and second contact area between tower segments so that the second tower segments are smoothly placed in the top of the first tower segments.Need solution Release, " width " refers to the size in the radial direction in tower segments 21, " length " is referred in tower segments 21 Size in circumferential direction.
In some embodiments of the invention, the height between the upper surface of the upper surface of levelling pad 28 and the first tower segments Degree is not less than 10mm.Thus, it is possible to the thickness for making the adhesive linkage between the first tower segments and the second tower segments is not less than 10mm, from And the thickness of adhesive linkage between the first tower segments and the second tower segments can be can ensure that to ensure bonding strength.Need to explain , " thickness of adhesive linkage " refers to adhesive linkage size in the vertical direction.
The adhering method of above-mentioned concrete towers cartridge module 100 according to embodiments of the present invention is described referring to Fig. 1-Fig. 5.
According to a second aspect of the present invention the adhering method of the above-mentioned concrete towers cartridge module 100 of embodiment, walks including following Suddenly:
S10, on the outside of the upper end of the first tower segments ring baffle is provided with, the upper end of ring baffle is more than the first tower segments Upper end.By the ring baffle for arranging, can prevent the adhesive linkage subsequently smeared from overflowing to the outside of tower segments 21, keep tower It is smooth on the outside of section 21, while operation can be simplified, improve efficiency of construction.Alternatively, ring baffle is elastic component, for example annular Baffle plate can be flexible foam part.Thus, it is possible to make ring baffle be fitted tightly on the lateral surface of tower segments 21, can be with Well barrier adhesion layer such as thixotroping mortar outwards overflows.
For the height of ring baffle, can be determined according to the thickness of adhesive linkage.For example, the thickness in adhesive linkage is set to During 10mm, the height of ring baffle could be arranged to 20mm.
S20, tack coat is smeared in the upper surface of the first tower segments, for example, smear thixotroping ash in the upper surface of the first tower segments Slurry or epoxy resin.The thickness of tack coat thus it can be prevented that tack coat blocking in advance should less than the upper end of prestressing force sleeve 22 The upper port of power sleeve 22.
S30, the upper end that the second tower segments are lifted on the first tower segments and using tack coat to the first tower segments and second Tower segments carry out bonding.Thus, by the bonding effect of adhesive linkage, the first tower segments and the second tower segments can be connected Connect.
Thus, when adhesive linkage is smeared by the cooperation of ring baffle, the adhesive linkage that makes that can be uniform, closely knit is filled in In horizontal joint between one tower segments and the second tower segments, while with higher mechanical strength.
The adhering method of above-mentioned concrete towers cartridge module 100 according to embodiments of the present invention, by neighbouring connection Two tower segments 21 horizontal joint at smear adhesive linkage so that stable connection between two tower segments 21 of adjacent connection, And ring baffle is set in the outside of horizontal joint, such that it is able to prevent the adhesive linkage at horizontal joint from outwards overflowing, it is ensured that The Forming Quality and aesthetic property of concrete towers cartridge module 100, while operation can be simplified, improves efficiency of construction.
In some embodiments of the invention, also include after step S30:S40, to the first tower segments and the second tower segments The tack coat overflow content of internal face struck off.It is understood that the workbench of operating personnel is generally located in coagulation The inner side of native tower component 100, thus employ the outside wall surface of above-mentioned ring baffle, the first tower segments and the second tower segments without Need to carry out striking off operation.And the tack coat overflow content of the internal face of the first tower segments and the second tower segments, by striking off operation, Unnecessary material can be removed, it is ensured that the quality and aesthetic property of concrete towers cartridge module 100.
Below to the concrete tower group of a specific embodiment of the invention so that adhesive linkage is for thixotroping mortar as an example The adhering method of part 100 is described in detail.
Reference picture 1- Fig. 5, concrete towers cartridge module 100 includes:First tower segments, the second tower segments and prestressing force sleeve 22.It is embedded with the top of first tower segments at the top of positioning screw 24, and the first tower segments and is provided with leveling groove 27, the second tower The bottom of section is provided with the first detent 25.Prestressing force sleeve 22 is set in the duct of the first tower segments and the second tower segments, And the upper end of 22 sets of prestressing force sleeve, higher than the upper end in corresponding duct, the bottom of the second tower segments is provided with the second detent 26。
First, by placing levelling pad 28 in each leveling groove 27 so that the leveling in each leveling groove 27 The upper surface of pad 28 is located at sustained height, and makes the upper surface of levelling pad 28 higher than the upper surface 10mm of the first tower segments, It is possible thereby to the height for making the horizontal joint between the first tower segments and the second tower segments is 10mm.Meanwhile, locating dowel 23 is revolved Enter in corresponding positioning screw 24, and ring baffle is set in into the upper end of the first tower segments and makes the upper end that ring baffle covers high In the upper end of the first tower segments.
Then, thixotroping mortar is applied to the upper surface of the first tower segments to form adhesive linkage, and causes the upper of adhesive linkage End face is consistently lower than the upper surface of 22 sets of prestressing force sleeve.The thixotroping mortar smeared can be with slightly excessive, and thixotroping mortar can be higher than The about 5-10mm of levelling pad 28, but levelling pad 28 is not covered, the bottom of such second tower segments can be located immediately at leveling pad The upper surface of piece 28, it is ensured that thixotroping mortar fills whole horizontal joint.Additionally, in view of leakage situation may occur, it is tactile smearing Before becoming mortar, it is ensured that have enough thixotroping mortar to fill whole seams on workbench.Rule of thumb, 25% can be had Extra thixotroping mortar for standby.
After the thixotroping mortar of adhesive linkage is smeared and finished, thixotroping mortar suitably extends in the top surface of the first tower segments, So that thixotroping mortar is sufficient filling with space.In order to ensure the adhesive strength of adhesive linkage, the thickness of adhesive linkage is verified enough and continuously Gap/space, especially around prestressing force sleeve 22 and levelling pad 28, and guarantees the upper surface of each levelling pad 28 Cleaning is clean.
Second tower segments are lifted on into the upper end of the first tower segments, during the second tower segments are lifted, in the second tower When cylinder section is higher than the first tower segments about 50cm, it is ensured that the second tower segments are just right with the first tower segments.Then, the second tower segments are slow The top of the first tower segments is placed on, and causes the locating dowel 23 at the top of the first tower segments to coordinate in the second tower segments first In detent 25, while the upper end of the prestressing force sleeve 22 of the first tower segments coordinates the second positioning in the second tower segments recessed In groove 26, such that it is able to make the second tower segments accurately and fast position.Now, the bottom of the second tower segments and levelling pad 28 Upper surface only support, and while thixotroping mortar is under the extruding of the second tower segments, the sky that will can be likely to occur in horizontal joint Gap is fully filled with, and makes joint surface even uniform.
When the second tower segments it is totally stationary in the first tower segments when, unnecessary thixotroping mortar should be removed, such as to overflow Thixotroping mortar to the first tower segments and the internal face of the second tower segments is struck off.Also, going through in horizontal joint is It is no to there is gap, particularly in prestressing force sleeve 22 and the near zone of levelling pad 28, if finding any shortage grouting phenomenon, Using mud shovel excess stock can be removed from joint surface and reuse thixotroping mortar and fill up space, make joint surface smooth Uniformly.Carry out the lifting of next tower segments 21 by the thixotroping mortar of adhesive linkage is conserved to appropriate intensity.
It should be noted that in the process of above-mentioned construction, mixing and pouring thixotroping mortar and the top in the first tower segments The time interval between the second tower segments is placed, this time interval is commonly referred to as open assembly time (or process time).It is generally above-mentioned Open assembly time should be less than 25 minutes.In order to realize this purpose, before mixing grouting starts, next tower should be just got out Duan Yibei is lifted, and correct placement levelling pad 28, locating dowel 23 and ring baffle etc..
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example are described Structure, material or feature are contained at least one embodiment of the present invention or example.In this manual, to above-mentioned term Schematic representation is not necessarily referring to identical embodiment or example.And, the specific features of description, structure, material or spy Point can in an appropriate manner be combined in any one or more embodiments or example.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not These embodiments can be carried out with various changes, modification, replacement and modification in the case of the principle and objective that depart from the present invention, this The scope of invention is limited by claim and its equivalent.

Claims (8)

1. a kind of concrete towers cartridge module, it is characterised in that include:
First tower segments and the second tower segments above first tower segments, are provided with fixed at the top of first tower segments Position post, the bottom of second tower segments is provided with the first detent, and the locating dowel coordinates with first detent, institute State and tack coat is provided between the first tower segments and second tower segments, in first tower segments and second tower segments It is provided with through the duct of height;
Prestressing force sleeve, the prestressing force sleeve is respectively provided at the hole of the duct of first tower segments and second tower segments In road, the upper end of each prestressing force sleeve is higher than the upper end in the corresponding duct, under each described prestressing force sleeve End is less than the lower end in the corresponding duct so as to form the second detent positioned at the duct of the bottom of the prestressing force sleeve, The upper end of the prestressing force sleeve in first tower segments coordinates in described the in second tower segments In two detents.
2. concrete towers cartridge module according to claim 1, it is characterised in that the tack coat is thixotroping mortar or epoxy Resin.
3. concrete towers cartridge module according to claim 1, it is characterised in that be additionally provided with the top of first tower segments Multiple levelling pads, multiple levelling pads are spaced apart around the center of first tower segments and arrange.
4. concrete towers cartridge module according to claim 3, it is characterised in that be provided with tune at the top of first tower segments Flat grooves, the levelling pad coordinates in the leveling groove.
5. concrete towers cartridge module according to claim 3, it is characterised in that the upper surface of the levelling pad with it is described Height between the upper surface of the first tower segments is not less than 10mm.
6. concrete towers cartridge module according to claim 1, it is characterised in that the upper surface of the prestressing force sleeve is all the time Higher than the upper surface of the tack coat.
7. a kind of adhering method of the concrete towers cartridge module according to any one of claim 1-6, it is characterised in that bag Include following steps:
S10, ring baffle is provided with the outside of the upper end of first tower segments, the upper end of the ring baffle exceedes described first The upper end of tower segments;
S20, smear the tack coat in the upper surface of first tower segments, the upper surface of the tack coat is less than described pre- The upper surface of stress sleeve;
S30, second tower segments are lifted on the upper end of first tower segments and using the tack coat to described first Tower segments and second tower segments carry out bonding.
8. adhering method according to claim 7, it is characterised in that also include after step S30:
S40, the tack coat overflow content to first tower segments and the second tower segments internal face strike off.
CN201610883164.2A 2016-10-08 2016-10-08 Concrete tower cylinder module and bonding method thereof Pending CN106640542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610883164.2A CN106640542A (en) 2016-10-08 2016-10-08 Concrete tower cylinder module and bonding method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610883164.2A CN106640542A (en) 2016-10-08 2016-10-08 Concrete tower cylinder module and bonding method thereof

Publications (1)

Publication Number Publication Date
CN106640542A true CN106640542A (en) 2017-05-10

Family

ID=58855049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610883164.2A Pending CN106640542A (en) 2016-10-08 2016-10-08 Concrete tower cylinder module and bonding method thereof

Country Status (1)

Country Link
CN (1) CN106640542A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331385A (en) * 2018-04-24 2018-07-27 建华建材(中国)有限公司 Prefabricated rod structure and its construction method are cheated in a kind of inspection
CN111287900A (en) * 2018-12-06 2020-06-16 深圳京创重工特种工程有限公司 Upper tower barrel section of concrete tower barrel and concrete tower barrel with upper tower barrel section
CN113464370A (en) * 2021-07-16 2021-10-01 上海市机电设计研究院有限公司 Method for connecting concrete tower barrel convenient to disassemble

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057713A (en) * 2007-08-30 2009-03-19 Kyushu Electric Power Co Inc Wind power generation hybrid tower, and its construction method
CN101648335A (en) * 2009-09-08 2010-02-17 南车南京浦镇车辆有限公司 Technology for installing windows of railway vehicles
CN101672007A (en) * 2008-09-12 2010-03-17 株式会社大宇建设 Constructing method of precast pier footing for bridge
CN202500731U (en) * 2012-02-22 2012-10-24 阜新金胤新能源技术咨询有限公司 Internal prestressed steel-concrete wind power tower
CN103821677A (en) * 2014-03-20 2014-05-28 哈尔滨工业大学(威海) Assembly type prestress reactive powder concrete wind power tower
CN104121155A (en) * 2014-07-10 2014-10-29 中国电建集团西北勘测设计研究院有限公司 Prestressed concrete and steel combined tower on which self-support wind generator set can be assembled and anchoring method of prestressed concrete and steel combined tower
CN205106685U (en) * 2015-11-12 2016-03-30 南昌理工学院 Contain and prevent that food spills over press mold cutlery box of function
CN205217251U (en) * 2015-11-12 2016-05-11 广州惠利电子材料有限公司 Glass flange is along rubber coating device
CN105909477A (en) * 2016-04-20 2016-08-31 广东明阳风电产业集团有限公司 Transition section structure connecting steel tower drum with prestressed concrete tower drum
CN206221170U (en) * 2016-10-08 2017-06-06 霍尔果斯新国金新能源科技有限公司 Concrete towers cartridge module

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057713A (en) * 2007-08-30 2009-03-19 Kyushu Electric Power Co Inc Wind power generation hybrid tower, and its construction method
CN101672007A (en) * 2008-09-12 2010-03-17 株式会社大宇建设 Constructing method of precast pier footing for bridge
CN101648335A (en) * 2009-09-08 2010-02-17 南车南京浦镇车辆有限公司 Technology for installing windows of railway vehicles
CN202500731U (en) * 2012-02-22 2012-10-24 阜新金胤新能源技术咨询有限公司 Internal prestressed steel-concrete wind power tower
CN103821677A (en) * 2014-03-20 2014-05-28 哈尔滨工业大学(威海) Assembly type prestress reactive powder concrete wind power tower
CN104121155A (en) * 2014-07-10 2014-10-29 中国电建集团西北勘测设计研究院有限公司 Prestressed concrete and steel combined tower on which self-support wind generator set can be assembled and anchoring method of prestressed concrete and steel combined tower
CN205106685U (en) * 2015-11-12 2016-03-30 南昌理工学院 Contain and prevent that food spills over press mold cutlery box of function
CN205217251U (en) * 2015-11-12 2016-05-11 广州惠利电子材料有限公司 Glass flange is along rubber coating device
CN105909477A (en) * 2016-04-20 2016-08-31 广东明阳风电产业集团有限公司 Transition section structure connecting steel tower drum with prestressed concrete tower drum
CN206221170U (en) * 2016-10-08 2017-06-06 霍尔果斯新国金新能源科技有限公司 Concrete towers cartridge module

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331385A (en) * 2018-04-24 2018-07-27 建华建材(中国)有限公司 Prefabricated rod structure and its construction method are cheated in a kind of inspection
CN108331385B (en) * 2018-04-24 2024-05-03 建华建材(中国)有限公司 Inspection pit precast column structure and construction method thereof
CN111287900A (en) * 2018-12-06 2020-06-16 深圳京创重工特种工程有限公司 Upper tower barrel section of concrete tower barrel and concrete tower barrel with upper tower barrel section
CN113464370A (en) * 2021-07-16 2021-10-01 上海市机电设计研究院有限公司 Method for connecting concrete tower barrel convenient to disassemble
CN113464370B (en) * 2021-07-16 2023-03-07 上海市机电设计研究院有限公司 Method for connecting concrete tower barrel convenient to disassemble

Similar Documents

Publication Publication Date Title
CN104400898B (en) The vertical integrally forming mould in precast concrete section of jurisdiction and forming method
CN102587265B (en) Auxiliary component and concrete slab for roadbed construction and method for roadbed construction
CN106088530A (en) Large area method for constructing terrace
CN106640542A (en) Concrete tower cylinder module and bonding method thereof
CN106460355A (en) A foundation for a wind turbine
CN106121090A (en) 3D prints the method for anchor connection reinforcing bar in filled wall
CN103790379A (en) Method for constructing connection joint between flat slab and post cap in reverse construction method
CN106438215A (en) Tower drum used for wind driven generator
CN106438214A (en) Tower drum used for wind driven generator
CN104897143B (en) A kind of cylinder forced centering observation pier and its method for embedding
CN103696439B (en) A kind of immersed tube pouring procedure
CN108643217A (en) A kind of high-speed railway subgrade contact net upright post basic construction method
CN108755972B (en) Foot pad for prefabricated part and using method thereof
CN206221170U (en) Concrete towers cartridge module
CN104060737A (en) Washroom water-proof structure and construction method
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN107965124A (en) A kind of adjustable resin connector and its construction method
CN208966022U (en) A kind of template poured for large-scale beam column
CN207727622U (en) A kind of connector and Prefabricated block for Prefabricated block connects composition
JP2010275708A (en) Method for forming building
CN207437274U (en) Lift levelling device, tower member, pylon and wind power generating set
CN107354872B (en) A kind of variable cross-section fish-bellied type cast-in-situ box girder concrete faulting of slab ends control structure and construction method
CN207812958U (en) A kind of adjustable resin connector
CN110424439B (en) Prefabricated ceramsite concrete hollow slab shaping tire membrane and construction method thereof
CN110536992A (en) The method of the false conjugation precast concrete unit of production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211214

Address after: 200021 room 1001, 10th floor, 138 Huaihai Middle Road, Huangpu District, Shanghai

Applicant after: Shanghai Fengling new energy Co.,Ltd.

Address before: 835099 room 332-3, building 11, European classic community, Karasu River, Horgos port, Ili Kazakh Autonomous Prefecture, Xinjiang Uygur Autonomous Region

Applicant before: KHORGAS XINGUOJIN NEW ENERGY TECHNOLOGY CO.,LTD.