Nothing Special   »   [go: up one dir, main page]

Project 23900 amphibious assault ship: Difference between revisions

Content deleted Content added
No edit summary
Tags: Reverted Visual edit Mobile edit Mobile web edit
Tag: Reverted
Line 137:
| ''2028''<ref name="TASSapril2020"/><ref name="navykorabel2022b">{{Cite web|url=https://navy-korabel.livejournal.com/257030.html#cutid1|title=Строительство боевых кораблей основных классов для ВМФ России на 01.01.2022|date=1 January 2022|language=ru|website=navy-korabel}}</ref>
| [[Pacific Fleet (Russia)|Pacific Fleet]]<ref name="navykorabel2022b"/>
| Under construction<ref name="seawaves">{{Cite web |url=https://seawaves.com/?p=9411 |title=Zaliv Shipyard Begins Construction of UDC Assault Ships |date=2 March 2021 |website=SeaWaves Magazine}}</ref>. Presumably damaged/destroyed as a result of a Ukrainian missile attack on the Zaliv shipyard on November 4, 2023
|-
| ''Mitrofan Moskalenko''
| Zaliv Shipyard
Line 145 ⟶ 144:
| ''2029''<ref name="TASSapril2020"/><ref name="navykorabel2022b"/>
| [[Black Sea Fleet|Black Sea]]<ref>{{Cite web|url=https://tass.com/defense/1347055|title = Mitrofan Moskalenko helicopter carrier to become Russian Black Sea Fleet flagship — source}}</ref>
| Under construction<ref name="seawaves"/>. Presumably damaged/destroyed as a result of a Ukrainian missile attack on the Zaliv shipyard on November 4, 2023
|}
 
==See also==