Nothing Special   »   [go: up one dir, main page]

×
Please click here if you are not redirected within a few seconds.
Each job has a ready time only at or after which the job can be processed. All the jobs have a common due date, which needs to be determined. The problem is to ...
Each job has a ready time only at or after which the job can be processed. All the jobs have a common due date, which needs to be determined. The problem is to ...
Fingerprint. Dive into the research topics of 'Common due date assignment and scheduling with ready times'. Together they form a unique fingerprint.
Common due date assignment and scheduling with a rate-modifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery cost.
Common due date assignment and scheduling with ready times. Comput. Oper Res 29: 1957-1967. 13 Panwalkar SS, Smith ML and Seidmann (1982). Common due date ...
This paper investigates common (slack) due-date assignment single-machine scheduling with controllable processing times within a group technology environment.
This penalty function is based on the due date value and on the earliness or the lateness of each job in the selected sequence. We present a polynomial bound ...
Mar 5, 2021 · In this paper, the single-machine scheduling problem is studied by simultaneously considering due-date assignment and group technology (GT).
We consider here the problem of scheduling tasks each of which is logically decomposed into a mandatory subtask and an optional subtask.
In this paper, we consider different due-date assignment scheduling with group technology and resource allocation on a single machine, where the due date of ...