The upcoming BPMN 2.0 revision will provide this clear semantics. In this paper, we show how the dead path elimination (DPE) capabilities of BPEL can be.
Jul 20, 2009 · In this paper, we show how the dead path elimination (DPE) capabilities of BPEL can be expressed with this new semantics and discuss the ...
The upcoming BPMN 2.0 revision will provide this clear semantics. In this paper, we show how the dead path elimination (DPE) capabilities of BPEL can be.
Jul 20, 2009 · We define the semantics for general control-flow graphs, including cyclic graphs. 2. We show that the proposed dynamic blocking generalizes the ...
In this paper, we show how the dead path elimination (DPE) capabilities of BPEL can be expressed with this new semantics and discuss the limitations.
This paper shows how the dead path elimination (DPE) capabilities of BPEL can be expressed with this new semantics and provides a generic formal definition ...
In this paper, we show how the dead path elimination (DPE) capabilities of BPEL can be expressed with this new semantics and discuss the limitations. We provide ...
Fingerprint. Dive into the research topics of 'Realising dead path elimination in BPMN'. Together they form a unique fingerprint.
People also ask
What is a collapsed sub process in BPMN?
Is BPMN still relevant?
What is the difference between a flowchart and a BPMN?
What is sequence flow in BPMN?
即将发布的BPMN~2.0版本将提供这种清晰的语义。在本文中,我们将展示如何用这种新语义表达BPEL的死路消除(DPE)功能,并讨论其局限性。我们提供了DPE的通用正式定义,并讨论 ...
Oct 31, 2019 · A Specific Language for Developing Business Process by Refinement based on BPMN 2.0. Conference Paper · Jan 2021 ; Realising dead path elimination ...