Nothing Special   »   [go: up one dir, main page]

Jump to content

South German natural gas pipeline: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
The Anomebot2 (talk | contribs)
Adding geodata: {{coord missing|Germany}}
Conti (talk | contribs)
Removing Template:Future pipeline per its new guidelines. Feel free to leave comments at Template talk:Future#Guidelines if you agree or disagree with them.
Line 1: Line 1:
{{future pipeline}}
'''South German natural gas pipeline''' ({{lang-de|Süddeutsche Erdgasleitung (SEL)}}) is a planned 500 kilometers long [[Germany|German]] natural gas pipeline with a diameter of 1200 mm, which was planned to run from [[Lampertheim]] to [[Burghausen]] on the German-[[Austria]]n border. The pipeline should be constructed jointly by [[E.ON]] Ruhrgas and [[Wingas]], a joint company of [[Wintershall]], subsidiary of [[BASF]], and [[Russia]]n [[Gazprom]]. Project was stopped in november 2008.
'''South German natural gas pipeline''' ({{lang-de|Süddeutsche Erdgasleitung (SEL)}}) is a planned 500 kilometers long [[Germany|German]] natural gas pipeline with a diameter of 1200 mm, which was planned to run from [[Lampertheim]] to [[Burghausen]] on the German-[[Austria]]n border. The pipeline should be constructed jointly by [[E.ON]] Ruhrgas and [[Wingas]], a joint company of [[Wintershall]], subsidiary of [[BASF]], and [[Russia]]n [[Gazprom]]. Project was stopped in november 2008.



Revision as of 16:02, 14 July 2009

South German natural gas pipeline (German: Süddeutsche Erdgasleitung (SEL)) is a planned 500 kilometers long German natural gas pipeline with a diameter of 1200 mm, which was planned to run from Lampertheim to Burghausen on the German-Austrian border. The pipeline should be constructed jointly by E.ON Ruhrgas and Wingas, a joint company of Wintershall, subsidiary of BASF, and Russian Gazprom. Project was stopped in november 2008.