Nothing Special   »   [go: up one dir, main page]

Jump to content

Mpanga Hydroelectric Power Station

Coordinates: 00°04′00″N 30°19′16″E / 0.06667°N 30.32111°E / 0.06667; 30.32111
From Wikipedia, the free encyclopedia
(Redirected from Mpanga Power Station)
Mpanga Power Station
Mpanga Hydroelectric Power Station is located in Uganda
Mpanga Hydroelectric Power Station
Map of Uganda showing the location of Mpanga Power Station
CountryUganda
LocationMpanga
Coordinates00°04′00″N 30°19′16″E / 0.06667°N 30.32111°E / 0.06667; 30.32111
StatusOperational
Dam and spillways
ImpoundsMpanga River
Reservoir
Normal elevation1,000 m (3,300 ft)
Commission date10 February 2011
TypeRun-of-the-river
Turbines1
Installed capacity18 MW (24,000 hp)

Mpanga Power Station is an 18 megawatts (24,000 hp) mini hydroelectric power project located across River Mpanga, in Kitagwenda County, Kitagwenda District in Western Uganda.[1]

Location

[edit]

The power station is located across River Mpanga, in Kitagwenda County, Kitagwenda District where the district headquarters are located, approximately 25 kilometres (16 mi), by road, southwest of Kamwenge.[2] This location is approximately 305 kilometres (190 mi), by road, west of Kampala, Uganda's capital and largest city.[3]

Overview

[edit]

Mpanga Power Station is situated at the location of Mpanga Falls, on Mpanga River. The 18.0 MW power station was developed by Africa Energy Management Systems. Construction began in 2007.[4] The completed power station came online in 2011.[5] A new 33kV transmission line connects the power station to the national electrical grid. As of February 2011, construction of the power station was complete. Technical commissioning was scheduled for Thursday 10 February 2011, while the public commissioning was planned for March 2011.[6] Construction of the power station was undertaken by a Sri Lankan hydropower construction company called VS Hydro (Private) Limited,[7] at an estimated cost of US$26 million.[8]

Mpanga Hydro Power is owned by "EMS Africa" and all the engineering tasks including Operations and Maintenance is done by Sri Lankan Engineers. There are 32 staff (Both Ugandan and Sri Lankan) members currently employed at the site to do the day-to-day operation of the plant. Annual expected generation of the plant is 64 gigawatt-hours (230 TJ).

See also

[edit]

References

[edit]
  1. ^ Raymond Baguma (12 January 2009). "River Mpanga To Generate Power". New Vision. Archived from the original on 14 October 2012. Retrieved 6 May 2014.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  2. ^ "Map Showing Kamwenge And Mpanga With Distance Marker". Globefeed.com. Retrieved 6 May 2014.
  3. ^ "Road Distance Between Kampala And Mpanga With Map". Globefeed.com. Retrieved 6 May 2014.
  4. ^ Byaruhanga, Achilles (21 May 2008). "Mpanga Gorge: Uganda's Ecological Gem Is Going". New Vision. Archived from the original on 6 May 2014. Retrieved 6 May 2014.
  5. ^ "Mpanga Small Hydro Project Commissioned In Uganda". Hydroworld.com. 11 May 2011. Retrieved 6 May 2014.
  6. ^ Mitti, Joseph (14 February 2011). "Mpanga Hydro Power Plant Commissioned". Daily Monitor. Retrieved 6 May 2014.
  7. ^ "Website of VSHydro". VSHydro. Retrieved 6 May 2014.
  8. ^ Vision, Reporter (8 February 2011). "Mpanga Project Boosts Electricity Supply". New Vision. Retrieved 6 May 2014.