Siddiqui et al., 2023 - Google Patents
Underbalance Coil Tubing Drilling in Depleted Tight Gas Reservoir with Closed Loop System-Contributed Towards Adnoc Sustainability Targets by Minimizing …Siddiqui et al., 2023
- Document ID
- 10457635639021004124
- Author
- Siddiqui M
- Al Hosani A
- Subaihi M
- Al Janahi M
- Zain F
- Baslaib M
- Al Zarouni A
- AlBlooshi M
- Alhammadi R
- El-Meguid M
- Ahmad M
- Al Marzouqi A
- Al Mutawa A
- Shahat A
- Sumaida A
- Publication year
- Publication venue
- Abu Dhabi International Petroleum Exhibition and Conference
External Links
Snippet
With the depletion of reservoir pressure in low permeable formation, drilling (overbalance) always become challenging and thus the productivity due to high invasion. In order to opt the unconventional solution to maximize the recovery, it requires integrated approach such …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B2021/006—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Derricks; Masts; Other supports
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ladmia et al. | Underbalance Coiled Tubing Drilling in Tight Gas Reservoir Study Case Onshore Field, Abu Dhabi | |
Abd EL Meguid et al. | Novel Engineering Approach Utilizing Underbalanced Coil Tubing Drilling Solutions for Tight Sour Gas Carbonate. | |
Duthie et al. | Modular hydraulic workover unit enhances operational efficiency and cost savings for ESP replacement's | |
Flores et al. | The integrated approach to formation water management: from reservoir management to the protection of the environment | |
Siddiqui et al. | Underbalance Coil Tubing Drilling in Depleted Tight Gas Reservoir with Closed Loop System-Contributed Towards Adnoc Sustainability Targets by Minimizing Hydrocarbon Flaring in High Sour Gas Well | |
Healy et al. | Design, Installation, and Performance of Big Bore (9-5/8 in.) Completions: Mari-B Field, Offshore Israel | |
WU et al. | Lessons learned from hydraulic fracturing the Diyab shale gas wells in UAE | |
Zain et al. | Coiled Tubing Underbalanced Drilling Implementation Planning in Tight Gas Reservoirs (First Time in ADNOC Group of Companies) | |
Osama et al. | Planning And Execution Of First Underbalanced Coiled Tubing Drilling In Adnoc´ s Fields Utilizing First Successful Closed Loop System Globally | |
Lynn et al. | Unlocking Oman's Tight Gas Potential using State-of-the-Art Underbalanced Coiled Tubing Drilling Technologies | |
Mubashir Ahmad et al. | Best Practices While Testing Sour GAS Wells | |
Ladmia et al. | Case Study of Underbalance Coiled Tubing Drilling to Increase Well Productivity and Ultimate Recovery in Tight Gas Reservoir Onshore Field, Abu Dhabi | |
Healy et al. | Design, Installation, and Initial Performance of Ultra-High-Rate Gas Deepwater Completions-Tamar Field, Offshore Israel | |
Ardila Jaimes et al. | Design of underbalanced drilling program to improve wells productivity index and characterize multi layered tight oil reservoir in an environmentally sensitive field | |
Verma et al. | Case Study: First Ever Implementation of Managed Pressure Drilling to Drill Exploratory and Near Wildcat Well at Ongc Tripura Asset | |
Elendu et al. | Offline Production Tree Installation: Key Decisions, Value Drivers and Lessons Learnt | |
Ahmad Mubashir et al. | Sour Gas Well Testing Challenges-A Successful Case Study | |
Bela et al. | Carbon Footprint Reduction, Operation Efficiency and Low Operation Cost by Deploying CoilHose™ as Light Well Circulation System on Marginal Field in Malaysia | |
Abd El-Meguid et al. | Underbalanced coiled tubing drilling: Delivering well production safely in high H2S and tight gas reservoirs, UAE | |
Mubashir Ahmad et al. | Sour Gas Production Challenges-CASE Study | |
Ojeh-Oziegbe et al. | Bonga Deepwater Project Mid-Life Abandonment Campaign–A Success Story | |
Burdin et al. | Gas shutoff treatment in mega rich horizontal well with coiled tubing inflatable packer for North Caspian | |
Zain et al. | First Multilateral Well Drilled in Under Balanced Manner within ADNOC Group with Successful Trials Of UBCTD | |
Choodesh et al. | Significant Operation Efficiency Improvement of Cased Hole Gravel Pack Completion by Implementing Factory Completion Strategy | |
Saad | Zero Condensate Flaring Utilizing Well Power and Equipment Modifications |