Nothing Special   »   [go: up one dir, main page]

Bundesautobahn 7 (translates from German as Federal Motorway 7, short form Autobahn 7, abbreviated as BAB 7 or A 7) is the longest German Autobahn and the longest national motorway in Europe at 963 km (598 mi). It bisects the country almost evenly between east and west. In the north, it starts at the border with Denmark as an extension of the Danish part of E45. In the south, the autobahn ends at the Austrian border. This final gap was closed in September 2009.

A 7 shield}}
A 7
Bundesautobahn 7
Route information
Length963 km (598 mi)
Major junctions
North endDanish border
Major intersections
E45 Denmark

(1) Ellund border crossing
Services Ellund
(2) Flensburg / Harrislee B 199
Rest area Handewitter Forst/Altholzkrug
100 m
(3) Flensburg B 200
Treenetalbrücke 200 m
(4) Tarp
Rest area Jalmer Moor/Jalm
Rest area Arenholz
(5) Schleswig / Schuby B 201
Rest area Husby
(6) Schleswig / Jagel
Rest area Moor/Lottorf
(7) Owschlag
Services Hüttener Berge
(8) Rendsburg / Büdelsdorf B 203
Europabrücke 1.498 m
Rade parking area
(9) Rendsburg 4-way interchange A 210
Rest area Ohe
(10) Warder
Rest area Brahmsee/Dätgen
(11) Bordesholm

6-streifiger Ausbau bis Hamburg-Nordwest
Intersection 3-way interchange Bordesholm A 215
Neumünster-Nord (under construction) B 205
AB-Rast.svg Under construction Rest area Aalbek (under construction)
Neumünster-Mitte (under construction) B 430
Neumünster-Süd (under construction) B 205
AB-Rast.svg Under construction Rest area Brokenlande (under construction)
Großenaspe (under construction)
Biemölen/Sielsbrook
Bad Bramstedt (under construction) B 206
Kreuz Schmalfeld (planned) A 20
Schmalfeld
Schmalfeld
Kaltenkirchen (under construction)
Moorkaten
Henstedt-Ulzburg (under construction) B 433
Beckershof
Ellerau (planned)
Quickborn (under construction)
AB-Rast.svg Under construction Rest area Holmmoor (under construction)
Norderstedt-Mitte (planned)
Bönningstedt
Hamburg-Schnelsen Nord (under construction) (Airport) B 432
Hamburg-Schnelsen (under construction) B 447

(25) Hamburg-Nordwest 3-way interchange A 23
(26) Hamburg-Stellingen B 4 B 5
(27) Hamburg-Volkspark
Tunnel Überdeckelung Altona 3000 m (planned)
(28) Hamburg-Bahrenfeld B 431
(29) Hamburg-Othmarschen
Elbtunnel
Intersection 3-way interchange HH-Hafen (planned) A 252
Hochstraße Elbmarsch 4.359 m
(30) Hamburg-Waltershof
(31) Hamburg-Moorburg
(32) Hamburg-Heimfeld B 73
(33) Hamburg Südwest 3-way interchange A 261
(34) Hamburg-Marmstorf / Buchholz B 75
Services Harburger Berge
(35) Fleestedt B 4
(36) Maschener Kreuz A 1, A 39
(37) Horster Dreieck A 1
Services Seevetal
(38) Seevetal - Ramelsloh
Services Hasselhöhe
(39) Thieshope
Eichberg parking area
Utspann parking area
(40) Garlstorf
Rest area Garlstorfer Wald/Schaabbskaben
(42) Evendorf
Auegrund parking area
Vorm Naturschutzpark parking area
Services Brunautal
(43) Bispingen
Bispinger Tor parking area
Timmerloh parking area
Am Stühbeckshorn parking area
Bei den Schnellbergen parking area
(44) Soltau-Ost B 71 B 209
Rest area Abelbeck
Services Vorm Wietzenbruch
(45) Soltau-Süd B 3
Rest area Dorfmark
(46) Dorfmark B 440
parking area
(47) Fallingbostel B 209
Rest area Wolfsgrund
(48) Dreieck Walsrode 3-way interchange A 27
(49) Westenholz
Services Allertal (includes junction)
Allerbrücke 200 m
(50) Schwarmstedt B 214
(51) Berkhof
(52) Mellendorf
(53) Hannover-Nord 3-way interchange A 352
Rest area
(54) Großburgwedel
(55) Altwarmbüchen
(56) Hannover / Kirchhorst 4-way interchange A 37
Rest area
(57) Kreuz Hannover-Ost 4-way interchange A 2
(58) Hannover-Anderten B 65
Mittellandkanalbrücke
Services Wülferode
(59) Laatzen B 443
(60) Hannover-Süd 3-way interchange A 37
Rest area
Brücke Stichkanal Hildesheim
Hildesheim-Nord (planned)
(61) Hildesheim-Drispenstedt B 494
(62) Hildesheim 4-way interchange B 1
parking area
Services Hildesheimer Börde
Talbrücke 100 m
(63) Derneburg / Salzgitter B 6
(64) Dreieck Salzgitter 3-way interchange A 39
Rest area Sillium
(65) Bockenem B 243a

8-streifiger Ausbau bis Herbst 2015
Bornum am Harz/?
Rhüden (under construction) B 82
AB-Rast.svg Under construction Rest area Harz (under construction)

(67) Seesen B 243
Services Seesen
parking area
(68) Echte B 445
Rest area Kalefeld
(69) Northeim-Nord B 3
Flutbrücke Northeim300 m
Leinebrücke75 m
(70) Northeim-West B 241
(71) Nörten-Hardenberg B 446
Rest area Parensen
(72) Göttingen-Nord
(73) Göttingen B 3
Services Göttingen (includes junction)
(74) Drammetal 3-way interchange A 38
Rest area Heckelberg/Hedemünden
(75) Hann. Münden / Hedemünden
Werratalbrücke 422 m
Rest area Hann. Münden-Humboldtblick
(76) Hann. Münden / Lutterberg B 496
Rest area Staufenberg
Rest area Herkulesblick
Niestebrücke 200 m
(77) Kassel-Nord
(78) Kassel-Ost B 7
Intersection 3-way interchange Lossetaldrieck (planned) A 44
Lossetalbrücke 200 m
(79) Kassel-Mitte 4-way interchange A 49
Services Kassel (includes junction)
(80) Dreieck Kassel-Süd 3-way interchange A 44
(81) Guxhagen
Rest area Markwald/Quillerwald
Brückenbachtalbrücke 100 m
(82) Melsungen B 253
(83) Malsfeld
Services Hasselberg
(84) Homberg (Efze) B 323
Raboldshausen parking area
Rest area Am Pommer
(85) Bad Hersfeld-West B 324
(86) Kirchheimer Dreieck A 4
Raststätte Kirchheim (abolished)
(87) Kirchheim B 454
Autobahnkirche Kirchheim/Hesse
Aulatalbrücke 200 m
(88) Hattenbacher Dreieck A 5
Strampen/Ottersbach parking area
(89) Niederaula B 62
Fuldabrücke
Dornbusch/Richtgraben parking area
Services Großenmoor
Mahlertshof parking area
(90) Hünfeld / Schlitz
Fuchsberg/Rotkopf parking area
Hummelskopf/Geißhecke parking area
(91) Fulda-Nord B 27
Rauschenberg/Petersberg parking area
(92) Fulda-Mitte B 458
Röther Tannen parking area
Pilgerzell parking area
Eichenzell parking area
(93) Fulda-Süd / Dreieck Fulda A 66
Fuldabrücke 932 m
Steinhauk/Riederberg parking area
Steinborntal parking area
Thalaubachtalbrücke ca. 400 m
Lohmühle parking area
Döllbachtalbrücke ca. 600 m
Services Uttrichshausen
Talbrücke Uttrichshausen 870 m
Röhneiche parking area
Forsthaus parking area
Grenzwaldbrücke 965 m
parking area
(94) Bad Brückenau-Volkers B 27
parking area
parking area
Römershagbrücke 313 m
Sinntalbrücke 810 m
parking area
(95) Bad Brückenau / Wildflecken B 286
parking area
Services Rhön
parking area
parking area
(96) Bad Kissingen / Oberthulba
Thulbabrücke 493 m
parking area
Fränkische-Saale-Brücke 372 m
Brücke 150 m
(97) Hammelburg B 287
Klöffelsbergbrücke 367 m
parking area
parking area
parking area
(98) Schweinfurt / Niederwerrn B 303
parking area
(99) Schweinfurt / Werneck 4-way interchange A 70 B 26a
Stettbachbrücke 249 m
parking area
Schraudenbachbrücke 249 m
parking area
Werntalbrücke 482 m
Services / Motel Riedener Wald
parking area
parking area
(100) Gramschatzer Wald
parking area
parking area
Pleichachtalbrücke 375 m
(101) Würzburg / Estenfeld B 19
Kürnachtalbrücke 375 m
parking area
parking area
Rothofbrücke 440 m
parking area
(102) Biebelried 4-way interchange A 3
(103) Kitzingen B 8
Talbrücke Kaltensondheim 155 m
Rest area
Mainbrücke Marktbreit 928 m
Bräubachtalbrücke 247 m
(104) Marktbreit

8-streifiger Ausbau bis 2015
Gollhofen (under construction) B 13
Uffenheim / Langensteinach (under construction)
AB-Rast.svg Under construction Rest area Ohrenbach (under construction)
Bad Windsheim (under construction) B 470
Enstalbrücke 181 m
Rothenburg ob der Tauber (under construction)
Talbrücke Wolfsau 344 m
Talbrücke Pfeffermühle 406 m

(109) Wörnitz
(110) Feuchtwangen / Crailsheim 4-way interchange A 6
(111a) Feuchtwangen-West / Schopfloch
(112) Dinkelsbühl / Fichtenau
Buchbachtalbrücke 300 m
Virngrundtunnel 468/465 m
Services Ellwanger Berge
(113) Ellwangen
Sechtatal (planned)
Jagsttalbrücke 547 m
(114) Aalen / Westhausen B 29
Agnesburgtunnel 704/702 m
(115) Aalen / Oberkochen
Heidenheimer Kohlplatten/Härtsfeld - to be rebuilt as:
Heidenheim-Nord (planned)
Möhntalbrücke 208 m
Lindletalbrücke 300 m
(116) Heidenheim
Taubentalbrücke 115 m
Brenztalbrücke 372 m
(117) Giengen / Herbrechtingen B 19
Talbrücke Hürben 178 m
Services Lonetal
(118) Niederstotzingen
Hungerbrunnentalbrücke 240 m
Lonetalbrücke 282 m
Rest area Vor dem Donauried/Sankt Jakob
(119) Langenau B 19
(120) Ulm / Elchingen 4-way interchange A 8
Donaubrücke 270 m
parking area
(121) Nersingen B 10
parking area
(121a) Neu-Ulm
Rest area
(122) Hittistetten 3-way interchange B 28
Brücke 200 m
parking area
(123) Vöhringen
parking area
parking area
(124) Illertissen
parking area
parking area
(125) Altenstadt an der Iller
Illerbrücke 320 m
Services Illertal
(126) Dettingen an der Iller
parking area
Illerkanalbrücke 150 m
(127) Berkheim B 312
Illerbrücke 160 m
parking area
(128) Memmingen 4-way interchange A 96
parking area
(129) Memmingen-Süd B 300
parking area
(130) Woringen
parking area
(131) Bad Grönenbach
Services Allgäuer Tor
(132) Dietmannsried
parking area
parking area
parking area
(133) Kempten-Leubas B 19
(134) Kempten im Allgäu B 12
(135) Betzigau
parking area
Talbrücke 290 m
(136) Allgäu 3-way interchange A 980
Rest area
Rottachtalbrücke 705 m
(137) Oy-Mittelberg B 309
Wertachtalbrücke 335 m
Services
(138) Nesselwang
(139) Enzenstetten
Talbrücke Enzenstetten 546 m
(140) Hopfensee
Tunnel Reinertshof 630 m
(141) Füssen
Grenztunnel Füssen 1.245 m
( ) border crossing
(230) "Füssen"

B 179 Austria
South endAustrian border
Location
CountryGermany
StatesSchleswig-Holstein, Hamburg, Lower Saxony, Hesse, Bavaria, Baden-Württemberg, Bavaria
Highway system
  • Roads in Germany
A 6 A 8

Overview

edit
 
BAB 7 approaching Hamburg

The Bundesautobahn 7 starts at Flensburg and travels through the two states at Schleswig and Rendsburg, through the world's busiest artificial waterway of Kiel Canal crossing the Rader high bridge. At Rendsburg you can change to the A 210, a feeder to the Schleswig-Holstein capital, Kiel. A few kilometers further south there is another feeder route to Kiel, the A 215, into the A7 at the interchange Bordesholm; however, this can only be reached from the south, likewise from the A 215 you can only reach the A7 in the south. South of Bordesholm, the highway has been continuously expanded to six lanes since 2014 due to the high traffic volume to Hamburg. Since 2016 and 2017, several sections have six lanes. Here, the motorway leads past the cities of Neumünster, Bad Bramstedt and Norderstedt, before the hamlet of Schnelsen reaches Hamburg's urban area, and also Hamburg Airport. From the intersection Hamburg-Nordwest, where the A23 branches off towards Heide, the A7 is six lanes, but is currently being expanded to eight lanes.

The section through the city of Hamburg is characterized by an immense volume of traffic, congestion is the order of the day here. There are several reasons for this: the motorway runs through inner-city areas, there is a lot of holiday traffic on the route during school holidays, there are practically no opportunities for bypassing, the speed is permanently limited to 80 km / h as an urban area and the section is extended, South of the equipped with four tubes to two lanes Elbe tunnel leads the A7 on the highway Elbmarsch, the longest road bridge in Germany, right through the harbor area and the Harburg mountains to Lower Saxony. Via the corner junction A 261 you get to the A 1 to Bremen, at the following Maschener Kreuz on the A 39 to Lüneburg.

Going through Hanover from Hamburg, the highway has six lanes, and it was downgraded to the four-lane section between Soltau and Walsrode the hard shoulder can be temporarily released as a third lane. It leads across the Lüneburg Heath, partly with separate directional lanes. At the triangle Walsrode you reach the A 27 to Bremen and a few kilometers to the south, before reaching the capital of Lower Saxony, at the junction Hannover-Nord on the A 352, which connects to Hannover Airport and ends at the A 2, which leads to Dortmund. The following motorway junctions of the A7 provide a connection to the A37 Hanover city center and to Celle or A 2 Ruhrgebiet-Berlin dar. By the Altwarmbüchener Moor the highway leads east to Hanover; at the triangle Hannover-Süd, where the southern branch of the A 37 to the fair Hanover is connected only with the further south part of the A7.

South of Hildesheim, the A7 enters a low mountain range and the terrain becomes hilly. The Salzgitter triangle also connects only the southern part of the A7 with the A 39 to Braunschweig and Salzgitter. Between the triangle Salzgitter and Göttingen the highway is expands to six lanes. Passing the university town, the A 38 branches off at Dreieck Drammetal to Leipzig, then the A7 leads over steep gradients and slopes down into the Werratal near the town of Hann. Münden and continues onto Hesse.

At Kassel, it is the largest district, from there you can get on the A44 in the direction of the west to the Ruhr area and in some years, when the extension Kassel-Herleshausen will be completed, also in the direction of Eisenach. Between the interchange Kassel-Ost and the interchange Kassel-Süd, the A7 is being developed eight-lane for a future convergence with the then branching off to the east A44. In Kassel, the unfinished A 49 branches off, which will lead from completed completion to the Ohmtal triangle, which is to be built near Homberg (Ohm) between the junctions Alsfeld-West and Homberg (Ohm) on the A5. Between Kassel and Kirchheim the Knüllgebirge is crossed. The Kirchheim triangle and the Hattenbacher triangle, which are close to each other and quite close to the geographic center of Germany, together form one of the most important motorway junctions of the state. The A 4 leads to the New Länder and Eastern Europe, the A 5 to the Rhine-Main area and on to the border of Switzerland. South of the Hattenbacher triangle is the A7 sections four-lane expanded, leads past Fulda, where the A 66 branches off to Hanau and reaches Bavarian territory.

Crossing the Rhön Mountains, pass Schweinfurt (cross with the A 70 to Bayreuth) and Würzburg to the Biebelried intersection, where the A 3 Ruhrgebiet-Frankfurt am Main-Nürnberg-Passau is crossed. This was the southern end of the A7 for a long time. The completion of the south in the 1980s leads past Rothenburg ob der Tauber on the western edge of the Frankenhöhe to the freeway junction Feuchtwangen / Crailsheim (intersection with the A 6 Saarbrücken-Heilbronn-Nuremberg- Waidhaus) and partly Baden-Württemberg area over the Ostalb, for the crossing even two tunnels had to be built, via Aalen to Ulm. At the motorway junction Ulm / Elchingen, the A8 (Luxembourg-Karlsruhe-Stuttgart-Munich-Salzburg) is crossed. South of Ulm it goes through the Illertal parallel to the river back to Bavaria, via Memmingen (cross with the A 96 Lindau Munich) and Kempten (branch to the A 980 to Oberstdorf), over the 2009 completed section through the Reinertshoftunnel to the edge of the foot of the Alps. There, the lane becomes one lane and flows into the border tunnel Füssen to Austria.

History

edit
 
The expressway near Füssen

The highway replaced as a trunk connection the imperial or federal roads 76, 77, 205 and 4 (Flensburg-Hamburg), 3 (Hamburg-Kassel) and 27 (Göttingen-Würzburg), which in turn went back to medieval precursors. On the route between Flensburg and Hamburg, for example, it follows the historic Ochsenweg and can be described as its successor in terms of its importance as a trade route from Scandinavia to the south. Plans for a highway from Hamburg to the south were made in the framework of the HaFraBa from 1926. This project is considered to be the predecessor of the A7 between Hamburg and the Hattenbacher Dreieck.

The first section opened from Göttingen to Bad Hersfeld in 1937. Construction of the section between Bad Hersfeld and Würzburg (Strecke 46) began in 1937 with various bridge structures built however the road wasn't completed before war broke out in 1939 and construction was stopped before being fully abandon in 1940. After World War 2 the route of A7 was altered leaving some of the abandoned bridge structures of Strecke 46 to be preserved as historic monuments.

From the 1950s, the highway was built between the A 1 south of Hamburg and the existing part of the A7 near Göttingen and opened in sections. At the A1 the "Horster triangle" was created as the new beginning of the A7. From the south (Hanover) coming vehicles had there at the threading to the A1 in the direction of west (Bremen) drive through a steep curve for many years.

The section Echte-Seesen was opened on 14 November 1959. The section Seesen Hildesheim was opened on 15 December 1960 by Secretary of Transportation Seebohm.

From 1956, the seven sections between Hamburg and Hanover were handed over to traffic. In 1960, the 21 km section between junction Berkhof and the cross Hannover / Kirchhorst was opened last.

The four remaining sections in between were opened in 1958. The gap closure was achieved with the 35 km section between motorway junction Hannover / Kirchhorst and junction Hildesheim in 1962.

In the 1960s, the A7 was then built on a slightly different route. The first to be opened in 1965 was the 10.9 km section north of the Biebelried interchange to the junction Würzburg / Estenfeld. 1966 followed the adjacent section to the present cross Schweinfurt / Werneck and the 14.8 km long section between Fulda North and Fulda South. The northernmost section from the Hattenbacher Triangle to Fulda (32 km) and the middle section between Fulda and Schweinfurt (68 km) were finally handed over to traffic in 1968.

In the 1960s and 1970s, the highway was built in the Hamburg area and the so-called north axis to Denmark and handed over to traffic. The construction took place in nine sections. An important milestone was the opening of the New Elbe Tunnel in 1975. On 13 July 1976, Ernst Haar, Parliamentary State Secretary of the Federal Ministry of Transport, and Schleswig-Holstein's Minister of the Interior Rudolf Titzck solemnly opened the motorway section from Tarp to Handewitt. Only in 1978, the last vacant space between Tarp and Schuby was closed, so that the highway could be driven from Hamburg to the federal border.

On 13 June 1978, Queen Margrethe II and President Walter Scheel opened the border crossing Ellund, accompanied by Prime Minister Gerhard Stoltenberg and the Flensburg Mayor Ingrid Gross. At 10.55 clock they officially released the freeway and passport control, at 12.32 clock rolled the first car through the new border crossing. Ellund developed into the most important transit point of German-Danish border traffic. In 1979, 3.2 million travelers passed the counters; until 1997, the number had more than quintupled at 16.7 million.

In the preliminary draft for a motor vehicle road network of Germany of the study company for automotive road construction (STUFA) of 1926 a highway Würzburg-Ulm-Lindau was provided, detail planning took place from 1935 to 1941. In 1969, the states of Bavaria and Baden-Württemberg were able to agree on a line parallel to the federal highway 19.

From 1972 first sections could be released. It started with the Berkheim section to junction Memmingen-Süd (9.4 km) and the first 27.1 km long directional lane between Bad Grönenbach and Kempten-Leubas.

Major sections were between Kreuz Biebelried and junction Uffenheim-Langensteinach (34.7 km) in 1980, the southern extension to the junction Feuchtwangen (42.1 km) in 1985 and further to the junction Heidenheim (59.6 km) opened in 1987. Since the last 6.8 kilometers to the junction Oy-Mittelberg were already released a year ago, the highway was already passable from Denmark to the Allgäu.

In 1992, the A7 was extended by another 4.9 km to Nesselwang. A few meters west of the junction of the same name is the highest motorway point in Germany: "914.081 m above sea level. NN ".

In July 1999, the opening of the border tunnel Füssen to Tyrol followed with a tube and two lanes. The tunnel is supposed to relieve the surrounding communities of the high traffic volume during vacation time. In 2005, the northern adjoining first directional lane was opened up to the county road at Gunzenberg. Until September 2009, traffic from the end of the motorway at Nesselwang was routed via various routes for cars and trucks to the border tunnel, which often led to traffic jams.

On 1 September 2009 was the official inauguration of the last 15-kilometer section, which was released more than a year late. The viaduct Enzenstetten was initially only one-way passable, as the construction-performing consortium could not complete it on time. The second half of the bridge went into operation in December 2010, to the Austrian border.

Recent changes

edit

The highway is from the Danish border to the Bordesholmer triangle with the A 215 four-lane expanded. To triangle Hamburg northwest with the A 23 are several sections since 2016/2017 six-lane, the remaining four-lobed sections are expected to end of 2019 six lanes expanded. It follows a six-lane section to the junction Hamburg-Bahrenfeld. Thereafter, eight lanes will be available in the Elbtunnels area. In the further course there are again six lanes, between the triangle Hamburg-southwest (A 261) and the Horster triangle (A 1) only four.

Between Hamburg and Hildesheim, the motorway has six lanes, with the exception of the four-lane section between the Soltau-Ost junction and the Walsrode junction (A 27). In this four-lane section can be released with a traffic control system as needed both hard shoulder as each third lane.

In this area, the highway was in early 2009 despite the heavy traffic largely from only four lanes. Only in a few gradient areas there was an additional third lane available. By the end of 2016, several sections were expanded. About half of the road is widened to six lanes.

Between Nörten-Hardenberg and the Hattenbacher Dreieck, the highway is consistently expanded to six-lane. South of Kassel, as well as between the Kirchheim triangle and the Hattenbacher triangle, there is an additional fourth lane on inclines in the direction of south. Because of the steep climbs and gradients, the section is known as the Kassel mountains and is considered by motorists to be particularly demanding for trucks and caravans.

Throughout the southern section, the A7 is four lanes. Only a few sections have more than two strips per directional lane. The highway ends since 1 September 2009 at the border tunnel Füssen. This contains only one tube with one lane per direction. In the area of the valley bridge Enzenstetten the A7 was only two-lane drivable until the completion of the second bridge in December 2010.

Under construction

edit

The A7 is being upgraded from the Bordesholm motorway intersection to the Hamburg Northwest motorway junction on 65 kilometers from four to six lanes. This measure will be realized through a public-private partnership and should cost a total of 600 million euros. The official starting signal for the major project in Schleswig-Holstein was on 1 September 2014. Already in May, preparations were started, especially in Hamburg. The expansion should take place until 2018. On 16 December 2016, Prime Minister Albig released the first section of the 6-lane A7 between the Bordesholm motorway junction and the AS Neumünster-Nord interchange. It has been agreed that the operating company will carry out the remaining work on the six-kilometer stretch between Neumünster and Bordesholm and then transfer it to the state of Schleswig-Holstein. The other 59 kilometers operates and receives the company until 2044. Since March, a 9.9-kilometer section at Großenaspe is six-lane expanded. On 7 April 2017, another expanded section was released by Prime Minister Albig. It is about 10 kilometers between the junctions Kaltenkirchen and Quickborn. At the end of the decade the realization of the project can be expected.

As part of the widening works, the A7 north of the Elbtunnel three covers of the highway are provided in Schnelsen, Stellingen, Othmarschen and Bahrenfeld. The allotments that have existed in the area for 90 years are to be "relocated" to these and thus ensure that the districts separated by the motorway grow together again. In addition to 25 hectares of green space and 3000 apartments to be created. The plan approval decision for the six-lane expansion between the triangle Hamburg-Nordwest and Schnelsen was made on 15 December 2012. After the end of the current construction measures, the lids should have a total length of 3.8 kilometers. In addition to 240 million euros from the federal government, 160 to 240 million euros will go to the city of Hamburg for noise control measures.

In the further demand with planning right the six-lane development of the A7 over the connection point Soltau-Ost was planned up to the triangle Walsrode. On 30 March 2012, the federal government began planning for the six-lane expansion. The expansion is divided into three sections: triangle Walsrode to Bad Fallingbostel, Bad Fallingbostel to Dorfmark and Dorfmark to Soltau-Ost. For the section triangle Walsrode to Bad Fallingbostel, the plan approval decision was issued on 4 August 2015. Since the end of October there is building law for this section. 58 million euros were released in December 2015. Construction work began in early 2016 and construction began in August 2016. Construction of this section is expected to be ready in 2019. For the other two sections the design planning is running.

The six-lane widening of the sections from Soltau-Ost to Fallingbostel has been classified as an urgent need since 2016. The further eight-lane expansion to the triangle Hannover-Nord is only in the further need. On 29 January 2016, the planning approval procedure was initiated to expand the tank and rest area Allertal and to build the Allertal junction. The short four-lane section to the north of the Salzgitter triangle with the A 39 was upgraded to a priority requirement in 2016 with the amendment of the Fernstraßenausbaugesetz - bottleneck elimination. The continuation to Göttingen is unannounced plan-established, with the exception of the sections between Seesen and Nörten-Hardenberg already finished six-lane expansion and is in the status of ongoing and firmly scheduled in the highway development law.

From June 2012 to June 2013, a public-private partnership (PPP) was examined for the extension of the line between Seesen and Nörten-Hardenberg. According to this audit report of the Federal Court of Auditors, the expansion would not be cheaper in a PPP, but by 12.8 million euros more expensive. The project was awarded with the contract beginning 1 May 2017 to the consortium Via Niedersachsen with the shareholders VINCI Concessions Deutschland GmbH and Meridiam Investments. On 26 August 2015, the planning approval procedure was initiated for the conversion and expansion of the tank and service facility Göttingen with the construction of the Rosdorf exit.

The section between the future triangle Kassel-Ost and the triangle Kassel-Süd is under construction into eight lanes, since the total traffic of the A7 and the A44 shares this route. Construction began in fall 2011 and is expected to be completed in 2022. First, the noise protection is expanded. The additional lanes are created by making lanes and median strips narrower.[1] In the course of the expansion, the refueling and rest area Kassel (-West and -Ost) was dismantled and rebuilt at the location of the Rastanlage Kassel-Ost between 2016 and 2018.

In planning stages

edit

The A20 is to be connected at the level Bad Bramstedt via a motorway junction to the A7. At the south of the Hamburg Elbe Tunnel, the highway to the planned motorway junction Hamburg-Süderelbe with the federal highway 26 is eight stripe to be expanded. This should be implemented by 2022.

Current plans of the Federal Ministry of Transport provide an intersection of the A26 at the future motorway intersection Hamburg-Süderelbe south of the Elbe, where it will continue east through Wilhelmsburg as a so-called port passage to A1 with a motorway junction Hamburg-Stillhorn. In May 2011, funding was approved by the Federal Ministry of Transport.[2]

To the east of Würzburg, between Kreuz Schweinfurt / Werneck and Kreuz Biebelried an expansion to six strips in the further need with planning right classified. On 15 June 2016, during the construction of the Schraudenbach valley bridge near Schraudenbach, the shoring collapsed during the concreting of a superstructure section. The accident cost the life of a construction worker. In addition, there were 14 life-threatening injuries.

The six-lane widening of the A7 in the section between the AD Hittistetten and the AS Illertissen was included in the Federal Transport Infrastructure Plan 2030 and the Highway Act as urgent needs, the further expansion to the junction Memmingen-South is added as a further need with planning law.[3][4]

Strecke 46

edit

Through the Rhön Mountains and Spessart, where the autobahn was known as Strecke 46 (Route 46), some bridges were built as early as 1937, but construction was halted in October 1939 by World War II. In 1954, the Strecke 46 route was abandoned and the final stretch of the A 7 in this area was later built on a slightly different route and finally completed in 1968. The remains of Strecke 46 have been classified as a listed building in 2003 by the government of Bavaria.[5]

Exit List

edit
StateDistrictLocationkmmiExitNameDestinationsNotes
Schleswig-HolsteinSchleswig-FlensburgHandewitt1Grenzübergang Ellund  E45 – Koldingnorthern endpoint of motorway

Border crossing no longer operational since 2001


crossing equipped with parking areas


northern endpoint of concurrency with the E45 european road
2Flensburg/Harrislee  B 199 – Flensburg, Harrislee, Handewitt, Niebüll, Leck
Parking areaHandewitter Forst/AltholzkrugHandewitter Forst parking area (southbound)
Altholzkrug parking area (northbound)
3Flensburg  B 200 – Flensburg, Glücksburg, Kappeln, Husum, BredstedtGlücksburg is only signed northbound
Bredstedt is only signed southbound
Sieverstedt4TarpTarp, Sörup, BredstedtBredstedt is only signed northbound
Parking areaJalm/Jalmer MoorJalmer Moor parking area (southbound)
Jalm parking area (northbound)
LürschauParking areaArenholzer SeeArenholzer See parking areaonly northbound
Schuby5Schleswig/Schuby  B 201 – Schleswig, Schuby, Kappeln, HusumKappeln is only signed northbound
HüsbyParking areaHüsbyHüsby parking areaonly southbound
Busdorf6Schleswig/Jagel  B 77 – Schleswig, Jagel, KroppKropp is only signed southbound
LottorfParking areaLottorfLottorf parking areaonly northbound
Rendsburg-EckernfördeOwschlag7OwschlagEckernförde, Owschlag, Brekendorf, KroppKropp is only signed northbound
Eckernförde is only signed southbound
Alt DuvenstedtRest areaHüttener BergeHüttener Berge rest area
Borgstedt8Rendsburg/Büdelsdorf  B 203 – Damp, Eckernförde, Rendsburg, Büdelsdorf, HeideDamp and Eckernförde are only signed northbound
Heide is only signed southbound
Kiel CanalRadar High BridgeKiel Canallength:1,498 m
Bridge is currently rebuild and widened to 6 lanes
Schülldorf9Rendsburg interchange  A 210 – Kiel, Itzehoe, Rendsburg-MitteItzehoe is only signed southbound
Parking areaOheOhe parking area
Warder10WarderWarder, Nortorf, WestenseeNortorf is only signed southbound
DätgenParking areaDätgenDätgen parking areaonly northbound
11BordesholmPlön, BordesholmPlön is only signed southbound
Schönbek12Bordesholm interchange  A 215 – Kiel, Blumenthalno ramps between Kiel and Flensburg
motorway widens form 4 to 6 lanes
NeumünsterEinfeld13Neumünster-NordNeumünster-Nord, NortorfNortorf is only signed northbound
GartenstadtRest areaAalbekAalbek rest areaonly southbound
Rendsburg-EckernfördeWasbek14Neumünster-Mitte  B 430 – Neumünster-Mitte, Itzehoe, HohenwestedtItzehoe is only signed southbound
Padenstedt15Neumünster-Süd  B 205 – Neumünster-Süd, Lübeck, Bad SegebergLübeck and Bad Segeberg are only signed southbound
SegebergGroßenaspeRest areaBrokenlandeBrokenlande rest areaonly northbound
16GroßenaspeGroßenaspe, Plön, Bad Bramstedt-NordPlön is only signed northbound
Bad Bramstedt-Nord is only signed southbound
BimöhlenParking areaBimöhlen/SielsbrookBimöhlen parking area (southbound)
Sielsbrook parking area (northbound)
Bad Bramstedt17Bad Bramstedt  B 206 – Bad Bramstedt, Lübeck, Bad Segeberg
LentföhrdenBad Bramstedt interchange  A 20 – Stade, Lübeckinterchange proposed
Nützen18KaltenkirchenKaltenkirchen, Elmshorn
KaltenkirchenParking areaMoorkatenMoorkaten parking area
19Henstedt-UlzburgHenstedt-Ulzburg, Kaltenkirchen-Süd
PinnebergQuickborn21QuickbornQuickborn, Pinneberg, Norderstedt-NordPinneberg is only signed southbound
Rest areaHolmmoorHolmmoor rest area
BönningstedtParking areaBönningstedtBönningstedt parking area
HamburgEimsbüttelSchnelsen23Hamburg-Schnelsen-Nord  B 432 – Hamburg-Schnelsen-Nord, Norderstedt-Süd
24Hamburg-Schnelsen  B 447 – Hamburg-Schnelsen, Hamburg-NiendorfHH-Niendorf is only signed northbound
Schnelsen tunnellength:580 m
Eidelstedt25Hamburg-Nordwest interchange  A 23 – Husum, Heide, Hamburg-Eidelstedtmotorway widens form 6 to 8 lanes
StellingenStellingen tunnellength:893 m
26Hamburg-Stellingen   B 4 / B 5 – Hamburg-Stellingen
AltonaBahrenfeld27Hamburg-VolksparkHamburg-Volkspark, Hamburg-Centrumroad narrows down from 8 to 6 lanes (widening to 8 lanes under construction)
Altona tunnellength:2,230 m
tunnel under construction along with a widening to 8 lanes
28Hamburg-Bahrenfeld  B 431 – Hamburg-Bahrenfeld
Othmarschen29Hamburg-OthmarschenHamburg-Othmarschen
Altona/MitteElbe riverElbe TunnelElbe riverlength:3.101 m
4 tubes with 2 lanes each
MitteWaltershofHochstraße Elbmarschlength:4.539 m
30Hamburg-Waltershof  B 3 – Hamburg-Waltershof, Hamburg-Finkenwerder, Hamburg-Hafen
HarburgMoorburgHamburg-Süderelbe interchange  A 26 – Stade, Hamburg-Bergedorfinterchange under construction
Heimfeld31Hamburg-HausbruchHamburg-Hausbruch, Hafen Harburg
32Hamburg-Heimfeld  B 73 – Hamburg-Heimfeld, Hamburg-Harburg, Cuxhaven
Eißendorf33Hamburg-Südwest interchange  A 261 – Bremen, Tötensenno ramps between Bremen and Hanover
road narrows down from 6 to 4 lanes
Marmstorf34Hamburg-Marmstorf  B 75 – Hamburg-Marmstorf, Hamburg-HarburgHH-Harburg is only signed northbound
SinstorfRest areaHarburger BergeHarburger Berge rest area
Lower SaxonyHarburgSeevetal35Seevetal-FleestedtSeevetal-Fleestedt, Seevetal-Hittfeld, Hamburg-SinstorfSeevetal-Hittfeld is only signed southbound
36Maschen interchange  A 39 – Lüneburg, Seevetal-Maschen
   A 1 / E22 – Lübeck, Berlin, Bremen (via   A 39)
no ramps from/to Hanover
37Horst interchange   A 1 / E22 – Lüneburg, Berlin, Hamburg, Lüneburg, Bremen, Seevetal-Hittfeldno ramps from/to Hamburg (A 7)
road widens from 4 to 6 lanes
Rest areaSeevetalSeevetal rest areaonly northbound
38Seevetal-RamelslohSeevetal-Ramelsloh, Seevetal-Ohlendorf
Rest areaHasselhöheHasselhöhe rest areaonly southbound
Brackel39ThieshopeThieshope, Hanstedt, Winsen (Luhe), BrackelHanstedt is only signed southbound
Winsen (Luhe) is only signed northbound
Parking areaEichbergEichberg parking areaonly northbound
ToppenstedtParking areaUtspannUtspann parking areaonly northbound
Garlstorf40GarlstorfGarlstorf, Salzhausen, Handorf, NindorfSalzhausen is only signed southbound
Handorf is only signed northbound
Rest areaGarlstorfer Wald/SchaapskabenGarlstorfer Wald rest area (southbound)
Schaapskaben rest area (northbound)
Egestorf41EgestorfEgestorf, Lübberstedt, Eyendorf, SalzhausenSalzhausen is only signed northbound
42EvendorfEvendorf, Amelinghausen, Döhle
HeidekreisBispingenParking areaAuegrundAuegrund parking areaonly southbound
Parking areaVorm NaturschutzparkVorm Naturschutzpark parking areaonly southbound
Rest areaLüneburger HeideLüneburger Heide rest area
43BispingenBispingen, Behringen
Parking areaBispinger TorBispinger Tor parking areaonly northbound
43aSchneverdingen  B 3 – Schneverdingen, Munster, Bispingen, NeuenkirchenMunster and Neuenkirchen are only signed southbound
SoltauParking areaTimmerloh/Wilseder BergTimmerloh parking area (southbound)
Wilseder Berg parking area (northbound)
44Soltau-Ost  B 71 – Soltau, Munster, Uelzen
  B 209 – Lüneburg
Uelzen and Lüneburg are only signed southbound
road narrows down from 6 to 4 lanes
Rest areaWietzenbruch/Abelbeck-KuhbuschWietzenbruch rest area (southbound)
Abelbeck-Kuhbusch rest area (northbound)
45Soltau-Süd  B 3 – Soltau, Celle, Bergen, WietzendorfCelle is only signed southbound
Bad FallingbostelParking areaDorfmarkDorfmark parking areaonly northbound
46Dorfmark  B 440 – Dorfmark, Visselhövede
Parking areaSteinbachSteinbach parking areaonly southbound
47Bad Fallingbostel  B 209 – Bad Fallingbostel, Walsrode, OerbkeWalsrode is only signed southbound
road widens from 4 to 6 lanes
WalsrodeRest areaWolfsgrundWolfsgrund rest area
48Walsrode interchange   A 27 / E234 – Bremen, Walsroderoad widens from 6 to 8 lanes
49WestenholzWestenholz, Ostenholz, Hodenhagen, Krelingen
EsselRest areaAllertalAllertal rest area
Buchholz (Aller)50Schwarmstedt  B 214 – Schwarmstedt, Nienburg, Celle, Wietze
Parking areaSüdhornSüdhorn parking area
Region HannoverWedemark51BerkhofBerkhof
Parking areaOsterriehe/Up'n BummelskampeOsterriehe parking area (southbound)
Up'n Bummelskampe parking area (northbound)
52MellendorfMellendorf, Celle, Fuhrberg, BissendorfCelle is only signed northbound
53Hannover-Nord interchange  A 352 – Dortmund, Hannover-Nordno ramps between Dortmund and Kassel
BurgwedelParking areaSeckbruch/SpringhorstSeckbruch parking area (southbound)
Springhorst parking area (northbound)
54GroßburgwedelGroßburgwedel, Isernhagen-Hohenhorster Bauerschaft
Isernhagen55AltwarmbüchenAltwarmbüchen, Kirchhorst
56Hannover/Kirchhorst interchange   A 37 / B 3 – Hannover-Messe, Celle, Burgdorf, Beinhorn, DortmundBeinhorn and Dortmund are only signed northbound
HannoverParking areaAltwarmbüchener MoorAltwarmbüchener Moor parking areaonly northbound
Lehrte57Hannover-Ost interchange   A 2 / E30 – Berlin, Braunschweig, Dortmund, Hannover
Hannover58Hannover-Anderten  B 65 – Hannover-Anderten, Hannover-Misburg, Sehnde, AhltenSehnde and Hannover-Misburg are only signed southbound
Ahlten is only signed northbound
Rest areaHannover-WülferodeHannover-Wülferode rest area
Laatzen59Laatzen  B 443 – Laatzen, Pattensen, Sarstedt, SehndeSarstedt is only signed southbound
Sehnde is only signed northbound
Sehnde60Hannover-Süd interchange  A 37 – Hannover-Messeno ramps between Hamburg and Hanover
HildesheimSarstedtParking areaAn der AlpeAn der Alpe parking area
Hildesheim61Hildesheim-Drispenstedt  B 494 – Hildesheim-Drispenstedt, Hohenhameln, Harsum
62Hildesheim  B 1 – Hildesheim, Alfeld, Elze, Hoheneggelsen, Sarstedt, BettmarAlfeld and Hoheneggelsen are only signed southbound

Sarstedt and Bettmar are only signed northbound


road narrows down from 6 to 5 lanes
(2 lanes southbound, 3 lanes northbound)
Bad SalzdetfurthRest areaHildesheimer BördeHildesheimer Börde rest area
Holle63Derneburg/Salzgitter  B 6 – Salzgitter, Goslar, Derneburg, Peine, Hoheneggelsen, GrasdorfSalzgitter and Goslar are only signed southbound

Peine, Hoheneggelsen and Grasdorf are only signed northbound


road narrows down from 5 to 4 lanes
64Salzgitter interchange  A 39 – Berlin, Braunschweig, Salzgitterroad widens from 4 to 6 lanes
Parking areaJägerturmJägerturm parking area
Bockenem65Bockenem  B 243 – Bockenem, Bad Salzdetfurth, Lutter am BarenbergeBad Salzdetfurth is only signed northbound
Parking areaAmbergauAmbergau parking area
GoslarSeesen66Rhüden/Harz  B 82 – Rhüden/Harz, Lamspringe, Bad Harzburg, Goslar
Rest areaHarzHarz rest area
67Seesen/Harz   B 243 / B 248 – Seesen/Harz, Osterode am Harz (  B 64), Clausthal-Zellerfeld, Bad Gandersheim (  B 64)
Parking areaSchwalenbergSchwalenberg parking area
NortheimKalefeld68Echte  B 445 – Echte, Bad Gandersheim, Kreiensen, KalefeldBad Gandersheim and Kreiensen are only signed northbound
Parking areaAm BierbergAm Bierberg parking area
Northeim69Northeim-Nord  B 3 – Northeim-Nord, Duderstadt, Einbeck, Alfeld, HamelnDuderstadt is only signed southbound
Alfeld and Hameln are only signed northbound
Parking areaSchlochauSchlochau parking areaparking area named after the former german city of Schlochau (now Człuchów, Poland)
70Northeim-West  B 241 – Northeim-West, Moringen, Osterode am HarzOsterode am Harz is only signed northbound
Nörten-Hardenberg71Nörten-Hardenberg  B 446 – Nörten-Hardenberg, Uslar/Solling, Hardegsen
GöttingenBovendenParking areaLeineholzLeineholz parking area
Göttingen72Göttingen-Nord  B 27 – Göttingen-Nord, Bovenden, Duderstadt, AdelebsenDuderstadt is only signed northbound
73Göttingen  B 3 – Göttingen, Rosdorf, Dransfeld
RosdorfRest areaGöttingenGöttingen rest area
74Drammetal interchange  A 38 – Leipzig, Halle, Nordhausen
Hann. MündenParking areaHedemündenHedemünden parking area
75Hann. Münden-Hedemünden  B 80 – Hann. Münden-Hedemünden, Witzenhausen, Bad Sooden-Allendorf
Parking areaHumboldtblickHumboldtblick parking areaonly southbound
Staufenberg76Hann. Münden/Staufenberg-Lutterberg  B 496 – Hann. Münden, Staufenberg-Lutterberg, Bad KarlshafenBad Karlshafen is only signed northbound
Parking areaStaufenbergStaufenberg parking areaonly northbound
HesseKasselNiestetalParking areaHerkulesblickHerkulesblick parking areaonly southbound
77Kassel-NordKassel-Nord, Flughafen Kassel-Calden, Niestetal
78Kassel-Ost  B 7 – Kassel-Ost, Eisenach, Eschwege, KaufungenInterchange with A 44 motorway planned
Planned northern endpoint of concurrency with A 44 motorway
Lohfelden79Kassel-Mitte interchange  A 49 – Marburg, Kassel
Rest areaKassel-OstKassel-Ost rest areano entrance ramps
entrance possible by a direct ramp to the A 49 motorway and the previous interchange
80Kassel-Süd interchange   A 44 / E331 – Dortmund, Paderborn, Kassel-West interchangePlanned southern endpoint of concurrency with A 44 motorway
Schwalm-Eder-KreisGuxhagen81Guxhagen  B 83 – Guxhagen, Körle, Baunatal, EdermündeBaunatal is only signed northbound
FelsbergParking areaMarkwaldMarkwald parking area
82Melsungen  B 253 – Melsungen, Felsberg
Malsfeld83MalsfeldMalsfeld, Spangenberg, Rotenburg an der FuldaRotenburg an der Fulda is only signed southbound
KnüllwaldRest areaHasselbergHasselberg rest area
84Homberg (Efze)  B 323 – Homberg (Efze), Bad Wildungen, Fritzlar, Knüllwald
Parking areaFuchsrainFuchsrain parking areaonly northbound
Hersfeld-RotenburgNeuensteinParking areaAm PommerAm Pommer parking areaonly southbound
85Bad Hersfeld-West  B 324 – Bad Hersfeld, Neuenstein, SchwarzenbornSchwarzenborn is only signed northbound
Kirchheim86Kirchheim interchange   A 4 / E40 – Berlin, Dresden, Erfurt, Bad Hersfeldnorthern endpoint of concurrency with the E40 european road
87Kirchheim  B 454 – Kirchheim, Niederaula
Niederaula88Hattenbach interchange   A 5 / E40 – Basel, Frankfurt, Wiesbaden, Gießensouthern endpoint of concurrency with the E40 european road

road narrows down from 6 to 4 lanes


Wiesbaden is only signed southbound
Parking areaStrampen/OttersbachStrampen parking area (southbound)
Ottersbach parking area (northbound)
89Niederaula  B 62 – Niederaula, Bad Hersfeld, Breitenbach am Herzberg, SchlitzSchlitz is only signed southbound
Bad Hersfeld is only signed northbound
Parking areaRichtgrabenRichtgraben parking areaonly northbound
HaunetalParking areaDornbuschDornbusch parking areaonly southbound
FuldaBurghaunRest areaGroßenmoorGroßenmoor rest area
Parking areaGüntherswald/MahlertshofGüntherswald parking area (southbound)
Mahlertshof parking area (northbound)
Hünfeld90Hünfeld/SchlitzHünfeld, Schlitz, Tann (Rhön), Bad SalzschlirfTann (Rhön) is only signed southbound
Parking areaFuchsbergFuchsberg parking areaonly southbound
FuldaParking areaHummelskopf/RotkopfHummelskopf parking area (southbound)
Rotkopf parking area (northbound)
Parking areaGeißheckeGeißhecke parking areaonly northbound
Petersberg91Fulda-Nord  B 27 – Fulda-Nord, Künzell-Nord, Tann (Rhön), Hünfeld-SüdKünzell-Nord is only signed southbound
Tann (Rhön) and Hünfeld-Süd are only signed northbound
Parking areaRauschenberg/PetersbergRauschenberg parking area (southbound)
Petersberg parking area (northbound)
92Fulda-Mitte  B 458 – Fulda, Hilders, Petersburg, Künzell
KünzellParking areaRöther TannenRöther Tannen parking areaonly southbound
EichenzellParking areaPilgerzellPilgerzell parking areaonly southbound
93Fulda interchange  A 66 – Frankfurt, Hanau, Fulda-Süd
Parking areaSteinhauk/RiederbergSteinhauk parking area (southbound)
Riederberg parking area (northbound)
Parking areaSteinborntal/LohmühleSteinborntal parking area (southbound)
Lohmühle parking area (northbound)
KalbachRest areaUttrichshausenUttrichshausen rest area
Parking areaAm Forsthaus/RhöneicheAm Forsthaus parking area (southbound)
Rhöneiche parking area (northbound)
BavariaBad KissingenRömershager Forst-NordParking areaAm Forsthaus/RhöneicheAm Forsthaus parking area (southbound)
Rhöneiche parking area (northbound)
94Bad Brückenau-Volkers  B 286 – Bad Brückenau-Volkers, Jossa, Schlüchtern, MottenJossa is only signed southbound
Schlüchtern is only signed northbound
Parking areaVolkersberg/RehheckeVolkersberg parking area (southbound)
Rehhecke parking area (northbound)
Oberleichtersbach95Bad Brückenau/Wildflecken  B 286 – Bad Brückenau, Wildflecken, Bischofsheim, Burkardroth, JossaBurkardroth is only signed southbound
Jossa is only signed northbound
SchondraParking areaSchildeckSchildeck parking areaonly northbound
Rest areaRhönRhön rest area
Parking areaVeitsbrunnVeitsbrunn parking areaonly southbound
Parking areaBornhagBornhag parking areaonly southbound
OberthulbaParking areaBrodpfad/SeifertsholzBrodpfad parking area (southbound)
Seifertsholz parking area (northbound)
96Bad Kissingen/OberthulbaBad Kissingen, Oberthulba, Bad Bocklet, BurkardrothBurkardroth is only signed northbound
ElfershausenParking areaElfershausenElfershausen parking areaonly northbound
97Hammelburg  B 287 – Hammelburg, Karlstadt, Gemünden, Bad Kissingen, ElfershausenKarlstadt is only signed southbound
Bad Kissingen is only signed northbound
Parking areaHeinersbergHeinersberg parking areaonly northbound
SchweinfurtWasserlosenParking areaDollwieseDollwiese parking areaonly southbound
Parking areaLerchenberg/SchwemmelsbachLerchenberg parking area (southbound)
Schwemmelsbach parking area (northbound)
98Wasserlosen  B 303 – Wasserlosen, Euerbach
Parking areaBrebersdorfBrebersdorf parking areaonly northbound
Werneck99Schweinfurt/Werneck interchange   A 70 / E48 – Bamberg, Schweinfurt, Werneck, Erfurt
  B 26a – Arnstein
Parking areaSchraudenbachbrückeSchraudenbachbrücke parking areaonly southbound
WürzburgHausen bei WürzburgRest areaRiedener WaldRiedener Wald rest area
Parking areaLindigLindig parking area
100Gramschatzer WaldGramschatz, Karlstadt, Arnstein, BergtheimKarlstadt is only signed northbound
UnterpleichfeldParking areaparking areaonly southbound
RimparParking areaHirtentannenHirtentannen parking areaonly northbound
Kürnach101Würzburg/Estenfeld  B 19 – Würzburg, Estenfeld, Volkach, Rimpar
Parking areaHuthstadt/KapellenholzHuthstadt parking area (southbound)
Kapellenholz parking area (northbound)
EstenfeldParking areaMasurenMasuren parking areaonly northbound
KitzingenBiebelried102Biebelried interchange   A 3 / E43 – Frankfurt, Würzburg, Stuttgart
   A 3 / E45 – Nürnberg, München
southern endpoint of concurrency with the E45 european road

northern endpoint of concurrency with the E43 european road


München and Stuttgart are only signed southbound


Würzburg is only signed northbound
Kitzingen103Kitzingen  B 8 – Kitzingen, Neustadt an der Aisch, Iphofen, BiebelriedNeustadt an der Aisch and Iphofen are only signed southbound
Sulzfeld am MainParking areaWolfsgrabenWolfsgraben parking area
Martinsheim104MarktbreitMarktbreit, Iphofen, Kitzingen-Ost, OchsenfurtIphofen and Kitzingen-Ost are only signed northbound
Parking areaFuchslochFuchsloch parking area
Neustadt an der Aisch-Bad WindsheimIppesheim105Gollhofen  B 13 – Gollhofen, Uffenheim, Aub, OberickelsheimUffenheim is only signed southbound
Uffenheim106Uffenheim/LangensteinachUffenheim-Langensteinach, Creglingen, Bad MergentheimCreglingen is only signed southbound
Bad Mergentheim is only signed northbound
AnsbachOhrenbachRest areaOhrenbachOhrenbach rest area
Steinsfeld107Bad Windsheim  B 470 – Bad Windsheim, Endsee, Steinach an der Ens, Burgbernheim
Neusitz108Rothenburg ob der TauberRothenburg ob der Tauber, Colmberg, Schrozberg, Neusitz
Parking areaKreuzbergKreuzberg parking area
Wörnitz109WörnitzWörnitz, Wettringen, Dombühl, Schillingsfürst
Parking areaKurzmandlKurzmandl parking area
Feuchtwangen110Feuchtwangen/Crailsheim interchange   A 6 / E50 – München, Mannheim, Heilbronn, Nürnberg, Ansbach, Feuchtwangen-Nord, CrailsheimMünchen and Crailsheim are only signed southbound
Mannheim and Ansbach are only signed northbound
111Feuchtwangen-WestFeuchtwangen, Crailsheim, Schopfloch, Kreßberg, SchnelldorfSchopfloch is only signed southbound
Schnelldorf is only signed northbound
DinkelsbühlParking areaMühlbuckMühlbuck parking area
Baden-WürttembergSchwäbisch HallFichtenau112Dinkelsbühl/FichtenauDinkelsbühl, Fichtenau, Crailsheim-Süd, SchopflochCrailsheim-Süd and Schopfloch are only signed northbound
OstalbkreisEllwangen (Jagst)Rest areaEilwanger BergeEilwanger Berge rest area
113EllwangenEllwangen, Bopfingen, UnterschneidheimBopfingen is only signed southbound
Westhausen114Aalen/Westhausen  B 29 – Aalen, Westhausen, Nördlingen, Schwäbisch Gmüd, BopfingenSchwäbisch Gmüd is only signed southbound
Bopfingen is only signed northbound
Aalen115Aalen/Oberkochen  B 29a – Aalen-Süd, Oberkochen, Schwäbisch Gmüd, Königsbronn, NeresheimKönigsbronn and Neresheim are only signed southbound
Schwäbisch Gmüd is only signed northbound
HeidenheimHeidenheim an der BrenzParking areaHärtsfeldHärtsfeld parking area
Nattheim116Heidenheim  B 466a – Heidenheim, Steinheim, Dischingen, Königsbronn, Neresheim, NattheimSteinheim and Dischingen are only signed southbound
Königsbronn and Neresheim are only signed northbound
Giengen an der Brenz117Giengen/Herbrechtingen  B 19 – Herbrechtingen, Heidenheim
  B 462 – Giengen, Sontheim/Brenz, Dillingen
Sontheim/Brenz is only signed southbound
Heidenheim only signed northbound
Rest areaLonetalLonetal rest area
Herbrechtingen118NiederstotzingenNiederstotzingen, Sontheim (Brenz), Herbrechtingen-Bissingen, GerstettenSontheim (Brenz) is only signed northbound
Alb-Donau-KreisLangenauParking areaVor dem Donauried/Sankt JakobVor dem Donauried parking area (southbound)
Sankt Jakob parking area (northbound)
119LangenauLangenau, Bernstadt
BavariaNeu-UlmElchingen120Ulm/Elchingen interchange   A 8 / E52 – München, Augsburg, Stuttgart, Ulm
NersingenParking areaLeibiseeLeibisee parking area
Neu-Ulm121Nersingen  B 10 – Nersingen, Neu-Ulm, Pfuhl, Burlafingen
Parking areaHahnenbergHahnenberg parking area
Parking areaBuchwaldBuchwald parking area
Senden122Hittisetten interchange  B 28 – Ulm, Neu-Ulm, Senden, FriedrichshafenFriedrichshafen is only signed southbound
Neu-Ulm is only signed northbound
Parking areaBuchenbergBuchenberg parking areaonly southbound
VöhringenParking areaWinterhaldeWinterhalde parking areaonly northbound
123VöhringenVöhringen, Weißenhorn, Bellenberg
IllertissenParking areaReutelsberger ForstReutelsberger Forst parking area
Parking areaTannengartenTannengarten parking area
124IllertissenIllertissen, Dietenheim, Krumbach (Schwaben), Babenhausen
AltenstadtParking areaBadhauser WaldBadhauser Wald parking area
125AltenstadtAltenstadt, Kellmünz an der Iller
Baden-WürttembergBiberachDettingen an der IllerRest areaIllertalIllertal rest area
126Dettingen an der IllerDettingen an der Iller, Ochsenhausen, Kirchberg an der Iller, Erolzheim, Kirchdorf an der IllerOchsenhausen and Kirchdorf an der Iller are only signed southbound
Kirchberg an der Iller is only signed northbound
BavariaUnterallgäuFellheimParking areaBrühlBrühl parking area
Heimertingen127Berkheim  B 300 – Heimertingen
  B 312 – Berkheim, Biberach an der Riß, Tannheim, Kirchdorf an der Iller
Tannheim is only signed southbound
Kirchdorf an der Iller is only signed northbound
BuxheimParking areaAumühleAumühle parking area
128Memmingen interchange    A 96 / E43 / E54 – Bregenz, Lindau
   A 96 / E54 – München, Memmingen-Nord
southern endpoint of concurrency with the E43 european road
northern endpoint of concurrency with the E532 european road
MemmingenParking areaBuxachtalBuxachtal parking area
129Memmingen-SüdMemmingen-Süd, OttobeurenOttobeuren is only signed southbound
UnterallgäuWoringenParking areaKönigsrainKönigsrain parking areaonly southbound
130WoringenWoringen
WolfertschwendenParking areaDarastfeldDarastfeld parking areaonly southbound
Bad Grönenbach131Bad GrönenbachBad Grönenbach, Wolfertschwenden, OttobeurenOttobeuren is only signed northbound
OberallgäuDietmannsriedRest areaAllgäuer TorAllgäuer Tor rest area
132DietmannsriedDietmannsried, Altusried, Obergünzburg, ProbstriedObergünzburg is only signed southbound
Parking areaSeebachSeebach parking areaonly southbound
Kempten (Allgäu)Parking areaLeubastalLeubastal parking area
133Kempten-Leubas  B 19 – Kempten-Leubas, Obergünzburg, LaubenObergünzburg and Lauben are only signed northbound
134Kempten  B 12 – Kempten, München, Augsburg, Kaufbeuren, MarktoberdorfKaufbeuren and Marktoberdorf are only signed southbound
München and Augsburg are only signed northbound
135BetzigauBetzigau
OberallgäuDurachParking areaVorwaldVorwald parking area
Sulzberg136Allgäu interchange  A 980 – Lindau, Oberstdorf, Sonthofen
Oy-MittelbergParking areaRottachtalRottachtal parking area
137Oy-Mittelberg  B 310 – Oy-Mittelberg, Bad Hindelang-Oberjoch, Wertach, PfrontenPfronten is only signed southbound
OstallgäuNesselwang138NesselwangNesselwang, Marktoberdorf, Roßhaupten, Seeg, RückholzRoßhaupten is only signed southbound
Marktoberdorf is only signed northbound
Füssen139Füssen  B 310 – Füssen, Schwangau, Kaufbeuren, Pfronten, Rieden am Forggensee, HopferauSchwangau and Hopferau are only signed southbound

Kaufbeuren and Pfronten are only signed southbound


road narrows down from 4 to 2 lanes
Grenztunnel Füssen   B 179 / E532 – Innsbruck, Reuttesouthern endpoint of motorway
southern endpoint of concurrency with the E532 european road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

edit
  1. ^ "Hessen Mobil – Roads – Projects Under Construction". verwaltung.hessen.de. 21 January 2016.
  2. ^ st/ag (7 March 2011). "Entscheidung für Südtrasse". hrsg: HAN-online. Archived from the original on 25 September 2011. Retrieved 26 January 2018.
  3. ^ "Bundesgesetzblatt" (PDF). 9 May 2017.
  4. ^ "Dossier". 9 May 2017.
  5. ^ "Strecke 46 Flyer (German)" (PDF). Arbeitsgemeinschaft Autobahngeschichte eV. Retrieved 30 December 2013.

Bibliography

edit
edit