AU2008310901B2 - Converting CAD drawing files into intelligent objects for the design, analysis of electrical power systems - Google Patents
Converting CAD drawing files into intelligent objects for the design, analysis of electrical power systems Download PDFInfo
- Publication number
- AU2008310901B2 AU2008310901B2 AU2008310901A AU2008310901A AU2008310901B2 AU 2008310901 B2 AU2008310901 B2 AU 2008310901B2 AU 2008310901 A AU2008310901 A AU 2008310901A AU 2008310901 A AU2008310901 A AU 2008310901A AU 2008310901 B2 AU2008310901 B2 AU 2008310901B2
- Authority
- AU
- Australia
- Prior art keywords
- computer
- power
- aided design
- design drawing
- simulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 129
- 238000013461 design Methods 0.000 title description 17
- 238000004088 simulation Methods 0.000 claims abstract description 123
- 238000011960 computer-aided design Methods 0.000 claims abstract description 121
- 230000015654 memory Effects 0.000 claims abstract description 42
- 238000000034 method Methods 0.000 claims description 168
- 238000012360 testing method Methods 0.000 claims description 39
- 230000001052 transient effect Effects 0.000 claims description 24
- 238000003909 pattern recognition Methods 0.000 claims description 15
- 238000003860 storage Methods 0.000 claims description 15
- 230000004224 protection Effects 0.000 claims description 11
- 238000012986 modification Methods 0.000 claims description 9
- 230000004048 modification Effects 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 8
- 230000008676 import Effects 0.000 abstract description 13
- 230000008569 process Effects 0.000 description 82
- 238000007726 management method Methods 0.000 description 45
- 230000001681 protective effect Effects 0.000 description 44
- 238000010586 diagram Methods 0.000 description 42
- 230000036541 health Effects 0.000 description 38
- 238000009826 distribution Methods 0.000 description 35
- 230000003068 static effect Effects 0.000 description 32
- 230000005540 biological transmission Effects 0.000 description 24
- 230000006698 induction Effects 0.000 description 23
- 238000013459 approach Methods 0.000 description 22
- 238000010801 machine learning Methods 0.000 description 19
- 238000010248 power generation Methods 0.000 description 18
- 230000006870 function Effects 0.000 description 16
- 230000001423 neocortical effect Effects 0.000 description 16
- 230000004044 response Effects 0.000 description 16
- 238000004422 calculation algorithm Methods 0.000 description 14
- 238000004364 calculation method Methods 0.000 description 14
- 238000012545 processing Methods 0.000 description 14
- 238000005516 engineering process Methods 0.000 description 13
- 238000012544 monitoring process Methods 0.000 description 13
- 230000001953 sensory effect Effects 0.000 description 13
- 238000012800 visualization Methods 0.000 description 13
- 238000004891 communication Methods 0.000 description 11
- 230000003679 aging effect Effects 0.000 description 10
- 230000008859 change Effects 0.000 description 10
- 230000008439 repair process Effects 0.000 description 10
- 230000001360 synchronised effect Effects 0.000 description 10
- 238000007792 addition Methods 0.000 description 9
- 230000000875 corresponding effect Effects 0.000 description 9
- 239000000835 fiber Substances 0.000 description 9
- 239000003990 capacitor Substances 0.000 description 8
- 238000011161 development Methods 0.000 description 8
- 230000018109 developmental process Effects 0.000 description 8
- 238000011068 loading method Methods 0.000 description 8
- 101000581533 Homo sapiens Methylcrotonoyl-CoA carboxylase beta chain, mitochondrial Proteins 0.000 description 7
- 102100027320 Methylcrotonoyl-CoA carboxylase beta chain, mitochondrial Human genes 0.000 description 7
- 238000005094 computer simulation Methods 0.000 description 7
- 230000002950 deficient Effects 0.000 description 6
- 238000011156 evaluation Methods 0.000 description 6
- 230000005284 excitation Effects 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 6
- 238000005259 measurement Methods 0.000 description 6
- 230000000007 visual effect Effects 0.000 description 6
- 239000003054 catalyst Substances 0.000 description 5
- 239000003795 chemical substances by application Substances 0.000 description 5
- 230000006378 damage Effects 0.000 description 5
- 230000001419 dependent effect Effects 0.000 description 5
- 230000007613 environmental effect Effects 0.000 description 5
- 230000005856 abnormality Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 4
- 230000003044 adaptive effect Effects 0.000 description 4
- 230000032683 aging Effects 0.000 description 4
- 238000001311 chemical methods and process Methods 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 4
- 230000010355 oscillation Effects 0.000 description 4
- 230000000246 remedial effect Effects 0.000 description 4
- 238000004513 sizing Methods 0.000 description 4
- 230000035882 stress Effects 0.000 description 4
- 238000012546 transfer Methods 0.000 description 4
- 230000006399 behavior Effects 0.000 description 3
- 239000000969 carrier Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000003993 interaction Effects 0.000 description 3
- 238000002955 isolation Methods 0.000 description 3
- 238000013439 planning Methods 0.000 description 3
- 238000010223 real-time analysis Methods 0.000 description 3
- SYQQWGGBOQFINV-FBWHQHKGSA-N 4-[2-[(2s,8s,9s,10r,13r,14s,17r)-10,13-dimethyl-17-[(2r)-6-methylheptan-2-yl]-3-oxo-1,2,6,7,8,9,11,12,14,15,16,17-dodecahydrocyclopenta[a]phenanthren-2-yl]ethoxy]-4-oxobutanoic acid Chemical compound C1CC2=CC(=O)[C@H](CCOC(=O)CCC(O)=O)C[C@]2(C)[C@@H]2[C@@H]1[C@@H]1CC[C@H]([C@H](C)CCCC(C)C)[C@@]1(C)CC2 SYQQWGGBOQFINV-FBWHQHKGSA-N 0.000 description 2
- 101100055418 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) AMF1 gene Proteins 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 230000001149 cognitive effect Effects 0.000 description 2
- 238000004590 computer program Methods 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 238000013481 data capture Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 2
- 230000009977 dual effect Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 208000014674 injury Diseases 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012163 sequencing technique Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000000342 Monte Carlo simulation Methods 0.000 description 1
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000009118 appropriate response Effects 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000003542 behavioural effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 238000013211 curve analysis Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000002500 effect on skin Effects 0.000 description 1
- 238000005206 flow analysis Methods 0.000 description 1
- 239000003102 growth factor Substances 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000005055 memory storage Effects 0.000 description 1
- 230000003278 mimic effect Effects 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 210000000478 neocortex Anatomy 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000013441 quality evaluation Methods 0.000 description 1
- 239000000376 reactant Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
- 238000013097 stability assessment Methods 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41885—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/36—Circuit design at the analogue level
- G06F30/367—Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/23—Pc programming
- G05B2219/23008—Computer aided software engineering, program generation, case tools, CASE
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/49—Nc machine tool, till multiple
- G05B2219/49181—Calculation, estimation, creation of error model using measured error values
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/12—Symbolic schematics
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/06—Power analysis or power optimisation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, is disclosed. The computer system can include a processor, a memory, a display device, and an input device. The memory device can be coupled to the processor and configured to maintain a component classification database, an import engine, computer aided design drawing parser, and a symbol classification engine. The display device can be coupled to the processor and configured for displaying the computer aided design drawing file of the electrical power system. The processor can be operative to execute instructions within the import engine to control the import of the computer aided design drawing file to the computer and execute instructions within the symbol classification engine to control the assigning of a component classification to the component symbol.
Description
WO 2009/048960 PCT/US2008/079215 CONVERTING CAD DRAWING FILES INTO INTELLIGENT OBJECTS FOR THE DESIGN, ANALYSIS OF ELECTRICAL POWER SYSTEMS BACKGROUND I. Technical Field [0001] The embodiments described herein relate generally to computer modeling and management of electrical power systems and, more particularly, to a simplified way to convert the CAD drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation. II. Background [0002] Computer models of complex systems enable improved system design, development, and implementation through techniques for off-line simulation of system operation. That is, system models can be created on computers and then "operated" in a virtual environment to assist in the determination of system design parameters. All manner of systems can be modeled, designed, and operated in this way, including machinery, factories, electrical power and distribution systems, processing plants, devices, chemical processes, biological systems, and the like. Such simulation techniques have resulted in reduced development costs and superior operation. [0003] Design and production processes have benefited greatly from such computer simulation techniques, and such techniques are relatively well developed, but they have not been applied in real-time, e.g., for real-time operational monitoring and management. In addition, predictive failure analysis techniques do not generally use real-time data that reflect actual 1 WO 2009/048960 PCT/US2008/079215 system operation. Greater efforts at real-time operational monitoring and management would provide more accurate and timely suggestions for operational decisions, and such techniques applied to failure analysis would provide improved predictions of system problems before they occur. [0004] That is, an electrical network model that can age and synchronize itself in real time with the actual facility's operating conditions is critical to obtaining predictions that are reflective of the system's reliability, availability, health and performance in relation to the life cycle of the system. Static systems simply cannot adjust to the many daily changes to the electrical system that occur at a facility (e.g., motors and pumps switching on or off, changes to on-site generation status, changes to utility electrical feed... etc.) nor can they age with the facility to accurately predict the required indices. Without a synchronization or aging ability, reliability indices and predictions are of little value as they are not reflective of the actual operational status of the facility and may lead to false conclusions. With such improved techniques, operational costs and risks can be greatly reduced. [0005] For example, mission critical electrical systems, e.g., for data centers or nuclear power facilities, must be designed to ensure that power is always available. Thus, the systems must be as failure proof as possible, and many layers of redundancy must be designed in to ensure that there is always a backup in case of a failure. It will be understood that such systems are highly complex, a complexity made even greater as a result of the required redundancy. Computer design and modeling programs allow for the design of such systems by allowing a designer to model the system and simulate its operation. Thus, the designer can ensure that the system will operate as intended before the facility is constructed. 2 WO 2009/048960 PCT/US2008/079215 [0006] As with all analytical tools, predictive or otherwise, the manner in which data and results are communicated to the user is often as important as the choice of analytical tool itself. Ideally, the data and results are communicated in a fashion that is simple to understand while also painting a comprehensive and accurate picture for the user. For example, graphical displays (e.g., two-dimensional and three-dimensional views) of the operational aspects of an electrical system greatly enhances the ability of a system operator, owner and/or executive to understand the health and predicted performance of the electrical system. [0007] Moreover, the ability to predict, and understand the health and stability of an electrical network (the capability of a power system to maintain stability and/or recover from events and disturbances without violating system operational constraints) in both static and in real-time, is important in order to insure that the power distribution system can meet the power demands and maintain sufficient active and reactive power reserves to hand the ongoing changes in demand and disturbances to the system due to various contingencies. Traditional transient stability programs are capable of accurately computing the trajectories of power system quantities, such as voltages, frequencies, power flow, etc., following disturbances. However, programs leave the understanding of these trajectories, i.e., severity of these disturbances, and their relevance to the power system security largely to an engineer's judgment. [0100] Conventional approaches to analyzing and simulating the operation of an electrical power system require the creation and maintenance of two different sets of drawings: 1. an electrical schematic and 2. a computer aided design (CAD) drawing. This approach significantly adds to the time and cost of engineering projects due to the duplication of efforts by draftspersons and power system engineers. That is because, typically, the CAD drawing represents the final document/design specification for the electrical power system and the 3 WO 2009/048960 PCT/US2008/079215 simulation/analysis results generated off the duplicate electrical schematic have to be manually transposed back to the CAD drawing. This duplication of effort is not only costly but also introduces the potential for human error. As such, novel methods that provide the ability to automatically convert a CAD file of an electrical power system into one or more component objects for power analytic analysis and simulation are needed. SUMMARY [0008] Systems and methods converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, are disclosed. [0009] In one aspect, the system can include a processor, a memory, a display device, and an input device. The memory device can be coupled to the processor and configured to maintain a component classification database, an import engine, computer aided design drawing parser, and a symbol classification engine. The display device can be coupled to the processor and configured for displaying the computer aided design drawing file of the electrical power system. The processor can be operative to execute instructions within the import engine to control the import of the computer aided design drawing file to the computer, execute instructions within the computer aided design drawing parser to control the parsing of the computer aided design drawing file into at least one component object containing a component symbol and execute instructions within the symbol classification engine to control the assigning of a component classification to the component symbol. [0010] In another aspect, a computer implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation can include importing a computer aided design drawing 4 WO 2009/048960 PCT/US2008/079215 file, parsing the computer aided design drawing file into at least one component object containing a component symbol, and assigning a component classification to the component symbol. [0011] These and other features, aspects, and embodiments are described below in the section entitled "Detailed Description." BRIEF DESCRIPTION OF THE DRAWINGS [0012] For a more complete understanding of the principles disclosed herein, and the advantages thereof, reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which: [0013] Figure 1 is an illustration of a system for utilizing real-time data for predictive analysis of the performance of a monitored system, in accordance with one embodiment. [0014] Figure 2 is a diagram illustrating a detailed view of an analytics server included in the system of figure 1, in accordance with one embodiment. [0015] Figure 3 is a diagram illustrating how the system of figure 1 operates to synchronize the operating parameters between a physical facility and a virtual system model of the facility, in accordance with one embodiment. [0016] Figure 4 is an illustration of the scalability of a system for utilizing real-time data for predictive analysis of the performance of a monitored system, in accordance with one embodiment. [0017] Figure 5 is a block diagram that shows the configuration details of the system illustrated in Figure 1, in accordance with one embodiment. [0018] Figure 6 is an illustration of a flowchart describing a method for real-time monitoring and predictive analysis of a monitored system, in accordance with one embodiment. 5 WO 2009/048960 PCT/US2008/079215 [0019] Figure 7 is an illustration of a flowchart describing a method for managing real time updates to a virtual system model of a monitored system, in accordance with one embodiment. [0020] Figure 8 is an illustration of a flowchart describing a method for synchronizing real-time system data with a virtual system model of a monitored system, in accordance with one embodiment. [0021] Figure 9 is a flow chart illustrating an example method for updating the virtual model, in accordance with one embodiment. [0022] Figure 10 is a diagram illustrating an example process for monitoring the status of protective devices in a monitored system and updating a virtual model based on monitored data, in accordance with one embodiment. [0023] Figure 11 is a flowchart illustrating an example process for determining the protective capabilities of the protective devices being monitored, in accordance with one embodiment. [0024] Figure 12 is a diagram illustrating an example process for determining the protective capabilities of a High Voltage Circuit Breaker (HVCB), in accordance with one embodiment. [0025] Figure 13 is a flowchart illustrating an example process for determining the protective capabilities of the protective devices being monitored, in accordance with another embodiment. [0026] Figure 14 is a diagram illustrating a process for evaluating the withstand capabilities of a MVCB, in accordance with one embodiment. 6 WO 2009/048960 PCT/US2008/079215 [0027] Figure 15 is a flow chart illustrating an example process for analyzing the reliability of an electrical power distribution and transmission system, in accordance with one embodiment. [0028] Figure 16 is a flow chart illustrating an example process for analyzing the reliability of an electrical power distribution and transmission system that takes weather information into account, in accordance with one embodiment. [0029] Figure 17 is a diagram illustrating an example process for predicting in real-time various parameters associated with an alternating current (AC) arc flash incident, in accordance with one embodiment. [0030] Figure 18 is a flow chart illustrating an example process for real-time analysis of the operational stability of an electrical power distribution and transmission system, in accordance with one embodiment. [0031] Figure 19 is a flow chart illustrating an example process for conducting a real time power capacity assessment of an electrical power distribution and transmission system, in accordance with one embodiment. [0032] Figure 20 is a flow chart illustrating an example process for performing real-time harmonics analysis of an electrical power distribution and transmission system, in accordance with one embodiment. [0033] Figure 21 is a diagram illustrating how the HTM Pattern Recognition and Machine Learning Engine works in conjunction with the other elements of the analytics system to make predictions about the operational aspects of a monitored system, in accordance with one embodiment. 7 WO 2009/048960 PCT/US2008/079215 [0034] Figure 22 is an illustration of the various cognitive layers that comprise the neocortical catalyst process used by the HTM Pattern Recognition and Machine Learning Engine to analyze and make predictions about the operational aspects of a monitored system, in accordance with one embodiment. [0035] Figure 23 is an example process for real-time three-dimensional (3D) visualization of the health, reliability, and performance of an electrical system, in accordance with one embodiment. [0036] Figure 24 is a diagram illustrating how the 3D Visualization Engine works in conjunction with the other elements of the analytics system to provide 3D visualization of the health, reliability, and performance of an electrical system, in accordance with one embodiment. [0037] Figure 25 provides a client terminal screenshot of some 2D and 3D model views that are generated by the power analytics server, in accordance with one embodiment. [0038] Figure 26 is a diagram illustrating how the Schematic Interface Creator Engine works in conjunction with the other elements of the analytics system to automatically generate a schematic user interface for visualizing the health, reliability, and performance of an electrical system, in accordance with one embodiment. [0039] Figure 27 is an example process for automatically generating a schematic user interface for visualizing the health, reliability, and performance of an electrical system, in accordance with one embodiment. [0040] Figure 28 is a diagram illustrating how the Energy Management System Engine works in conjunction with the other elements of the analytics system to intelligently monitor and manage the cost, quality and reliability of energy generated and/or utilized by an electrical system, in accordance with one embodiment. 8 WO 2009/048960 PCT/US2008/079215 [0041] Figure 29 is a logic flow diagram depicting how the various elements of the Energy Management System can interact to provide intelligent energy monitoring and management of an electrical system, in accordance with one embodiment. [0042] Figure 30 is a diagram illustrating how the Energy Management System Engine works in conjunction with the other elements of the analytics system to provide indexing of the stability and reliability of an electrical power system, in accordance with one embodiment. [0043] Figure 31 is an example process for real-time stability indexing of an electrical system, in accordance with one embodiment. [0044] Figure 32 is a diagram illustrating a system (computing environment) for implementing a method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, in accordance with one embodiment. [0045] Figure 33 is a diagram illustrating how the various functional elements of the system depicted in Figure 32 work together to convert the CAD drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, in accordance with one embodiment. [0046] Figure 34 is an example process for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, in accordance with one embodiment. DETAILED DESCRIPTION [0047] Systems for intelligent monitoring and management of an electrical system are disclosed. It will be clear, however, that the various embodiments described herein may be practiced without some or all of these specific details. In other instances, well known process 9 WO 2009/048960 PCT/US2008/079215 operations have not been described in detail in order not to unnecessarily obscure the present invention. [0048] As used herein, a system denotes a set of components, real or abstract, comprising a whole where each component interacts with or is related to at least one other component within the whole. Examples of systems include machinery, factories, electrical systems, processing plants, devices, chemical processes, biological systems, data centers, aircraft carriers, and the like. An electrical system can designate a power generation and/or distribution system that is widely dispersed (i.e., power generation, transformers, and/or electrical distribution components distributed geographically throughout a large region) or bounded within a particular location (e.g., a power plant within a production facility, a bounded geographic area, on board a ship, a factory, a data center, etc.). [0049] A network application is any application that is stored on an application server connected to a network (e.g., local area network, wide area network, etc.) in accordance with any contemporary client/server architecture model and can be accessed via the network. In this arrangement, the network application programming interface (API) resides on the application server separate from the client machine. The client interface would typically be a web browser (e.g. INTERNET EXPLORER T M , FIREFOX T M , NETSCAPE
TM
, etc) that is in communication with the network application server via a network connection (e.g., HTTP, HTTPS, RSS, etc.). [0050] Figure 1 is an illustration of a system for utilizing real-time data for predictive analysis of the performance of a monitored system, in accordance with one embodiment. As shown herein, the system 100 includes a series of sensors (i.e., Sensor A 104, Sensor B 106, Sensor C 108) interfaced with the various components of a monitored system 102, a data acquisition hub 112, an analytics server 116, and a thin-client device 128. In one embodiment, 10 WO 2009/048960 PCT/US2008/079215 the monitored system 102 is an electrical power generation plant. In another embodiment, the monitored system 102 is an electrical power transmission infrastructure. In still another embodiment, the monitored system 102 is an electrical power distribution system. In still another embodiment, the monitored system 102 includes a combination of one or more electrical power generation plant(s), power transmission infrastructure(s), and/or an electrical power distribution system. It should be understood that the monitored system 102 can be any combination of components whose operations can be monitored with conventional sensors and where each component interacts with or is related to at least one other component within the combination. For a monitored system 102 that is an electrical power generation, transmission, or distribution system, the sensors can provide data such as voltage, frequency, current, power, power factor, and the like. [0051] The sensors are configured to provide output values for system parameters that indicate the operational status and/or "health" of the monitored system 102. For example, in an electrical power generation system, the current output or voltage readings for the various components that comprise the power generation system is indicative of the overall health and/or operational condition of the system. In one embodiment, the sensors are configured to also measure additional data that can affect system operation. For example, for an electrical power distribution system, the sensor output can include environmental information, e.g., temperature, humidity, etc., which can impact electrical power demand and can also affect the operation and efficiency of the power distribution system itself. [0052] Continuing with Figure 1, in one embodiment, the sensors are configured to output data in an analog format. For example, electrical power sensor measurements (e.g., voltage, current, etc.) are sometimes conveyed in an analog format as the measurements may be 11 WO 2009/048960 PCT/US2008/079215 continuous in both time and amplitude. In another embodiment, the sensors are configured to output data in a digital format. For example, the same electrical power sensor measurements may be taken in discrete time increments that are not continuous in time or amplitude. In still another embodiment, the sensors are configured to output data in either an analog or digital format depending on the sampling requirements of the monitored system 102. [0053] The sensors can be configured to capture output data at split-second intervals to effectuate "real time" data capture. For example, in one embodiment, the sensors can be configured to generate hundreds of thousands of data readings per second. It should be appreciated, however, that the number of data output readings taken by a sensor may be set to any value as long as the operational limits of the sensor and the data processing capabilities of the data acquisition hub 112 are not exceeded. [0054] Still with Figure 1, each sensor is communicatively connected to the data acquisition hub 112 via an analog or digital data connection 110. The data acquisition hub 112 may be a standalone unit or integrated within the analytics server 116 and can be embodied as a piece of hardware, software, or some combination thereof. In one embodiment, the data connection 110 is a "hard wired" physical data connection (e.g., serial, network, etc.). For example, a serial or parallel cable connection between the sensor and the hub 112. In another embodiment, the data connection 110 is a wireless data connection. For example, a radio frequency (RF), BLUETOOTHTM, infrared or equivalent connection between the sensor and the hub 112. [0055] The data acquisition hub 112 is configured to communicate "real-time" data from the monitored system 102 to the analytics server 116 using a network connection 114. In one embodiment, the network connection 114 is a "hardwired" physical connection. For example, 12 WO 2009/048960 PCT/US2008/079215 the data acquisition hub 112 may be communicatively connected (via Category 5 (CAT5), fiber optic or equivalent cabling) to a data server (not shown) that is communicatively connected (via CAT5, fiber optic or equivalent cabling) through the Internet and to the analytics server 116 server. The analytics server 116 being also communicatively connected with the Internet (via CAT5, fiber optic, or equivalent cabling). In another embodiment, the network connection 114 is a wireless network connection (e.g., Wi-Fi, WLAN, etc.). For example, utilizing an 802.1 lb/g or equivalent transmission format. In practice, the network connection utilized is dependent upon the particular requirements of the monitored system 102. [0056] Data acquisition hub 112 can also be configured to supply warning and alarms signals as well as control signals to monitored system 102 and/or sensors 104, 106, and 108 as described in more detail below. [0057] As shown in Figurel, in one embodiment, the analytics server 116 hosts an analytics engine 118, virtual system modeling engine 124 and several databases 126, 130, and 132. The virtual system modeling engine can, e.g., be a computer modeling system, such as described above. In this context, however, the modeling engine can be used to precisely model and mirror the actual electrical system. Analytics engine 118 can be configured to generate predicted data for the monitored system and analyze difference between the predicted data and the real-time data received from hub 112. [0058] Figure 2 is a diagram illustrating a more detailed view of analytic server 116. As can be seen, analytic server 116 is interfaced with a monitored facility 102 via sensors 202, e.g., sensors 104, 106, and 108. Sensors 202 are configured to supply real-time data from within monitored facility 102. The real-time data is communicated to analytic server 116 via a hub 204. 13 WO 2009/048960 PCT/US2008/079215 Hub 204 can be configure to provide real-time data to server 116 as well as alarming, sensing and control featured for facility 102. [0059] The real-time data from hub 204 can be passed to a comparison engine 210, which can form part of analytics engine 118. Comparison engine 210 can be configured to continuously compare the real-time data with predicted values generated by simulation engine 208. Based on the comparison, comparison engine 210 can be further configured to determine whether deviations between the real-time and the expected values exists, and if so to classify the deviation, e.g., high, marginal, low, etc. The deviation level can then be communicated to decision engine 212, which can also comprise part of analytics engine 118. [0060] Decision engine 212 can be configured to look for significant deviations between the predicted values and real-time values as received from the comparison engine 210. If significant deviations are detected, decision engine 212 can also be configured to determine whether an alarm condition exists, activate the alarm and communicate the alarm to Human Machine Interface (HMI) 214 for display in real-time via, e.g., thin client 128. Decision engine 212 can also be configured to perform root cause analysis for significant deviations in order to determine the interdependencies and identify the parent-child failure relationships that may be occurring. In this manner, parent alarm conditions are not drowned out by multiple children alarm conditions, allowing the user/operator to focus on the main problem, at least at first. [0061] Thus, in one embodiment, and alarm condition for the parent can be displayed via HMI 214 along with an indication that processes and equipment dependent on the parent process or equipment are also in alarm condition. This also means that server 116 can maintain a parent child logical relationship between processes and equipment comprising facility 102. Further, the processes can be classified as critical, essential, non-essential, etc. 14 WO 2009/048960 PCT/US2008/079215 [0062] Decision engine 212 can also be configured to determine health and performance levels and indicate these levels for the various processes and equipment via HMI 214. All of which, when combined with the analytic capabilities of analytics engine 118 allows the operator to minimize the risk of catastrophic equipment failure by predicting future failures and providing prompt, informative information concerning potential/predicted failures before they occur. Avoiding catastrophic failures reduces risk and cost, and maximizes facility performance and up time. [0063] Simulation engine 208 operates on complex logical models 206 of facility 102. These models are continuously and automatically synchronized with the actual facility status based on the real-time data provided by hub 204. In other words, the models are updated based on current switch status, breaker status, e.g., open-closed, equipment on/off status, etc. Thus, the models are automatically updated based on such status, which allows simulation engine to produce predicted data based on the current facility status. This in turn, allows accurate and meaningful comparisons of the real-time data to the predicted data. [0064] Example models 206 that can be maintained and used by server 116 include power flow models used to calculate expected kW, kVAR, power factor values, etc., short circuit models used to calculate maximum and minimum available fault currents, protection models used to determine proper protection schemes and ensure selective coordination of protective devices, power quality models used to determine voltage and current distortions at any point in the network, to name just a few. It will be understood that different models can be used depending on the system being modeled. 15 WO 2009/048960 PCT/US2008/079215 [0065] In certain embodiments, hub 204 is configured to supply equipment identification associated with the real-time data. This identification can be cross referenced with identifications provided in the models. [0066] In one embodiment, if the comparison performed by comparison engine 210 indicates that the differential between the real-time sensor output value and the expected value exceeds a Defined Difference Tolerance (DDT) value (i.e., the "real-time" output values of the sensor output do not indicate an alarm condition) but below an alarm condition (i.e., alarm threshold value), a calibration request is generated by the analytics engine 118. If the differential exceeds, the alarm condition, an alarm or notification message is generated by the analytics engine 118. If the differential is below the DTT value, the analytics engine does nothing and continues to monitor the real-time data and expected data. [0067] In one embodiment, the alarm or notification message is sent directly to the client (i.e., user) 128, e.g., via HMI 214, for display in real-time on a web browser, pop-up message box, e-mail, or equivalent on the client 128 display panel. In another embodiment, the alarm or notification message is sent to a wireless mobile device (e.g., BLACKBERRYTM, laptop, pager, etc.) to be displayed for the user by way of a wireless router or equivalent device interfaced with the analytics server 116. In still another embodiment, the alarm or notification message is sent to both the client 128 display and the wireless mobile device. The alarm can be indicative of a need for a repair event or maintenance to be done on the monitored system. It should be noted, however, that calibration requests should not be allowed if an alarm condition exists to prevent the models form being calibrated to an abnormal state. [0068] Once the calibration is generated by the analytics engine 118, the various operating parameters or conditions of model(s) 206 can be updated or adjusted to reflect the 16 WO 2009/048960 PCT/US2008/079215 actual facility configuration. This can include, but is not limited to, modifying the predicted data output from the simulation engine 208, adjusting the logic/processing parameters utilized by the model(s) 206, adding/subtracting functional elements from model(s) 206, etc. It should be understood, that any operational parameter of models 206 can be modified as long as the resulting modifications can be processed and registered by simulation engine 208. [0069] Referring back to figure 1, models 206 can be stored in the virtual system model database 126. As noted, a variety of conventional virtual model applications can be used for creating a virtual system model, so that a wide variety of systems and system parameters can be modeled. For example, in the context of an electrical power distribution system, the virtual system model can include components for modeling reliability, voltage stability, and power flow. In addition, models 206 can include dynamic control logic that permits a user to configure the models 206 by specifying control algorithms and logic blocks in addition to combinations and interconnections of generators, governors, relays, breakers, transmission line, and the like. The voltage stability parameters can indicate capacity in terms of size, supply, and distribution, and can indicate availability in terms of remaining capacity of the presently configured system. The power flow model can specify voltage, frequency, and power factor, thus representing the "health" of the system. [0070] All of models 206 can be referred to as a virtual system model. Thus, virtual system model database can be configured to store the virtual system model. A duplicate, but synchronized copy of the virtual system model can be stored in a virtual simulation model database 130. This duplicate model can be used for what-if simulations. In other words, this model can be used to allow a system designer to make hypothetical changes to the facility and test the resulting effect, without taking down the facility or costly and time consuming analysis. 17 WO 2009/048960 PCT/US2008/079215 Such hypothetical can be used to learn failure patterns and signatures as well as to test proposed modifications, upgrades, additions, etc., for the facility. The real-time data, as well as trending produced by analytics engine 118 can be stored in a real-time data acquisition database 132. [0071] As discussed above, the virtual system model is periodically calibrated and synchronized with "real-time" sensor data outputs so that the virtual system model provides data output values that are consistent with the actual "real-time" values received from the sensor output signals. Unlike conventional systems that use virtual system models primarily for system design and implementation purposes (i.e., offline simulation and facility planning), the virtual system models described herein are updated and calibrated with the real-time system operational data to provide better predictive output values. A divergence between the real-time sensor output values and the predicted output values generate either an alarm condition for the values in question and/or a calibration request that is sent to the calibration engine 134. [0072] Continuing with Figure 1, the analytics engine 118 can be configured to implement pattern/sequence recognition into a real-time decision loop that, e.g., is enabled by a new type of machine learning called associative memory, or hierarchical temporal memory (HTM), which is a biological approach to learning and pattern recognition. Associative memory allows storage, discovery, and retrieval of learned associations between extremely large numbers of attributes in real time. At a basic level, an associative memory stores information about how attributes and their respective features occur together. The predictive power of the associative memory technology comes from its ability to interpret and analyze these co-occurrences and to produce various metrics. Associative memory is built through "experiential" learning in which each newly observed state is accumulated in the associative memory as a basis for interpreting future events. Thus, by observing normal system operation over time, and the normal predicted 18 WO 2009/048960 PCT/US2008/079215 system operation over time, the associative memory is able to learn normal patterns as a basis for identifying non-normal behavior and appropriate responses, and to associate patterns with particular outcomes, contexts or responses. The analytics engine 118 is also better able to understand component mean time to failure rates through observation and system availability characteristics. This technology in combination with the virtual system model can be characterized as a "neocortical" model of the system under management. [0073] This approach also presents a novel way to digest and comprehend alarms in a manageable and coherent way. The neocortical model could assist in uncovering the patterns and sequencing of alarms to help pinpoint the location of the (impending) failure, its context, and even the cause. Typically, responding to the alarms is done manually by experts who have gained familiarity with the system through years of experience. However, at times, the amount of information is so great that an individual cannot respond fast enough or does not have the necessary expertise. An "intelligent" system like the neocortical system that observes and recommends possible responses could improve the alarm management process by either supporting the existing operator, or even managing the system autonomously. [0074] Current simulation approaches for maintaining transient stability involve traditional numerical techniques and typically do not test all possible scenarios. The problem is further complicated as the numbers of components and pathways increase. Through the application of the neocortical model, by observing simulations of circuits, and by comparing them to actual system responses, it may be possible to improve the simulation process, thereby improving the overall design of future circuits. [0075] The virtual system model database 126, as well as databases 130 and 132, can be configured to store one or more virtual system models, virtual simulation models, and real-time 19 WO 2009/048960 PCT/US2008/079215 data values, each customized to a particular system being monitored by the analytics server 118. Thus, the analytics server 118 can be utilized to monitor more than one system at a time. As depicted herein, the databases 126, 130, and 132 can be hosted on the analytics server 116 and communicatively interfaced with the analytics engine 118. In other embodiments, databases 126, 130, and 132 can be hosted on a separate database server (not shown) that is communicatively connected to the analytics server 116 in a manner that allows the virtual system modeling engine 124 and analytics engine 118 to access the databases as needed. [0076] Therefore, in one embodiment, the client 128 can modify the virtual system model stored on the virtual system model database 126 by using a virtual system model development interface using well-known modeling tools that are separate from the other network interfaces. For example, dedicated software applications that run in conjunction with the network interface to allow a client 128 to create or modify the virtual system models. [0077] The client 128 may utilize a variety of network interfaces (e.g., web browser,
CITRIX
T M , WINDOWS TERMINAL SERVICES T M , telnet, or other equivalent thin-client terminal applications, etc.) to access, configure, and modify the sensors (e.g., configuration files, etc.), analytics engine 118 (e.g., configuration files, analytics logic, etc.), calibration parameters (e.g., configuration files, calibration parameters, etc.), virtual system modeling engine 124 (e.g., configuration files, simulation parameters, etc.) and virtual system model of the system under management (e.g., virtual system model operating parameters and configuration files). Correspondingly, data from those various components of the monitored system 102 can be displayed on a client 128 display panel for viewing by a system administrator or equivalent. [0078] As described above, server 116 is configured to synchronize the physical world with the virtual and report, e.g., via visual, real-time display, deviations between the two as well 20 WO 2009/048960 PCT/US2008/079215 as system health, alarm conditions, predicted failures, etc. This is illustrated with the aid of figure 3, in which the synchronization of the physical world (left side) and virtual world (right side) is illustrated. In the physical world, sensors 202 produce real-time data 302 for the processes 312 and equipment 314 that make up facility 102. In the virtual world, simulations 304 of the virtual system model 206 provide predicted values 306, which are correlated and synchronized with the real-time data 302. The real-time data can then be compared to the predicted values so that differences 308 can be detected. The significance of these differences can be determined to determine the health status 310 of the system. The health stats can then be communicated to the processes 312 and equipment 314, e.g., via alarms and indicators, as well as to thin client 128, e.g., via web pages 316. [0079] Figure 4 is an illustration of the scalability of a system for utilizing real-time data for predictive analysis of the performance of a monitored system, in accordance with one embodiment. As depicted herein, an analytics central server 422 is communicatively connected with analytics server A 414, analytics server B 416, and analytics server n 418 (i.e., one or more other analytics servers) by way of one or more network connections 114. Each of the analytics servers is communicatively connected with a respective data acquisition hub (i.e., Hub A 408, Hub B 410, Hub n 412) that communicates with one or more sensors that are interfaced with a system (i.e., Monitored System A 402, Monitored System B 404, Monitored System n 406) that the respective analytical server monitors. For example, analytics server A 414 is communicative connected with data acquisition hub A 408, which communicates with one or more sensors interfaced with monitored system A 402. [0080] Each analytics server (i.e., analytics server A 414, analytics server B 416, analytics server n 418) is configured to monitor the sensor output data of its corresponding 21 WO 2009/048960 PCT/US2008/079215 monitored system and feed that data to the central analytics server 422. Additionally, each of the analytics servers can function as a proxy agent of the central analytics server 422 during the modifying and/or adjusting of the operating parameters of the system sensors they monitor. For example, analytics server B 416 is configured to be utilized as a proxy to modify the operating parameters of the sensors interfaced with monitored system B 404. [0081] Moreover, the central analytics server 422, which is communicatively connected to one or more analytics server(s) can be used to enhance the scalability. For example, a central analytics server 422 can be used to monitor multiple electrical power generation facilities (i.e., monitored system A 402 can be a power generation facility located in city A while monitored system B 404 is a power generation facility located in city B) on an electrical power grid. In this example, the number of electrical power generation facilities that can be monitored by central analytics server 422 is limited only by the data processing capacity of the central analytics server 422. The central analytics server 422 can be configured to enable a client 128 to modify and adjust the operational parameters of any the analytics servers communicatively connected to the central analytics server 422. Furthermore, as discussed above, each of the analytics servers are configured to serve as proxies for the central analytics server 422 to enable a client 128 to modify and/or adjust the operating parameters of the sensors interfaced with the systems that they respectively monitor. For example, the client 128 can use the central analytics server 422, and vice versa, to modify and/or adjust the operating parameters of analytics server A 414 and utilize the same to modify and/or adjust the operating parameters of the sensors interfaced with monitored system A 402. Additionally, each of the analytics servers can be configured to allow a client 128 to modify the virtual system model through a virtual system model development interface using well-known modeling tools. 22 WO 2009/048960 PCT/US2008/079215 [0082] In one embodiment, the central analytics server 422 can function to monitor and control a monitored system when its corresponding analytics server is out of operation. For example, central analytics server 422 can take over the functionality of analytics server B 416 when the server 416 is out of operation. That is, the central analytics server 422 can monitor the data output from monitored system B 404 and modify and/or adjust the operating parameters of the sensors that are interfaced with the system 404. [0083] In one embodiment, the network connection 114 is established through a wide area network (WAN) such as the Internet. In another embodiment, the network connection is established through a local area network (LAN) such as the company intranet. In a separate embodiment, the network connection 114 is a "hardwired" physical connection. For example, the data acquisition hub 112 may be communicatively connected (via Category 5 (CAT5), fiber optic or equivalent cabling) to a data server that is communicatively connected (via CAT5, fiber optic or equivalent cabling) through the Internet and to the analytics server 116 server hosting the analytics engine 118. In another embodiment, the network connection 114 is a wireless network connection (e.g., Wi-Fi, WLAN, etc.). For example, utilizing an 802.1 lb/g or equivalent transmission format. [0084] In certain embodiments, regional analytics servers can be placed between local analytics servers 414, 416, . . ., 418 and central analytics server 422. Further, in certain embodiments a disaster recovery site can be included at the central analytics server 422 level. [0085] Figure 5 is a block diagram that shows the configuration details of analytics server 116 illustrated in Figure 1 in more detail. It should be understood that the configuration details in Figure 5 are merely one embodiment of the items described for Figure 1, and it should 23 WO 2009/048960 PCT/US2008/079215 be understood that alternate configurations and arrangements of components could also provide the functionality described herein. [0086] The analytics server 116 includes a variety of components. In the Figure 5 embodiment, the analytics server 116 is implemented in a Web-based configuration, so that the analytics server 116 includes (or communicates with) a secure web server 530 for communication with the sensor systems 519 (e.g., data acquisition units, metering devices, sensors, etc.) and external communication entities 534 (e.g., web browser, "thin client" applications, etc.). A variety of user views and functions 532 are available to the client 128 such as: alarm reports, Active X controls, equipment views, view editor tool, custom user interface page, and XML parser. It should be appreciated, however, that these are just examples of a few in a long list of views and functions 532 that the analytics server 116 can deliver to the external communications entities 534 and are not meant to limit the types of views and functions 532 available to the analytics server 116 in any way. [0087] The analytics server 116 also includes an alarm engine 506 and messaging engine 504, for the aforementioned external communications. The alarm engine 506 is configured to work in conjunction with the messaging engine 504 to generate alarm or notification messages 502 (in the form of text messages, e-mails, paging, etc.) in response to the alarm conditions previously described. The analytics server 116 determines alarm conditions based on output data it receives from the various sensor systems 519 through a communications connection (e.g., wireless 516, TCP/IP 518, Serial 520, etc) and simulated output data from a virtual system model 512, of the monitored system, processed by the analytics engines 118. In one embodiment, the virtual system model 512 is created by a user through interacting with an external communication entity 534 by specifying the components that comprise the monitored system and 24 WO 2009/048960 PCT/US2008/079215 by specifying relationships between the components of the monitored system. In another embodiment, the virtual system model 512 is automatically generated by the analytics engines 118 as components of the monitored system are brought online and interfaced with the analytics server 508. [0088] Continuing with Figure 5, a virtual system model database 526 is communicatively connected with the analytics server 116 and is configured to store one or more virtual system models 512, each of which represents a particular monitored system. For example, the analytics server 116 can conceivably monitor multiple electrical power generation systems (e.g., system A, system B, system C, etc.) spread across a wide geographic area (e.g., City A, City B, City C, etc.). Therefore, the analytics server 116 will utilize a different virtual system model 512 for each of the electrical power generation systems that it monitors. Virtual simulation model database 538 can be configured to store a synchronized, duplicate copy of the virtual system model 512, and real-time data acquisition database 540 can store the real-time and trending data for the system(s) being monitored. [0089] Thus, in operation, analytics server 116 can receive real-time data for various sensors, i.e., components, through data acquisition system 202. As can be seen, analytics server 116 can comprise various drivers configured to interface with the various types of sensors, etc., comprising data acquisition system 202. This data represents the real-time operational data for the various components. For example, the data may indicate that a certain component is operating at a certain voltage level and drawing certain amount of current. This information can then be fed to a modeling engine to generate a virtual system model 612 that is based on the actual real-time operational data. 25 WO 2009/048960 PCT/US2008/079215 [0090] Analytics engine 118 can be configured to compare predicted data based on the virtual system model 512 with real-time data received from data acquisition system 202 and to identify any differences. In some instances, analytics engine can be configured to identify these differences and then update, i.e., calibrate, the virtual system model 512 for use in future comparisons. In this manner, more accurate comparisons and warnings can be generated. [0091] But in other instances, the differences will indicate a failure, or the potential for a failure. For example, when a component begins to fail, the operating parameters will begin to change. This change may be sudden or it may be a progressive change over time. Analytics engine 118 can detect such changes and issue warnings that can allow the changes to be detected before a failure occurs. The analytic engine 118 can be configured to generate warnings that can be communicated via interface 532. [0092] For example, a user can access information from server 116 using thin client 534. For example, reports can be generate and served to thin client 534 via server 540. These reports can, for example, comprise schematic or symbolic illustrations of the system being monitored. Status information for each component can be illustrated or communicated for each component. This information can be numerical, i.e., the voltage or current level. Or it can be symbolic, i.e., green for normal, red for failure or warning. In certain embodiments, intermediate levels of failure can also be communicated, i.e., yellow can be used to indicate operational conditions that project the potential for future failure. It should be noted that this information can be accessed in real-time. Moreover, via thin client 534, the information can be accessed form anywhere and anytime. [0093] Continuing with Figure 5, the Analytics Engine 118 is communicatively interfaced with a HTM Pattern Recognition and Machine Learning Engine 551. The HTM 26 WO 2009/048960 PCT/US2008/079215 Engine 551 is configured to work in conjunction with the Analytics Engine 118 and a virtual system model of the monitored system to make real-time predictions (i.e., forecasts) about various operational aspects of the monitored system. The HTM Engine 551 works by processing and storing patterns observed during the normal operation of the monitored system over time. These observations are provided in the form of real-time data captured using a multitude of sensors that are imbedded within the monitored system. In one embodiment, the virtual system model is also updated with the real-time data such that the virtual system model "ages" along with the monitored system. Examples of a monitored system includes machinery, factories, electrical systems, processing plants, devices, chemical processes, biological systems, data centers, aircraft carriers, and the like. It should be understood that the monitored system can be any combination of components whose operations can be monitored with conventional sensors and where each component interacts with or is related to at least one other component within the combination. [0094] Figure 6 is an illustration of a flowchart describing a method for real-time monitoring and predictive analysis of a monitored system, in accordance with one embodiment. Method 600 begins with operation 602 where real-time data indicative of the monitored system status is processed to enable a virtual model of the monitored system under management to be calibrated and synchronized with the real-time data. In one embodiment, the monitored system 102 is a mission critical electrical power system. In another embodiment, the monitored system 102 can include an electrical power transmission infrastructure. In still another embodiment, the monitored system 102 includes a combination of thereof It should be understood that the monitored system 102 can be any combination of components whose operations can be 27 WO 2009/048960 PCT/US2008/079215 monitored with conventional sensors and where each component interacts with or is related to at least one other component within the combination. [0095] Method 600 moves on to operation 604 where the virtual system model of the monitored system under management is updated in response to the real-time data. This may include, but is not limited to, modifying the simulated data output from the virtual system model, adjusting the logic/processing parameters utilized by the virtual system modeling engine to simulate the operation of the monitored system, adding/subtracting functional elements of the virtual system model, etc. It should be understood, that any operational parameter of the virtual system modeling engine and/or the virtual system model may be modified by the calibration engine as long as the resulting modifications can be processed and registered by the virtual system modeling engine. [0096] Method 600 proceeds on to operation 606 where the simulated real-time data indicative of the monitored system status is compared with a corresponding virtual system model created at the design stage. The design stage models, which may be calibrated and updated based on real-time monitored data, are used as a basis for the predicted performance of the system. The real-time monitored data can then provide the actual performance over time. By comparing the real-time time data with the predicted performance information, difference can be identified a tracked by, e.g., the analytics engine 118. Analytics engines 118 can then track trends, determine alarm states, etc., and generate a real-time report of the system status in response to the comparison. [0097] In other words, the analytics can be used to analyze the comparison and real-time data and determine if there is a problem that should be reported and what level the problem may be, e.g., low priority, high priority, critical, etc. The analytics can also be used to predict future 28 WO 2009/048960 PCT/US2008/079215 failures and time to failure, etc. In one embodiment, reports can be displayed on a conventional web browser (e.g. INTERNET EXPLORER T M , FIREFOX T M , NETSCAPE T M , etc) that is rendered on a standard personal computing (PC) device. In another embodiment, the "real-time" report can be rendered on a "thin-client" computing device (e.g., CITRIXTM, WINDOWS TERMINAL SERVICES
TM
, telnet, or other equivalent thin-client terminal application). In still another embodiment, the report can be displayed on a wireless mobile device (e.g., BLACKBERRYTM, laptop, pager, etc.). For example, in one embodiment, the "real-time" report can include such information as the differential in a particular power parameter (i.e., current, voltage, etc.) between the real-time measurements and the virtual output data. [0098] Figure 7 is an illustration of a flowchart describing a method for managing real time updates to a virtual system model of a monitored system, in accordance with one embodiment. Method 700 begins with operation 702 where real-time data output from a sensor interfaced with the monitored system is received. The sensor is configured to capture output data at split-second intervals to effectuate "real time" data capture. For example, in one embodiment, the sensor is configured to generate hundreds of thousands of data readings per second. It should be appreciated, however, that the number of data output readings taken by the sensor may be set to any value as long as the operational limits of the sensor and the data processing capabilities of the data acquisition hub are not exceeded. [0099] Method 700 moves to operation 704 where the real-time data is processed into a defined format. This would be a format that can be utilized by the analytics server to analyze or compare the data with the simulated data output from the virtual system model. In one embodiment, the data is converted from an analog signal to a digital signal. In another embodiment, the data is converted from a digital signal to an analog signal. It should be 29 WO 2009/048960 PCT/US2008/079215 understood, however, that the real-time data may be processed into any defined format as long as the analytics engine can utilize the resulting data in a comparison with simulated output data from a virtual system model of the monitored system. [00100] Method 700 continues on to operation 706 where the predicted (i.e., simulated) data for the monitored system is generated using a virtual system model of the monitored system. As discussed above, a virtual system modeling engine utilizes dynamic control logic stored in the virtual system model to generate the predicted output data. The predicted data is supposed to be representative of data that should actually be generated and output from the monitored system. [00101] Method 700 proceeds to operation 708 where a determination is made as to whether the difference between the real-time data output and the predicted system data falls between a set value and an alarm condition value, where if the difference falls between the set value and the alarm condition value a virtual system model calibration and a response can be generated. That is, if the comparison indicates that the differential between the "real-time" sensor output value and the corresponding "virtual" model data output value exceeds a Defined Difference Tolerance (DDT) value (i.e., the "real-time" output values of the sensor output do not indicate an alarm condition) but below an alarm condition (i.e., alarm threshold value), a response can be generated by the analytics engine. In one embodiment, if the differential exceeds, the alarm condition, an alarm or notification message is generated by the analytics engine 118. In another embodiment, if the differential is below the DTT value, the analytics engine does nothing and continues to monitor the "real-time" data and "virtual" data. Generally speaking, the comparison of the set value and alarm condition is indicative of the functionality of one or more components of the monitored system. 30 WO 2009/048960 PCT/US2008/079215 [0101] Figure 8 is an illustration of a flowchart describing a method for synchronizing real-time system data with a virtual system model of a monitored system, in accordance with one embodiment. Method 800 begins with operation 802 where a virtual system model calibration request is received. A virtual model calibration request can be generated by an analytics engine whenever the difference between the real-time data output and the predicted system data falls between a set value and an alarm condition value. [0102] Method 800 proceeds to operation 804 where the predicted system output value for the virtual system model is updated with a real-time output value for the monitored system. For example, if sensors interfaced with the monitored system outputs a real-time current value of A, then the predicted system output value for the virtual system model is adjusted to reflect a predicted current value of A. [0103] Method 800 moves on to operation 806 where a difference between the real-time sensor value measurement from a sensor integrated with the monitored system and a predicted sensor value for the sensor is determined. As discussed above, the analytics engine is configured to receive "real-time" data from sensors interfaced with the monitored system via the data acquisition hub (or, alternatively directly from the sensors) and "virtual" data from the virtual system modeling engine simulating the data output from a virtual system model of the monitored system. In one embodiment, the values are in units of electrical power output (i.e., current or voltage) from an electrical power generation or transmission system. It should be appreciated, however, that the values can essentially be any unit type as long as the sensors can be configured to output data in those units or the analytics engine can convert the output data received from the sensors into the desired unit type before performing the comparison. 31 WO 2009/048960 PCT/US2008/079215 [0104] Method 800 continues on to operation 808 where the operating parameters of the virtual system model are adjusted to minimize the difference. This means that the logic parameters of the virtual system model that a virtual system modeling engine uses to simulate the data output from actual sensors interfaced with the monitored system are adjusted so that the difference between the real-time data output and the simulated data output is minimized. Correspondingly, this operation will update and adjust any virtual system model output parameters that are functions of the virtual system model sensor values. For example, in a power distribution environment, output parameters of power load or demand factor might be a function of multiple sensor data values. The operating parameters of the virtual system model that mimic the operation of the sensor will be adjusted to reflect the real-time data received from those sensors. In one embodiment, authorization from a system administrator is requested prior to the operating parameters of the virtual system model being adjusted. This is to ensure that the system administrator is aware of the changes that are being made to the virtual system model. In one embodiment, after the completion of all the various calibration operations, a report is generated to provide a summary of all the adjustments that have been made to the virtual system model. [0105] As described above, virtual system modeling engine 124 can be configured to model various aspects of the system to produce predicted values for the operation of various components within monitored system 102. These predicted values can be compared to actual values being received via data acquisition hub 112. If the differences are greater than a certain threshold, e.g., the DTT, but not in an alarm condition, then a calibration instruction can be generated. The calibration instruction can cause a calibration engine 134 to update the virtual model being used by system modeling engine 124 to reflect the new operating information. 32 WO 2009/048960 PCT/US2008/079215 [0106] It will be understood that as monitored system 102 ages, or more specifically the components comprising monitored system 102 age, then the operating parameters, e.g., currents and voltages associated with those components will also change. Thus, the process of calibrating the virtual model based on the actual operating information provides a mechanism by which the virtual model can be aged along with the monitored system 102 so that the comparisons being generated by analytics engine 118 are more meaningful. [0107] At a high level, this process can be illustrated with the aid of Figure 9, which is a flow chart illustrating an example method for updating the virtual model in accordance with one embodiment. In step 902, data is collected from, e.g., sensors 104, 106, and 108. For example, the sensors can be configured to monitor protective devices within an electrical distribution system to determine and monitor the ability of the protective devices to withstand faults, which is describe in more detail below. [0108] In step 904, the data from the various sensors can be processed by analytics engine 118 in order to evaluate various parameters related to monitored system 102. In step 905, simulation engine 124 can be configured to generate predicted values for monitored system 102 using a virtual model of the system that can be compared to the parameters generated by analytics engine 118 in step 904. If there are differences between the actual values and the predicted values, then the virtual model can be updated to ensure that the virtual model ages with the actual system 102. [0109] It should be noted that as the monitored system 102 ages, various components can be repaired, replaced, or upgraded, which can also create differences between the simulated and actual data that is not an alarm condition. Such activity can also lead to calibrations of the virtual model to ensure that the virtual model produces relevant predicted values. Thus, not only 33 WO 2009/048960 PCT/US2008/079215 can the virtual model be updated to reflect aging of monitored system 102, but it can also be updated to reflect retrofits, repairs, etc. [0110] As noted above, in certain embodiments, a logical model of a facilities electrical system, a data acquisition system (data acquisition hub 112), and power system simulation engines (modeling engine 124) can be integrated with a logic and methods based approach to the adjustment of key database parameters within a virtual model of the electrical system to evaluate the ability of protective devices within the electrical distribution system to withstand faults and also effectively "age" the virtual system with the actual system. [0111] Only through such a process can predictions on the withstand abilities of protective devices, and the status, security and health of an electrical system be accurately calculated. Accuracy is important as the predictions can be used to arrive at actionable, mission critical or business critical conclusions that may lead to the re-alignment of the electrical distribution system for optimized performance or security. [0112] Figures 10-12 are flow charts presenting logical flows for determining the ability of protective devices within an electrical distribution system to withstand faults and also effectively "age" the virtual system with the actual system in accordance with one embodiment. Figure 10 is a diagram illustrating an example process for monitoring the status of protective devices in a monitored system 102 and updating a virtual model based on monitored data. First, in step 1002, the status of the protective devices can be monitored in real time. As mentioned, protective devices can include fuses, switches, relays, and circuit breakers. Accordingly, the status of the fuses/switches, relays, and/or circuit breakers, e.g., the open/close status, source and load status, and on or off status, can be monitored in step 1002. It can be determined, in step 1004, if there is any change in the status of the monitored devices. If there is a change, then in 34 WO 2009/048960 PCT/US2008/079215 step 1006, the virtual model can be updated to reflect the status change, i.e., the corresponding virtual components data can be updated to reflect the actual status of the various protective devices. [0113] In step 1008, predicted values for the various components of monitored system 102 can be generated. But it should be noted that these values are based on the current, real-time status of the monitored system. Real time sensor data can be received in step 1012. This real time data can be used to monitor the status in step 1002 and it can also be compared with the predicted values in step 1014. As noted above, the difference between the predicted values and the real time data can also be determined in step 1014. [0114] Accordingly, meaningful predicted values based on the actual condition of monitored system 102 can be generated in steps 1004 to 1010. These predicted values can then be used to determine if further action should be taken based on the comparison of step 1014. For example, if it is determined in step 1016 that the difference between the predicted values and the real time sensor data is less than or equal to a certain threshold, e.g., DTT, then no action can be taken e.g., an instruction not to perform calibration can be issued in step 1018. Alternatively, if it is determined in step 1020 that the real time data is actually indicative of an alarm situation, e.g., is above an alarm threshold, then a do not calibrate instruction can be generated in step 1018 and an alarm can be generated as described above. If the real time sensor data is not indicative of an alarm condition, and the difference between the real time sensor data and the predicted values is greater than the threshold, as determined in step 1022, then an initiate calibration command can be generated in step 1024. [0115] If an initiate calibration command is issued in step 1024, then a function call to calibration engine 134 can be generated in step 1026. The function call will cause calibration 35 WO 2009/048960 PCT/US2008/079215 engine 134 to update the virtual model in step 1028 based on the real time sensor data. A comparison between the real time data and predicted data can then be generated in step 1030 and the differences between the two computed. In step 1032, a user can be prompted as to whether or not the virtual model should in fact be updated. In other embodiments, the update can be automatic, and step 1032 can be skipped. In step 1034, the virtual model could be updated. For example, the virtual model loads, buses, demand factor, and/or percent running information can be updated based on the information obtained in step 1030. An initiate simulation instruction can then be generated in step 1036, which can cause new predicted values to be generated based on the update of virtual model. [0116] In this manner, the predicted values generated in step 1008 are not only updated to reflect the actual operational status of monitored system 102, but they are also updated to reflect natural changes in monitored system 102 such as aging. Accordingly, realistic predicted values can be generated in step 1008. [0117] Figure 11 is a flowchart illustrating an example process for determining the protective capabilities of the protective devices being monitored in step 1002. Depending on the embodiment, the protective devices can be evaluated in terms of the International Electrotechnical Commission (IEC) standards or in accordance with the United States or American National Standards Institute (ANSI) standards. It will be understood, that the process described in relation to Figure 11 is not dependent on a particular standard being used. [0118] First, in step 1102, a short circuit analysis can be performed for the protective device. Again, the protective device can be any one of a variety of protective device types. For example, the protective device can be a fuse or a switch, or some type of circuit breaker. It will be understood that there are various types of circuit breakers including Low Voltage Circuit 36 WO 2009/048960 PCT/US2008/079215 Breakers (LVCBs), High Voltage Circuit Breakers (HVCBs), Mid Voltage Circuit Breakers (MVCBs), Miniature Circuit Breakers (MCBs), Molded Case Circuit Breakers (MCCBs), Vacuum Circuit Breakers, and Air Circuit Breakers, to name just a few. Any one of these various types of protective devices can be monitored and evaluated using the processes illustrated with respect to Figures 10-12. [0119] For example, for LVCBs, or MCCBs, the short circuit current, symmetric (Isym) or asymmetric (Iasym), and/or the peak current (Ipeak) can be determined in step 1102. For, e.g., LVCBs that are not instantaneous trip circuit breakers, the short circuit current at a delayed time (Isymdelay) can be determined. For HVCBs, a first cycle short circuit current (Isym) and/or Ipeak can be determined in step 1102. For fuses or switches, the short circuit current, symmetric or asymmetric, can be determined in step 1102. And for MVCBs the short circuit current interrupting time can be calculated. These are just some examples of the types of short circuit analysis that can be performed in Step 1102 depending on the type of protective device being analyzed. [0120] Once the short circuit analysis is performed in step 1102, various steps can be carried out in order to determine the bracing capability of the protective device. For example, if the protective device is a fuse or switch, then the steps on the left hand side of Figure 11 can be carried out. In this case, the fuse rating can first be determined in step 1104. In this case, the fuse rating can be the current rating for the fuse. For certain fuses, the X/R can be calculated in step 1105 and the asymmetric short circuit current (Iasym) for the fuse can be determined in step 1106 using equation 1. EqI:JASYM
-
1 SYM ±1+ 2 p/(X/R) 37 WO 2009/048960 PCT/US2008/079215 [0121] In other implementations, the inductants/reactants (X/R) ratio can be calculated instep 1108 and compared to a fuse test X/R to determine if the calculated X/R is greater than the fuse test X/R. The calculated X/R can be determined using the predicted values provided in step 1008. Various standard tests X/R values can be used for the fuse test X/R values in step 1108. For example, standard test X/R values for a LVCB can be as follows: PCB, ICCB = 6.59 MCCB, ICCB rated <= 10,000 A = 1.73 MCCB, ICCB rated 10,001- 20,OOOA = 3.18 MCCB, ICCB rated > 20,000 A = 4.9 [0122] If the calculated X/R is greater than the fuse test X/R, then in step 1112, equation 12 can be used to calculate an adjusted symmetrical short circuit current (Iadjsym). I1+2 2p/(CALCX/R) Eq12 1 ADJSYM 1 SYM
-
2 p/(TEST X/R) LI +2 2p(ETR [0123] If the calculated X/R is not greater than the fuse test X/R then ladjsym can be set equal to Isym in step 1110. In step 1114, it can then be determined if the fuse rating (step 1104) is greater than or equal to laajsym or lasym. If it is, then it can determine in step 1118 that the protected device has passed and the percent rating can be calculated in step 1120 as follows: 38 WO 2009/048960 PCT/US2008/079215 % rating = 1ADJSYM Device rating or % rating = IASYM Device rating [0124] If it is determined in step 1114 that the device rating is not greater than or equal to Iadjsym, then it can be determined that the device as failed in step 1116. The percent rating can still be calculating in step 1120. [0125] For LVCBs, it can first be determined whether they are fused in step 1122. If it is determined that the LVCB is not fused, then in step 1124 can be determined if the LVCB is an instantaneous trip LVCB. If it is determined that the LVCB is an instantaneous trip LVCB, then in step 1130 the first cycle fault X/R can be calculated and compared to a circuit breaker test X/R (see example values above) to determine if the fault X/R is greater than the circuit breaker test X/R. If the fault X/R is not greater than the circuit breaker test X/R, then in step 1132 it can be determined if the LVCB is peak rated. If it is peak rated, then Ipeak can be used in step 1146 below. If it is determined that the LVCB is not peak rated in step 1132, then Iadjsym can be set equal to Isym in step 1140. In step 1146, it can be determined if the device rating is greater or equal to Iadjsym, or to Ipeak as appropriate, for the LVCB. [0126] If it is determined that the device rating is greater than or equal to Iadjsym, then it can be determined that the LVCB has passed in step 1148. The percent rating can then be determined using the equations for Iadjsym defined above (step 1120) in step 1152. If it is determined that the device rating is not greater than or equal to Iadjsym, then it can be determined that the device has failed in step 1150. The percent rating can still be calculated in step 1152. 39 WO 2009/048960 PCT/US2008/079215 [0127] If the calculated fault X/R is greater than the circuit breaker test X/R as determined in step 1130, then it can be determined if the LVCB is peak rated in step 1134. If the LVCB is not peak rated, then the Iadjsym can be determined using equation 12. If the LVCB is peak rated, then Ipeak can be determined using equation 11. Eq 11: IPEAK = r2ISYM '02 + o.98e-/(X/ [0128] It can then be determined if the device rating is greater than or equal to Iadjsym or Ipeak as appropriate. The pass/fail determinations can then be made in steps 1148 and 1150 respectively, and the percent rating can be calculated in step 1152. % rating = ADJSYM Device rating or % rating = PEAK Device rating [0129] If the LVCB is not an instantaneous trip LVCB as determined in step 1124, then a time delay calculation can be performed at step 1128 followed by calculation of the fault X/R and a determination of whether the fault X/R is greater than the circuit breaker test X/R. If it is not, then ladjsym can be set equal to Isym in step 1136. If the calculated fault at X/R is greater than the circuit breaker test X/R, then ladjsymdelay can be calculated in step 1138 using the following equation with, e.g., a 0.5 second maximum delay: 40 WO 2009/048960 PCT/US2008/079215 SI1+ 2 60 p(CALCX/R) DELAY DELAY [ e Eq4:ISIY D SY l± 2 -p(TSTXR) [0130] It can then be determined if the device rating is greater than or equal to Iadjsym or Iadjsymdelay. The pass/fail determinations can then be made in steps 1148 and 1150, respectively and the percent rating can be calculated in step 1152. [0131] If it is determined that the LVCB is fused in step 1122, then the fault X/R can be calculated in step 1126 and compared to the circuit breaker test X/R in order to determine if the calculated fault X/R is greater than the circuit breaker test X/R. If it is greater, then Iadjsym can be calculated in step 1154 using the following equation: S1.02+0o.98 e -3/(CALCX/R) Eq 13: IADJSYM SYM
-
3 /(TEST X/R) [0132] If the calculated fault X/R is not greater than the circuit breaker test X/R, then Iadjsym can be set equal to Isym in step 1156. It can then be determined if the device rating is greater than or equal to Iadjsym in step 1146. The pass/fail determinations can then be carried out in steps 1148 and 1150 respectively, and the percent rating can be determined in step 1152. [0133] Figure 12 is a diagram illustrating an example process for determining the protective capabilities of a HVCB. In certain embodiments, X/R can be calculated in step 1157 and a peak current (Ipeak) can be determined using equation 11 in step 1158. In step 1162, it can be determined whether the HVCB's rating is greater than or equal to Ipeak as determined in step 1158. If the device rating is greater than or equal to Ipeak, then the device has passed in step 41 WO 2009/048960 PCT/US2008/079215 1164. Otherwise, the device fails in step 1166. In either case, the percent rating can be determined in step 1168 using the following: % rating = PEAK Device rating [0134] In other embodiments, an interrupting time calculation can be made in step 1170. In such embodiments, a fault X/R can be calculated and then can be determined if the fault X/R is greater than or equal to a circuit breaker test X/R in step 1172. For example, the following circuit breaker test X/R can be used; 50 Hz Test X/R = 13.7 60 Hz Test X/R = 16.7 (DC Time contant = 0.45ms) [0135] If the fault X/R is not greater than the circuit breaker test X/R then Iadjintsym can be set equal to Isym in step 1174. If the calculated fault X/R is greater than the circuit breaker test X/R, then contact parting time for the circuit breaker can be determined in step 1176 and equation 15 can then be used to determine Iadjintsym in step 1178. Eq i15 ADJIN T I { EI I+ 2 C -4pf*t/(CALCX/R) SYM SYM VI + 2
-
4 pf*t/(TEST X/R) 42 WO 2009/048960 PCT/US2008/079215 [0136] In step 1180, it can be determined whether the device rating is greater than or equal to Iadjintsym. The pass/fail determinations can then be made in steps 1182 and 1184 respectively and the percent rating can be calculated in step 1186 using the following: % rating = ADJINT SYM Device rating [0137] Figure 13 is a flowchart illustrating an example process for determining the protective capabilities of the protective devices being monitored in step 1002 in accordance with another embodiment. The process can start with a short circuit analysis in step 1302. For systems operating at a frequency other than 60hz, the protective device X/R can be modified as follows: (X/R)mod = (X/R) * 60H/(system Hz). [0138] For fuses/switches, a selection can be made, as appropriate, between use of the symmetrical rating or asymmetrical rating for the device. The Multiplying Factor (MF) for the device can then be calculated in step 1304. The MF can then be used to determine Iadjasym or Iadjsym. In step 1306, it can be determined if the device rating is greater than or equal to Iadjasym or Iadjsym. Based on this determination, it can be determined whether the device passed or failed in steps 1308 and 1310 respectively, and the percent rating can be determined in step 1312 using the following: 43 WO 2009/048960 PCT/US2008/079215 % rating = Iadjasym * 100/device rating; or % rating= Iaajsym *100/device rating. [0139] For LVCBs, it can first be determined whether the device is fused in step 1314. If the device is not fused, then in step 1315 it can be determined whether the X/R is known for the device. If it is known, then the LVF can be calculated for the device in step 1320. It should be noted that the LVF can vary depending on whether the LVCB is an instantaneous trip device or not. If the X/R is not known, then it can be determined in step 1317, e.g., using the following: PCB, ICCB = 6.59 MCCB, ICCB rated <= 10,000 A = 1.73 MCCB, ICCB rated 10,001- 20,OOOA = 3.18 MCCB, ICCB rated > 20,000 A = 4.9 [0140] If the device is fused, then in step 1316 it can again be determined whether the X/R is known. If it is known, then the LVF can be calculated in step 1319. If it is not known, then the X/R can be set equal to, e.g., 4.9. [0141] In step 1321, it can be determined if the LVF is less than 1 and if it is, then the LVF can be set equal to 1. In step 1322 Iintadj can be determined using the following: MCCB/ICCB/PCBWith Instantaneous: lint, adj = LVF * Isym,rms PCB Without Instantaneous: lint, adj = LVFp * Isym,rms(X Cyc) int, adj = LVFasym* Isym, rms(3 -8 Cyc) [0142] In step 1323, it can be determined whether the device's symmetrical rating is greater than or equal to Iintadj, and it can be determined based on this evaluation whether the 44 WO 2009/048960 PCT/US2008/079215 device passed or failed in steps 1324 and 1325 respectively. The percent rating can then be determined in step 1326 using the following: %rating= Iintad *100/device rating. [0143] Figure 14 is a diagram illustrating a process for evaluating the withstand capabilities of a MVCB in accordance with one embodiment. In step 1328, a determination can be made as to whether the following calculations will be based on all remote inputs, all local inputs or on a No AC Decay (NACD) ratio. For certain implementations, a calculation can then be made of the total remote contribution, total local contribution, total contribution (Iintrmssym), and NACD. If the calculated NACD is equal to zero, then it can be determined that all contributions are local. If NACD is equal to 1, then it can be determined that all contributions are remote. [0144] If all the contributions are remote, then in step 1332 the remote MF (MFr) can be calculated and Iint can be calculated using the following: - it= Fr * Iintrmssym [0145] If all the inputs are local, then MFl can be calculated and Iint can be calculated using the following: int MF 1 I intrmssym 45 WO 2009/048960 PCT/US2008/079215 [0146] If the contributions are from NACD, then the NACD, MFr, MFl, and AMF1 can be calculated. If AMF1 is less than 1, then AMFI can be set equal to 1. Iint can then be calculated using the following: Iint = AMFI* Iintrmssym/S [0147] In step 1338, the 3-phase device duty cycle can be calculated and then it can be determined in step 1340, whether the device rating is greater than or equal to Iint. Whether the device passed or failed can then be determined in steps 1342 and 1344, respectively. The percent rating can be determined in step 1346 using the following: % rating = Iint *100/ 3 p device rating. [0148] In other embodiments, it can be determined, in step 1348, whether the user has selected a fixed MF. If so, then in certain embodiments the peak duty (crest) can be determined in step 1349 and MFp can be set equal to 2.7 in step 1354. If a fixed MF has not been selected, then the peak duty (crest) can be calculated in step 1350 and MFp can be calculated in step 1358. In step 1362, the MFp can be used to calculate the following: 1 mompeak * Isymrms 46 WO 2009/048960 PCT/US2008/079215 [0149] In step 1366, it can be determined if the device peak rating (crest) is greater than or equal to Imompeak. It can then be determined whether the device passed or failed in steps 1368 and 1370 respectively, and the percent rating can be calculated as follows: % rating = Imompeak *100/device peak (crest) rating. [0150] In other embodiments, if a fixed MF is selected, then a momentary duty cycle (C&L) can be determined in step 1351 and MFm can be set equal to, e.g., 1.6. If a fixed MF has not been selected, then in step 1352 MFm can be calculated. MFm can then be used to determine the following: Imomsym =MFm*I [0151] It can then be determined in step 1374 whether the device C&L, rms rating is greater than or equal to Imomsym. Whether the device passed or failed can then be determined in steps 1376 and 1378 respectively, and the percent rating can be calculated as follows: % rating= Imomasym * 100/device C & L, rms rating. [0152] Thus, the above methods provide a mean to determine the withstand capability of various protective devices, under various conditions and using various standards, using an aged, up to date virtual model of the system being monitored. 47 WO 2009/048960 PCT/US2008/079215 [0153] The influx of massive sensory data, e.g., provided via sensors 104, 106, and 108, intelligent filtration of this dense stream of data into manageable and easily understandable knowledge. For example, as mentioned, it is important to be able to assess the real-time ability of the power system to provide sufficient generation to satisfy the system load requirements and to move the generated energy through the system to the load points. Conventional systems do not make use of an on-line, real-time system snap shot captured by a real-time data acquisition platform to perform real time system availability evaluation. [0154] Figure 15 is a flow chart illustrating an example process for analyzing the reliability of an electrical power distribution and transmission system in accordance with one embodiment. First, in step 1502, reliability data can be calculated and/or determined. The inputs used in step 1502 can comprise power flow data, e.g., network connectivity, loads, generations, cables/transformer impedances, etc., which can be obtained from the predicted values generated in step 1008, reliability data associated with each power system component, lists of contingencies to be considered, which can vary by implementation including by region, site, etc., customer damage (load interruptions) costs, which can also vary by implementation, and load duration curve information. Other inputs can include failure rates, repair rates, and required availability of the system and of the various components. [0155] In step 1504 a list of possible outage conditions and contingencies can be evaluated including loss of utility power supply, generators, UPS, and/or distribution lines and infrastructure. In step 1506, a power flow analysis for monitored system 102 under the various contingencies can be performed. This analysis can include the resulting failure rates, repair rates, cost of interruption or downtime versus the required system availability, etc. In step 1510, it can be determined if the system is operating in a deficient state when confronted with a 48 WO 2009/048960 PCT/US2008/079215 specific contingency. If it is, then is step 1512, the impact on the system, load interruptions, costs, failure duration, system unavailability, etc. can all be evaluated. [0156] After the evaluation of step 1512, or if it is determined that the system is not in a deficient state in step 1510, then it can be determined if further contingencies need to be evaluated. If so, then the process can revert to step 1506 and further contingencies can be evaluated. If no more contingencies are to be evaluated, then a report can be generated in step 1514. The report can include a system summary, total and detailed reliability indices, system availability, etc. The report can also identify system bottlenecks are potential problem areas. [0157] The reliability indices can be based on the results of credible system contingencies involving both generation and transmission outages. The reliability indices can include load point reliability indices, branch reliability indices, and system reliability indices. For example, various load/bus reliability indices can be determined such as probability and frequency of failure, expected load curtailed, expected energy not supplied, frequency of voltage violations, reactive power required, and expected customer outage cost. The load point indices can be evaluated for the major load buses in the system and can be used in system design for comparing alternate system configurations and modifications. [0158] Overall system reliability indices can include power interruption index, power supply average MW curtailment, power supply disturbance index, power energy curtailment index, severity index, and system availability. For example, the individual load point indices can be aggregated to produce a set of system indices. These indices are indicators of the overall adequacy of the composite system to meet the total system load demand and energy requirements and can be extremely useful for the system planner and management, allowing more informed decisions to be made both in planning and in managing the system. 49 WO 2009/048960 PCT/US2008/079215 [0159] The various analysis and techniques can be broadly classified as being either Monte Carlo simulation or Contingency Enumeration. The process can also use AC, DC and fast linear network power flow solutions techniques and can support multiple contingency modeling, multiple load levels, automatic or user-selected contingency enumeration, use a variety of remedial actions, and provides sophisticated report generation. [0160] The analysis of step 1506 can include adequacy analysis of the power system being monitored based on a prescribed set of criteria by which the system must be judged as being in the success or failed state. The system is considered to be in the failed state if the service at load buses is interrupted or its quality becomes unacceptable, i.e., if there are capacity deficiency, overloads, and/or under/over voltages [0161] Various load models can be used in the process of figure 15 including multi-step load duration curve, curtailable and Firm, and Customer Outage Cost models. Additionally, various remedial actions can be proscribed or even initiated including MW and MVAR generation control, generator bus voltage control, phase shifter adjustment, MW generation rescheduling, and load curtailment (interruptible and firm). [0162] In other embodiments, the effect of other variables, such as the weather and human error can also be evaluated in conjunction with the process of figure 15 and indices can be associated with these factors. For example, figure 16 is a flow chart illustrating an example process for analyzing the reliability of an electrical power distribution and transmission system that takes weather information into account in accordance with one embodiment. Thus, in step 1602, real-time weather data can be received, e.g., via a data feed such as an XML feed from National Oceanic and Atmosphere Administration (NOAA). In step 1604, this data can be converted into reliability data that can be used in step 1502. 50 WO 2009/048960 PCT/US2008/079215 [0163] It should also be noted that National Fire Protection Association (NFPA) and the Occupational Safety and Health Association (OSHA) have mandated that facilities comply with proper workplace safety standards and conduct Arc Flash studies in order to determine the incident energy, protection boundaries and PPE levels needed to be worn by technicians. Unfortunately, conventional approaches/systems for performing such studies do not provide a reliable means for the real-time prediction of the potential energy released (in calories per centimeter squared) for an arc flash event. Moreover, no real-time system exists that can predict the required personal protective equipment (PPE) required to safely perform repairs as required by NFPA 70E and IEEE 1584. [0164] When a fault in the system being monitored contains an arc, the heat released can damage equipment and cause personal injury. It is the latter concern that brought about the development of the heat exposure programs referred to above. The power dissipated in the arc radiates to the surrounding surfaces. The further away from the arc the surface is, the less the energy is received per unit area. [0165] As noted above, conventional approaches are based on highly specialized static simulation models that are rigid and non-reflective of the facilities operational status at the time a technician may be needed to conduct repairs on electrical equipment. But the PPE level required for the repair, or the safe protection boundary may change based on the actual operational status of the facility and alignment of the power distribution system at the time repairs are needed. Therefore, a static model does not provide the real-time analysis that can be critical for accurate PPE level determination. This is because static systems cannot adjust to the many daily changes to the electrical system that occur at a facility, e.g., motors and pumps may be on or off, on-site generation status may have changed by having diesel generators on-line, 51 WO 2009/048960 PCT/US2008/079215 utility electrical feed may also change, etc., nor can they age with the facility to accurately predict the required PPE levels. [0166] Accordingly, existing systems rely on exhaustive studies to be performed off-line by a power system engineer or a design professional/specialist. Often the specialist must manually modify a simulation model so that it is reflective of the proposed facility operating condition and then conduct a static simulation or a series of static simulations in order to come up with recommended safe working distances, energy calculations and PPE levels. But such a process is not timely, accurate nor efficient, and as noted above can be quite costly. [0167] Using the systems and methods described herein a logical model of a facility electrical system can be integrated into a real-time environment, with a robust AC Arc Flash simulation engine (system modeling engine 124), a data acquisition system (data acquisition hub 112), and an automatic feedback system (calibration engine 134) that continuously synchronizes and calibrates the logical model to the actual operational conditions of the electrical system. The ability to re-align the simulation model in real-time so that it mirrors the real facility operating conditions, coupled with the ability to calibrate and age the model as the real facility ages, as describe above, provides a desirable approach to predicting PPE levels, and safe working conditions at the exact time the repairs are intended to be performed. Accordingly, facility management can provide real-time compliance with, e.g., NFPA 70E and IEEE 1584 standards and requirements. [0168] Figure 17 is a diagram illustrating an example process for predicting in real-time various parameters associated with an alternating current (AC) arc flash incident. These parameters can include for example, the arc flash incident energy, arc flash protection boundary, and required Personal Protective Equipment (PPE) levels, e.g., in order to comply with NFPA 52 WO 2009/048960 PCT/US2008/079215 70E and IEEE-1584. First, in step 1702, updated virtual model data can be obtained for the system being model, e.g., the updated data of step 1006, and the operating modes for the system can be determined. In step 1704, an AC 3-phase short circuit analysis can be performed in order to obtain bolted fault current values for the system. In step 1706, e.g., IEEE 1584 equations can be applied to the bolted fault values and any corresponding arcing currents can be calculated in step 1708. [0169] The ratio of arc current to bolted current can then be used, in step 1710, to determine the arcing current in a specific protective device, such as a circuit breaker or fuse. A coordinated time-current curve analysis can be performed for the protective device in step 1712. In step 1714, the arcing current in the protective device and the time current analysis can be used to determine an associated fault clearing time, and in step 1716 a corresponding arc energy can be determined based on, e.g., IEEE 1584 equations applied to the fault clearing time and arcing current. [0170] In step 1718, the 100% arcing current can be calculated and for systems operating at less than 1kV the 8 5% arcing current can also be calculated. In step 1720, the fault clearing time in the protective device can be determined at the 85% arcing current level. In step 1722, e.g., IEEE 1584 equations can be applied to the fault clearing time (determined in step 1720) and the arcing current to determine the 85% arc energy level, and in step 1724 the 100% arcing current can be compared with the 85% arcing current, with the higher of the two being selected. IEEE 1584 equations, for example, can then be applied to the selected arcing current in step 1726 and the PPE level and boundary distance can be determined in step 1728. In step 1730, these values can be output, e.g., in the form of a display or report. 53 WO 2009/048960 PCT/US2008/079215 [0171] In other embodiments, using the same or a similar procedure as illustrated in figure 17, the following evaluations can be made in real-time and based on an accurate, e.g., aged, model of the system: Arc Flash Exposure based on IEEE 1584; Arc Flash Exposure based on NFPA 70E; Network-Based Arc Flash Exposure on AC Systems/Single Branch Case; Network-Based Arc Flash Exposure on AC Systems/Multiple Branch Cases; Network Arc Flash Exposure on DC Networks; Exposure Simulation at Switchgear Box, MCC Box, Open Area and Cable Grounded and Ungrounded; Calculate and Select Controlling Branch(s) for Simulation of Arc Flash; Test Selected Clothing; Calculate Clothing Required; Calculate Safe Zone with Regard to User Defined Clothing Category; Simulated Art Heat Exposure at User Selected locations; User Defined Fault Cycle for 3-Phase and Controlling Branches; User Defined Distance for Subject; 100% and 85% Arcing Current; 100% and 8 5 % Protective Device Time; Protective Device Setting Impact on Arc Exposure Energy; User Defined Label Sizes; Attach Labels to One-Line Diagram for User Review; Plot Energy for Each Bus; 54 WO 2009/048960 PCT/US2008/079215 Write Results into Excel; View and Print Graphic Label for User Selected Bus(s); and Work permit. [0172] With the insight gained through the above methods, appropriate protective measures, clothing and procedures can be mobilized to minimize the potential for injury should an arc flash incident occur. Facility owners and operators can efficiently implement a real-time safety management system that is in compliance with NFPA 70E and IEEE 1584 guidelines. [0173] Figure 18 is a flow chart illustrating an example process for real-time analysis of the operational stability of an electrical power distribution and transmission system in accordance with one embodiment. The ability to predict, in real-time, the capability of a power system to maintain stability and/or recover from various contingency events and disturbances without violating system operational constraints is important. This analysis determines the real time ability of the power system to: 1. sustain power demand and maintain sufficient active and reactive power reserve to cope with ongoing changes in demand and system disturbances due to contingencies, 2. operate safely with minimum operating cost while maintaining an adequate level of reliability, and 3. provide an acceptably high level of power quality (maintaining voltage and frequency within tolerable limits) when operating under contingency conditions. [0174] In step 1802, the dynamic time domain model data can be updated to re-align the virtual system model in real-time so that it mirrors the real operating conditions of the facility. The updates to the domain model data coupled with the ability to calibrate and age the virtual system model of the facility as it ages (i.e., real-time condition of the facility), as describe above, provides a desirable approach to predicting the operational stability of the electrical power system operating under contingency situations. That is, these updates account for the natural 55 WO 2009/048960 PCT/US2008/079215 aging effects of hardware that comprise the total electrical power system by continuously synchronizing and calibrating both the control logic used in the simulation and the actual operating conditions of the electrical system [0175] The domain model data includes data that is reflective of both the static and non static (rotating) components of the system. Static components are those components that are assumed to display no changes during the time in which the transient contingency event takes place. Typical time frames for disturbance in these types of elements range from a few cycles of the operating frequency of the system up to a few seconds. Examples of static components in an electrical system include but are not limited to transformers, cables, overhead lines, reactors, static capacitors, etc. Non-static (rotating) components encompass synchronous machines including their associated controls (exciters, governors, etc), induction machines, compensators, motor operated valves (MOV), turbines, static var compensators, fault isolation units (FIU), static automatic bus transfer (SABT) units, etc. These various types of non-static components can be simulated using various techniques. For example: " For Synchronous Machines: thermal (round rotor) and hydraulic (salient pole) units can be both simulated either by using a simple model or by the most complete two-axis including damper winding representation. " For Induction Machines: a complete two-axis model can be used. Also it is possible to model them by just providing the testing curves (current, power factor, and torque as a function of speed). " For Motor Operated Valves (MOVs): Two modes of MOV operation are of interest, namely, opening and closing operating modes. Each mode of operation consists of five distinct stages, a) start, b) full speed, c) unseating, d) travel, and e) 56 WO 2009/048960 PCT/US2008/079215 stall. The system supports user-defined model types for each of the stages. That is, "start" may be modeled as a constant current while "full speed" may be modeled by constant power. This same flexibility exists for all five distinct stages of the closing mode. e For AVR and Excitation Systems: There are a number of models ranging form rotating (DC and AC) and analogue to static and digital controls. Additionally, the system offers a user-defined modeling capability, which can be used to define a new excitation model. " For Governors and Turbines: The system is designed to address current and future technologies including but not limited to hydraulic, diesel, gas, and combined cycles with mechanical and/or digital governors. " For Static Var Compensators (SVCs): The system is designed to address current and future technologies including a number of solid-state (thyristor) controlled SVC's or even the saturable reactor types. " For Fault Isolation Units (FIUs): The system is designed to address current and future technologies of FIUs also known as Current Limiting Devices, are devices installed between the power source and loads to limit the magnitude of fault currents that occur within loads connected to the power distribution networks. " For Static Automatic Bus Transfers (SABT): The system is designed to address current and future technologies of SABT (i.e., solid-state three phase, dual position, three-pole switch, etc.) [0176] In one embodiment, the time domain model data includes "built-in" dynamic model data for exciters, governors, transformers, relays, breakers, motors, and power system 57 WO 2009/048960 PCT/US2008/079215 stabilizers (PSS) offered by a variety of manufactures. For example, dynamic model data for the electrical power system may be OEM manufacturer supplied control logic for electrical equipment such as automatic voltage regulators (AVR), governors, under load tap changing transformers, relays, breakers motors, etc. In another embodiment, in order to cope with recent advances in power electronic and digital controllers, the time domain model data includes "user defined" dynamic modeling data that is created by an authorized system administrator in accordance with user-defined control logic models. The user-defined models interacts with the virtual system model of the electrical power system through "Interface Variables" 1816 that are created out of the user-defined control logic models. For example, to build a user-defined excitation model, the controls requires that generator terminal voltage to be measured and compared with a reference quantity (voltage set point). Based on the specific control logic of the excitation and AVR, the model would then compute the predicted generator field voltage and return that value back to the application. The user-defined modeling supports a large number of pre-defined control blocks (functions) that are used to assemble the required control systems and put them into action in a real-time environment for assessing the strength and security of the power system. In still another embodiment, the time domain model data includes both built-in dynamic model data and user-defined model data. [0177] Moving on to step 1804, a contingency event can be chosen out of a diverse list of contingency events to be evaluated. That is, the operational stability of the electrical power system can be assessed under a number of different contingency event scenarios including but not limited to a singular event contingency or multiple event contingencies (that are simultaneous or sequenced in time). In one embodiment, the contingency events assessed are manually chosen by a system administrator in accordance with user requirements. In another 58 WO 2009/048960 PCT/US2008/079215 embodiment, the contingency events assessed are automatically chosen in accordance with control logic that is dynamically adaptive to past observations of the electrical power system. That is the control logic "learns" which contingency events to simulate based on past observations of the electrical power system operating under various conditions. [0178] Some examples of contingency events include but are not limited to: Application/removal of three-phase fault. Application/removal of phase-to-ground fault Application/removal of phase-phase-ground fault. Application/removal of phase-phase fault. Branch Addition. Branch Tripping Starting Induction Motor. Stopping Induction Motor Shunt Tripping. Shunt Addition (Capacitor and/or Induction) Generator Tripping. SVC Tripping. Impact Loading (Load Changing Mechanical Torque on Induction Machine. With this option it is actually possible to turn an induction motor to an induction generator) Loss of Utility Power Supply/Generators/UPS/Distribution Lines/System Infrastructure Load Shedding 59 WO 2009/048960 PCT/US2008/079215 [0179] In step 1806, a transient stability analysis of the electrical power system operating under the various chosen contingencies can be performed. This analysis can include identification of system weaknesses and insecure contingency conditions. That is, the analysis can predict (forecast) the system's ability to sustain power demand, maintain sufficient active and reactive power reserve, operate safely with minimum operating cost while maintaining an adequate level of reliability, and provide an acceptably high level of power quality while being subjected to various contingency events. The results of the analysis can be stored by an associative memory engine 1818 during step 1814 to support incremental learning about the operational characteristics of the system. That is, the results of the predictions, analysis, and real-time data may be fed, as needed, into the associative memory engine 1818 for pattern and sequence recognition in order to learn about the logical realities of the power system. In certain embodiments, engine 1818 can also act as a pattern recognition engine or a Hierarchical Temporal Memory (HTM) engine. Additionally, concurrent inputs of various electrical, environmental, mechanical, and other sensory data can be used to learn about and determine normality and abnormality of business and plant operations to provide a means of understanding failure modes and give recommendations. [0180] In step 1810, it can be determined if the system is operating in a deficient state when confronted with a specific contingency. If it is, then in step 1812, a report is generated providing a summary of the operational stability of the system. The summary may include general predictions about the total security and stability of the system and/or detailed predictions about each component that makes up the system. 60 WO 2009/048960 PCT/US2008/079215 [0181] Alternatively, if it is determined that the system is not in a deficient state in step 1810, then step 1808 can determine if further contingencies needs to be evaluated. If so, then the process can revert to step 1806 and further contingencies can be evaluated. [0182] The results of real-time simulations performed in accordance with figure 18 can be communicated in step 1812 via a report, such as a print out or display of the status. In addition, the information can be reported via a graphical user interface (thick or thin client) that illustrated the various components of the system in graphical format. In such embodiments, the report can simply comprise a graphical indication of the security or insecurity of a component, subsystem, or system, including the whole facility. The results can also be forwarded to associative memory engine 1818, where they can be stored and made available for predictions, pattern/sequence recognition and ability to imagine, e.g., via memory agents or other techniques, some of which are describe below, in step 1820. [0183] The process of figure 18 can be applied to a number of needs including but not limited to predicting system stability due to: Motor starting and motor sequencing, an example is the assessment of adequacy of a power system in emergency start up of auxiliaries; evaluation of the protections such as under frequency and under-voltage load shedding schemes, example of this is allocation of required load shedding for a potential loss of a power generation source; determination of critical clearing time of circuit breakers to maintain stability; and determination of the sequence of protective device operations and interactions. [0184] Figure 19 is a flow chart illustrating an example process for conducting a real time power capacity assessment of an electrical power distribution and transmission system, in accordance with one embodiment. The stability of an electrical power system can be classified into two broad categories: transient (angular) stability and voltage stability (i.e., power 61 WO 2009/048960 PCT/US2008/079215 capacity). Voltage stability refers to the electrical system's ability to maintain acceptable voltage profiles under different system topologies and load changes (i.e., contingency events). That is, voltage stability analyses determine bus voltage profiles and power flows in the electrical system before, during, and immediately after a major disturbance. Generally speaking, voltage instability stems from the attempt of load dynamics to restore power consumption beyond the capability of the combined transmission and generation system. One factor that comes into play is that unlike active power, reactive power cannot be transported over long distances. As such, a power system rich in reactive power resources is less likely to experience voltage stability problems. Overall, the voltage stability of a power system is of paramount importance in the planning and daily operation of an electrical system. [0185] Traditionally, transient stability has been the main focus of power system professionals. However, with the increased demand for electrical energy and the regulatory hurdles blocking the expansion of existing power systems, the occurrences of voltage instability has become increasingly frequent and therefore has gained increased attention from power system planners and power system facility operators. The ability to learn, understand and make predictions about available power system capacity and system susceptibility to voltage instability, in real-time would be beneficial in generating power trends for forecasting purposes. [0186] In step 1902, the voltage stability modeling data for the components comprising the electrical system can be updated to re-align the virtual system model in "real-time" so that it mirrors the real operating conditions of the facility. These updates to the voltage stability modeling data coupled with the ability to calibrate and age the virtual system model of the facility as it ages (i.e., real-time condition of the facility), as describe above, provides a desirable approach to predicting occurrences of voltage instability (or power capacity) in the electrical 62 WO 2009/048960 PCT/US2008/079215 power system when operating under contingency situations. That is, these updates account for the natural aging effects of hardware that comprise the total electrical power system by continuously synchronizing and calibrating both the control logic used in the simulation and the actual operating conditions of the electrical system [0187] The voltage stability modeling data includes system data that has direct influence on the electrical system's ability to maintain acceptable voltage profiles when the system is subjected to various contingencies, such as when system topology changes or when the system encounters power load changes. Some examples of voltage stability modeling data are load scaling data, generation scaling data, load growth factor data, load growth increment data, etc. [0188] In one embodiment, the voltage stability modeling data includes "built-in" data supplied by an OEM manufacturer of the components that comprise the electrical equipment. In another embodiment, in order to cope with recent advances power system controls, the voltage stability data includes "user-defined" data that is created by an authorized system administrator in accordance with user-defined control logic models. The user-defined models interact with the virtual system model of the electrical power system through "Interface Variables" 1916 that are created out of the user-defined control logic models. In still another embodiment, the voltage stability modeling data includes a combination of both built-in model data and user-defined model data [0189] Moving on to step 1904, a contingency event can be chosen out of a diverse list of contingency events to be evaluated. That is, the voltage stability of the electrical power system can be assessed under a number of different contingency event scenarios including but not limited to a singular event contingency or multiple event contingencies (that are simultaneous or sequenced in time). In one embodiment, the contingency events assessed are manually chosen 63 WO 2009/048960 PCT/US2008/079215 by a system administrator in accordance with user requirements. In another embodiment, the contingency events assessed are automatically chosen in accordance with control logic that is dynamically adaptive to past observations of the electrical power system. That is the control logic "learns" which contingency events to simulate based on past observations of the electrical power system operating under various conditions. Some examples of contingency events include but are not limited to: loss of utility supply to the electrical system, loss of available power generation sources, system load changes/fluctuations, loss of distribution infrastructure associated with the electrical system, etc. [0190] In step 1906, a voltage stability analysis of the electrical power system operating under the various chosen contingencies can be performed. This analysis can include a prediction (forecast) of the total system power capacity, available system power capacity and utilized system power capacity of the electrical system of the electrical system under various contingencies. That is, the analysis can predict (forecast) the electrical system's ability to maintain acceptable voltage profiles during load changes and when the overall system topology undergoes changes. The results of the analysis can be stored by an associative memory engine 1918 during step 1914 to support incremental learning about the power capacity characteristics of the system. That is, the results of the predictions, analysis, and real-time data may be fed, as needed, into the associative memory engine 1918 for pattern and sequence recognition in order to learn about the voltage stability of the electrical system in step 1920. Additionally, concurrent inputs of various electrical, environmental, mechanical, and other sensory data can be used to learn about and determine normality and abnormality of business and plant operations to provide a means of understanding failure modes and give recommendations. 64 WO 2009/048960 PCT/US2008/079215 [0191] In step 1910, it can be determined if there is voltage instability in the system when confronted with a specific contingency. If it is, then in step 1912, a report is generated providing a summary of the specifics and source of the voltage instability. The summary may include general predictions about the voltage stability of the overall system and/or detailed predictions about each component that makes up the system. [0192] Alternatively, if it is determined that the system is not in a deficient state in step 1910, then step 1908 can determine if further contingencies needs to be evaluated. If so, then the process can revert to step 1906 and further contingencies can be evaluated. [0193] The results of real-time simulations performed in accordance with figure 19 can be communicated in step 1912 via a report, such as a print out or display of the status. In addition, the information can be reported via a graphical user interface (thick or thin client) that illustrated the various components of the system in graphical format. In such embodiments, the report can simply comprise a graphical indication of the capacity of a subsystem or system, including the whole facility. The results can also be forwarded to associative memory engine 1918, where they can be stored and made available for predictions, pattern/sequence recognition and ability to imagine, e.g., via memory agents or other techniques, some of which are describe below, in step 1920 [0194] The systems and methods described above can also be used to provide reports (step 1912) on, e.g., total system electrical capacity, total system capacity remaining, total capacity at all busbars and/or processes, total capacity remaining at all busbars and/or processes, total system loading, loading at each busbar and/or process, etc. [0195] Thus, the process of figure 19 can receive input data related to power flow, e.g., network connectivity, loads, generations, cables/transformers, impedances, etc., power security, 65 WO 2009/048960 PCT/US2008/079215 contingencies, and capacity assessment model data and can produce as outputs data related to the predicted and designed total system capacity, available capacity, and present capacity. This information can be used to make more informed decisions with respect to management of the facility. [0196] Figure 20 is a flow chart illustrating an example process for performing real-time harmonics analysis of an electrical power distribution and transmission system, in accordance with one embodiment. As technological advances continue to be made in the field of electronic devices, there has been particular emphasis on the development of energy saving features. Electricity is now used quite differently from the way it used be used with new generations of computers and peripherals using very large-scale integrated circuitry operating at low voltages and currents. Typically, in these devices, the incoming alternating current (AC) voltage is diode rectified and then used to charge a large capacitor. The electronic device then draws direct current (DC) from the capacitor in short non-linear pulses to power its internal circuitry. This sometimes causes harmonic distortions to arise in the load current, which may result in overheated transformers and neutrals, as well as tripped circuit breakers in the electrical system. [0197] The inherent risks (to safety and the operational life of components comprising the electrical system) that harmonic distortions poses to electrical systems have led to the inclusion of harmonic distortion analysis as part of traditional power analysis. Metering and sensor packages are currently available to monitor harmonic distortions within an electrical system. However, it is not feasible to fully sensor out an electrical system at all possible locations due to cost and the physical accessibility limitations in certain parts of the system. Therefore, there is a need for techniques that predict, through real-time simulation, the sources of harmonic distortions within an electrical system, the impacts that harmonic distortions have or 66 WO 2009/048960 PCT/US2008/079215 may have, and what steps (i.e., harmonics filtering) may be taken to minimize or eliminate harmonics from the system. [0198] Currently, there are no reliable techniques for predicting, in real-time, the potential for periodic non-sinusoidal waveforms (i.e. harmonic distortions) to occur at any location within an electrical system powered with sinusoidal voltage. In addition, existing techniques do not take into consideration the operating conditions and topology of the electrical system or utilizes a virtual system model of the system that "ages" with the actual facility or its current condition. Moreover, no existing technique combines real-time power quality meter readings and predicted power quality readings for use with a pattern recognition system such as an associative memory machine learning system to predict harmonic distortions in a system due to changes in topology or poor operational conditions within an electrical system. [0199] The process, described herein, provides a harmonics analysis solution that uses a real-time snap shot captured by a data acquisition system to perform a real-time system power quality evaluation at all locations regardless of power quality metering density. This process integrates, in real-time, a logical simulation model (i.e., virtual system model) of the electrical system, a data acquisition system, and power system simulation engines with a logic based approach to synchronize the logical simulation model with conditions at the real electrical system to effectively "age" the simulation model along with the actual electrical system. Through this approach, predictions about harmonic distortions in an electrical system may be accurately calculated in real-time. Condensed, this process works by simulating harmonic distortions in an electrical system through subjecting a real-time updated virtual system model of the system to one or more simulated contingency situations. 67 WO 2009/048960 PCT/US2008/079215 [0200] In step 2002, the harmonic frequency modeling data for the components comprising the electrical system can be updated to re-align the virtual system model in "real time" so that it mirrors the real operating conditions of the facility. These updates to the harmonic frequency modeling data coupled with the ability to calibrate and age the virtual system model of the facility as it ages (i.e., real-time condition of the facility), as describe above, provides a desirable approach to predicting occurrences of harmonic distortions within the electrical power system when operating under contingency situations. That is, these updates account for the natural aging effects of hardware that comprise the total electrical power system by continuously synchronizing and calibrating both the control logic used in the simulation and the actual operating conditions of the electrical system. [0201] Harmonic frequency modeling data has direct influence over how harmonic distortions are simulated during a harmonics analysis. Examples of data that is included with the harmonic frequency modeling data include: IEEE 519 and/or Mil 1399 compliant system simulation data, generator/cable/motor skin effect data, transformer phase shifting data, generator impedance data, induction motor impedance data, etc. [0202] Moving on to step 2004, a contingency event can be chosen out of a diverse list of contingency events to be evaluated. That is, the electrical system can be assessed for harmonic distortions under a number of different contingency event scenarios including but not limited to a singular event contingency or multiple event contingencies (that are simultaneous or sequenced in time). In one embodiment, the contingency events assessed are manually chosen by a system administrator in accordance with user requirements. In another embodiment, the contingency events assessed are automatically chosen in accordance with control logic that is dynamically adaptive to past observations of the electrical power system. That is the control logic "learns" 68 WO 2009/048960 PCT/US2008/079215 which contingency events to simulate based on past observations of the electrical power system operating under various conditions. Some examples of contingency events include but are not limited to additions (bringing online) and changes of equipment that effectuate a non-linear load on an electrical power system (e.g., as rectifiers, arc furnaces, AC/DC drives, variable frequency drives, diode-capacitor input power supplies, uninterruptible power supplies, etc.) or other equipment that draws power in short intermittent pulses from the electrical power system. [0203] Continuing with Figure 20, in step 2006, a harmonic distortion analysis of the electrical power system operating under the various chosen contingencies can be performed. This analysis can include predictions (forecasts) of different types of harmonic distortion data at various points within the system. Harmonic distortion data may include but are not limited to: Wave-shape Distortions/Oscillations data Parallel and Series Resonant Condition data Total Harmonic Distortion Level data (both Voltage and Current type) Data on the true RMS system loading of lines, transformers, capacitors, etc. Data on the Negative Sequence Harmonics being absorbed by the AC motors Transformer K-Factor Level data Frequency scan at positive, negative, and zero angle response throughout the entire scanned spectrum in the electrical system. [0204] That is, the harmonics analysis can predict (forecast) various indicators (harmonics data) of harmonic distortions occurring within the electrical system as it is being subjected to various contingency situations. The results of the analysis can be stored by an associative memory engine 2016 during step 2014 to support incremental learning about the harmonic distortion characteristics of the system. That is, the results of the predictions, analysis, 69 WO 2009/048960 PCT/US2008/079215 and real-time data may be fed, as needed, into the associative memory engine 2016 for pattern and sequence recognition in order to learn about the harmonic distortion profile of the electrical system in step 2018. Additionally, concurrent inputs of various electrical, environmental, mechanical, and other sensory data can be used to learn about and determine normality and abnormality of business and plant operations to provide a means of understanding failure modes and give recommendations. [0205] In step 2010, it can be determined if there are harmonic distortions within the system when confronted with a specific contingency. If it is, then in step 2012, a report is generated providing a summary of specifics regarding the characteristics and sources of the harmonic distortions. The summary may include forecasts about the different types of harmonic distortion data (e.g., Wave-shape Distortions/Oscillations data, Parallel and Series Resonant Condition data, etc.) generated at various points throughout the system. Additionally, through these forecasts, the associative memory engine 2016 can make predictions about the natural oscillation response(s) of the facility and compare those predictions with the harmonic components of the non-linear loads that are fed or will be fed from the system as indicated form the data acquisition system and power quality meters. This will give an indication of what harmonic frequencies that the potential resonant conditions lie at and provide facility operators with the ability to effectively employ a variety of harmonic mitigation techniques (e.g., addition of harmonic filter banks, etc.) [0206] Alternatively, if it is determined that the system is not in a deficient state in step 2010, then step 2008 can determine if further contingencies needs to be evaluated. If so, then the process can revert to step 2006 and further contingencies can be evaluated. 70 WO 2009/048960 PCT/US2008/079215 [0207] The results of real-time simulations performed in accordance with figure 20 can be communicated in step 2012 via a report, such as a print out or display of the status. In addition, the information can be reported via a graphical user interface (thick or thin client) that illustrated the various components of the system in graphical format. In such embodiments, the report can simply comprise a graphical indication of the harmonic status of subsystem or system, including the whole facility. The results can also be forwarded to associative memory engine 2016, where they can be stored and made available for predictions, pattern/sequence recognition and ability to imagine, e.g., via memory agents or other techniques, some of which are describe below, in step 2018 [0208] Thus, the process of Figure 20 can receive input data related to power flow, e.g., network connectivity, loads, generations, cables/transformers, impedances, etc., power security, contingencies, and can produce as outputs data related to Point Specific Power Quality Indices, Branch Total Current Harmonic Distortion Indices, Bus and Node Total Voltage Harmonic Distortion Indices, Frequency Scan Indices for Positive Negative and Zero Sequences, Filter(s) Frequency Angle Response, Filter(s) Frequency Impedance Response, and Voltage and Current values over each filter elements (r, xl, xc). [0209] Figure 21 is a diagram illustrating how the HTM Pattern Recognition and Machine Learning Engine works in conjunction with the other elements of the analytics system to make predictions about the operational aspects of a monitored system, in accordance with one embodiment. As depicted herein, the HTM Pattern Recognition and Machine Learning Engine 551 is housed within an analytics server 116 and communicatively connected via a network connection 114 with a data acquisition hub 112, a client terminal 128 and a virtual system model database 526. The virtual system model database 526 is configured to store the virtual system 71 WO 2009/048960 PCT/US2008/079215 model of the monitored system. The virtual system model is constantly updated with real-time data from the data acquisition hub 112 to effectively account for the natural aging effects of the hardware that comprise the total monitored system, thus, mirroring the real operating conditions of the system. This provides a desirable approach to predicting the operational aspects of the monitored power system operating under contingency situations. [0210] The HTM Machine Learning Engine 551 is configured to store and process patterns observed from real-time data fed from the hub 112 and predicted data output from a real-time virtual system model of the monitored system. These patterns can later be used by the HTM Engine 551 to make real-time predictions (forecasts) about the various operational aspects of the system. [0211] The data acquisition hub 112 is communicatively connected via data connections 110 to a plurality of sensors that are embedded throughout a monitored system 102. The data acquisition hub 112 may be a standalone unit or integrated within the analytics server 116 and can be embodied as a piece of hardware, software, or some combination thereof In one embodiment, the data connections 110 are "hard wired" physical data connections (e.g., serial, network, etc.). For example, a serial or parallel cable connection between the sensors and the hub 112. In another embodiment, the data connections 110 are wireless data connections. For example, a radio frequency (RF), BLUETOOTHTM, infrared or equivalent connection between the sensor and the hub 112. [0212] Examples of a monitored system includes machinery, factories, electrical systems, processing plants, devices, chemical processes, biological systems, data centers, aircraft carriers, and the like. It should be understood that the monitored system can be any combination of 72 WO 2009/048960 PCT/US2008/079215 components whose operations can be monitored with conventional sensors and where each component interacts with or is related to at least one other component within the combination. [0213] Continuing with Figure 21, the client 128 is typically a conventional "thin-client" or "thick client" computing device that may utilize a variety of network interfaces (e.g., web browser, CITRIX T M , WINDOWS TERMINAL SERVICES
TM
, telnet, or other equivalent thin client terminal applications, etc.) to access, configure, and modify the sensors (e.g., configuration files, etc.), power analytics engine (e.g., configuration files, analytics logic, etc.), calibration parameters (e.g., configuration files, calibration parameters, etc.), virtual system modeling engine (e.g., configuration files, simulation parameters, etc.) and virtual system model of the system under management (e.g., virtual system model operating parameters and configuration files). Correspondingly, in one embodiment, the data from the various components of the monitored system and the real-time predictions (forecasts) about the various operational aspects of the system can be displayed on a client 128 display panel for viewing by a system administrator or equivalent. In another embodiment, the data may be summarized in a hard copy report 2102. [0214] As discussed above, the HTM Machine Learning Engine 551 is configured to work in conjunction with a real-time updated virtual system model of the monitored system to make predictions (forecasts) about certain operational aspects of the monitored system when it is subjected to a contingency event. For example, where the monitored system is an electrical power system, in one embodiment, the HTM Machine Learning Engine 551 can be used to make predictions about the operational reliability of an electrical power system in response to contingency events such as a loss of power to the system, loss of distribution lines, damage to system infrastructure, changes in weather conditions, etc. Examples of indicators of operational 73 WO 2009/048960 PCT/US2008/079215 reliability include but are not limited to failure rates, repair rates, and required availability of the power system and of the various components that make up the system. [0215] In another embodiment, the operational aspects relate to an arc flash discharge contingency event that occurs during the operation of the power system. Examples of arc flash related operational aspects include but are not limited to quantity of energy released by the arc flash event, required personal protective equipment (PPE) for personnel operating within the confines of the system during the arc flash event, and measurements of the arc flash safety boundary area around components comprising the power system. In still another embodiment, the operational aspect relates to the operational stability of the system during a contingency event. That is, the system's ability to sustain power demand, maintain sufficient active and reactive power reserve, operate safely with minimum operating cost while maintaining an adequate level of reliability, and provide an acceptably high level of power quality while being subjected to a contingency event. [0216] In still another embodiment, the operational aspect relates to the voltage stability of the electrical system immediately after being subjected to a major disturbance (i.e., contingency event). Generally speaking, voltage instability stems from the attempt of load dynamics to restore power consumption, after the disturbance, in a manner that is beyond the capability of the combined transmission and generation system. Examples of predicted operational aspects that are indicative of the voltage stability of an electrical system subjected to a disturbance include the total system power capacity, available system power capacity and utilized system power capacity of the electrical system under being subjected to various contingencies. Simply, voltage stability is the ability of the system to maintain acceptable voltage profiles while under the influence of the disturbances. 74 WO 2009/048960 PCT/US2008/079215 [0217] In still yet another embodiment, the operational aspect relates to harmonic distortions in the electrical system subjected to a major disturbance. Harmonic distortions are characterized by non-sinusoidal (non-linear) voltage and current waveforms. Most harmonic distortions result from the generation of harmonic currents caused by nonlinear load signatures. A nonlinear load is characteristic in products such as computers, printers, lighting and motor controllers, and much of today's solid-state equipment. With the advent of power semiconductors and the use of switching power supplies, the harmonics distortion problem has become more severe. [0218] Examples of operational aspects that are indicative of harmonic distortions include but are not limited to: wave-shape distortions/oscillations, parallel and series resonance, total harmonic distortion level, transformer K-Factor levels, true RMS loading of lines/transformers/capacitors, indicators of negative sequence harmonics being absorbed by alternating current (AC) motors, positive/negative/zero angle frequency response, etc. [0219] Figure 22 is an illustration of the various cognitive layers that comprise the neocortical catalyst process used by the HTM Pattern Recognition and Machine Learning Engine to analyze and make predictions about the operational aspects of a monitored system, in accordance with one embodiment. As depicted herein, the neocortical catalyst process is executed by a neocortical model 2202 that is encapsulated by a real-time sensory system layer 2204, which is itself encapsulated by an associative memory model layer 2206. Each layer is essential to the operation of the neocortical catalyst process but the key component is still the neocortical model 2202. The neocortical model 2202 represents the "ideal" state and performance of the monitored system and it is continually updated in real-time by the sensor layer 2204. The sensory layer 2204 is essentially a data acquisition system comprised of a 75 WO 2009/048960 PCT/US2008/079215 plurality of sensors imbedded within the electrical system and configured to provide real-time data feedback to the neocortical model 2202. The associative memory layer observes the interactions between the neocortical model 2202 and the real-time sensory inputs from the sensory layer 2204 to learn and understand complex relationships inherent within the monitored system. As the neocortical model 2202 matures over time, the neocortical catalyst process becomes increasingly accurate in making predictions about the operational aspects of the monitored system. This combination of the neocortical model 2202, sensory layer 2204 and associative memory model layer 2206 works together to learn, refine, suggest and predict similarly to how the human neocortex operates. [0220] Figure 23 is an example process for real-time three-dimensional (3D) visualization of the health, reliability, and performance of an electrical system, in accordance with one embodiment. The complexity of electrical power systems coupled with the many operational conditions the systems can be asked to operate under pose significant challenges to owners, operators and managers of critical electrical networks. It is vital for owners and operators alike to have a precise and well understood perspective of the overall health and performance of the electrical network. Communication of such status through three-dimensional (3D) visualization views (such as 3D Plant Lifecycle Models), in addition to the traditional two dimensional (2D) views, greatly enhances the ability of operators, owners and executives to understand the health and predicted performance of their power networks, elegantly and efficiently. [0221] In step 2302, the power analytics server can determine which operating mode(s) that the electrical system is being simulated under. That is, the virtual system model of the electrical system can be modified by the user to simulate the system operating under multiple 76 WO 2009/048960 PCT/US2008/079215 different operating scenarios (conditions) and system contingencies. The power analytics server is configured to utilize the operating mode settings while simulating the operation of the electrical system to make predictions about the system's health, performance, availability and reliability. In one embodiment, the operating mode(s) relate to the multiple contingency events that the electrical system may be subjected to during regular operations. The contingency events can be chosen out of a diverse list of contingency events to be evaluated. That is, the operational health, performance, availability and reliability of the electrical power system can be assessed under a number of different contingency event scenarios including but not limited to a singular event contingency or multiple event contingencies (that are simultaneous or sequenced in time). That is, in one embodiment, the contingency events assessed are manually chosen by a user in accordance with the his/her requirements. In another embodiment, the contingency events assessed are automatically chosen in accordance with control logic that is dynamically adaptive to past observations of the electrical power system. That is the control logic "learns" which contingency events to simulate based on past observations of the electrical power system operating under various conditions. [0222] Some examples of contingency events include but are not limited to: Application/removal of three-phase fault Application/removal of phase-to-ground fault Application/removal of phase-phase-ground fault Application/removal of phase-phase fault Branch Addition Branch Tripping Starting Induction Motor 77 WO 2009/048960 PCT/US2008/079215 Stopping Induction Motor Shunt Tripping Shunt Addition (Capacitor and/or Induction) Generator Tripping SVC Tripping Impact Loading (Load Changing Mechanical Torque on Induction Machine. With this option it is actually possible to turn an induction motor to an induction generator) Loss of Utility Power Supply/Generators/UPS/Distribution Lines/System Infrastructure Load Shedding [0223] In another embodiment, the operating mode(s) can relate to the multiple load levels that the electrical system operates under. That is, the virtual system model of the electrical system can be simulated under various power system load configurations or capacity conditions. In one embodiment, the system is simulated as operating under a base load power configuration. That is, the electrical system can be simulated as operating continuously at its maximum rated power output. Under this configuration, power systems only shut down to perform maintenance or if something breaks. Accordingly, the ability to test under such conditions cannot be achieved in conventional systems. In another embodiment, the electrical system can be simulated as operating under a load following power configuration. That is, the electrical system is simulated as operating in a fluctuating manner by adjusting its power output as demand for electricity fluctuates throughout the day. In still another embodiment, the electrical system is simulated as operating at various different power load capacity levels. For example, the electrical system may 78 WO 2009/048960 PCT/US2008/079215 be simulated as operating at 10%, 2 5 %, 5 0%, 7 5 %, or 100% of its rated power generation capacity. [0224] Continuing with Figure 23, the operating mode(s) can relate to different system and load point reliability indices assigned to the components that make up the electrical system. In one embodiment, for example, changes can be made to the reliability indices of individual components. In another embodiment, changes can be made to all the components that make up the system. [0225] In still yet another embodiment, the operating mode(s) relate to the different remedial measures or actions that are implemented on the electrical system to respond to the various contingency situations that the system may be subjected to. For example, remedial measures can relate to: the various types of uninterruptible power supply (UPS) systems operating on the electrical system, various protective devices that are integrated to the system, various operating limits and conditions that are placed on the system, etc. [0226] In step 2304, the power analytics server is configured to utilize the operating mode settings, determined in step 2302, and the updated virtual system model of the electrical system to simulate and predict aspects relating to the real-time health, performance, reliability and availability of the electrical system. For example, the power analytics server can simulate and predict aspects relating to: - Power System Health and Performance - Variations or deviations of electrical system performance from the power system design parameters. That is, the ability of the electrical system to resist system output variations or deviations from defined tolerance limits of the electrical system 79 WO 2009/048960 PCT/US2008/079215 - Incorporation of performance and behavioral specifications for all the equipment and components that comprise the electrical system into a real time management environment - System Reliability and Availability - As a function of different system, process and load point reliability indices - Implementation of different technological solutions to achieve reliability centered maintenance targets and goals - Power System Capacity levels - As-designed total power capacity of the power system. - How much of the total power capacity remains or is available (ability of the electrical system to maintain availability of its total power capacity) - Present utilized power capacity. - Power System Strength and Resilience - Dynamic stability predictions across all contingency events - Determination of protection system stress and withstand status - Determination of system security and stability [0227] Additionally, the predictions may also relate to the real-time ability of the electrical system to: 1. sustain power demand and maintain sufficient active and reactive power reserve to cope with ongoing changes in demand and system disturbances due to contingencies, 2. operate safely with minimum operating cost while maintaining an adequate level of reliability, and 3. provide an acceptably high level of power quality (maintaining voltage and frequency within tolerable limits) when operating under contingency conditions. 80 WO 2009/048960 PCT/US2008/079215 [0228] Continuing with Figure 23, in step 2306, the power analytics server is configured to output the predictions in the form of a print out or display of text, graphics, charts, labels, and model views that readily communicates the health and predicted performance of the electrical system in an elegant and efficient fashion. The information can be reported via a graphical user interface ("thick" or "thin" client) that illustrates the various components of the system in graphical format. In such embodiments, the report can simply comprise a graphical indication of the capacity of a subsystem or system, including the whole facility. The results can also be forwarded to associative memory engine 2308, where they can be stored and made available for predictions, pattern/sequence recognition and ability to imagine, e.g., via memory agents or other techniques, some of which are describe below, in step 2308. [0229] In one embodiment, the model views are 3D (i.e., 3D Plant Lifecycle Model) model views of the various components, equipment and sub-systems that comprise the electrical system. Examples of some 3D model views 2502 are depicted in a client interface screenshot in Figure 25. The 3D model views 2502, can be generated by an integrated 3D visualization engine that is an integrated part of the power analytics server. In another embodiment, the model views are 2D model views of the various components, equipment and sub-systems making up the electrical system. An example of a 2D model view 2504 is also depicted in Figure 25. [0230] As alluded to above, in step 2308, the results of the simulation and predictive analysis can be stored by an associative memory engine to support incremental learning about the power capacity characteristics of the system. That is, the results of the predictions, analysis, and real-time data may be fed, as needed, into an machine learning engine for pattern and sequence recognition in order to learn about the health, performance, reliability and availability of the electrical system. Additionally, concurrent inputs of various electrical, environmental, 81 WO 2009/048960 PCT/US2008/079215 mechanical, and other sensory data can be used to learn about and determine normality and abnormality of business and plant operations to provide a means of understanding failure modes and generate recommendations. [0231] Figure 24 is a diagram illustrating how the 3D Visualization Engine works in conjunction with the other elements of the analytics system to provide 3D visualization of the health, reliability, and performance of an electrical system, in accordance with one embodiment. As depicted herein, the 3D Visualization Engine 2402 is integrated within a power analytics server 116 that is communicatively connected via a network connection 114 with a data acquisition hub 112, a client terminal 128 and a virtual system model database 526. The virtual system model database 526 is configured to store the virtual system model of the electrical system. The virtual system model is constantly updated with real-time data from the data acquisition hub 112 to effectively account for the natural aging effects of the hardware that comprise the total electrical power system, thus, mirroring the real operating conditions of the system. This provides a desirable approach to predicting the operational aspects of the monitored power system and for communicating the predicted aspects through 3D visualization models of the facility. [0232] The 3D visualization engine 2402 is interfaced with the predictive elements of the power analytics server and communicatively connected to the data acquisition hub 112 and the client 128. The data acquisition hub 112 is communicatively connected via data connections 110 to a plurality of sensors that are embedded throughout the electrical system 102. The data acquisition hub 112 may be a standalone unit or integrated within the analytics server 116 and can be embodied as a piece of hardware, software, or some combination thereof In one embodiment, the data connections 110 are "hard wired" physical data connections (e.g., serial, 82 WO 2009/048960 PCT/US2008/079215 network, etc.). For example, a serial or parallel cable connection between the sensors and the hub 112. In another embodiment, the data connections 110 are wireless data connections. For example, a radio frequency (RF), BLUETOOTHTM, infrared or equivalent connection between the sensor and the hub 112. Real-time system data readings can be fed continuously to the data acquisition hub 112 from the various sensors that are embedded within the electrical system 102. [0233] Continuing with Figure 24, the client 128 is typically a conventional thin-client or thick-client computing device that may utilize a variety of network interfaces (e.g., web browser,
CITRIX
T M , WINDOWS TERMINAL SERVICES
TM
, telnet, or other equivalent thin-client terminal applications, etc.) to access, configure, and modify the sensors (e.g., configuration files, etc.), analytics engine (e.g., configuration files, analytics logic, etc.), calibration parameters (e.g., configuration files, calibration parameters, etc.), virtual system modeling engine (e.g., configuration files, simulation parameters, choice of contingency event to simulate, etc.), 3D visualization engine (e.g., configuration files, 3D visualization parameters, etc.) and virtual system model of the system under management (e.g., virtual system model operating parameters and configuration files). Correspondingly, in one embodiment, the data from the various components of the electrical system and the real-time predictions (forecasts) about the health, performance, reliability and availability of the electrical system can be displayed on a client 128 display panel for viewing by a system administrator or equivalent. In another embodiment, the data may be summarized in a hard copy report 2404. [0234] Figure 26 is a diagram illustrating how the Schematic User Interface Creator Engine works in conjunction with the other elements of the analytics system to automatically generate a schematic user interface for visualizing the health, reliability, and performance of an electrical system, in accordance with one embodiment. Conventional electrical power system 83 WO 2009/048960 PCT/US2008/079215 monitoring technologies typically rely on custom graphical design and user-interface development efforts in order to create a system schematic user interface (displayable on a client terminal) that can be linked to real-time sensory data output by the various components that comprise an electrical power system. In general, custom development efforts tend to be cumbersome and often require an extraordinarily amount of time to implement. [0235] Given the complexity of modern electrical power systems and the significant challenges they pose to owners, operators and managers of critical (regional, national and international) electrical networks; there is a need for automated software tools that can allow the rapid deployment of schematic based user interfaces to provide precise and well understood perspective of the overall health and performance of the various components that comprise an electrical power system. Ideally, the tools can be configured to automatically read electrical system configuration data from a database containing a virtual system representation (i.e., virtual system model) of the electrical system, generate a schematic user interface view of the electrical system, and intelligently link the various components included in the user interface to the predicted, monitored and/or derived output/values of those various components. [0236] As depicted herein, the Schematic User Interface Creator Engine 2602 can be integrated within a power analytics server 116 that can be communicatively connected via a network connection 114 with a data acquisition hub 112, a client terminal 128 and a virtual system model database 526. The virtual system model database 526 can be configured to store the virtual system model of the electrical system. The virtual system model can be constantly updated with real-time data from the data acquisition hub 112 to effectively account for the natural aging effects of the hardware that comprise the total electrical power system, thus, mirroring the real operating conditions of the system. The Schematic User Interface Creator 84 WO 2009/048960 PCT/US2008/079215 Engine 2602 can be configured to automatically create a schematic user interface that is representative of the electrical system and link that interface to the sensors monitoring the components (i.e., electrical equipment) that comprise the electrical system to enable real-time monitoring of the derived output/values from those components. The user interface can include a visual representation of each piece of electrical equipment (associated/tagged with a unique identifier) that comprises the electrical system. In one embodiment, the schematic user interface is based on a one-line diagram construct. In another embodiment, the schematic user interface is based on a technical system schematic diagram construct. However, it should be appreciated that the user interface can be based on any engineering diagram construct as long as the resulting interface can be displayed on a client terminal 128 to allow viewing by an operator/administrator. [0237] In addition to being communicatively connected to the data acquisition hub 112 and the client 128, the Schematic User Interface Creator Engine 2602 can also be interfaced with the predictive elements of the power analytics server. The predictive elements of the power analytics server may relate to the real-time health, performance, reliability and availability of the electrical system. They may also relate to the virtual model database and model based predictions. For example, the predictions can be indicative of the real-time Carbon Footprint, Power Usage Effectiveness, and infrastructure power efficiency, or the real-time ability of the electrical system to: 1. sustain power demand and maintain sufficient active and reactive power reserve to cope with ongoing changes in demand and system disturbances due to contingencies, 2. operate safely with minimum operating cost while maintaining an adequate level of reliability, and 3. provide an acceptably high level of power quality (maintaining voltage and frequency within tolerable limits) when operating under contingency conditions. 85 WO 2009/048960 PCT/US2008/079215 [0238] The data acquisition hub 112 can be communicatively connected via data connections 110 to a plurality of sensors that can be embedded throughout the electrical system 102. The data acquisition hub 112 can be a standalone unit or integrated within the analytics server 116 and can be embodied as a piece of hardware, software, or some combination thereof. In one embodiment, the data connections 110 are "hard wired" physical data connections (e.g., serial, network, etc.). For example, a serial or parallel cable connection between the sensors and the hub 112. In another embodiment, the data connections 110 are wireless data connections. For example, a radio frequency (RF), BLUETOOTHTM, infrared or equivalent connection between the sensor and the hub 112. Real-time system data readings can be fed continuously to the data acquisition hub 112 from the various sensors that are embedded within the electrical system 102. [0239] Continuing with Figure 26, the client 128 can be a conventional thin-client or thick-client computing device that can utilize a variety of network interfaces (e.g., web browser,
CITRIX
T M , WINDOWS TERMINAL SERVICES
TM
, telnet, or other equivalent thin-client terminal applications, etc.) to access, configure, and modify the sensors (e.g., configuration files, etc.), power analytics engine (e.g., configuration files, analytics logic, etc.), calibration parameters (e.g., configuration files, calibration parameters, etc.), virtual system modeling engine (e.g., configuration files, simulation parameters, choice of contingency event to simulate, etc.), Schematic User Interface Creator Engine 2602 (e.g., configuration files, schematic interface algorithms, etc.) and virtual system model of the electrical system under management (e.g., virtual system model operating parameters and configuration files). Correspondingly, in one embodiment, the real-time data from the various monitored components of the electrical system and the real-time predictions (forecasts) about the health, performance, reliability and 86 WO 2009/048960 PCT/US2008/079215 availability of the electrical system can be simultaneously visualized on the schematic user interface that is displayed on a client terminal 128 for viewing by a system administrator or equivalent. This schematic user interface can provide a desirable approach to communicating the monitored and predicted operational aspects of an electrical system to an operator/administrator. In one embodiment, the schematic user interface is rendered in a 2 dimensional (2D) graphical image format. In another embodiment, the schematic user interface is rendered in a 3-dimensional (3D) graphical image format. [0240] Figure 27 is an example process for automatically generating a schematic user interface for visualizing the health, reliability, and performance of an electrical system, in accordance with one embodiment. In one embodiment, the operational steps that comprise the process are implemented through a schematic user interface creator engine (application/software tool) that runs on the power analytics server. In another embodiment, the operational steps that comprise the process are implemented through a schematic interface creator engine that runs on a separate (network application) server that is communicatively connected to the power analytics server. In still another embodiment, the operational steps that comprise the process are implemented through a plurality of discrete applications that are distributed amongst one or more (network application) servers that are communicatively connected with the power analytics server. It should be understood, however, that the application(s) can be distributed in any configuration as long as the application(s) can communicatively access the power analytics server to implement the process. [0241] The process begins with step 2702, where system configuration data can be extracted from a virtual system model of the electrical system. The virtual system model can be stored in one or more virtual system model database(s) that are communicatively connected to 87 WO 2009/048960 PCT/US2008/079215 the power analytics server. The configuration data can be stored in the memory of the power analytics server (or a network application server) and can include the unique identifiers (i.e., node IDs) of each of the components (i.e., piece of electrical equipment) that comprise the virtual system model, connectivity information (i.e., the electrical connectivity between the various virtual system model components and/or the data connectivity with the sensors monitoring those components) and/or equipment specific information such as bus or branch specific equipment type (e.g., generator, circuit breaker, transformer, motor, fuse, static load, etc.). [0242] In step 2704, a logical construct of the virtual system model can be constructed from the system configuration data. In one embodiment, the logical construct can be created in an Extensible Markup Language (XML) format. In another embodiment, the logical construct can be created in an Extensible HyperText Markup Language (XHTML) format. It should be appreciated that the logical construct can be created using any mark-up language as long as it can be utilized to convey system configuration information about the components (i.e., electrical equipment) that make up the virtual system model. [0243] In step 2706, one or more graphical objects can be generated to represent one or more pieces of electrical equipment included in the logical construct. This can be accomplished through the schematic user interface creator engine or equivalent application(s) parsing the system configuration data stored in the logical construct and generating appropriate symbol block(s) and/or graphical object(s) for each piece of electrical equipment that comprise the electrical system. The symbol block(s) or graphical object(s) that are generated can then be individually organized as buses and/or branches. 88 WO 2009/048960 PCT/US2008/079215 [0244] In step 2708, the one or more graphical objects can be organized to generate a schematic user interface layout of the electrical system. This can be accomplished using a self executing algorithm that can be either an integrated component of the schematic user interface creator engine or a separate discrete application that is configured to work in conjunction with the schematic user interface creator engine. In one embodiment, the self-executing algorithm is a .NET based application. In another embodiment, the self-executing algorithm is an ACTIVE X based application. In still another embodiment, the self-executing algorithm is a JAVA based application. It should be understood, however, that the self-executing algorithm can be created using any type of programming language as long as the resulting algorithm can function either as a component of the schematic user interface creator engine or in conjunction with the same. [0245] In one embodiment, the self-executing algorithm is in a force directed layout format. In another embodiment, the self-executing algorithm is in a tree layout format. In still another embodiment, the self-executing algorithm is in a layered diagraph layout format. It should be appreciated that the self-executing algorithm can follow any format as long as each of the one ore more graphical objects/symbol blocks in the resulting schematic user interface layout can later be linked to a corresponding piece of electrical equipment that comprise the electrical system. [0246] After the schematic user interface layout of the electrical system is generated, it can be further optimized using the schematic interface creator engine (or equivalent application) to scan the schematic user interface layout and re-align the graphical object(s) based on one or more user selected optimization criteria. [0247] In step 2710, communicatively linking each of the one or more graphical objects in the schematic user interface layout to channels, database tags, or sensors configured to 89 WO 2009/048960 PCT/US2008/079215 monitor the operational status of one or more pieces of electrical equipment represented by the one or more graphical objects including virtual system model status, analysis and simulation results. This can be accomplished by intelligently linking the unique identifiers (e.g., equipment IDs) associated with each of the graphical objects/symbol blocks to their corresponding database files and creating a tag or communication channel with the same unique identifier to allow the files to be populated with data from the electrical equipment associated with each unique identifier. For example, a Graphical Object A with a unique identifier of "001" can be linked to the database file "A" which is associated with the "001" identifier. A communication channel "001" can then be opened to allow data, acquired from a piece of electrical equipment associated with the "001" identifier, to populate database file "A." [0248] The communication linkage between the graphical objects in the schematic user interface layout and the database(s) that store real-time data acquired from the virtual model or the operation of the electrical equipment allow the schematic user interface to dynamically represent fluctuations in the real-time health, performance, reliability and availability of the electrical system. For example, the buses and branches in the schematic user interface layout can be configured so that they change colors and/or become animated in response to the monitored real-time data of and/or predicted values for the electrical system during operation. [0249] Figure 28 is a diagram illustrating how the Energy Management System Engine works in conjunction with the other elements of the analytics system to provide indexing of the stability and reliability of an electrical power system, in accordance with one embodiment. Conventional approaches to energy management typically rely on real-time data readings supplied directly from power quality meters and sensors that are interfaced with the components (that comprise an electrical system) to provide a simple live metrics (e.g., voltage, current, 90 WO 2009/048960 PCT/US2008/079215 frequency, etc.) of how the electrical system is operating. Alternatively, conventional energy management systems may also permit basic historical trending and rudimentary statistical methods to be performed to generate a historical energy profile of how the electrical system has previously operated. [0250] That is, a conventional energy management system only presents a user (i.e., electrical system owner, administrator, and/or operator) with a view of how the electrical system is currently operating and/or has operated in the past without having the ability to make predictions about how the electrical system will operate in the future or allow the running of simulations based on user programmed "what-if' scenarios. The ability to predict the active power demand, system losses, reactive power demand and other energy parameters via a model (i.e., virtual system model) of the electrical system that can age and synchronize itself in real time with the electrical system's actual operating conditions is critical in obtaining accurate predictions of the system's energy efficiency (i.e., cost of losses that are inherent to the electrical system and those due to the inefficient operation of the electrical system), energy costs, reliability, availability, health and performance. Without operational conditions synchronization or an aging ability, these predictions are of little value as they are not reflective of the actual facility status and may lead the user to make false conclusions. [0251] Given the attendant challenges that modern electrical power systems pose to owners, operators and managers of critical (facility specific, regional, national and international) electrical networks and the shortcomings of conventional energy management systems; there is a need for an energy management system that integrates a real-time energy cost computational algorithm (i.e., real-time utility power pricing engine) along with a logical power flow, forecasting, state estimation, reliability and availability model (i.e., virtual system model) of the 91 WO 2009/048960 PCT/US2008/079215 electrical system, a data acquisition system, and power system simulation engines with a logic based approach to the adjustment of key parameters within the virtual system model to synchronize the virtual system model with the real facility and effectively "age" the virtual system model along with the electrical system it is associated with. Such a system can be configured to make predictions regarding the expected energy efficiency, energy costs, cost of inherent system losses and cost due to running the electrical system at poor power factors along with calculating and comparing the availability and reliability of the electrical system in real time. These predictions and calculations can then be used to arrive at actionable, reliability centered maintenance and energy management strategies for mission critical or business critical operations which may lead to the re-alignment of the electrical system for optimized performance, maintenance or security. [0252] As depicted herein, the Energy Management System Engine 2802 can be integrated within a power analytics server 116 that can be communicatively connected via a network connection 114 with a data acquisition hub 112, a client terminal 128 and a virtual system model database 526. The virtual system model database 526 can be configured to store the virtual system model of the electrical system 102. The virtual system model can be constantly updated with real-time data from the data acquisition hub 112 to effectively account for the natural aging effects of the hardware that comprise the total electrical power system, thus, mirroring the real operating conditions of the system. [0253] In addition to being communicatively connected to the data acquisition hub 112 and the client 128, the Energy Management System Engine 2802 can also be interfaced with the predictive elements of the power analytics server. The predictive elements of the power analytics server 116 may relate to the real-time health, performance, efficiency, reliability and 92 WO 2009/048960 PCT/US2008/079215 availability of the electrical system 102. For example, the predictions can be indicative of the real-time ability of the electrical system 102 to: 1. sustain power demand and maintain sufficient active and reactive power reserve to cope with ongoing changes in demand and system disturbances due to contingencies, 2. operate safely with minimum operating cost while maintaining an adequate level of reliability, and 3. provide an acceptably high level of power quality (maintaining voltage and frequency within tolerable limits) when operating under contingency conditions. [0254] The Energy Management System Engine 2802 can be configured to process the real-time data output, the predicted data output, historical data output and forecasted aspects about the operation of the electrical system 102 to generate a user interface that can convey an operational state of the electrical system 102 to a user (i.e., electrical system 102 owner/system administrator/operator). In one embodiment, the operational state can be the real-time operational performance of the electrical system 102. In another embodiment, the operational state can be the predicted operational performance of the electrical system 102. In still another embodiment, the operational state can be a historical data trending display of the historical operational performance of the electrical system 102. [0255] For example, the Energy Management System Engine 2802 can be configured to generate a text-based or a graphics-based user interface that conveys real-time, predicted and/or historical operational performance of the electrical system 102 that can include real-time, predicted or historical information regarding the electrical system's 102 energy efficiency (i.e., the cost of energy utilized by the electrical system 102, the cost of intrinsic power losses within the electrical system 102, the cost of power losses due to the electrical system 102 running at poor power factors), reliability (i.e., the predicted ability of the electrical system 102 to 93 WO 2009/048960 PCT/US2008/079215 withstand a contingency event that results in stress to the electrical system 102), availability (e.g., the predicted ability of the electrical system 102 to maintain availability of total power capacity), health and performance. Moreover, the user interface can also include a visual representation of each piece of electrical equipment (associated/tagged with a unique identifier) that comprises the electrical system 102. In one embodiment, the user interface is based on a one-line diagram construct. In another embodiment, the user interface is based on a technical system schematic diagram construct. However, it should be appreciated that the user interface can be based on any engineering diagram construct as long as the resulting interface can be displayed on a client terminal 128 to allow viewing by an operator/administrator. [0256] The data acquisition hub 112 can be communicatively connected via data connections 110 to a plurality of sensors that can be embedded throughout the electrical system 102. The data acquisition hub 112 can be a standalone unit or integrated within the analytics server 116 and can be embodied as a piece of hardware, software, or some combination thereof. In one embodiment, the data connections 110 are "hard wired" physical data connections (e.g., serial, network, etc.). For example, a serial or parallel cable connection between the sensors and the hub 112. In another embodiment, the data connections 110 are wireless data connections. For example, a radio frequency (RF), BLUETOOTHTM, infrared or equivalent connection between the sensor and the hub 112. Real-time system data readings can be fed continuously to the data acquisition hub 112 from the various sensors that are embedded within the electrical system 102. [0257] Continuing with Figure 28, the client 128 can be a conventional thin-client or thick-client computing device that can utilize a variety of network interfaces (e.g., web browser,
CITRIX
T M , WINDOWS TERMINAL SERVICES
TM
, telnet, or other equivalent thin-client 94 WO 2009/048960 PCT/US2008/079215 terminal applications, etc.) to access, configure, and modify the sensors (e.g., configuration files, etc.), power analytics engine (e.g., configuration files, analytics logic, etc.), calibration parameters (e.g., configuration files, calibration parameters, etc.), virtual system modeling engine (e.g., configuration files, simulation parameters, choice of contingency event to simulate, etc.), Energy Management System Engine 2802 (e.g., configuration files, etc.) and virtual system model of the electrical system 102 under management (e.g., virtual system model operating parameters and configuration files). Correspondingly, in one embodiment, the real-time data from the various monitored components of the electrical system 102 and the real-time predictions (forecasts) about the health, performance, reliability and availability of the electrical system 102 can be simultaneously visualized on the user interface that is displayed on a client 128 terminal for viewing by a system administrator or equivalent. This user interface can provide a desirable approach to communicating the monitored and predicted operational aspects of an electrical system 102 to an operator/administrator. In one embodiment, the user interface is rendered in a 2-dimensional (2D) graphical image format. In another embodiment, the user interface is rendered in a 3-dimensional (3D) graphical image format. [0258] Figure 29 is a logic flow diagram depicting how the various elements of the Energy Management System can interact to provide intelligent energy monitoring and management of an electrical system, in accordance with one embodiment. As depicted, the Energy Management System can include a power analytics server 116 that can be communicatively connected to a real-time historical data trending database 2902, a virtual system model database 526, a data acquisition component 112 and a conventional web browser 2904. The data acquisition component 112 can be configured to communicate "real-time" sensor 95 WO 2009/048960 PCT/US2008/079215 data readings 2906 from the various sensors interfaced throughout the electrical system to the analytics server 116. [0259] In one embodiment, the connection is a "hardwire" physical connection. For example, the power analytics server 116 can be communicatively connected (via Category 5 (CAT5), fiber optic or equivalent cabling) to the data acquisition component 112. In another embodiment, the connection is a wireless connection (e.g., Wi-Fi, BLUETOOTH, etc.). For example, a wireless connection utilizing an 802.1 lb/g or equivalent transmission format. In still another embodiment, the connection can be a combination of "hardwire" and "wireless" connection elements that are linked together based on the particular requirements of the Energy Management System. [0260] Still with Figure 29, the power analytics server 116 can be configured to host one or more analytic engines that allow the Energy Management System to perform its various functions. For example, as depicted herein Figure 29, the power analytics server 116 can host a machine learning engine 2908, a virtual system modeling engine 2922 and/or a utility power pricing engine 2914. The machine learning engine 2908 can be configured to work in conjunction with the virtual system modeling engine 2922 and a virtual system model of the electrical system to make real-time predictions (i.e., forecasts) about the various operational aspects of the electrical system. The machine learning engine 2908 work by processing and storing patterns observed during the normal operation of the electrical system over time. These observations are provided in the form of real-time data captured using a multitude of sensors that are imbedded within the electrical system. [0261] The utility pricing engine 2914 can be configured to access a utility power pricing data source 2916 (that includes energy cost tables and other power billing data) to generate real 96 WO 2009/048960 PCT/US2008/079215 time energy cost and usage data 2910 that is reflective of the operational efficiency and performance of the electrical system. Examples of real-time energy cost and usage data 2910 can include, but are not limited to: 1. the real-time cost of energy utilized by the electrical system (energy cost), 2. the real-time cost of intrinsic power losses within the electrical system (cost of losses), and/or 3. the real-time cost of power losses due to the electrical system running at poor power factors (cost due to poor power factor). [0262] In one embodiment, the utility power pricing data source 2916 is populated with static utility power pricing data 2918. That is, utility power pricing data that is either directly supplied by a user of the Energy Management System or data that is extracted from utility data pricing data sheets/tables that are downloaded from the utility power provider supplying electrical power to the electrical system. In another embodiment, the utility power pricing data source 2916 is populated with real-time dynamic power pricing data 2920 directly from the utility power provider supplying the electrical power to the electrical system. For example, the real-time dynamic power pricing data 2920 can be power spot pricing that is set by a utility power provider based on a variety of different real-time power grid operational factors (e.g., power grid load, cost of power generation, etc.). [0263] Continuing with Figure 29, the virtual system model database 526 can be configured to store a virtual system model of the electrical system. The virtual system model can be constantly updated with real-time data from the data acquisition hub 112 to effectively account for the natural aging effects of the hardware that comprise the total electrical power system, thus, mirroring the real operating conditions of the system. Moreover, the virtual system model stored in the virtual system model database 526 can be accessed by the power analytic engines (i.e., machine learning engine 2908 and virtual system modeling engine 2922) that are 97 WO 2009/048960 PCT/US2008/079215 part of the Energy Management System to make various types of power analytics forecasts/predictions including, but not limited to: power system reliability predictions 2928, power system operations forecasts 2926, power system state estimations 2924 and/or power system operational cost predictions (i.e., cost of energy, cost of losses and cost associated with running the electrical system inefficiently). [0264] The real-time historical data trending database 2902 can be configured to store the real-time data output, the predicted data output and the forecasted aspects output from the power analytics server 116 and apply a historical trending algorithm to generate a historical data trending display that is indicative of the historical performance of the electrical system. The historical data trending display can present many different categories of data relating to the historical operation of the electrical system, including but not limited to: - Active Power (kW) - Reactive Power (kVAR) - Power Factor (%) - Humidity (%) - Temperature (OF) - Total Cost of Energy ($) - Total Penalty Cost Due to Poor Power Factor ($) - Frequency (Hz) - Voltage (p.u.) - Cost of Losses ($) [0265] In one embodiment, the network connection 114 is a "hardwired" physical connection. For example, the data acquisition hub 112 may be communicatively connected (via 98 WO 2009/048960 PCT/US2008/079215 Category 5 (CAT5), fiber optic or equivalent cabling) to a data server (not shown) that is communicatively connected (via CAT5, fiber optic or equivalent cabling) through the Internet and to the analytics server 116 server. The analytics server 116 being also communicatively connected with the Internet (via CAT5, fiber optic, or equivalent cabling). In another embodiment, the network connection 114 is a wireless network connection (e.g., Wi-Fi, WLAN, etc.). For example, utilizing an 802.1lb/g or equivalent transmission format. In practice, the network connection utilized is dependent upon the particular requirements of the monitored system 102. [0266] The energy management system engine, hosted by the power analytics server 116, can be configured to collect and process the real-time data output, the predicted data output and the forecasted aspects output from the various analytic engines (i.e., a machine learning engine 2908, a virtual system modeling engine 2922 and/or a utility power pricing engine 2914) that comprise the Energy Management System and generate a text or graphical user interface that conveys an operational state of the electrical system. [0267] Figure 30 is a diagram illustrating how the Transient Stability Modeling Engine works in conjunction with the other elements of the analytics system to intelligently predict and understand an electrical system's ability to maintain stability and/or recover from events and disturbances without violating system operational constraints, in accordance with one embodiment. Conventional transient stability modeling programs/engines, such as those offered by a majority of power system analysis software vendors, are capable of accurately computing the trajectories of power system quantities (e.g., voltages, frequencies, power flows, etc.) following disturbances, while leaving the comprehension of these trajectories (i.e., severity of 99 WO 2009/048960 PCT/US2008/079215 these disturbances) and their relevance to power system security largely to the judgment of engineers. [0268] That is, a conventional transient stability modeling program/engine only presents a user (i.e., electrical system owner, administrator, and/or operator) with a view of how the trajectories of the various operational power parameters of an electrical power system are impacted after a disturbance, but, fails to give any interpretive indicia of how well the overall security and stability of the power system improves after the disturbance. [0269] The ability to predict (i.e., compute) an electrical power system security (and stability) index, in static and real-time, via a model (i.e., virtual system model) of the electrical power system that can age and synchronize itself in real-time with the electrical power system's actual operating conditions is critical in obtaining accurate predictions of the system's ability to handle disturbances to the system due to various contingencies. Without operational conditions synchronization, these predictions are of little value as they are not reflective of the actual facility status and may lead the user to make false conclusions. In one embodiment, the power system security (and stability) index may be a combination of the transient stability values of multiple operational indices associated with the power system. For example, the power system security (and stability) index may be determined from a voltage stability index, a frequency stability index, and an angular (transient) stability index. [0270] According to one embodiment, trajectories are quickly and accurately computed to provide an overall system security index by assigning an index score between 0 to 100. For example, a system security index of 100 may indicate that the power system is fully secure and stable following a disturbance or plurality of disturbances. A system security index of 0 may indicate that the power system is insecure and unstable, and unable to recover and maintain 100 WO 2009/048960 PCT/US2008/079215 stability following a disturbance or plurality of disturbances. Thus, by combining various security indices, an overall system security index may be determined to provide a complete understanding of the relevance of different disturbances to the power system in order to provide a real-time understanding of the security and stability of the power system. [0271] The Angular Stability Index (ASI) is computed, for example, using a heuristic method for each individual sub-system (island) of the complete power system. The ASI for the complete power system is determined to be the smallest index of each of the individual the sub systems. Accordingly, the ASI can be no higher than the smallest index of the sub-systems. [0272] The Frequency Stability Index (FSI) may be defined, for example, as a maximum time duration for which the frequency excursion, i.e., rise/drop, violates a predefined frequency threshold. [0273] The Voltage Stability Index (VSI) may be defined, for example, as a maximum time duration for which a voltage excursion, i.e., rise/drop, violates a predefined voltage threshold. [0274] The System Security Index (SSI) is an overall system security index of the complete power system and may be defined, for example, as an algorithmic calculation of the ASI, FSI, and VSI, wherein the algorithmic calculation may include a multiplication of each of the ASI, FSI, and VSI. Based upon the result of the algorithmic calculation, the security of the power system may be declared. As an example, in order for the power system to be declared secure, each of the ASI, FSI, and VSI should be greater than 0, or greater than a predetermined acceptable threshold value. [0275] Once the power system undergoes a disturbance or a plurality of disturbances, the security of the power system may be quickly and accurately assessed based upon the SSI. 101 WO 2009/048960 PCT/US2008/079215 Moreover, the SSI also provides a real-time indication as to the ability of the power system to recover from the disturbance or plurality of disturbances. [0276] System input data provided by various power system components allows for the determination of the SSI. For example, the system input data includes information regarding interconnections, interdependencies and dynamic behavior of the power system in order to compute trajectories, indexes, and the SSI. As an example, system static component (non rotating equipment) input data and rotating equipment input data may comprise the system input data. [0277] System static components may include static elements, such as transformers, cables, overhead power transmission lines, and reactors. These static elements are presumed to display no operational/functional changes during the time duration in which the transient disturbance takes place. For example, the time duration for the transient disturbance may range, for example, from a few cycles up to a few seconds. The static component input data may be a basis for what is termed the "power flow solution." [0278] Rotating equipment data may encompass data received from synchronous machines including their associated controls, i.e., exciters, governors, etc., induction machines, and static var compensators. As an example, the synchronous machines may include generators and/or motors. In addition, thermal (round rotor) and hydraulic (salient pole) units may both be simulated either by using a simple model or by a complete two-axis model including damper winding representations. Moreover, as detailed below, other rotating equipment may include: [0279] For induction machines, which may include motors and/or generators, a complete two-axis model may be used. In addition, it may be possible to model the induction machines by 102 WO 2009/048960 PCT/US2008/079215 providing test curves (current, power factor, and torque as a function of speed), wherein no electrical dynamics modeling is necessary for the torque as a function of speed curve; [0280] For doubly-fed induction generators that may include the use of wind power generators, voltage and frequency behaviors of the power system networks are likely to be significantly affected; [0281] For motor operated valves (MOVs), which are commonly used in nuclear power plant auxiliaries operation, as well as other industrial installations, two modes of operation may be provided. For opening and closing operating modes, wherein each mode includes: (a) start; (b) full speed; (c) unseating; (d) travel; and (e) stall, a user-defined model type for each mode may be provided. For example, the "start" stage may be modeled as a constant current, while the "full speed" stage may be modeled by constant power. The modeling for the opening mode may be the same as modeling for the closing mode; [0282] For Automatic Voltage Regulator (AVR) and excitation systems, there may be a number of models ranging from rotating, i.e., DC and AC, and analogue to static and digital controls. In addition, a system may offer user-defined modeling capability that can be used to define a new excitation model; [0283] For governors and turbines, a system may be designed to address current and future technologies including, but not limited to, hydraulic, diesel, gasoline, and combined cycle with mechanical and/or digital governors; [0284] For relays, a system may be designed to address current and future technologies including under frequency, under voltage, over current, and impedance types; 103 WO 2009/048960 PCT/US2008/079215 [0285] For Static Var Compensators (SVCs), a system may be designed to address current and future technologies including a number of solid-state (thyristor) controlled SVCs or even the saturable reactor type SVCs; [0286] For Fault Isolation Units (FIUs), also known as Current Limiting Devices (CLDs), a system may be designed to address current and future technologies, wherein a device is installed between a power source and loads to limit the magnitude of fault currents that may occur within loads connected to power distribution networks; and [0287] For Status Automatic Bus Transfers (SABTs), a system may be designed to address current and future technologies of SABTs, which is a solid-state three-phase, dual position, three-pole switch, consisting of six pairs of silicon controlled rectifiers (SCRs) connected in an AC switch configuration. [0288] Various events (disturbances) may be supported, either individually or simultaneously, or sequenced in time, including application/removal of three-phase faults, application/removal of phase-to-ground faults, application/removal of phase-phase-ground faults, and application/removal of phase-phase faults. In addition, other events may include branch addition/tripping, starting/stopping induction motors, shunt tripping/addition, and generator/SVC tripping. Moreover, impact loading, which involves changing a load based upon changing mechanical torque on an induction machine, and load shedding may be considered an event. During the impact loading, it may be possible to convert an induction motor into an induction generator. [0289] According to the one embodiment, the understanding of stability trajectories may be automated, and their relevance to overall power system stability. For example, power system 104 WO 2009/048960 PCT/US2008/079215 security may no longer be dependent upon the sole judgment of an individual user, but now may be automated. [0290] According to the one embodiment, a static and real-time stability assessment may be performed using a security index for static simulations that incorporates a security index into a real-time system along with machine learning technologies, such as associative memories, HTM, and on-line/real-time system snap shot capture by a real-time data acquisition platform to perform the real-time system security and strength evaluation. [0291] According to the one embodiment, an accurately interpretation and prediction of security of an electrical power system includes actual interaction with a power facility that accounts for natural aging effects of hardware components that comprise the total power distribution system and the need for machine learning to understand, consume, and use non electrical sensory data in combination with electrical sensory data to identify failure mode patterns for early warnings and predictions. [0292] In Figure 30, the Transient Stability Modeling Engine 3002 can be integrated within a power analytics server 116 that can be communicatively connected via a network connection 114 with a data acquisition hub 112, a client terminal 128 and a virtual system model database 526. The virtual system model database 526 can be configured to store the virtual system model of the electrical system 102. The virtual system model can be constantly updated with real-time data from the data acquisition hub 112 to effectively account for the natural aging effects of the hardware that comprise the total electrical power system, thus, mirroring the real operating conditions of the system. [0293] In addition to being communicatively connected to the data acquisition hub 112 and the client 128, the Transient Stability Modeling Engine 3002 can also be interfaced with the 105 WO 2009/048960 PCT/US2008/079215 components of the power analytics server 116. The components of the electrical system 102 may relate to the static components and rotating equipment, as detailed above. For example, the stability indices data from the components can be indicative of the real-time ability of the electrical system 102 to sustain power demand and maintain sufficient active and reactive power reserve to cope with ongoing changes in demand and system disturbances due to contingencies, operate safely with minimum operating costs while maintaining an adequate level of reliability, and provide an acceptably high level of power quality (maintaining voltage and frequency within tolerable limits) when operating under contingency conditions. [0294] The Transient Stability Modeling Engine 3002 can be configured to process the real-time data output, the predicted data output, historical data output and forecasted aspects about the operation of the electrical system 102 to generate a user interface that can convey system security index values of the electrical system 102 to a user (i.e., electrical system 102 owner/system administrator/operator). In one embodiment, the system security index values can be the real-time operational performance of the individual components of the electrical system 102. In another embodiment, the operational state can be the predicted operational performance of the electrical system 102. In still another embodiment, the operational state can be a historical data trending display of the historical operational performance of the electrical system 102. [0295] For example, the Transient Stability Modeling Engine 3002 can be configured to generate a text-based or a graphics-based user interface that conveys real-time, predicted and/or historical operational performance of the electrical system 102 that can include real-time, predicted or historical information regarding the electrical system's 102 energy efficiency (i.e., the cost of energy utilized by the electrical system 102, the cost of intrinsic power losses within the electrical system 102, the cost of power losses due to the electrical system 102 running at 106 WO 2009/048960 PCT/US2008/079215 poor power factors), reliability (i.e., the predicted ability of the electrical system 102 to withstand a contingency event that results in stress to the electrical system 102), availability (e.g., the predicted ability of the electrical system 102 to maintain availability of total power capacity), health and performance. Moreover, the user interface can also include a visual representation of each piece of electrical equipment (associated/tagged with a unique identifier) that comprises the electrical system 102. In one embodiment, the user interface is based on a one-line diagram construct. In another embodiment, the user interface is based on a technical system schematic diagram construct. However, it should be appreciated that the user interface can be based on any engineering diagram construct as long as the resulting interface can be displayed on a client terminal 128 to allow viewing by an operator/administrator. [0296] In another example, the Transient Stability Modeling Engine 3002 can be configured to generate a text-based or a graphics-based user interface that conveys real-time operational performance of the electrical system 102 that can include real-time system security index values regarding the electrical system's 102 energy efficiency (i.e., the cost of energy utilized by the electrical system 102, the cost of intrinsic power losses within the electrical system 102, the cost of power losses due to the electrical system 102 running at poor power factors), security and stability (i.e., the predicted ability of the electrical system 102 to withstand a contingency event that results in stress to the electrical system 102), and availability (e.g., the predicted ability of the electrical system 102 to maintain availability of total power capacity). Moreover, the user interface can also include a visual representation of each piece of electrical equipment (associated/tagged with a unique identifier) that comprises the electrical system 102. In one embodiment, the user interface is based on a one-line diagram construct. In another embodiment, the user interface is based on a technical system schematic diagram construct. 107 WO 2009/048960 PCT/US2008/079215 However, it should be appreciated that the user interface can be based on any engineering diagram construct as long as the resulting interface can be displayed on a client terminal 128 to allow viewing by an operator/administrator. [0297] The data acquisition hub 112 can be communicatively connected via data connections 110 to a plurality of sensors that can be embedded with the individual system components throughout the electrical system 102. The data acquisition hub 112 can be a standalone unit or integrated within the analytics server 116 and can be embodied as a piece of hardware, software, or some combination thereof In one embodiment, the data connections 110 are "hard wired" physical data connections (e.g., serial, network, etc.). For example, a serial or parallel cable connection between the sensors and the hub 112. In another embodiment, the data connections 110 are wireless data connections. For example, a radio frequency (RF),
BLUETOOTH
T M , infrared or equivalent connection between the sensor and the hub 112. Real time system data readings can be fed continuously to the data acquisition hub 112 from the various sensors that are embedded within the electrical system 102. [0298] Continuing with Figure 30, the client 128 can be a conventional thin-client or thick-client computing device that can utilize a variety of network interfaces (e.g., web browser,
CITRIX
T M , WINDOWS TERMINAL SERVICES
TM
, telnet, or other equivalent thin-client terminal applications, etc.) to access, configure, and modify the sensors (e.g., configuration files, etc.), power analytics engine (e.g., configuration files, analytics logic, etc.), calibration parameters (e.g., configuration files, calibration parameters, etc.), virtual system modeling engine (e.g., configuration files, simulation parameters, choice of contingency event to simulate, etc.), Transient Stability Modeling Engine 3002 (e.g., configuration files, etc.) and virtual system model of the electrical system 102 under management (e.g., virtual system model operating 108 WO 2009/048960 PCT/US2008/079215 parameters and configuration files). Correspondingly, in one embodiment, the real-time stability data from the various monitored components of the electrical system 102 and the real-time predictions (forecasts) about the health, performance, reliability, security, and availability of the electrical system 102 can be simultaneously visualized on the user interface that is displayed on a client 128 terminal for viewing by a system administrator or equivalent. This user interface can provide a desirable approach to communicating the monitored and predicted operational aspects of an electrical system 102 to an operator/administrator. In one embodiment, the user interface is rendered in a 2-dimensional (2D) graphical image format. In another embodiment, the user interface is rendered in a 3-dimensional (3D) graphical image format. [0299] Figure 31 is an example process for real-time stability indexing of an electrical system, in accordance with one embodiment. In one embodiment, the operational steps that comprise the process are implemented through a transient stability modeling engine (application/software tool) that runs on the power analytics server. In another embodiment, the operational steps that comprise the process are implemented through a transient stability modeling engine that runs on a separate (network application) server that is communicatively connected to the power analytics server. In still another embodiment, the operational steps that comprise the process are implemented through a plurality of discrete applications that are distributed amongst one or more (network application) servers that are communicatively connected with the power analytics server. It should be understood, however, that the application(s) can be distributed in any configuration as long as the application(s) can communicatively access the power analytics server to implement the process. [0300] The method begins with operation 3102 where real-time data output from components of the electrical system is acquired using a data acquisition component 109 WO 2009/048960 PCT/US2008/079215 communicatively connected to sensors interfaced with the electrical system in the manner described above with respect to Figures 1 and 4. [0301] Next, the method moves on to operation 3104 where the virtual system model of the electrical system under management is updated in response to the real-time data output acquired. This may include, but is not limited to, modifying the simulated data output from the first virtual system model, adjusting the logic/processing parameters utilized by the virtual system modeling engine to simulate the operation of the electrical system, adding/subtracting functional elements of the first virtual system model, etc. It should be understood, that any operational parameter of the virtual system modeling engine and/or the first virtual system model may be modified by the calibration engine as long as the resulting modifications can be processed and registered by the virtual system modeling engine. [0302] In step 3106, real-time system security index values for the electrical system can be calculated based upon stability indices data generated from the updated virtual system model. In one embodiment, the system security values can be a product of the stability indices data input from at least one of an angular stability index, a frequency index, and a voltage stability index. For example, the system security values can range from 0, which can be indicative of an insecure and unstable electrical system, to 100, which can be indicative of a fully secure and stable electrical system. In addition, the generation of the real-time system security index values can occur after detection of a disturbance event or events, as detailed above, within the electrical system, thereby effectively communicating a real-time indication as to the stability of the electrical system immediately after the disturbance event or events. [0303] In step 3108, the system security index values can be displayed using a client terminal communicatively connected to the power analytics server. 110 WO 2009/048960 PCT/US2008/079215 [0304] Currently, owner(s), manager(s), and/or operator(s) of an electrical power system have to produce and maintain two different sets of drawings: 1. an electrical schematic and 2. a computer aided design (CAD) drawing. The CAD drawing can be created using any CAD application (i.e., AUTOCAD@, MICROSTATION@, etc.) or 2D/3D design tool and is basically a graphical representation of the electrical schematic, but lacking any database linkage or simulation capabilities. Therefore, the electrical schematic is typically modeled (independently of the CAD drawing) by an engineer using traditional power system modeling tools to allow for database linking as well as power system simulation/analysis and sizing calculations to be performed using traditional analysis tools. [0305] This traditional approach significantly adds to the time and cost of engineering projects due to the duplication of efforts by draftspersons and power system engineers. That is because, typically, the CAD drawing represents the final document/design specification for the electrical power system and the simulation/analysis results generated off the duplicate electrical schematic have to be manually transposed back to the CAD drawing. This duplication of effort is not only costly but also introduces the potential for human error. [0306] As such, novel methods that provide the ability to automatically convert a CAD file of an electrical power system into one or more component objects for power analytic analysis and simulation are needed. One such method can involve parsing the CAD file into one or more component software objects that can be individually classified and linked to a database(s) that can impart electrical characteristics, connectivity, and interdependencies to the objects as well as simulation, analysis, and sizing calculation functionalities. [0307] Figure 32 is a diagram illustrating a system (computing environment) for implementing a method for converting a computer aided design drawing file of an electrical 111 WO 2009/048960 PCT/US2008/079215 power system into one or more component objects for power analytic analysis and simulation, in accordance with one embodiment. The method can be described in the general context of an application program that runs on an operating system 3228 in conjunction with a computing device 3202. The application program can include code, applets, engines, routines, components, modules, objects, data structure, etc., that can perform particular processing tasks or implement particular abstract data types. As shown herein, the application can be comprised of various functional elements such as an import engine 3230, an export engine 3232, a CAD drawing parser 3236, a symbol classification engine 3238, and an editor engine 3239. It should be understood, however, that the application may include more or less engines, components, and/or modules than what is depicted herein Figure 32. For example, in certain embodiments, the functionalities of the import engine 3230, the export engine 3232, the CAD drawing parser 3236, the symbol classification engine 3238, and the editor engine 3239 can be combined into one or more engine elements. That is, there is no requirement for the application to be partitioned out into more than one engine element, as long as a single engine element possesses the functional capabilities of the import engine 3230, the export engine 3232, the CAD drawing parser 3236, the symbol classification engine 3238, and the editor engine 3239. [0308] In one embodiment, the computer 3202 is a standalone personal computer. That is, the application is wholly stored and executed by the computer 3202. In another embodiment, the computer 3202 is a thin-client computing device that is communicatively connected to one or more application/database server(s) 3242 (i.e., thin-client servers) via a network connection 114. That is, the application can be wholly or partially stored and executed by one or more thin-client server(s). 112 WO 2009/048960 PCT/US2008/079215 [0309] As shown in Figure 32, the system can include a computer 3202, a display device 3214, a keyboard 3216, a pointing device 3218 (i.e., mouse), and a network connection 114 to a power analytics server 116. The computer 3202 can include various hardware components (e.g., processor 3204, video adapter 3206, system memory 3220, network interface 3210, serial port interface 3212, internal storage device 3240, etc.) that are communicatively linked together by a system bus 3208. The system memory 3220 can include read only memory (ROM) 3222 and random access memory (RAM) 3226. A basic input/output system (BIOS) 3224 is stored in ROM 3222. The BIOS 3224 can contain basic routines that help to transfer information between elements/subsystems within the computer 3202 during certain computer 3202 operations. A number of program modules, components and/or engines can be temporarily stored in the RAM 3226, such as an operating system 3228, an import engine 3230, an export engine 3232, a CAD drawing parser 3236, a symbol classification engine 3238, an editor engine 3239, and/or a component classification database 3234. In one embodiment, permanent storage for the program modules, components, and/or engines described above can be provided by one or more types of internal storage device 3240 interfaced to the computer 3202 via the system bus 3208 including, but not limited to, a hard disk drive, an optical disk drive, magnetic disk drive, etc. In another embodiment, permanent storage for the program modules, components, and/or engines can be provided by one or more external storage device 3246 interfaced to the computer 3202 via the serial port interface 3212 and the system bus 3208 including, but not limited to, an external hard drive, a flash drive, an external optical disk drive, etc. In still another embodiment, permanent storage for the program modules, components, and/or engines can be provided by distributed computing devices (e.g., application/database servers 3242) that are communicatively connected to the computer 3202 via a network connection 114. 113 WO 2009/048960 PCT/US2008/079215 [0310] The operating system 3228, in conjunction with the system BIOS 3224 and associated device drivers, provides the basic interface between the computer's hardware and software resources, the user, and program modules/components/engines. A user may enter commands and information into the computer 3202 through a keyboard 3216 and/or an input pointing device (i.e., mouse) 3218. These and other input devices are connected to the processor 3204 via serial port interface 3212 and a system bus 3208. A monitor 3214 or other type of display device can be connected to the system bus 3208 via a video adapter 3206. [0311] As discussed above, the computer 3202 can operate in a networked environment using network connections 114 to one or more remote computing devices. The remote computing devices can be a server (e.g., power analytics server 3238, application/database server 3242, etc.), a router, a device, or other common network node. Typically, the remote computer devices can include many of the elements described above with respect to computer 3202. In one embodiment, the remote computing devices serve as an external memory storage location for the import engine 3230, the export engine 3232, the CAD drawing parser 3236, the symbol classification engine 3238, the editor engine 3239, and/or the component classification database 3234. The various application(s) hosted by the power analytics server 3238 can perform power analytic analyses and simulations using the system information provided by CAD drawing file, the component classification database, and other related or linked databases. [0312] Figure 33 is a diagram illustrating how the various functional elements of the system depicted in Figure 32 work together to convert the CAD drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, in accordance with one embodiment. As shown herein, the import engine 3230 can be configured to import a CAD drawing file 3302 (and all its symbol attributes) from an internal 3240, external 114 WO 2009/048960 PCT/US2008/079215 3246, and/or distributed 3242 storage device (communicatively linked to computer 3202) to the RAM of the computer hosting the application program. The CAD drawing file 3302 can be in any format including, but not limited to: .DWG, .DGN, .DXF, etc. Once the CAD drawing file 3302 has been imported, the CAD drawing parser 3236 can be configured to parse the filed 3302 into one or more component objects, each representing a system element of the electrical power system and containing a system element identification symbol (i.e., component symbol). [0313] The component symbols can be matched 3310 to component classifications that are stored in the component classification database 3234. The component classification defines the electrical system element that the component object represents and provides a means for defining the electrical, connectivity and interdependency characteristics of the component object, thus, making them intelligent objects with simulation, analysis and, sizing calculation functionalities. That is, the component classification can designate either the equipment type or equipment model of the electrical system element that the component object represents, thus, allowing the object to be linked to one or more databases (e.g., equipment parameters, performance, and model connectivity database 3320; equipment purchase, installation, testing and connection cost database 3318; etc.) that can be used to impart electrical, connectivity and interdependency characteristics (i.e., attributes) to the component object for simulation and analysis purposes. [0314] In one embodiment, the component symbols are classified automatically 3308 utilizing an object/pattern recognition component. That is, the object/pattern recognition component can be configured to automatically assign a component classification to each component object symbol. In another embodiment, the component symbols are manually classified 3304 utilizing a symbol classification engine component (as discussed above). In still 115 WO 2009/048960 PCT/US2008/079215 another embodiment, the component symbols are classified semi-automatically 3306 (i.e., assisted recognition) via both manual 3304 and automatic matching methods 3308. That is, any component object that cannot be automatically identified may be colored, highlighted, or moved to a pre-defined layer where a user can manually assign component classifications to them. [0315] As discussed above, the component classification can be used to help define the electrical, connectivity and interdependency characteristics (i.e., attributes) of a component object by linking it to one or more one or more databases (e.g., equipment parameters, performance, and model connectivity database 3320; equipment purchase, installation, testing and connection cost database 3318; etc.). The attributes of each component classification stored in the component classification database 3234 can be modified 3312 using the editor engine component of the application. That is, the editor engine can be configured to modify 3312 various component classification attributes stored in the databases described above. Examples of attributes that can be modified includes, but are not limited to, equipment operational parameters, equipment electrical characteristics (impedance, efficiency, power factor, resistance, reactance, capacitance, rated temperature, material... etc.), equipment performance parameter, equipment connectivity, equipment purchase cost, equipment installation cost, equipment testing and connection cost, etc. After the attributes have been modified 3312, the editor engine can be configured to validate the modifications to see if the changes will result in any connectivity issues in the electrical system and generate an exception report 3314. Moreover, the editor engine can also be configured to generate a updated CAD drawing file 3234 for the electrical system incorporating the attribute modifications. [0316] The updated CAD drawing file 3316, with its one or more classified component objects, can be utilized by the analytics/calibration components of the power analytics server 116 116 WO 2009/048960 PCT/US2008/079215 to update a virtual system model (stored in a virtual system model database 526) of the electrical system represented by the updated CAD drawing file. As discussed above, each of the classified component objects can be linked to one or more databases (e.g., equipment parameters, performance, and model connectivity database 3320; equipment purchase, installation, testing and connection cost database 3318; etc.) that impart electrical, connectivity and interdependency characteristics (i.e., attributes) to the component object. Therefore, if a symbol is deleted from the CAD drawing 3302, the associated database(s) entry for that object is also deleted. If connectivity is changed in the CAD drawing 3302, the associated connectivity defined in the database(s) also changes. In short, the updated CAD drawings (3302 and 3316) become a visual representation of the underlying linked database(s) which always mirrors changes made to the CAD drawings (3302 and 3316) and the component objects in them. [0317] The updated virtual system model can then be utilized by various power analytics application components (many of which are described above), stored in the power analytics server 116, to perform various power analytics analyses and simulations that predict operational aspects or events occurring within the electrical power system depicted by the updated virtual system model. Examples of operational aspects, include, but are not limited to: power system operational power flow, power system protection coordination, power system harmonics, power system transient stability, etc. Examples of operational events, include, but are not limited to: power system short circuit, power system arc flash, etc. The results from the power analytics analyses and simulations may be stored in a simulation and analyses reporting database 3322. The simulation and analyses reporting database 3322 can be configured to allow a user to choose between various reporting options 3234 to include in the final analyses and/or simulation report. 117 WO 2009/048960 PCT/US2008/079215 [0318] An export engine 3232 can be configured to export the updated CAD drawing 3316 back to the storage location of the original CAD drawing 3302 for storage as a new CAD drawing file or to replace the original CAD drawing file 3302. [0319] Figure 34 is an example process for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, in accordance with one embodiment. [0320] In step 3402, a computer aided design drawing file (and all its symbol attributes) is imported from an internal, external, and/or distributed storage device (communicatively linked to computer) to the RAM of the computer running an application program designed to convert the computer aided design drawing file into one or more component objects for power analytic analysis and simulation. The CAD drawing file can be in any format including, but not limited to: .DWG, .DGN, .DXF, etc. [0321] In step 3404, the computer aided design drawing file is parsed into at least one component object containing a component symbol. The component object represents a system element of the electrical power system. A typical computer aided design drawing file is comprised of a plurality of different component objects. [0322] In step 3406, a component classification is assigned to the component symbol. Typically, the component classifications are stored in a component classification database. The component classification defines the electrical system element that the component object represents and provides a means for defining the electrical, connectivity and interdependency characteristics of the component object, thus, making them intelligent objects with simulation, analysis and, sizing calculation functionalities. That is, the component classification can designate either the equipment type or equipment model of the electrical system element that the 118 WO 2009/048960 PCT/US2008/079215 component object represents, thus, allowing the object to be linked to one or more databases (e.g., equipment parameters, performance, and model connectivity database; equipment purchase, installation, testing and connection cost database; etc.) that can be used to impart electrical, connectivity and interdependency characteristics (i.e., attributes) to the component object for simulation and analysis purposes. [0323] In one embodiment, the component symbols are classified automatically utilizing an object/pattern recognition component. That is, the object/pattern recognition component can be configured to automatically assign a component classification to each component object symbol. In another embodiment, the component symbols are manually classified utilizing a symbol classification engine component (as discussed above). In still another embodiment, the component symbols are classified semi-automatically (i.e., assisted recognition) via both manual and automatic matching methods. That is, any component object that cannot be automatically identified may be colored, highlighted, or moved to a pre-defined layer where a user can manually assign component classifications to them. [0324] The embodiments described herein, can be practiced with other computer system configurations including hand-held devices, microprocessor systems, microprocessor-based or programmable consumer electronics, minicomputers, mainframe computers and the like. The embodiments can also be practiced in distributing computing environments where tasks are performed by remote processing devices that are linked through a network. [0325] It should also be understood that the embodiments described herein can employ various computer-implemented operations involving data stored in computer systems. These operations are those requiring physical manipulation of physical quantities. Usually, though not necessarily, these quantities take the form of electrical or magnetic signals capable of being 119 WO 2009/048960 PCT/US2008/079215 stored, transferred, combined, compared, and otherwise manipulated. Further, the manipulations performed are often referred to in terms, such as producing, identifying, determining, or comparing. [0326] Any of the operations that form part of the embodiments described herein are useful machine operations. The invention also relates to a device or an apparatus for performing these operations. The systems and methods described herein can be specially constructed for the required purposes, such as the carrier network discussed above, or it may be a general purpose computer selectively activated or configured by a computer program stored in the computer. In particular, various general purpose machines may be used with computer programs written in accordance with the teachings herein, or it may be more convenient to construct a more specialized apparatus to perform the required operations. [0327] Certain embodiments can also be embodied as computer readable code on a computer readable medium. The computer readable medium is any data storage device that can store data, which can thereafter be read by a computer system. Examples of the computer readable medium include hard drives, network attached storage (NAS), read-only memory, random-access memory, CD-ROMs, CD-Rs, CD-RWs, magnetic tapes, and other optical and non-optical data storage devices. The computer readable medium can also be distributed over a network coupled computer systems so that the computer readable code is stored and executed in a distributed fashion. [0328] Although a few embodiments of the present invention have been described in detail herein, it should be understood, by those of ordinary skill, that the present invention may be embodied in many other specific forms without departing from the spirit or scope of the invention. Therefore, the present examples and embodiments are to be considered as illustrative 120 WO 2009/048960 PCT/US2008/079215 and not restrictive, and the invention is not to be limited to the details provided therein, but may be modified and practiced within the scope of the appended claims. 121
Claims (39)
- 2. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and si ulation, as recited in claim 1, wherein the component classification represents an equipment type.
- 3. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, wherein the component classification represents an equipment model.
- 4. The computer system for converting a computer aided design drawing file of an elect rical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, wherein the computer aided design drawing file is importe I from a storage device that is communicatively connected to the memory. i The computer system for converting a computer aided design drawing file of an elect-ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, wherein the component classification is automatically assigned to the component symbol.
- 6. The computer system for converting a computer aided design drawing file of an elect-ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, further including: a component classification database maintained within the memory, the component classification database configured to store one or more component classifications. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, further including: an input device coupled to the processor and configured to be operated by a user to manually assign a component classification to the component symbol. 123
- 8. The computer system for converting a computer aided design drawing file of an elect-ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, further including: an editor engine maintained within the memory.
- 9. The computer system for converting a computer aided design drawing file of an elect-ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 8, wherein, the processor is operative to execute instructions within the editor engine to allow a user to modify an attribute of a component classification. 0. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 9, wherein the attribute relates to an equipment operational parameter.
- 11. The computer system for converting a computer aided design drawing file of an elect ical power system into one or more component objects for power analytic analysis and sin ulation, as recited in claim 10, wherein the attribute relates to an equipment performance parameter.
- 12. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and si ulation, as recited in claim 10, wherein the attribute relates to equipment connectivity.
- 13. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 10, wherein the attribute relates to equipment purchase cost.
- 14. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis 124 and simulation, as recited in claim 10, wherein the attribute relates to equipment installation cost. 5. The computer system for converting a computer aided design drawing file of an elect -ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 10, wherein the attribute relates to equipment testing and connect on cost. 6. The computer system for converting a computer aided design drawing file of an elect -ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 9, wherein the attribute is stored in an equipment attribute database communicatively connected to the editor engine. 7. The computer system for converting a computer aided design drawing file of an elect -ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, wherein the analytics engine is further configured to simulate a power system operational aspect using the updated virtual system model. ]8. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 17, wherein the aspect is operational power flow.
- 19. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 17, wherein the aspect is power system protection coordination.
- 20. The computer system for converting a computer aided design drawing file of an elect ical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 17, wherein the aspect is power system harmonics. :1. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis 125 and simulation, as recited in claim 17, wherein the aspect is power system transient stability.
- 22. The computer system for converting a computer aided design drawing file of an elec rical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, wherein the analytics engine is further configured to simulate a power system operational event using the updated virtual system model.
- 23. The computer system for converting a computer aided design drawing file of an elec rical power system into one or more component objects for power analytic analysis and si ulation, as recited in claim 22, wherein the event is a power system short circuit.
- 24. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 22, wherein the event is a power system arc flash incident.
- 25. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 1, further including: an export engine maintained within the me ory.
- 26. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 25, wherein the processor is operative to execute instruct ons within the export engine to export the updated computer aided design drawing file to a storage device.
- 27. A computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, comprising: importing a computer aided design drawing file; 126 parsing the computer aided design drawing file into a plurality of component objects, wherein each of the plurality of component objects represents a system element of the electrical power system and contains a component symbol comprising a system element identification; assigning a component classification to the component symbol of each of the plurality of component objects, wherein the component classification defines one or more attributes which impart at least one of an electrical characteristic, connectivity characteristic, and interdependency characteristic to the component object; receiving a modification of the one or more attributes of a component classification; generating an updated computer aided design drawing file incorporating the modification; receiving real-time data from one or more sensors interfaced with the electrical power system; receiving predicted data generated using a virtual system model of the electrical power system, wherein the virtual system model comprises virtual component data corresponding to a plurality of components of the electrical power system; synchronizing the virtual system model based on a difference between the real-time data and the predicted data; and updating the virtual system model based on the updated computer aided design drawing file.
- 28. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, wherein the component classification represents an equipment type.
- 29. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, wherein the component classification represents an equipment model.
- 30. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power 127 analytic analysis and simulation, as recited in claim 27, wherein the computer aided design drawing file is imported from a storage device that is communicatively connected to the memory. S1. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, further including: modifying an attribute of the component classification using an editor engine. 2. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute relates to an equipment operational parameter. 3. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute relates to an equipment performance parameter.
- 34. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute relates to equipment connectivity.
- 35. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute relates to equipment purchase cost.
- 36. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute relates to equipment installation cost. 128
- 37. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute relates to equipment testing and connection cost.
- 38. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, wherein the attribute is stored in an equipment attribute database communicatively connected to the editor engine.
- 39. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, wherein a user manually assigns the component classification to the component symbol.
- 40. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, wherein the component classification is automatically assigned to the component symbol.
- 41. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, further including: simulating a power ;ystem operational aspect utilizing the virtual system model.
- 42. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 41, wherein the aspect is operational power flow.
- 43. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power 129 analytic analysis and simulation, as recited in claim 41, wherein the aspect is power system protection coordination. C4. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 41, wherein the aspect is power system harmonies.
- 45. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 41, wherein the aspect is power system transient stability.
- 46. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, further including: simulating a power system operational event utilizing the virtual system model.
- 47. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 46, wherein the event is a power system short cir uit.
- 48. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 46, wherein the event is a power system arc flash incident.
- 49. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 31, further including: identifying connectivity issues in the electrical power system as a result of the modified attribute; and generating an exception report. 130 40. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 49, wherein the exception report summar zes the connectivity issues identified. 1. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytics analysis and simulation, as recited in claim 1, wherein the assignment of a component classification to the component symbol of each of the plurality of component objects is performed automat cally utilizing pattern recognition.
- 52. The computer system for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and si rulation, as recited in claim 51, wherein, if a component object cannot be automatically identified, the component object is highlighted for manual assignment of a component classification.
- 53. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 27, wherein the assignment of a component classification to the component symbol of each of the plurality of component objects is performed automatically utilizing pattern recognition.
- 54. The computer-implemented method for converting a computer aided design drawing file of an electrical power system into one or more component objects for power analytic analysis and simulation, as recited in claim 53, wherein, if a component object cannot be automatically identified, the component object is highlighted for manual assignment of a component classification. 131
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US97968607P | 2007-10-12 | 2007-10-12 | |
US60/979,686 | 2007-10-12 | ||
US12/236,030 US8131401B2 (en) | 2006-07-19 | 2008-09-23 | Real-time stability indexing for intelligent energy monitoring and management of electrical power network system |
US12/236,030 | 2008-09-23 | ||
PCT/US2008/079215 WO2009048960A1 (en) | 2007-10-12 | 2008-10-08 | Converting cad drawing files into intelligent objects for the design, analysis of electrical power systems |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2008310901A1 AU2008310901A1 (en) | 2009-04-16 |
AU2008310901B2 true AU2008310901B2 (en) | 2013-06-13 |
Family
ID=40549532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2008310901A Expired - Fee Related AU2008310901B2 (en) | 2007-10-12 | 2008-10-08 | Converting CAD drawing files into intelligent objects for the design, analysis of electrical power systems |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2201488A4 (en) |
AU (1) | AU2008310901B2 (en) |
CA (1) | CA2700887A1 (en) |
WO (1) | WO2009048960A1 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105761570A (en) * | 2016-04-26 | 2016-07-13 | 中国南方电网有限责任公司电网技术研究中心 | Displaying and training apparatus and method for overall dynamic process of alternating current-direct current grid characteristic |
CN105761590B (en) * | 2016-04-26 | 2018-11-02 | 中国南方电网有限责任公司电网技术研究中心 | A kind of grid simulation training system and method |
DE102017125310A1 (en) * | 2017-10-27 | 2019-05-02 | Eaton Industries (Austria) Gmbh | Method and system for determining a hazard potential of an electrical system |
JP6992041B2 (en) * | 2019-12-27 | 2022-01-13 | 京セラ株式会社 | Power management system and power management method |
CN113313801A (en) * | 2020-10-19 | 2021-08-27 | 阿里巴巴集团控股有限公司 | Rendering method, apparatus, and storage medium for design |
CN113077138A (en) * | 2021-03-30 | 2021-07-06 | 国家电网有限公司 | Power load identification method based on waveform data characteristic analysis |
CN117574479B (en) * | 2024-01-16 | 2024-05-14 | 福州轨道交通设计院有限公司 | Automatic drawing method for rail transit environmental control cabinet system diagram |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6314194B1 (en) * | 1995-07-26 | 2001-11-06 | The United States Of America As Represented By The Secretary Of The Army | Method for generating computer aided design programming circuit designs from scanned images of the design |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5251268A (en) * | 1991-08-09 | 1993-10-05 | Electric Power Research Institute, Inc. | Integrated method and apparatus for character and symbol recognition |
EP0534446B1 (en) * | 1991-09-26 | 2001-07-11 | Mitsubishi Denki Kabushiki Kaisha | System with approximation means for recognizing graphical elements in a drawing |
US6321187B1 (en) * | 1998-12-22 | 2001-11-20 | Hamilton Sundstrand Corporation | System reliability assessment tool |
US6530065B1 (en) * | 2000-03-14 | 2003-03-04 | Transim Technology Corporation | Client-server simulator, such as an electrical circuit simulator provided by a web server over the internet |
US20020193978A1 (en) * | 2001-06-14 | 2002-12-19 | Christophe Soudier | Electrical power system performance simulation |
CA2641657A1 (en) * | 2006-02-14 | 2007-08-23 | Edsa Micro Corporation | Systems and methods for real-time system monitoring and predictive analysis |
AU2007225261B2 (en) * | 2006-03-10 | 2012-05-10 | Edsa Micro Corporation | Systems and methods for real- time protective device evaluation in an electrical power distribution system |
-
2008
- 2008-10-08 WO PCT/US2008/079215 patent/WO2009048960A1/en active Application Filing
- 2008-10-08 EP EP08837119A patent/EP2201488A4/en not_active Withdrawn
- 2008-10-08 AU AU2008310901A patent/AU2008310901B2/en not_active Expired - Fee Related
- 2008-10-08 CA CA2700887A patent/CA2700887A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6314194B1 (en) * | 1995-07-26 | 2001-11-06 | The United States Of America As Represented By The Secretary Of The Army | Method for generating computer aided design programming circuit designs from scanned images of the design |
Also Published As
Publication number | Publication date |
---|---|
WO2009048960A1 (en) | 2009-04-16 |
EP2201488A4 (en) | 2012-02-29 |
CA2700887A1 (en) | 2009-04-16 |
AU2008310901A1 (en) | 2009-04-16 |
EP2201488A1 (en) | 2010-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11016450B2 (en) | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks | |
US10867087B2 (en) | Systems and methods for real-time DC microgrid power analytics for mission-critical power systems | |
US9846752B2 (en) | System and methods for intuitive modeling of complex networks in a digital environment | |
US9031824B2 (en) | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks | |
US8155943B2 (en) | Systems and methods for automatically converting CAD drawing files into intelligent objects with database connectivity for the design, analysis, and simulation of electrical power systems | |
US9092593B2 (en) | Systems and methods for intuitive modeling of complex networks in a digital environment | |
US8131401B2 (en) | Real-time stability indexing for intelligent energy monitoring and management of electrical power network system | |
US8775934B2 (en) | Systems and methods for creation of a schematic user interface for monitoring and predicting the real-time health, reliability and performance of an electrical power system | |
AU2008284225B2 (en) | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks | |
CA2698606A1 (en) | Real-time stability indexing for intelligent energy monitoring and management of electrical power network system | |
CA2825777A1 (en) | Systems and methods for automated model-based real-time simulation of a microgrid for market-based electric power system optimization | |
CA2882796A1 (en) | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks | |
EP2041637A2 (en) | Systems and methods for real-time advanced visualization for predicting the health, reliability and performance of an electrical power system | |
AU2008310904A1 (en) | Electrical power system modeling, design, analysis, and reporting via a client-server application framework | |
AU2008310901B2 (en) | Converting CAD drawing files into intelligent objects for the design, analysis of electrical power systems | |
AU2008251610B2 (en) | Systems and methods for creation of a schematic user interface for monitoring and predicting the real- time health, reliability and performace of an electrical power system | |
AU2008304386A1 (en) | Systems and methods for intuitive modeling of complex networks in a digital environment | |
CA2882358A1 (en) | Systems and methods for intuitive modeling of complex networks in a digital environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK25 | Application lapsed reg. 22.2i(2) - failure to pay acceptance fee |