Nothing Special   »   [go: up one dir, main page]

×
Please click here if you are not redirected within a few seconds.
Cited. Article. October 1993. The Transitionist as Expert Consultant: A Case Study of the Installation of a Real-Time Scheduling System in an Aerospace Factory.
The Transitionist as Expert Consultant: A Case Study of the Installation of a Real-Time Scheduling System in an Aerospace Factory. Diffusion, Transfer and ...
The Transitionist as Expert Consultant: A Case Study of the Installation of a Real-Time Scheduling System in an Aerospace Factory · Author Picture Michael L ...
The transitionist as expert consultant: a case study of the installation of a real-time scheduling system in an aerospace factory and a new approach to ...
The transitionist as expert consultant: a case study of the installation of a real-time scheduling system in an aerospace factory and a new approach to ...
... scheduling jobs in flexible manufacturing systems; design requirements for a real-time production scheduling decision aid; an optimized Kanban system for a ...
... Case Study: Selecting a Commercial Real-Time Operating. System ... scheduling/dispatching, intertask communication/ synchronization, and memory management.
The Transitionist as Expert Consultant: A Case Study of the Installation of a Real-Time Scheduling System in an Aerospace Factory. Conference Paper. Jan 1993.
The implementation of Infor CSI transformed the client's operations by automating manual processes and providing real-time visibility into production. This led ...
This study proposes a digital twin for production estimation, scheduling, and real-time monitoring in offsite construction.