Nothing Special   »   [go: up one dir, main page]

Shore Line East

(Redirected from Shoreline East)

Shore Line East (SLE) is a commuter rail service which operates along the Northeast Corridor through southern Connecticut, United States. The rail service is a fully owned subsidiary of the Connecticut Department of Transportation (CTDOT) and is operated under the CT Rail brand. SLE provides service seven days a week along the Northeast Corridor between New London and New Haven; limited through service west of New Haven to Bridgeport and Stamford operates during weekday rush hours. Cross-platform transfers to Metro-North Railroad New Haven Line trains are available at New Haven for service to southwestern Connecticut and New York City. Pre-COVID, around 2,200 riders used the service on weekdays.[1]

Shore Line East
A train of electric railcars in motion
Shore Line East train in Niantic in 2024
Overview
LocaleSouthern Connecticut
Termini
Stations14
Websiteshorelineeast.com
Service
TypeCommuter rail / regional rail
SystemCT Rail
Operator(s)Amtrak (under contract from CTDOT)
Rolling stockKawasaki M8 EMUs
Daily ridership2,200 (Q4 2019)[1]
History
OpenedMay 29, 1990
Technical
Line length50.6 mi (81.4 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line;
Route map
Map
New London
Amtrak Cross Sound Ferry
Niantic (proposed)
Old Saybrook
Amtrak
Westbrook
Clinton
Madison
Guilford
Branford
New Haven State Street
Amtrak
New Haven Union Station
Amtrak
limited service
limited service
West Haven
Milford
Stratford
Bridgeport
Amtrak Bridgeport & Port Jefferson Ferry
New Haven Line intermediate stops
Stamford
Amtrak
Distance shown from Grand Central

The service was introduced in 1990 as a temporary measure to reduce congestion during construction work on I-95. However, it proved more popular than expected, and service was continued after construction ended despite criticisms that the line was too expensive to operate. Limited service was extended to New London in 1996 and to Stamford in 2001. A second station in New Haven was added in 2002, and most of the stations were rebuilt for accessibility between 2001 and 2008. Reverse peak service was added in 2007, followed by weekend service in 2008. Second platforms were added to several stations between 2014 and 2022 to support bidirectional service.

Service was temporarily cut during 2018–2019 due to Amtrak track work and a locomotive shortage. It was again cut in March 2020 due to the COVID-19 pandemic. Diesel trains were replaced by Kawasaki M8 electric multiple units in May 2022. Proposals for future expansion include extensions to Westerly, Rhode Island, and Norwich, Connecticut, and an infill station in Niantic.

Service

edit
A train with a diesel locomotive at a large train station 
A Shore Line East train at Union Station in New Haven, the focal point of the line

Most weekday SLE trains run local between New London and New Haven, with one peak train in each direction operating through New Haven as far as Stamford.[2] Eastbound morning trains and westbound afternoon trains skip Madison because it only has one platform, and trains operating in the other direction would have to switch tracks to serve the station.[3][4] All trains that do not operate west of New Haven make a connection with a Metro-North Railroad New Haven Line train at New Haven, for service to and from points in Connecticut, Westchester County, New York, and New York City.[3] These connections are commonly used by extreme commuters who live in suburban Connecticut and work in New York City.[5] New London SLE multi-ride pass holders are also allowed to board selected Northeast Regional trains.[3]

Although SLE service is funded by CTDOT, it is operated under contract by Amtrak. Amtrak owns and controls the Northeast Corridor east of New Haven. West of New Haven, the New Haven Line is owned by CTDOT and trains are dispatched by Metro-North.[6][4]

During the OpSail and SailFest tall ship festivals at New London, extra Friday and weekend service is operated from New Haven to New London.[7][8] During OpSail 2000, through service operated from New Haven to Mystic – the only time Shore Line East service has run east of New London.[9]

Service history

edit

Previous service

edit
A train with a diesel locomotive in a red, white, and black paint scheme 
A Shore Line East train with equipment painted in New York, New Haven and Hartford Railroad colors

The section of the Northeast Corridor that Shore Line East operates on was once the New York–Boston mainline of the New York, New Haven and Hartford Railroad. The section from New Haven to New London was built as the New Haven and New London Railroad. It was charted in 1848, began construction in 1850, and opened for service in July 1852.[10] The line was owned by the New York, Providence and Boston Railroad (the "Stonington Road") from 1858 to 1862, and by the Shore Line Railway from 1864 until it was acquired by the New York, New Haven, and Hartford Railroad (the "New Haven") in 1870. Crossing the Connecticut River required a ferry transfer until a drawbridge was built in 1870.[10]

The line was referred to by the New Haven Railroad as the Shore Line, to distinguish it from the railroad's Main Line from New Haven to Springfield, Massachusetts. In recognition of the large role played by the New Haven in the history of Connecticut, CTDOT painted SLE's diesel-powered locomotives in the New Haven's orange and black style. New Haven Railroad colors and emblems were placed at several stations, particularly New Haven Union Station.[11]

A map of southern Connecticut showing the Clamdigger service. It runs between New London and New Haven with nine intermediate stops marked. 
Clamdigger service as run by Amtrak in 1971

The New Haven Railroad operated local service on the Shore Line up until its merger with Penn Central on January 1, 1969, when most commuter service east of New Haven was abandoned. Intercity service continued, but generally only stopped at New Haven, Old Saybrook, and New London.[12] Penn Central continued to operate the Clamdigger, a single daily New London-New Haven round trip with local stops, as well as a New London-Boston round trip. Amtrak took over the Clamdigger along with most intercity passenger service, in May 1971.[13] In January 1972, Amtrak discontinued the Clamdigger and Penn Central cut the New London–Boston trip.[14]

In 1976–77, Amtrak operated the Clamdigger as a Providence-New Haven round trip with limited local stops; for three months in 1978, it was revived with additional commuter-based stops. It was replaced in April 1978 by the New Haven–Providence–Boston Beacon Hill, which made local stops including Branford, Madison, Old Saybrook, Niantic, New London, and Mystic. The Beacon Hill (which served the Providence and Boston commuting markets rather than New Haven) was discontinued in 1981 due to funding cuts, ending commuter rail service in Connecticut east of New Haven.[15]

Initial service

edit
A train with a streamlined diesel locomotive 
The PATrain at Pittsburgh in 1985. After that service ended in 1989, CTDOT purchased the equipment for use on Shore Line East.

In 1981 and 1986, legislation was proposed to restore commuter service between New Haven and New London, as well as between New Haven and Hartford. A 1986 CTDOT study analyzed congestion on Interstate 95, which runs parallel to the line. The study showed that Old Saybrook was a better terminus for initial service, with an expected ridership of 420 riders in each direction daily.[16] An additional study in 1989 indicated higher potential ridership of 700 to 1350 daily riders.[16]

Based on the 1986 study, Governor William O'Neill ordered CTDOT in October 1986 to initiate rail service on the corridor. It was established as a temporary service to newly reopened local stations between Union Station in New Haven and Old Saybrook, to alleviate traffic congestion that arose from scheduled construction work on I-95. O'Neill introduced a $50 million transportation program that included $900,000 (later reduced to $500,000) for basic stations and $4 million to refurbish 12 Budd Rail Diesel Cars for rolling stock. The RDCs were found to be insufficient and two diesel trainsets were purchased from the defunct PATrain service in 1989 instead.[16] Testing of the equipment on the Northeast Corridor began on December 2, 1989.[17]

The state bought Amtrak's New Haven maintenance facility in May 1989 and signed a service contract with Amtrak in November. Construction of 5 intermediate stations was completed in April 1990.[16] Shore Line East service began on May 29, 1990, with four trains each direction during the morning and evening. The service carried the Clamdigger name during planning; "Shore Line East" did not appear until shortly before service began. Shore Line East was threatened to be cut in 1991 by newly elected Governor Lowell Weicker, but it proved more popular than expected, and was effectively made permanent. A 1996 study found that Shore Line East captured eight percent of regional commuter trips and attracted a loyal ridership base.[16]

In 1995 and 1997, then-governor John Rowland proposed to replace Shore Line East and the Waterbury Branch with bus service, citing a high subsidy of $18.70 per rider per trip, in order to decrease the unpopular gas tax.[18] Lawmakers from the region called the proposals political and defended the line's ability to reduce congestion and pollution, while opponents of the line called it an example of government waste.[19] The Shore Line East Rider's Association and other groups lobbied to save both services each time, and after public hearings a small fare increase was enacted in late 1997 instead.[20]

Early expansions

edit
A train with a diesel locomotive at a large train station 
A rush-hour Shore Line East train at Stamford in 2007

In July 1995, Governor Rowland signed a bill ordering various studies, including one that analyzed extending service to New London as had been originally planned.[21] Before the study was completed, CTDOT unilaterally decided to implement New London service, which the report commended.[16] On February 1, 1996, two round trips per weekday were extended to New London.[22] At that point, ridership was up 18 percent over 1991 numbers.[23]

In December 2001, a single morning rush-hour round trip branded SLExpress was extended to Stamford, with a stop at Bridgeport plus eastbound-only stops at Stratford and Milford. An evening eastbound trip was also extended to Stamford with only the Bridgeport intermediate stop.[24] This trip was intended to allow commuters to reach employment centers in Bridgeport and Stamford without having to make a transfer at New Haven. On June 24, 2002, additional Stamford trains were added, for a total of two westbound and three eastbound trains. South Norwalk station was added as a stop for the single morning eastbound trip.[25] When West Haven opened on August 18, 2013, it was added to these trips as well.[2]

In 2003, in order to add four additional Amtrak trips along the corridor, four of the six round trips to New London were cut back to Old Saybrook. An agreement with the Connecticut Department of Energy and Environmental Protection limits service over the Amtrak Old Saybrook–Old Lyme Bridge in order to avoid inconveniencing recreational boaters. CTDOT's agreement with Amtrak allowed commuters with monthly passes to ride certain Amtrak trains instead.[26] After criticism over the service cuts, in April 2008 CTDOT began allowing commuters with multi-ride passes to board the selected Amtrak trains as well.[27]

Station reconstruction

edit
A train arriving at a below-grade train station 
State Street station in New Haven opened in 2002 near the city's downtown district.

Because Shore Line East was intended to be a temporary service, the five intermediate stations built in 1990 were little more than wooden decks. Since the service was started two months before the Americans with Disabilities Act was signed, the platforms were not built to be accessible. In January 2001, because of changes in Amtrak rules related to the introduction of Acela Express service, passengers were no longer allowed to cross tracks to access trains. New platforms were opened on the south side of the tracks at Branford and Westbrook at approximately the same locations.[28] Later that year, accessible high-level platforms were added at New London to support Acela Express service.[29]

On June 7, 2002, State Street station was opened in New Haven to provide better access to the downtown area than Union Station. It was built as a traffic mitigation measure during the reconstruction of the Pearl Harbor Memorial Bridge.[30] The first existing station to be rebuilt specifically for Shore Line East was Old Saybrook. A new high-level island platform and pedestrian bridge opened on November 1, 2002; the final configuration of two platforms serving all three tracks allows Amtrak trains to pass SLE trains at the station.[31]

A train station with a single high-level platform 
Clinton station as rebuilt in 2004–05

Beginning on May 24, 2004, construction of new platforms began at Clinton, Guilford, and Branford.[32] The rebuilt Clinton station opened on July 25, 2005, and the rebuilt Branford station opened on August 8, 2005; both consist of a single high-level platform on the south side of the tracks.[33] The new Guilford station, which has platforms on both sides of the tracks (connected by a pedestrian bridge) to allow for greater operational flexibility, opened on November 28, 2005.[34] Construction at Madison started on September 24, 2007, and finished with the opening of the rebuilt station platform on July 28, 2008.[35]

Reconstruction of Westbrook station was delayed due to environmental and cost issues.[36] No site was available until Westbrook and CTDOT traded the new station site on Norris Avenue for a highway garage site off Route 145. The controversial land swap was begun in 2004 but was not finalized until 2006, and town operations were not moved to the Route 145 site until September 2011.[37] Site clearing began in November 2011, and ground was broken for the $14.4 million station in January 2012.[36][37] A new station with a larger 210-space lot and platforms on both tracks opened on March 25, 2014, with full bidirectional service to the station beginning on May 11.[38][39]

Weekend and New London service

edit
A large railway bridge over a wide river 
Conflicts over closings of the Old Saybrook–Old Lyme bridge were the primary obstacle to full service to New London

On October 8, 2007, reverse-peak and more midday service were introduced, which officials hailed as the beginning of Shore Line East as a true bidirectional system. Several existing express trains also began to stop at Guilford.[40] A pilot of weekend service was run from November 17, 2007, to December 30, 2007, with six "Shopper's Special" round trips from Old Saybrook to New Haven. The trains were scheduled to connect with similar Metro-North specials at New Haven.[41] Year-round weekend service began on July 4, 2008, with 9 daily Old Saybrook – New Haven round trips on weekends. No weekend service was run to New London, but weekday service was increased by the addition of cross-honoring of multiple-ride and monthly tickets on two Amtrak trains.[42]

 
A weekend Shore Line East train arrives at New London in June 2013

The major obstacle preventing full New London service was the bridge over the Connecticut River between Old Saybrook and Old Lyme. The drawbridge section is closed for a certain period of time to allow trains to pass, which prevents large boats from passing under. The Marine Trades Association opposes additional service, which would mandate more bridge closings. The 2003 agreement with Amtrak limited weekday traffic over the bridge to 2 SLE and 39 Amtrak trains until 2018, although it was revised in 2010 and 2013.[4]

Since 2003, New London had been served by cross-honored Amtrak trains plus one or two dedicated SLE round trips. On February 16, 2010, an additional round trip was extended to New London.[43] Three more were extended on May 10, 2010.[44] However, advocates for full service to New London said that then-governor Jodi Rell failed to deliver on promises to New London, with one newspaper columnist writing that "she seems incapable of standing up to the marine trades lobby" regarding the bridge openings.[45]

In July 2012, then-governor Dannel Malloy announced that five weekend round trips would be extended to New London beginning in April 2013. However, the extension was dependent on ongoing negotiations with the marine industry over mandated closings of the Connecticut River bridge.[46] Two weekday midday trips were added in May 2013, while weekend service began on June 1, 2013, after the application for additional bridge closings was approved by the state Department of Energy and Environmental Protection.[47] By July, New London represented 26 percent of weekend ridership.[2] In December 2013, the state announced that ridership was up 35 percent for the year as a result of the increased service.[48] From 2009 to 2014, monthly New London ridership increased from less than 1,000 monthly passengers to approximately 5,000, accounting for a significant fraction of ridership increases on Shore Line East during that period.[49]

Second platforms

edit
A railway station with two high-level side platforms 
A second platform (left) was completed at Branford station in late 2016.

In a 2007 report, CTDOT outlined plans to turn SLE into a full-service bidirectional regional rail line, with full-day service and all trains extended to New London.[4] This involved incremental improvements, similar to those that have already been put into place. One of the first priorities was to add a second platform at all stations, which was mandated by the 2003 agreement with Amtrak. By that time, several stations already had multiple platforms (New London, Old Saybrook, Guilford, and the stations from New Haven Union Station west), while State Street had an island platform serving two tracks.[4]

Branford was the first previously rebuilt station to be further renovated with a second platform. A $60 million bond in February 2011 included $16.5 million for a second platform and pedestrian bridge at Branford, $7.3 million for platform extensions at Guilford, and $11 million to electrify several sidings along the line. Construction on the new platform at Branford began in September 2013, while the Guilford work was underway by early 2014.[50][51] After delays, the enlarged Branford station opened on September 30, 2016, although the north platform was not immediately served by trains.[52] The north platform entered service on November 5, 2016. As with other stations, reverse-peak trains began stopping at Branford with the opening of the second platform.[53]

Construction of a second platform at Clinton station was originally planned to start in early 2012, but was indefinitely delayed by 2014.[54][55] Construction was again announced in October 2017.[56] After delays due to funding issues, construction began in June 2019.[57][58][59] The second platform opened on April 4, 2022, leaving Madison as the only single-platform station.[60] (Bidding on a second platform and three-level parking garage at Madison, planned since 2009, was scheduled to begin in 2013 but did not occur.[35][61])

Expansion of the original parking facilities was also necessary to meet demand, since many started with small lots suitable for just a few dozen cars. The rebuilt stations at Branford, Guilford, Madison, Clinton, and Westbrook have larger lots than the 1990 stations, and a second lot with 272 spaces opened at Branford in June 2011.[62] A 585-space, three-level parking garage is eventually planned for Madison station.[35]

Service cuts

edit

In 2018, two separate issues caused numerous delays and cancellations with many trains replaced by buses. An Amtrak track maintenance project required single-tracking of sections of the line, and CTDOT lacked sufficient functional locomotives as the aging fleet was sent out for refurbishment.[63] Three weekday round trips were reverted from bus to train in January 2019 when one locomotive returned from refurbishment, though additional issues were expected during a second summer of track work in 2019.[64] Full service was restored on August 5, 2019. By that time, ridership had fallen by 25 percent, averaging 1,340 weekday riders and 767 weekend riders.[65]

On March 16, 2020, weekday service began operating on a reduced schedule due to the coronavirus pandemic. All Stamford through service was suspended.[66] Cross-honoring of tickets on Amtrak trains was suspended that June.[67] Weekday service was expanded from 8 to 11.5 round trips (compared to 18 pre-COVID round trips[68]) on July 26, 2021, with all trains running to New London.[69][70] Cross-honoring resumed on September 27, 2021.[71] Electrification and track work on Track 6 at New London took place from November 2021 to April 2022.[72] This allowed all-electric service using M8 railcars to begin on May 24, 2022.[73][74] Shore Line East ridership only reached about 25% of pre-pandemic ridership by mid-2022 – compared to 40% to 72% for other rail lines in the state – which was attributed to previous riders largely being white-collar workers who shifted to remote work.[75]

In April, 2024 a bill to restore service to pre-pandemic levels stalled in the state Senate.[76] However, in May 2024, $5 million in American Rescue Plan Act funds were allocated for the restoration of two additional weekday round trips, as well as the restoration of Stamford through service.[77] This increase took effect on October 7, 2024. One Stamford round trip was restored, with South Norwalk no longer a stop.[78][79]

Proposed expansion

edit

Extensions

edit
A railway station with a Spanish-style station building 
Westerly station is a possible future eastbound terminus of Shore Line East service.

The possibility of extending service eastward and/or northward from New London has been considered at several points. In a 2001 report examining commuter rail for Rhode Island, the Rhode Island Department of Transportation (RIDOT) considered an extension of Shore Line East to Providence via Westerly (effectively restoring the Clamdigger service).[80] Ultimately, MBTA Commuter Rail service, which already ran to Providence as part of the Providence/Stoughton Line, was extended southward instead (although only to Wickford Junction). However, both RIDOT and SLE have long-term plans to extend their services to meet at Westerly. Extending SLE service would require negotiations with the US Coast Guard, the Marine Trades Association, and other stakeholders for increased use of the Thames River Bridge and the Mystic River Bridge.[4] As part of Malloy's 2015 30-year transit plan, Shore Line East was to be extended to Westerly at a cost of $200 million.[81] In February 2016, the state public transportation commission issued a report recommending extension of Shore Line East rail service to Mystic and Westerly as soon as possible.[82][83]

In 2021, state lawmakers allocated $2.3 million for CTDOT to study an eastward extension to Westerly.[84] Released in 2023, the study indicated that extending 12 weekday round trips to Westerly would have a capital cost of at least $245 million and additional annual operating costs of $25 million. With intermediate stops at Groton, Mystic, and Stonington, the service was estimated to attract 159,300 annual riders. The study also analyzed potential service to Norwich via the Palmer Line (New England Central Railroad mainline) with intermediate stations at Connecticut College/U.S. Coast Guard Academy and Mohegan Sun. Capital costs were estimated as at least $636 million and annual operating costs at $6.8 million, with 8-10 weekday round trips attracting 126,400 daily riders. Alternate expansion of Southeast Area Transit bus service serving both corridors was estimated to have capital costs of $9-10 million and annual operating costs of $4.1 million, with an additional 303,000 annual riders.[85]

East Lyme infill station

edit

In April 2012, state officials released a report detailing possible sites for an infill station in East Lyme. Four sites were analyzed – two near downtown Niantic and two at Rocky Neck State Park.[86] (Niantic station had previously been a stop on the Clamdigger.) As part of a 2015 bonding proposal made by then-governor Malloy, $750,000 was to be allocated for a new station at Niantic.[81]

Rolling stock

edit
A train of electric railcars 
Kawasaki M8 railcars, seen here at New London, are used for all SLE service.

SLE service uses four-car trains of state-owned Kawasaki M8 electric multiple units. These cars are part of a larger fleet, jointly owned by the state and the Metropolitan Transportation Authority, that operate on the Metro-North Railroad New Haven Line and New Canaan Branch. The M8 cars replaced push-pull diesel-powered trains on May 24, 2022.[73][74] In 2007, CTDOT proposed to use up to 32 M8 cars in SLE service as far as Old Saybrook; the diesel equipment would then be used on the Hartford Line and for use with low platforms on New London / Mystic / Westerly service.[4] Amtrak crew qualification of M8 electric multiple units on Shore Line East took place in April 2022; testing had previously taken place as early as 2015.[87][88]

SLE operated diesel service from 1990 to 2022, as Amtrak had not yet electrified the Northeast Corridor between New Haven and Boston at the time service began. Initial service used two F7 locomotives and ten Pullman-Standard coaches purchased from Pittsburgh's PATrain for $1.7 million.[89][16] In 1991, CTDOT purchased 10 Bombardier Shoreliner III coaches, similar to ones already used on the Danbury Branch and Waterbury Branch, and leased three additional diesel locomotives: two EMD GP38s and one EMD GP7.[90][74] In 1994, Amtrak rebuilt 11 of CTDOT's surplus SPV-2000 diesel railcars into coaches, dubbed "Constitution Liners."[91]: 89 [22]

In 1996, SLE took delivery of six remanufactured GP40-2H diesels to replace the entire motive power fleet.[92][22] These were supplemented in 2005 with 8 GE P40DC Genesis diesels leased from Amtrak.[93] CTDOT purchased the P40DCs in 2008.[91]: 55  To augment capacity CTDOT acquired 33 Mafersa coaches from the Virginia Railway Express in 2004. These began entering service in 2006, displacing the Shoreliners and Constitution Liners.[94]

CTDOT acquired an additional four GE P40DC locomotives from New Jersey Transit in 2015. Originally built for Amtrak in 1993, these locomotives had been used by NJ Transit on the short-lived Atlantic City Express Service.[93] In January 2018, ConnDOT awarded a contract to Amtrak to overhaul all twelve P40DC locomotives at the Beech Grove Shops.[95] The first unit was completed in early 2021.[96] The GP40-2H locomotives were sent to NRE for rebuilding in 2017 and 2018, followed by use on the new Hartford Line service.[97]

Stations

edit

All stations are accessible.

Location Station Miles (km)
from GCT
SLE service began Rail connections
Stamford Stamford Transportation Center 33.1 (53.3) December 17, 2001[24] Amtrak: Northeast Regional, Acela, Vermonter
Metro-North Railroad: New Haven Line, New Canaan Branch, Danbury Branch
Bridgeport Bridgeport 55.4 (89.2) December 17, 2001[24] Amtrak: Northeast Regional, Vermonter
Metro-North Railroad: New Haven Line, Waterbury Branch
Stratford Stratford 59.0 (95.0) December 17, 2001[24] Metro-North Railroad: New Haven Line
Milford Milford 63.3 (101.9) December 17, 2001[24] Metro-North Railroad: New Haven Line
West Haven West Haven 69.4 (111.7) August 18, 2013[98] Metro-North Railroad: New Haven Line
New Haven Union Station 72.3 (116.4) May 29, 1990[99] Amtrak: Northeast Regional, Acela, Vermonter, Hartford Line, Valley Flyer
Metro-North Railroad: New Haven Line
CT Rail: Hartford Line
State Street 72.7 (117.0) June 7, 2002[30] Amtrak: Northeast Regional, Hartford Line, Valley Flyer
Metro-North Railroad: New Haven Line
CT Rail: Hartford Line
Branford Branford 81.4 (131.0) May 29, 1990[99]
Guilford Guilford 88.8 (142.9) May 29, 1990[99]
Madison Madison 93.1 (149.8) May 29, 1990[99]
Clinton Clinton 96.8 (155.8) May 29, 1990[99]
Westbrook Westbrook 101.2 (162.9) May 29, 1990[99]
Old Saybrook Old Saybrook 105.1 (169.1) May 29, 1990[99] Amtrak: Northeast Regional
New London New London 122.9 (197.8) February 1, 1996[23] Amtrak: Northeast Regional

References

edit
  1. ^ a b "Transit Ridership Report: Fourth Quarter 2019" (PDF). American Public Transportation Association. February 27, 2020.
  2. ^ a b c "Strong Ridership Growth for Expanded Shore Line East New London Train Service" (Press release). Connecticut Department of Transportation. September 4, 2013.
  3. ^ a b c "Schedules". Connecticut Department of Transportation. Retrieved May 31, 2022.
  4. ^ a b c d e f g "Expanding Rail Service" (PDF). Connecticut Department of Transportation. January 1, 2007. Archived from the original (PDF) on September 8, 2009.
  5. ^ Miller, Bryan (July 21, 2017). "Extreme Commuting". New York Times.
  6. ^ The NEC Master Plan Working Group (May 2010). "The Northeast Corridor Infrastructure Master Plan" (PDF). Amtrak. p. 5.
  7. ^ "OpSail 2012 Schedule" (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on July 10, 2012. Retrieved June 22, 2012.
  8. ^ "TAKE THE RAILS TO THE SAILS!". Connecticut Department of Transportation. Archived from the original on July 1, 2016. Retrieved July 2, 2016.
  9. ^ McKay, Molly (July 30, 2000). "OpSail proved that if you run trains, people will use them". The Day. p. D4.
  10. ^ a b Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 94–96. ISBN 0942147022.
  11. ^ Kadden, Jack (December 7, 2003). "COMMUTER'S JOURNAL; A Bit of New Haven Line Is Resurrected". New York Times.
  12. ^ "New Haven Sold to Penn Central – $145.6 Million Paid In Action Forced by Government". New York Times. January 1, 1969. Retrieved January 31, 2016.
  13. ^ National Railroad Passenger Corporation (Amtrak) (May 1, 1971). "Nationwide Schedules of Intercity Passenger Service". The Museum of Railway Timetables. p. 6. Retrieved October 11, 2012.
  14. ^ Baer, Christopher T. (June 2005). "PRR CHRONOLOGY: 1972" (PDF). Pennsylvania Technical and Historical Society. Archived from the original (PDF) on August 25, 2012.
  15. ^ "AMTRAK ALTERS ROUTES, CUTS SERVICE TO MEET BUDGET". New York Times. August 27, 1981.
  16. ^ a b c d e f g "Final Report of the Task Force on Rail Service". Connecticut General Assembly Office of Legislative Research. February 1996. Retrieved June 18, 2013.
  17. ^ Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1980-1989" (PDF). Pennsylvania Railroad Technical & Historical Society.
  18. ^ Nixon, Amy Ash (March 31, 1997). "End Of The Line?". Hartford Courant. Archived from the original on July 31, 2013. Retrieved August 5, 2012.
  19. ^ Daly, Matthew (March 11, 1995). "Shoreline Lawmakers Question Railroad Cut". Hartford Courant. Archived from the original on July 31, 2013. Retrieved August 5, 2012.
  20. ^ Dee, Jane E. (November 11, 1997). "Train Riders Facing Fare Hike". Hartford Courtant. Archived from the original on July 31, 2013. Retrieved August 5, 2012.
  21. ^ Public Safety Committee (July 6, 1995). "AN ACT CONCERNING LEGISLATIVE TASK FORCES AND STATE AGENCY STUDIES". Connecticut General Assembly. Retrieved June 19, 2013.
  22. ^ a b c "Shore Line East". Trains. July 5, 2006. Retrieved May 31, 2022.
  23. ^ a b "Rail Line Extended to New London". Hartford Courant. February 2, 1996. Archived from the original on March 10, 2016. Retrieved August 5, 2012.
  24. ^ a b c d e "What's New". Rideworks Review. December 17, 2001. Archived from the original on December 31, 2001. Retrieved August 5, 2012.
  25. ^ "What's New". Connecticut Department of Transportation. October 28, 2002. Archived from the original on November 20, 2002. Retrieved August 5, 2012.
  26. ^ "Where Commuters Come Last". New York Times. December 30, 2007. Retrieved August 5, 2012.
  27. ^ "ATTENTION OLD SAYBROOK AND NEW LONDON CUSTOMERS: Select Amtrak Trains Cross-Honor Shore Line East Multi-Ride Tickets" (Press release). Connecticut Department of Transportation. April 14, 2008. Archived from the original on April 16, 2008.
  28. ^ "Station Info". Rideworks Review. January 8, 2001. Archived from the original on March 3, 2001. Retrieved August 5, 2012.
  29. ^ "Acela Express Startup Scheduled—Again" (PDF). TrainRider. Vol. 10, no. 3. Train Riders/Northeast. Fall 2000. p. 1.
  30. ^ a b "New State Street Railroad Station Opens In Downtown New Haven". Rideworks Review. Summer 2002. Archived from the original on March 26, 2004. Retrieved August 5, 2012.
  31. ^ Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. p. 81. ISBN 9780942147087.
  32. ^ "Work on several Shore Line East stations scheduled to begin May 24th" (PDF). Rideworks Review. May 17, 2004. Archived from the original (PDF) on February 27, 2005. Retrieved August 5, 2012.
  33. ^ "What's New". Connecticut Department of Transportation. August 8, 2005. Archived from the original on August 17, 2005.
  34. ^ "Guilford Train Station Opens November 28th to Shore Line East Commuters". Connecticut Department of Transportation. Retrieved August 5, 2012.
  35. ^ a b c "Record of Decision: Madison Shore Line East Railroad Station" (PDF). Connecticut Department of Transportation. March 2009. Archived from the original (PDF) on May 26, 2013.
  36. ^ a b Sipe, Corey (January 26, 2012). "Westbrook Train Station Breaks Ground After Lengthy Delays". Montville Patch. Retrieved August 8, 2012.
  37. ^ a b Coffey, Becky (June 25, 2012). "New Westbrook Train Station Is Rolling Along". The New London Day. Retrieved August 8, 2012.
  38. ^ "Ribbon Cut for Westbrook Train Station" (Press release). Connecticut Department of Transportation. March 25, 2014. Retrieved March 29, 2014.
  39. ^ "Shore Line East Train Schedules" (PDF). Connecticut Department of Transportation. May 11, 2014. Archived from the original (PDF) on May 14, 2014. Retrieved May 14, 2014.
  40. ^ Libow, Gary (October 3, 2007). "Shore Line East Adds Midday Trains, Times". Hartford Courant. Archived from the original on July 31, 2013. Retrieved August 8, 2012.
  41. ^ "New Holiday Weekend Rail Service to Start on Shore Line East". Connecticut Department of Transportation. November 8, 2007.
  42. ^ "Governor Rell Announces Weekend Shore Line East Rail Service Starting on 4th of July". Connecticut Department of Transportation. June 27, 2008. Retrieved August 8, 2012.
  43. ^ "Rell: NL to get second daily commuter train". The Day. February 4, 2010. Retrieved February 12, 2010.
  44. ^ "ALL aboard the Shore Line East!". The Day. February 4, 2010. Retrieved May 9, 2010.
  45. ^ Collins, David (February 17, 2010). "Shore Line East expansion slips off the rails". The New London Day. Retrieved August 8, 2012.
  46. ^ "Shore Line East Steaming Into New London". Hartford Courant. July 6, 2012. Retrieved August 8, 2012.
  47. ^ Smith, Greg (May 17, 2013). "Shore Line East expands train service". The Day. Retrieved May 20, 2013.
  48. ^ Howard, Lee (December 13, 2013). "Shore Line East ridership up 35 percent this year". The New London Day. Archived from the original on December 17, 2013. Retrieved December 16, 2013.
  49. ^ Stacom, Don (November 17, 2014). "Shore Line East Trains Are Attracting More Riders". Hartford Courant. Retrieved November 18, 2014.
  50. ^ Mazzacane, Stephen M. (September 9, 2013). "Work Begins on Branford Train Station Improvements". Branford Seven. Retrieved May 31, 2022.
  51. ^ "Minutes of February 6, 2014" (PDF). Connecticut Public Transportation Commission. February 6, 2014. Archived from the original (PDF) on May 17, 2014.
  52. ^ Bahner, Sally E. (September 30, 2016). "Soft Opening Today for Two-Way Branford Train Station". New Haven Independent. Retrieved May 31, 2022.
  53. ^ "Shore Line East Rail Service Information" (PDF). Connecticut Department of Transportation. November 5, 2016. Archived from the original (PDF) on November 19, 2016.
  54. ^ "Public Information Meeting Regarding Improvements to the Clinton Shore Line East Railroad Station". Connecticut Department of Transportation. March 8, 2011. Retrieved October 8, 2012.
  55. ^ Garrety, Karina (April 9, 2014). "Clinton Train Station on Hold". Harbor News. Archived from the original on May 14, 2014. Retrieved May 14, 2014.
  56. ^ O'Connell, Eric (October 17, 2017). "Upgrades to Clinton Train Station to Start in March". Zip06.com. Retrieved November 25, 2017.
  57. ^ "Gov. Malloy, CTDOT Indefinitely Postpone Hundreds of Transportation Projects Across Connecticut". CT.gov. January 10, 2018. Archived from the original on January 21, 2018.
  58. ^ O’Connell, Eric (May 14, 2019). "Delayed Train Station Renovation Promised in Clinton". Zip06.
  59. ^ "Officials break ground on improvement project at Shore Line East Clinton station". The Middletown Press. June 26, 2019. Archived from the original on December 7, 2022. Retrieved June 1, 2022.
  60. ^ "New Boarding Platform at Clinton Railroad Station Opening Monday, April 4 on Shore Line East" (Press release). Connecticut Department of Transportation. April 1, 2022.
  61. ^ Mazzacane, Steven (July 31, 2012). "New Ethics Complaint Filed Against Meyer; Meyer Fires Back". The Branford Seven. Retrieved May 31, 2022.
  62. ^ Mazzacane, Steven (July 31, 2012). "New North Side Platform and Overpass for Branford Train Station". The Branford Seven. Retrieved August 8, 2012.
  63. ^ Stannard, Ed (November 18, 2018). "Shore Line East rail riders growing weary of taking the bus". New Haven Register.
  64. ^ Stannard, Ed (January 16, 2019). "6 Shore Line East trips returning to trains from buses next week". New Haven Register.
  65. ^ Werth, Julia (July 31, 2019). "Shore Line East Resumes Regular Service, with 25% Fewer Riders". Connecticut Examiner.
  66. ^ "Effective 3/16/20, all weekday CTrail Shore Line East trains operating on a weekend schedule until further notice" (Press release). Connecticut Department of Transportation. March 13, 2020. Archived from the original on August 5, 2020.
  67. ^ Courtney, Joe (June 23, 2021). "Letter to Amtrak on Shore Line East Service" (PDF).
  68. ^ "Shore Line East Service Information" (PDF). Connecticut Department of Transportation. September 30, 2019. Archived from the original (PDF) on December 21, 2019.
  69. ^ "Train Schedule Changes for Hartford Line, Shore Line East, and Amtrak" (Press release). Connecticut Department of Transportation. July 12, 2021. Archived from the original on February 2, 2022.
  70. ^ "Shore Line East Service Information EFFECTIVE JULY 26, 2021" (PDF). Connecticut Department of Transportation. July 26, 2021. Archived from the original (PDF) on July 13, 2021. Retrieved July 13, 2021.
  71. ^ "Amtrak Cross-Honoring Returns 9/27" (Press release). Connecticut Department of Transportation. September 2021. Archived from the original on June 1, 2022. Retrieved June 1, 2022.
  72. ^ "Project Information Appendix". Northeast Corridor Capital Investment Plan: Fiscal Years 2022-2026 (PDF). Northeast Corridor Commission. October 2021. p. A3-46.
  73. ^ a b "Governor Lamont Announces That M8 Electric Trains Have Arrived on Shore Line East". Office of the Governor of Connecticut (Press release). May 24, 2022.
  74. ^ a b c Hartley, Scott A. (May 24, 2022). "Connecticut replaces diesel Shore Line East trains with electric multiple-unit equipment". Trains Magazine. Retrieved May 31, 2022.
  75. ^ Brone, Abigail (June 20, 2022). "CT train riders are slow to return to Shore Line East, which is struggling to regain passengers in COVID era". CT Insider. Archived from the original on June 23, 2022. Retrieved June 27, 2022.
  76. ^ "An Act Restoring Service on the Shore Line East Rail Line". Connecticut General Assembly. 2024.
  77. ^ Moritz, John (May 7, 2024). "Last-minute spending bill will send $5 million to CT's Shore Line East to fund new peak-service trains". Connecticut Post.
  78. ^ "Stamford Through Service Returns to the Schedule" (Press release). Connecticut Department of Transportation. September 30, 2024.
  79. ^ "CTrail Shore Line East Schedule" (PDF). Connecticut Department of Transportation. October 7, 2024.
  80. ^ Edwards and Kelcey, Inc (July 2001). "South County Commuter Rail Service Plan" (PDF). Rhode Island Department of Transportation. Archived from the original (PDF) on April 16, 2009. Retrieved July 1, 2016.
  81. ^ a b "$750,000 would go toward Niantic train station plan". The New London Day. Retrieved January 31, 2016.
  82. ^ Howard, Lee (February 1, 2016). "Rail service to Westerly endorsed by state panel". The New London Day. Retrieved February 3, 2016.
  83. ^ Stacom, Don (February 1, 2016). "Panel Recommends Shore Line East's Next Stop: Rhode Island". Hartford Courant. Retrieved February 3, 2016.
  84. ^ Moritz, John (June 28, 2021). "Service to Rhode Island? Broad expansion of CT shoreline rails sees renewed interest". CT Insider. Archived from the original on September 30, 2022. Retrieved September 30, 2022.
  85. ^ "Eastern Connecticut Corridor Rail and Transit Feasibility Study (ECRTS)" (PDF). Connecticut Department of Transportation. November 2023.
  86. ^ Reindl, JC (April 6, 2012). "Niantic could be stop for railroad". The New London Day. Retrieved October 9, 2012.
  87. ^ Metro North/SLE M8 Test Train on Amtrak's Shore Line (NEC), October 11, 2015, archived from the original on December 12, 2021, retrieved August 10, 2021
  88. ^ "News photo: Changes coming for Shore Line East?". Trains News Wire. April 25, 2022.
  89. ^ Bowen, Douglas John (November 1, 1990). "Commuter rail lines build and rebuild to meet rising demand". Railway Age. Archived from the original on July 14, 2014. Retrieved December 10, 2012 – via HighBeam Research.
  90. ^ Middleton, William D. (1994). North American commuter rail 1994. Pasadena, CA: Pentrex. p. 30. OCLC 32665882.
  91. ^ a b Simon, Elbert; Warner, David C. (2011). Holland, Kevin J. (ed.). Amtrak by the Numbers: A Comprehensive Passenger Car and Motive Power Roster – 1971–2011. Kansas City, Missouri: White River Productions. ISBN 978-1-932804-12-6.
  92. ^ "Connecticut State Rail Plan 2012–2016" (PDF). Connecticut Department of Transportation. 2012. p. 220. Retrieved June 26, 2016.
  93. ^ a b Hartley, Scott A. (March 17, 2016). "Connecticut DOT taking on used P40DCs". Trains. Archived from the original on March 20, 2016. Retrieved March 26, 2016.
  94. ^ "Gov. Rell Tours Yonkers Rail Repair Plant To Review Virginia Railway Express Work". US Fed News Service, Including US State News. May 16, 2006. Archived from the original on September 11, 2016. Retrieved June 26, 2016 – via HighBeam Research.
  95. ^ "Notice of Contract Award" (PDF). Connecticut Department of Transportation. April 25, 2018.
  96. ^ "News Photo: First CDOT P40 rebuild debuts". Trains News Wire. March 8, 2021.
  97. ^ "NRE to overhaul Connecticut DOT commuter rail locomotives". Trains News Wire. March 20, 2017.
  98. ^ "Governor Malloy, Lieutenant Governor Wyman Cut Ribbon For New RR Station in West Haven" (Press release). Connecticut Department of Transportation. August 19, 2013.
  99. ^ a b c d e f g "Commuter Trains Have Smooth Start". The Hartford Courant. May 30, 1990. p. D9. Retrieved July 13, 2021 – via Newspapers.com. Open access icon 
edit
KML is from Wikidata