Aug 23, 2011 · The aim is to determine for each activity a gate—a time before it the activity cannot begin. Setting these gates is analogous to setting ...
Our objective is to set gates so as to minimize the sum of the expected holding and shortage costs. We employ the Cross-Entropy method to solve the problem. The ...
This paper addresses the problem of scheduling activities in projects with stochastic activity durations. The aim is to determine for each activity a gate—a ...
The Cross-Entropy method is employed to solve the problem of scheduling activities in projects with stochastic activity durations by determining for each ...
Bendavid, Illana; Golany, Boaz · This paper addresses the problem of scheduling activities in projects with stochastic activity durations.
The Cross-Entropy method is employed to solve the problem of scheduling activities in projects with stochastic activity durations by determining for each ...
In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the ...
May 29, 2009 · Abstract This paper addresses the problem of scheduling activities in projects with sto- chastic activity durations.
Our objective is to set gates so as to minimize the sum of the expected holding and shortage costs. We employ the Cross-Entropy method to solve the problem. The ...