Hassig et al., 2021 - Google Patents
Methodology to remediate and evaluate surface flowline capacity with coiled tubing cleanoutsHassig et al., 2021
- Document ID
- 107939969446339981
- Author
- Hassig S
- Serrano D
- Villacres C
- Flor D
- Marchan L
- Bravo L
- Pineda A
- Muslera E
- Estevez D
- Ramos G
- Chicango E
- Cattani M
- Morillo G
- Alabuela L
- Correa E
- Freire C
- Publication year
- Publication venue
- SPE Annual Technical Conference and Exhibition?
External Links
Snippet
Customers in Ecuador inject the byproduct formation water from production wells into injector wells. A limited injection rate bottlenecks production, which is economically undesirable. Two major contributors limit injection capacity: reservoir injectivity and flowline …
- 238000000034 method 0 title description 12
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Clarke et al. | Sucker rod pumping in the eagle ford shale field study | |
Hassig et al. | Methodology to remediate and evaluate surface flowline capacity with coiled tubing cleanouts | |
Edmonstone et al. | ICD Well History and Future Use in Giant Offshore Oilfield, Abu Dhabi | |
Healy et al. | Design, Installation, and Performance of Big Bore (9-5/8 in.) Completions: Mari-B Field, Offshore Israel | |
Gumarov et al. | Drill cuttings Re-Injection well design and completion: best practices and lessons learned | |
Hassig Fonseca et al. | Methodology to Remediate and Evaluate Surface Flowline Capacity with Coiled Tubing Cleanouts | |
Ovesen et al. | Efficient Sand Cleanouts in Larger Wellbores Using Coiled Tubing: A New Approach Making an Old Problem Simple | |
Healy et al. | Completion design, installation, and performance—Cannonball Field, offshore Trinidad | |
Fowler et al. | Subsea Debottlenecking Project Increases Production from Caesar Tonga Field, Gulf of Mexico | |
Ermakov et al. | Using fluidic oscillation technology with coiled tubing to cleanout scale from a high-pressure/extreme-temperature well beyond the limits of an HPHT motor: A case study from the UK North Sea | |
Mubashir Ahmad et al. | Best Practices While Testing Sour GAS Wells | |
EL Helali et al. | Successful CRI Project for Offshore Abu Dhabi Field: 3 Million Barrels Injected with ZERO Subsurface Failures | |
Duque et al. | Concentric coiled tubing well vacuuming provides a solution for flowline hydrate removal offshore Brazil | |
Poppenhagen et al. | Deliquification of South Texas Gas Wells using corrosion resistant coiled tubing: a six year case history | |
Quiroga et al. | Hard Scale Mechanical Removal: A Solution for Brazilian Offshore Operations | |
Syafruddin et al. | Effective Approach for Enhancement of Rigless Well Commissioning | |
Ruiz et al. | Procedure to Complete, Running, Testing, Cementing, Hanging and Cleaning out the Frac String to Complete Unconventional HP/HT Wells to Guarantee the Future Frac Operations in the Wells of Unconventional Project at Abu Dhabi UAE | |
Thomson | Successful creation of permanent reservoir isolation barriers using coiled tubing on the Norwegian continental shelf NCS | |
Sach et al. | Repeatedly Increased Efficiency and Success Rate From a New Solids-Cleanout Process Using Coiled Tubing: A Review of Recent Achievements From Over 100 Operations | |
Prasetya et al. | Comparison of offshore abandonment projects in Indonesia: the evaluation, challenges and effectiveness | |
Ahmad Mubashir et al. | Sour Gas Well Testing Challenges-A Successful Case Study | |
Raman et al. | A Successful Deployment of Permanent Coiled Tubing Gas Lift Completion in Sabah Mature Deepwater SPAR Asset Providing Significant Effects on Production | |
Okpalla et al. | Egina Deep Water Development: Isolation Barrier Valve Case Study | |
Okosun et al. | Production Optimization in Bonga Deepwater Through Rigless Intervention | |
Fornari et al. | Challenges and Innovations in Water Shut off for Naturally Fractured Reservoir in Subsea Wells |