In this paper, we study a two-agent scheduling problem on a two-machine flowshop where the objective is to minimize the total completion time of the first agent ...
Ng et al. [10] considered a two-agent scheduling problem on a single machine, where the objective is to minimize the total completion time of the first agent ...
May 18, 2021 · In this paper, we study the two-machine no-wait flow shop scheduling problem with two competing agents. The objective is to minimize the ...
We studied two-agent single-machine scheduling problem where the objective is to minimize the linear combination of the total completion time and maximum ...
Oct 22, 2024 · [22] studied a flowshop problem with two agents where the objective of each agent is to minimize the number of tardy jobs and the total ...
Jan 1, 2022 · In this paper, we study the two-machine no-wait flow shop scheduling problem with two competing agents. The objective is to minimize the overall completion ...
To bridge the gap, this paper aims at addressing the two-agent scheduling problem in a two-machine flowshop. Because of the importance of delay penalties and ...
People also ask
An investigation on a two-agent single-machine scheduling problem with unequal release dates · Engineering, Mathematics. Computers & Operations Research · 2012.
Oct 13, 2017 · An improved branch-and-bound algorithm for the two machine total completion time flow shop problem. European Journal of Operational Research, ...
TL;DR: This work considers a two-agent single-machine scheduling problem involving deteriorating jobs and learning effects simultaneously and develops a branch- ...