Zhu et al., 2022 - Google Patents
Prevention of water and mud inrush in longwall top coal cave mining under shallow buried thin bedrockZhu et al., 2022
- Document ID
- 11298205089362489485
- Author
- Zhu L
- Yao Q
- Xia Z
- Xu Q
- Yu L
- Li X
- Publication year
- Publication venue
- Bulletin of Engineering Geology and the Environment
External Links
Snippet
During longwall top coal caving mining of shallow buried thin bedrock and thick coal seams, penetrating fractures may form in the rock strata above the roof, causing an inrush of water and sand at the working face. The 507-working face of the Madiliang Coal Mine in Inner …
- 239000003245 coal 0 title abstract description 239
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/263—Methods for stimulating production by forming crevices or fractures using explosives
- E21B43/2635—Methods for stimulating production by forming crevices or fractures using explosives by means of nuclear energy
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/14—Telescopic props
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kang et al. | Mechanical behaviors of coal measures and ground control technologies for China's deep coal mines–A review | |
Zhang et al. | The application of short-wall block backfill mining to preserve surface water resources in northwest China | |
Zhang et al. | Prediction of the height of the water-conducting zone above the mined panel in solid backfill mining | |
Kang et al. | Improved compound support system for coal mine tunnels in densely faulted zones: a case study of China's Huainan coal field | |
Dammyr et al. | Feasibility of tunnel boring through weakness zones in deep Norwegian subsea tunnels | |
Schumacher et al. | Modeling the pipe umbrella roof support system in a Western US underground coal mine | |
Li et al. | On prevention and mechanism of bed separation water inrush for thick coal seams: a case study in China | |
Yuan et al. | Countermeasures of water and mud inrush disaster in completely weathered granite tunnels: a case study | |
Sui et al. | Environmental implications of mitigating overburden failure and subsidences using paste-like backfill mining: a case study | |
Zhang et al. | Ground stability of underground gateroad with 1 km burial depth: a case study from Xingdong coal mine, China | |
Li et al. | Numerical simulation and experimental study on floor failure mechanism of typical working face in thick coal seam in Chenghe mining area of Weibei, China | |
Liu et al. | Numerical modelling of mining-induced inrushes from subjacent water conducting karst collapse columns in northern China | |
Liu et al. | Field monitoring and numerical analysis of tunnel water inrush and the environmental changes | |
Fan et al. | Assessment and prevention of water and sand inrush associated with coal mining under a water-filled buried gully: a case study | |
Liu et al. | Full-floor grouting reinforcement for working faces with large mining heights and high water pressure: a case study in China | |
Tai et al. | Failure mechanism of the large‐section roadway under mined zones in the ultra‐thick coal seam and its control technology | |
Li et al. | Fracture development at laminated floor layers under longwall face in deep coal mining | |
Zhang et al. | Application of the retained gob-side gateroad in a deep underground coalmine | |
Huang et al. | Multi-step combined control technology for karst and fissure water inrush disaster during shield tunneling in spring areas | |
Hou et al. | Study on green filling mining technology and its application in deep coal mines: A case study in the Xieqiao coal mine | |
Xie et al. | Reasonable stopping method and retracement channel support at fully mechanized top coal caving working face of 15 m extra‐thick coal seam: A case study | |
Chen et al. | Failure analysis and countermeasures of highway tunnel crossing fault fracture zone in coal-bearing strata: A case study | |
Zhang et al. | A simple and efficient way to detect the mining induced water-conducting fractured zone in overlying strata | |
CN113622993B (en) | Mineralization ecological protective coal mining method utilizing CO2 waste gas | |
Zhu et al. | Prevention of water and mud inrush in longwall top coal cave mining under shallow buried thin bedrock |