This paper proposes an adaptive negotia- tion framework and two kinds of negotiation policies to fulfill scheduling and rescheduling in the flexible job shop.
Agent-based production scheduling is a promising approach to solve production scheduling problem, especially in a dynamic, uncertain environment.
People also ask
What is flexible job shop scheduling?
Is job shop scheduling NP-hard?
What is the complexity of job shop scheduling?
Bibliographic details on A Kind of Adaptive Negotiation Mechanism for Flexible Job Shop Scheduling.
Apr 16, 2024 · The flexible job shop scheduling problem (FJSP) is an NP-hard combinatorial optimization problem, which has wide applications in the real world.
To optimize makespan and critical machine load of FJSP, a discrete improved grey wolf optimization (DIGWO) algorithm is proposed.
An Adaptive Negotiation Framework is proposed which models the dynamic nature of agent based manufacturing scheduling at negotiation level explicitly and ...
A Kind of Adaptive Negotiation Mechanism for Flexible Job Shop Scheduling. Conference Paper. Full-text available. Aug 2006; Lect Notes Comput Sci.
Aug 5, 2019 · Flexible job shop scheduling problem (FJSP) is an NP-hard combinatorial optimisation problem, which has significant applications in the real world.
This paper proposes a novel distributed assembly flexible job shop scheduling problem (DAFJSP), which involves three stages: production stage, assembly stage, ...
The distributed scheduling problem deals with the assignment of jobs to various factories with different geographical locations and by searching the sequence of ...