Nothing Special   »   [go: up one dir, main page]

Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.21278/brod73401

DP CHALLENGES IN ANA PLATFORM JACKET INSTALLATION

Kimon Ardavanis ; GSP Offshore LLC, United Arab Emirates
Radoslav Nabergoj orcid id orcid.org/0000-0003-2317-484X ; Nasdis PDS d.o.o., Izola, Slovenia
Francesco Mauro orcid id orcid.org/0000-0003-3471-9411 ; University of Strathclyde, Glasgow, United Kingdom TU Delft, Delft, the Netherlands


Puni tekst: engleski pdf 925 Kb

str. 1-11

preuzimanja: 589

citiraj


Sažetak

Installation of jacket platforms requires simultaneous and combined operations of multiple assets. Once the whole process has to be planned, it is necessary to predict in a fast and reliable way the possible weather limitations that may occur during the operations. The paper will present the major challenges of this unusual and innovative Dynamic Positioning analysis which has been carried out for Ana Jacket installation. The obtained results show that the Dynamic Positioning system of the core vessel in intact configuration is capable to hold the position for the investigated vessels' arrangements and design operative weather conditions. Lifting, upending and installation of Ana Jacket were carried out successfully in 2021.

Ključne riječi

Offshore installation; Dynamic Positioning; Multibody dynamics

Hrčak ID:

283610

URI

https://hrcak.srce.hr/283610

Datum izdavanja:

16.9.2022.

Posjeta: 1.276 *