Nothing Special   »   [go: up one dir, main page]

×
Please click here if you are not redirected within a few seconds.
Oct 9, 2012 · Abstract. In a scheduling problem, denoted by 1|prec|∑C i in the Graham notation, we are given a set of n jobs, together with their processing ...
Aug 3, 2011 · Abstract:In the SCHED problem we are given a set of n jobs, together with their processing times and precedence constraints.
Abstract. In the SCHED problem we are given a set of n jobs, together with their processing times and prece- dence constraints. The task is to order the ...
In a scheduling problem, denoted by 1|prec|∑C i in the Graham notation, we are given a set of n jobs, together with their processing times and precedence ...
The task is to order the jobs so that their total completion time is minimized. SCHED is a special case of the Traveling Repairman Problem with precedences. A ...
This paper provides a survey of the few results known on scheduling problems as well as some techniques for deriving exponential algorithms, and focuses on ...
Jun 29, 2012 · The problem of minimizing total completion time on one machine, given precedence constraints on the set of jobs, can be solved by a standard ...
In the SCHED problem we are given a set of n jobs, together with their processing times and precedence constraints. The task is to order the jobs so that ...
The task is to order the jobs so that their total completion time is minimized. 1|prec| C i is a special case of the Traveling Repairman Problem with ...
Scheduling Partially Ordered Jobs Faster Than 2 n. https://doi.org/10.1007/978-3-642-23719-5_26 · Full text. Journal: Algorithms – ESA 2011 Lecture Notes in ...