Osama et al., 2023 - Google Patents
Planning And Execution Of First Underbalanced Coiled Tubing Drilling In Adnoc´ s Fields Utilizing First Successful Closed Loop System GloballyOsama et al., 2023
- Document ID
- 7543384244828953707
- Author
- Osama M
- Sumaida A
- Shahat A
- Mutawa A
- Almazrouei S
- Saleh A
- Yousfi F
- Almteiri N
- Baslaib M
- Mantilla A
- Deshmukh R
- Solaiman T
- Abdulsallam F
- Ladmia A
- Rangel P
- Rennox J
- Cui S
- Jumagaliyev Y
- Basha M
- Publication year
- Publication venue
- SPE/IADC Middle East Drilling Technology Conference and Exhibition
External Links
Snippet
The Operator planned and conducted Underbalanced Coiled Tubing Drilling (UBCTD), operations on 3 wells in Operator Onshore fields targeting tight sour gas carbonate reservoirs. The objectives of these operations were to evaluate the applicability of the …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/04—Electric drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ladmia et al. | Underbalance Coiled Tubing Drilling in Tight Gas Reservoir Study Case Onshore Field, Abu Dhabi | |
Buwauqi et al. | Case Study: How the Newest Generation of Autonomous Inflow Control Device Helps to Control Excessive Wells Water Production within a Major Sultanate of Oman Oilfield | |
Osama et al. | Planning And Execution Of First Underbalanced Coiled Tubing Drilling In Adnoc´ s Fields Utilizing First Successful Closed Loop System Globally | |
Abd EL Meguid et al. | Novel Engineering Approach Utilizing Underbalanced Coil Tubing Drilling Solutions for Tight Sour Gas Carbonate. | |
Al-Muhanna et al. | Successful completion of first ever CO2-foamed hydraulic acid fracturing pilot campaign in Jurassic gas wells of KOC delivering exemplary well clean up and production performance | |
Osama et al. | Preparation, Execution, and Associated Challenges for Utilizing the First Successful Closed Loop System Methodology Worldwide in Underbalanced Coiled Tubing Drilling in ADNOC'S Fields | |
Osama et al. | Step Change in CTD Strategy of Multilateral Drilling Using Under-Balanced Coiled Tubing Drilling (UBCTD) Technique in an Onshore Sour Gas Field-UAE-Case Study | |
Ovesen et al. | Efficient Sand Cleanouts in Larger Wellbores Using Coiled Tubing: A New Approach Making an Old Problem Simple | |
Asafa et al. | Improving Post-Stimulation Coiled Tubing Drillout | |
Foster et al. | The Use of MPD and an Unweighted Fluid system for drilling ROP Improvement | |
Ladmia et al. | Case Study of Underbalance Coiled Tubing Drilling to Increase Well Productivity and Ultimate Recovery in Tight Gas Reservoir Onshore Field, Abu Dhabi | |
Lynn et al. | Unlocking Oman's Tight Gas Potential using State-of-the-Art Underbalanced Coiled Tubing Drilling Technologies | |
Rajamani et al. | Subsea coiled tubing acid stimulation operation using CT tractor in Angola | |
Ladmia et al. | Fit for Purpose Completion Design & Work Flow Process to Improve Accessibility & Conformance Control Onshore Field Abu Dhabi | |
Abd El-Meguid et al. | Underbalanced coiled tubing drilling: Delivering well production safely in high H2S and tight gas reservoirs, UAE | |
Olawale et al. | Optimizing wellbore cleaning operations in high horizontal depth (HD)-To-Total Vertical Depth (TVD) ratio wells: insights from case studies in challenging well profiles | |
Huynh et al. | Composite Plug Milling Efficiency Improvement Through Rheology Control-Lessons Learned From The Horizontal Completions In The Duvernay Shale | |
Ruiz et al. | Procedure to Complete, Running, Testing, Cementing, Hanging and Cleaning out the Frac String to Complete Unconventional HP/HT Wells to Guarantee the Future Frac Operations in the Wells of Unconventional Project at Abu Dhabi UAE | |
Erivwo et al. | Considerations for mitigating early water breakthrough in horizontal wells in heavy oil reservoirs in the Niger delta-Ogini field case study | |
Nofal et al. | Multi-Lateral Jetting Technology Results in a 150% Uplift in Production During a Second Offshore Application in Abu Dhabi Offshore Field | |
Kumar et al. | A Literature Analysis of the Coiled-tubing Drilling Processes | |
Castro et al. | Optimizing the Most Common CT Operation in the US: Findings From More Than 60 Composite Frac Plug Underbalanced Milling Operations in the Piceance Basin | |
Magzoub et al. | A Dual Multilateral Completion as an Alternative to Un-Wanted Water Control in Horizontal Wells | |
Grifantini et al. | Maximizing Mature Offshore Field Value by Using Auto Gas Lift Technique | |
Martinez et al. | Breaking New Ground in Reservoir Management: Kuwait's First Underbalanced Coiled Tubing Drilling Operation for Blowout Relief in West Kuwait-A Global Success Story |