Nothing Special   »   [go: up one dir, main page]

AU2015299753A1 - A well system - Google Patents

A well system Download PDF

Info

Publication number
AU2015299753A1
AU2015299753A1 AU2015299753A AU2015299753A AU2015299753A1 AU 2015299753 A1 AU2015299753 A1 AU 2015299753A1 AU 2015299753 A AU2015299753 A AU 2015299753A AU 2015299753 A AU2015299753 A AU 2015299753A AU 2015299753 A1 AU2015299753 A1 AU 2015299753A1
Authority
AU
Australia
Prior art keywords
well
gas
water
water production
lower portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2015299753A
Inventor
Christopher James CONNELL
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2014903009A external-priority patent/AU2014903009A0/en
Application filed by Individual filed Critical Individual
Publication of AU2015299753A1 publication Critical patent/AU2015299753A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/126Adaptations of down-hole pump systems powered by drives outside the borehole, e.g. by a rotary or oscillating drive
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/13Lifting well fluids specially adapted to dewatering of wells of gas producing reservoirs, e.g. methane producing coal beds
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Remote Sensing (AREA)
  • Jet Pumps And Other Pumps (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A well system comprising at least one gas well extending from a ground surface into the ground, a water production well extending from a surface into the ground and a water drainage well fluidly connecting the at least one gas well to the water production well.

Description

WO 2016/019427 PCT/AU2015/050415 1
TITLE “A WELL SYSTEM”
FIELD OF THE INVENTION
The invention relates to a well system. In particular, although not exclusively, the invention relates to a Coal Bed Methane (CBM) well system. BACKGROUND TO THE INVENTION CBM, also referred to as coalbed gas, coal seam gas or coal-mine methane is a form of natural gas extracted from coal seams. CBM is distinct from other types of gas, as the methane is stored within the coal by a process called adsorption. When a coal seam is put into production, water in the fractured or cleated spaces is pumped off first. This leads to a reduction of pressure enhancing desorption of gas from the coal seam.
Existing wells for Coal Bed Methane typically have a steel encased hole that is drilled into a coal seam. A submerged pump located towards the bottom of the steel encased hole is used to pump the produced water through tubing in the hole to the surface. A disadvantage with existing CBM wells is that capital equipment costs are quite high due to the number of wells that need to be drilled. Another disadvantage is that tubing for the produced water and the submerged pump can obstruct reservoir surveillance activities.
It will be clearly understood that any reference herein to background material or information, or to a prior publication, does not constitute an admission that any material, information or publication forms part of the common general PCT/AU2015/050415 WO 2016/019427 2 knowledge in the art, or is otherwise admissible prior art, whether in Australia or in any other country.
OBJECT OF THE INVENTION
It is an object of the invention to overcome or at least alleviate one or more of the above problems and/or provide the consumer with a useful or commercial choice.
Other preferred objects of the present invention will become apparent from the following description.
DISCLOSURE OF THE INVENTION
In one form, although it need not be the only or indeed the broadest form, the invention resides in a well system comprising: at least one gas well extending from a ground surface into the ground; a water production well extending from a surface into the ground; and a water drainage well fluidly connecting the at least one gas well to the water production well.
Preferably the well system is a coal bed methane well system.
Preferably, the water production well comprises a pump towards a lower end thereof. Preferably water and/or other liquids that flow into the gas well flow through the water drainage well and into the water production well. Preferably the water production well pump pumps the water and/or other liquids in the water production well to the surface. Typically the water production well pump pumps the water and/or other liquids in the water production well to the surface through tubing located within the water production well.
It will be appreciated that a reference to water also includes other liquids PCT/AU2015/050415 WO 2016/019427 3 that may be present. For example, water and other liquids that are present in a coal seam. A skilled addressee will understand that not all of the water that flows into the gas well will flow through the water drainage well, and that not all the water in the water production well will necessarily be pumped up to the surface. For example, water in the gas well below a point where the water drainage well is fluidly connected to the gas well may not flow through the water drainage well and water below the pump in the water production well may not be pumped to the surface. Additionally, it will be appreciated that some water may be present in the gas that is produced to the surface.
Typically, the water production well is a vertical water production well. A skilled addressee will understand that a vertical water production well includes a water production well that is substantially vertical. In an alternate embodiment, the water production well may be a deviated water production well.
In an alternate embodiment, the water production well may be used to also convey gas from an annulus (the void between a casing of the water production well and the tubing located within the water production well) to the surface.
Preferably, the at least one gas well is a plurality of gas wells. Preferably each of the at least one gas well intersects a coal seam. Typically each of the at least one gas well is cased. For example, each of the at least one gas well is cased in a steel casing. Typically, each casing has perforated portions where it intersects the coal seam(s) to enable gas and water from the coal seam to flow into the at least one gas well. In an alternate embodiment, there may be no casing where each of the at least one gas well intersects the coal seam(s). Once PCT/AU2015/050415 WO 2016/019427 4 in the gas well, the gas will flow towards the top of the gas well and the water will flow towards the bottom of the gas well. In one embodiment, each of the at least one gas well intersects a plurality of coal seams. Typically, each of the at least one gas well is a vertical gas well. A skilled addressee will understand that a vertical gas well includes a gas well that is substantially vertical. In an alternate embodiment, each of the at least one gas well may be a deviated gas well, or the at least one gas well may be a plurality of gas wells comprising one or more vertical and deviated gas wells.
Preferably each of the at least one gas well will comprise a wireline entry guide. Typically the wireline entry guide is located towards an upper end of the corresponding gas well. A skilled addressee will understand that a wireline entry guide is a fitting on the end of a tubing string that is shaped to assist with the retrieval of reservoir surveillance tools when pulled upwards into the tubing string from the wellbore below.
Preferably the water drainage well fluidly connects a lower portion of each of the at least one gas well to a lower portion of the water production well.
Typically the water drainage well is inclined to assist the flow of water from the at least one gas well to the water production well. For example, the water drainage well may be inclined in a downward direction from where it is fluidly connected to the at least one gas well to where it is fluidly connected to the water production well. It will be appreciated that the water drainage well may be oriented in a substantially horizontal orientation or be inclined upwardly toward the water drainage well, although this is undesirable, due to more water potentially remaining in the at least one gas well, the water can still flow into the water production well due to hydrostatic pressures. PCT/AU2015/050415 WO 2016/019427 5
Preferably the water drainage well is lined or cased. For example , a steel, glass reinforced epoxy casing or the like.
Preferably the water drainage well is open to a lower portion of at least one of the at least one gas well. More preferably, the water drainage well intersects each of the at least one gas well. If the water drainage well is lined, the liner (e.g. casing) of the water drainage well may be perforated in proximity to the lower portion of the corresponding gas well such that the corresponding gas well is fluidly connected to the water drainage well.
Preferably the water drainage well is open to a lower portion of the water production well.
In yet a further form the invention relates to a method of forming a well system comprising the steps of: providing at least one gas well extending from a ground surface into the ground; drilling a water production well from a surface into the ground; drilling a water drainage well such that the water drainage well fluidly connects a lower portion of each of the at least one gas well to a lower portion of the water production well; and providing a pump in the lower portion of the water production well.
Preferably the well system is a coal bed methane well system.
In an alternate embodiment, the step of providing at least one gas well extending from a ground surface into the ground includes the step of removing a pump and associated tubing from each of the at least one gas well.
Preferably the step of drilling a water drainage well such that the water drainage well fluidly connects a lower portion of each of the at least one gas well PCT/AU2015/050415 WO 2016/019427 6 to a lower portion of the water production well involves drilling the water drainage well from a lower portion of one of the at least one gas well into a lower portion of the water production well.
Further features of the invention will become apparent from the following description. BRIEF DESCRIPTION OF THE DRAWINGS To assist in understanding the invention and to enable a person skilled in the art to put the invention into practical effect, preferred embodiments of the invention will be described by way of example only with reference to the accompanying drawings, wherein: FIG 1 shows a schematic view of a well system according to the present invention.
DETAILED DESCRIPTION OF THE INVENTION
With reference to Figure 1, there is shown a CBM well system 100. The CBM well system 100 has gas wells 110, 112 that extend from a surface 12 into the ground and into coal seams 14. A water production well 114 extends from the surface 12 into the ground. A water drainage well 116 fluidly connects the gas wells 110,112 to the water production well such that water (water flow indicated by arrows 18) can flow from the gas wells 110,112 through the water drainage well 116 and into the water production well 114. In the water production well 114, water is pumped by a pump 118 through tubing 120 to the surface 12.
Gas wells 110,112 are drilled from the surface 12 through coal seam 14. PCT/AU2015/050415 WO 2016/019427 7
The gas wells each have a casing 122. The casings have perforations 124 adjacent the coal such that the gas (gas flow indicated by arrows 16) and the water in the coal seam can flow into the gas wells 110,112.
Gas wells 110,112 have wireline entry guides 126 fitting on the ends of tubing strings 128. The wireline entry guides 126 assist with the retrieval of reservoir surveillance tools (not shown) when they are pulled upwards towards the well head 130.
The water drainage well 116 is drilled from a lower portion of the gas well 110 and into the water production well 114. The water drainage well 116 also intersects the gas well 112. The casing 122 of gas well 112 does not extend to the bottom of gas well 112, instead it stops just above the water drainage well 116. In this manner, the drilling of the water drainage well is not impeded by the casing 122 of gas well 112. The water drainage well 116 has a liner 132 that is attached to the lower portion of the gas well 110. The liner 132 has perforations 134 where the water drainage well 116 intersects the gas well 112 such that water can flow from the gas well 112 into the water drainage well 116.
The water production well 114 is drilled from the surface 12 into the ground. The water production well 114 has a casing 136. The casing 136 is open to the water drainage well 116 such that water can flow from the water drainage well 116 into a lower portion of the water production well 114 where the pump 118 is located, which pumps the water through the tubing 120 to the well head 138 on the surface 12.
As can be seen from figure 1, because water flows through the water drainage well 116 and into the water production well 114, the gas wells 110,112 do not have water pumps disposed therein. A benefit of this is that reservoir PCT/AU2015/050415 WO 2016/019427 8 surveillance activities are not obstructed in the gas wells. Additional benefits include a reduction in capital expenditure and operating costs, an improvement in vertical flow performance of the gas wells due to a larger effective cross section for gas flow, improved operational times due to less pumps to maintain and operate, and an improved pressure drawdown on the coal reservoir resulting in higher production rates and lower abandonment pressures.
Although it is counterintuitive, as the present invention requires more wells to be drilled than the prior art, there are advantages, as mentioned above, in having a water drainage well and a water production well.
The foregoing embodiments are illustrative only of the principles of the invention, and various modifications and changes will readily occur to those skilled in the art. The invention is capable of being practiced and carried out in various ways and in other embodiments. It is also to be understood that the terminology employed herein is for the purpose of description and should not be regarded as limiting.
In the present specification and claims (if any), the word "comprising" and its derivatives including "comprises" and "comprise" include each of the stated integers but does not exclude the inclusion of one or more further integers unless the context of use indicates otherwise.

Claims (20)

1. A well system comprising: at least one gas well extending from a ground surface into the ground; a water production well extending from a surface into the ground; and a water drainage well fluidly connecting the at least one gas well to the water production well.
2. The well system as claimed in claim 1, wherein the water production well comprises a pump towards a lower end thereof to pump liquid in the water production well to the surface.
3. The well system as claimed in claim 1 or 2, wherein each of the at least one gas well intersects a coal seam.
4. The well system as claimed in claim 3, wherein each of the at least one gas well is cased.
5. The well system as claimed in claim 4, wherein each of the at least one gas wells is cased in a steel casing.
6. The well system as claimed in claim 4 or 5, wherein each of the casings has perforations where the casing intersects the coal seam to enable gas and water from the coal seam to flow into each respective gas well.
7. The well system as claimed in any one of the preceding claims, wherein each of the at least one gas well is a vertical gas well.
8. The well system as claimed in any one of the preceding claims, wherein each of the at least one gas well has a wireline entry guide.
9. The well system as claimed in any one of the preceding claims, wherein the water production well is a vertical water production well.
10. The well system as claimed in any one of claims 1 to 8, wherein the water production well is a deviated water production well.
11. The well system as claimed in any one of the preceding claims, wherein the water production well is used to convey gas from an annulus between a casing of the water production well and tubing located within the water production well to the surface.
12. The well system as claimed in any one of the preceding claims, wherein the water drainage well fluidly connects a lower portion of each of the at least one gas well to a lower portion of the water production well.
13. The well system as claimed in any one of the preceding claims, wherein the water drainage well is inclined to assist the flow of water from the at least one gas well to the water production well.
14. The well system as claimed in any one of the preceding claims, wherein the water drainage well intersects each of the at least one gas well.
15. The well system as claimed in any one of the preceding claims, wherein the water drainage well is lined and the liner is perforated in proximity to each of the at least one gas well such that each corresponding gas well is fluidly connected to the water drainage well.
16. The well system as claimed in any one of the preceding claims, wherein the water drainage well is open to a lower portion of the water production well.
17. A method of forming a well system comprising the steps of: providing at least one gas well extending from a ground surface into the ground; drilling a water production well from a surface into the ground; drilling a water drainage well such that the water drainage well fluidly connects a lower portion of each of the at least one gas well to a lower portion of the water production well; and providing a pump in the lower portion of the water production well.
18. A method as claimed in claim 17, wherein the step of drilling a water drainage well such that the water drainage well fluidly connects a lower portion of each of the at least one gas well to a lower portion of the water production well involves drilling the water drainage well from a lower portion of one of the at least one gas well into a lower portion of the water production well.
19. A method as claimed in claim 17 or 18, wherein the step of providing at least one gas well extending from a ground surface into the ground includes the step of removing a pump and associated tubing from each of the at least one gas well.
20. The well system or method as claimed in any one of the preceding claims, wherein the well system is a coal bed methane well system.
AU2015299753A 2014-08-04 2015-07-23 A well system Abandoned AU2015299753A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AU2014903009A AU2014903009A0 (en) 2014-08-04 A well system
AU2014903009 2014-08-04
PCT/AU2015/050415 WO2016019427A1 (en) 2014-08-04 2015-07-23 A well system

Publications (1)

Publication Number Publication Date
AU2015299753A1 true AU2015299753A1 (en) 2017-02-23

Family

ID=55262923

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2015299753A Abandoned AU2015299753A1 (en) 2014-08-04 2015-07-23 A well system

Country Status (5)

Country Link
US (1) US20170226840A1 (en)
EP (1) EP3177805A4 (en)
AU (1) AU2015299753A1 (en)
CA (1) CA2956965A1 (en)
WO (1) WO2016019427A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035401B (en) * 2017-05-26 2018-04-10 中节能宁夏新能源股份有限公司 A kind of abandoned mine fire damp administers new technology
CN109184782B (en) * 2018-11-07 2020-11-13 孔维一 Siphon type drainage pipeline deslagging and water draining device
CN109577941B (en) * 2018-11-23 2022-04-29 北京奥瑞安能源技术开发有限公司 Coal bed gas drilling and mining method
CN109339746B (en) * 2018-12-07 2020-08-25 中国矿业大学 Roof separation layer water and coal-based gas collaborative dredging and discharging method
CN111119979B (en) * 2019-12-08 2021-12-03 山西晋煤集团技术研究院有限责任公司 Small-flow gas extraction drilling hole accurate measurement system
CN111520140A (en) * 2020-04-27 2020-08-11 中国矿业大学 Rock cross-cut coal uncovering method based on gas injection displacement enhanced electric pulse fracturing
CN111945853B (en) * 2020-08-31 2021-08-03 深圳瑞尔康生物科技股份有限公司 Quick vehicle passing device after water accumulation in tunnel

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4422505A (en) * 1982-01-07 1983-12-27 Atlantic Richfield Company Method for gasifying subterranean coal deposits
US8297377B2 (en) * 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US6280000B1 (en) * 1998-11-20 2001-08-28 Joseph A. Zupanick Method for production of gas from a coal seam using intersecting well bores
US20040003418A1 (en) * 2001-04-10 2004-01-01 Aya Jakobovits Nucleic acid and corresponding protein entitled 158P3D2 useful in treatment and detection of cancer
CA2525850C (en) * 2003-06-09 2013-02-19 Precision Drilling Technology Services Group, Inc. Method for drilling with improved fluid collection pattern
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location
US7493951B1 (en) * 2005-11-14 2009-02-24 Target Drilling, Inc. Under-balanced directional drilling system
EA201290503A1 (en) * 2009-12-15 2012-12-28 Шеврон Ю.Эс.Эй. Инк. SYSTEM, METHOD AND CONFIGURATION FOR MAINTENANCE AND OPERATION OF BOTTLES

Also Published As

Publication number Publication date
US20170226840A1 (en) 2017-08-10
EP3177805A4 (en) 2018-03-21
EP3177805A1 (en) 2017-06-14
CA2956965A1 (en) 2016-02-11
WO2016019427A1 (en) 2016-02-11

Similar Documents

Publication Publication Date Title
US20170226840A1 (en) A well system
US9909400B2 (en) Gas separator assembly for generating artificial sump inside well casing
US8997870B2 (en) Method and apparatus for separating downhole hydrocarbons from water
RU2007148901A (en) CAVITY DRILLING SYSTEM
US6854518B1 (en) Method and apparatus for enhancing production from an oil and/or gas well
CA2607683A1 (en) Inverted electrical submersible pump completion to maintain fluid segregation and ensure motor cooling in dual-stream well
US9181786B1 (en) Sea floor boost pump and gas lift system and method for producing a subsea well
US20100307765A1 (en) Method for using acid gas as lift-gas and to enhance oil recovery from a subsurface formation
US7216720B2 (en) Multi-string production packer and method of using the same
US8708039B2 (en) Producing gas and liquid from below a permanent packer in a hydrocarbon well
RU2260681C2 (en) Oil and gas deposit development method
US6666269B1 (en) Method and apparatus for producing fluid from a well and for limiting accumulation of sediments in the well
US4335786A (en) Oil well pumping string tubular extension for increasing oil to salt water ratio
CA2865786C (en) Subsurface well systems with multiple drain wells extending from a production well and methods for use thereof
US20110203792A1 (en) System, method and assembly for wellbore maintenance operations
Hardegree et al. Chamber Gas Lift in Horizontals
EA029770B1 (en) Oil production method
Chikwere et al. Economic Evaluation of Electrical Submersible Pump (ESP) and Gas Lift Well for Production Optimization in A Niger Delta Field.
US11898427B2 (en) Non-comingled concentric tubing production from two different reservoirs
US11905803B2 (en) Dual well, dual pump production
RU2547857C1 (en) Method of development of multireservoir oil deposits
US11131170B2 (en) Electrical submersible pump completion in a lateral well
RU2054528C1 (en) Method for separated lifting of products of producing wells
Davies et al. Analysis of Possible Applications of Dual ESPs—A Reservoir-Engineering Perspective
Ashfahani et al. Gas Lift Technology Guidance for Better Decision Making based on 40 Years Proven Implementation for Handil Field, Delta Mahakam

Legal Events

Date Code Title Description
MK4 Application lapsed section 142(2)(d) - no continuation fee paid for the application