Caravaggio (train): Difference between revisions
→Design: More copy edits |
No edit summary |
||
(23 intermediate revisions by 19 users not shown) | |||
Line 1: | Line 1: | ||
{{Expand Italian|date=December 2022|topic=transp}}{{Infobox train |
|||
⚫ | |||
| name = ETR 421/521/621 Rock |
|||
⚫ | |||
| image = Fara_Sabina_-_stazione_ferroviaria_-_elettrotreno_Trenitalia_Rock.jpg |
|||
| caption = A [[Trenitalia]] ETR 521 "Rock" train at Fara Sabina-Montelibretti railway station |
|||
| manufacturer = [[Hitachi Rail Italy]] |
|||
| yearconstruction = 2017– |
|||
| yearservice = 14 June 2019 |
|||
| formation = ETR 421 - 4 cars<br>ETR 521 - 5 cars<br>ETR 621 - 6 cars |
|||
| capacity = ETR 421 - 479<br>ETR 521 - 629<br>ETR 621 - 729 |
|||
| operator = [[Trenitalia]]<br>[[Trenord]] |
|||
| trainlength = ETR 421 - {{cvt|109.6|m|ftin}}<br>ETR 521 -{{cvt|136.8|m|ftin}}<br>ETR 621 - {{cvt|163.4|m|ftin}} |
|||
| width = {{convert|2.8|m|ftin}} |
|||
| height = {{convert|4.3|m|ftin}} |
|||
| maxspeed = {{cvt|160|km/h|mph}} |
|||
| acceleration = {{convert|1.1|m/s2|mph/s|abbr=on}} |
|||
| notes = {{cite web |title=Scheda treno Rock Trenitalia |url=https://www.fsitaliane.it/content/dam/fsitaliane/Documents/old-media-ed-eventi/comunicati-stampa-e-news/anno-2017/ottobre/2017_10_10_scheda_tecnica_rock.pdf |archive-url= |archive-date= |access-date=2022-09-20 |work=Train data sheet |publisher=Trenitalia}} |
|||
}} |
|||
⚫ | |||
⚫ | The Caravaggio was |
||
⚫ | |||
==History== |
==History== |
||
In June 2016, Trenitalia ordered the Caravaggio, awarding Hitachi Rail Italy a €333 million contract to supply 39 five-car multiple units. The order had options for up to 300 trainsets at a cost of €2.6 billion; Trenitalia claimed the potential value was unprecedented in Italy.<ref>{{cite web | url=https://www.railwaygazette.com/news/passenger/single-view/view/alstom-and-hitachi-selected-for-trenitalia-regional-train-order.html | title=Alstom and Hitachi selected for Trenitalia regional train order | publisher=Railway Gazette International | date=29 June 2016 | accessdate=15 September 2018}}</ref><ref>[https://railcolornews.com/2016/06/30/it-caravaggio-by-hitachi-rail-italy-the-new-star-for-regional-transport/ "Caravaggio by Hitachi Rail Italy, the new star for regional transport."] ''railcolornews.com'', 30 June 2016.</ref> By the time the first trainset was completed at Hitachi's factory in [[Pistoia]] in April 2018, Trenitalia had increased its order to 118 trainsets, including four-, five-, and six-car versions.<ref name="rgi">{{cite web | url=https://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/trenitalias-first-rock-rolls.html | title=Trenitalia's first Rock rolls | publisher=Railway Gazette International | date=19 April 2018 | accessdate=15 September 2018}}</ref> The Caravaggio was assigned class designations ''ETR 421'' and ''ETR 521'' dependent on its configuration; Trenitalia had branded the train as "Rock."<ref name="rgi"/> |
|||
In 2018, the first trainset was tested at the [[Velim railway test circuit]] in the [[Czech Republic]] ahead of its entry into service the following year.<ref name="rgi"/> On 14 June 2019, the Caravaggio's inaugural run took place between [[Piacenza]] and [[Bologna]], marking its entry into revenue service.<ref>Barrow, Keith. [https://www.railjournal.com/fleet/trenitalia-hitachi-rock-ready-to-roll/ "Trenitalia Rock ready to roll."] ''Rail Journal'', 14 June 2019.</ref> |
|||
In September 2018, Ferrovie Nord Milano (FNM) announced |
In September 2018, Ferrovie Nord Milano (FNM) announced it planned to purchase up to 120 Caravaggio EMUs over an eight year period, beginning with a €238 million order for 30 four-car trainsets.<ref name="irj"/><ref>[http://www.hitachi.eu/en/press/fnm-and-hitachi-rail-italy-sign-framework-agreement-new-high-capacity-trains "FNM and Hitachi Rail Italy sign Framework Agreement for new High Capacity trains."] ''Hitachi Rail'', 12 September 2018.</ref> The eight-year framework included an option for three years of maintenance support for the fleet. FNM deliveries are scheduled to begin by May 2020.<ref name="irj">{{cite web | url=https://www.railjournal.com/rolling-stock/fnm-and-hitachi-sign-double-deck-emu-framework | title=FNM and Hitachi sign double-deck EMU framework | publisher=International Rail Journal | date=12 September 2018 | accessdate=15 September 2018}}</ref> |
||
From 5 September 2022 the ETR 522s entered service on the [[Ferrovienord]] [[Saronno–Laveno railway]] line <ref>{{Cite web |date=2022-09-05 |title=Due treni Caravaggio in servizio sulla Milano Cadorna-Varese-Laveno |url=https://www.varesenoi.it/2022/09/05/leggi-notizia/argomenti/regione-3/articolo/due-treni-caravaggio-in-servizio-sulla-milano-cadorna-varese-laveno.html |access-date=2023-07-04 |website=Varese Noi |language=it-IT}}</ref> |
|||
==Design== |
==Design== |
||
[[File:Innotrans 2018, Berlin (P1070405).jpg|thumb|Front view of the Hitachi Caravaggio]] |
[[File:Innotrans 2018, Berlin (P1070405).jpg|thumb|Front view of the Hitachi Caravaggio]] |
||
The Caravaggio is a high-capacity double-deck EMU |
The Caravaggio is a high-capacity double-deck EMU for regional traffic, each car is about {{convert|27|m|ftin}} long.<ref name="irj"/> The Caravaggio is of equivalent quality to contemporary [[high speed train]]s for passengers and crews.<ref name="rgi"/> Compared to the trains it is replacing, it provides greater comfort and sustainability and is more accessible for people with reduced mobility. It consumes 30% less energy than the historic fleet, and is more than 95% recyclable.<ref name="rgi"/> Additional environmentally-friendly measures include [[regenerative braking]] and lower noise emissions.<ref name = "railtech">{{cite news |url=https://www.railway-technology.com/projects/hitachi-caravaggio-double-deck-regional-train/ |title=Hitachi Caravaggio Double-Deck Regional Train |work=railway-technology.com |access-date=4 September 2019}}</ref> In 2018, Maurizio Manfellotto, CEO of Hitachi Rail Italy, claimed the Caravaggio's carbon emissions of 5 grams CO2eq were the lowest for any mass transport mode in [[Italy]].<ref>{{cite news |last=Planinski |first=Konstantin |url=https://railcolornews.com/2018/09/13/it-fnm-and-hitachi-rail-sign-framework-agreement-caravaggio-emus/ |title=IT FNM and Hitachi Rail sign framework agreement for Caravaggio EMUs |publisher=railcolornews.com |date=13 September 2018}}</ref> |
||
⚫ | Each train is powered by a 3 kV DC electric system producing {{convert|3400|kW|hp}} and a maximum speed of {{convert|160|kph|mph}}.<ref name="hitachi sum">{{cite web | url=http://italy.hitachirail.com/en/caravaggio_531.html | title=Caravaggio | publisher=Hitachi Rail Italy | accessdate=15 September 2018 | archive-date=2 July 2020 | archive-url=https://web.archive.org/web/20200702203149/http://italy.hitachirail.com/en/caravaggio_531.html | url-status=dead }}</ref> The traction equipment is mostly roof-mounted, optimising the interior space for passenger accommodation. The train's acceleration is greater than 1m/sec², which has been credited with improving punctuality.<ref name="rgi"/> The train is equipped with side- and front-facing [[camera]]s with anomalous behaviour detection.<ref name = "railtech"/> The body is primarily made of lightweight [[alloy]]s, giving a low weight per passenger and a high passenger capacity per unit length.<ref name="rgi"/> Passenger capacity varies by operator; in Trentialia's configuration, a five-car set can carry up to 656 people, while an equivalent FNM set can carry 598 seated passengers and 575 standing.<ref name="rgi"/><ref name="irj"/> |
||
⚫ | The trainset's ergonomic eco-friendly leather seats are designed for comfort.<ref name = "railtech"/> The cabin has [[air conditioning]] which is adjusted according to the number of passengers on board, to lower energy consumption. Each 5-car train has ten doors per side and two [[toilet]]s (one standard and one for people with reduced mobility).<ref name = "railtech"/> The Caravaggio has luggage storage areas and dedicated spaces for bicycles, sockets to charge [[electric bicycle]]s. The trains have LED lighting, Wi-Fi, [[USB]] sockets, a passenger information system, energy meters, and a passenger counter.<ref name = "railtech"/> Staircases above the bogies give access to the upper deck. The doors are fitted with movable steps to cover the gap between the platform and vehicle when the train is stopped; a manually-operated ramp is available for passengers with reduced mobility.<ref name = "railtech"/> |
||
⚫ | Each |
||
==Gallery== |
|||
⚫ | |||
<gallery widths="150" class="center"> |
|||
⚫ | |||
File:Hitachi Caravaggio Top-deck Interior.jpg|Interior of a Trenord ETR.521 |
|||
File:Trenord_Hitachi_Caravaggio_at_Como_San_Giovanni.jpg|An ETR 521 Caravaggio of [[Trenord]]'s [[Line S11 (Milan suburban railway service)|S11 Line]], at the [[Como San Giovanni railway station]] |
|||
</gallery> |
|||
==References== |
==References== |
||
Line 30: | Line 56: | ||
[[Category:FNM electric railcars and multiple units]] |
[[Category:FNM electric railcars and multiple units]] |
||
[[Category:Double-decker EMUs]] |
[[Category:Double-decker EMUs]] |
||
[[Category:Train-related introductions in 2019]] |
|||
[[Category:3000 V DC multiple units]] |
|||
[[Category:Hitachi multiple units]] |
Latest revision as of 01:16, 18 July 2024
You can help expand this article with text translated from the corresponding article in Italian. (December 2022) Click [show] for important translation instructions.
|
ETR 421/521/621 Rock | |
---|---|
Manufacturer | Hitachi Rail Italy |
Constructed | 2017– |
Entered service | 14 June 2019 |
Formation | ETR 421 - 4 cars ETR 521 - 5 cars ETR 621 - 6 cars |
Capacity | ETR 421 - 479 ETR 521 - 629 ETR 621 - 729 |
Operators | Trenitalia Trenord |
Specifications | |
Train length | ETR 421 - 109.6 m (359 ft 7 in) ETR 521 -136.8 m (448 ft 10 in) ETR 621 - 163.4 m (536 ft 1 in) |
Width | 2.8 metres (9 ft 2 in) |
Height | 4.3 metres (14 ft 1 in) |
Maximum speed | 160 km/h (99 mph) |
Acceleration | 1.1 m/s2 (2.5 mph/s) |
Notes/references | |
"Scheda treno Rock Trenitalia" (PDF). Train data sheet. Trenitalia. Retrieved 2022-09-20. |
The Caravaggio (Rock for Trenitalia) is an electric multiple unit (EMU) developed and built by Hitachi Rail Italy. It is named after the Italian Baroque painter Michelangelo Merisi da Caravaggio.[1]
The Caravaggio was ordered by Italian operator Trenitalia in June 2016; follow-on orders were placed by Trenitalia and Ferrovie Nord Milano. The first trainset rolled-out in April 2018. The Caravaggio entered revenue service with Trenitalia on 14 June 2019; it has been branded as "Rock".
History
[edit]In June 2016, Trenitalia ordered the Caravaggio, awarding Hitachi Rail Italy a €333 million contract to supply 39 five-car multiple units. The order had options for up to 300 trainsets at a cost of €2.6 billion; Trenitalia claimed the potential value was unprecedented in Italy.[2][3] By the time the first trainset was completed at Hitachi's factory in Pistoia in April 2018, Trenitalia had increased its order to 118 trainsets, including four-, five-, and six-car versions.[4] The Caravaggio was assigned class designations ETR 421 and ETR 521 dependent on its configuration; Trenitalia had branded the train as "Rock."[4]
In 2018, the first trainset was tested at the Velim railway test circuit in the Czech Republic ahead of its entry into service the following year.[4] On 14 June 2019, the Caravaggio's inaugural run took place between Piacenza and Bologna, marking its entry into revenue service.[5]
In September 2018, Ferrovie Nord Milano (FNM) announced it planned to purchase up to 120 Caravaggio EMUs over an eight year period, beginning with a €238 million order for 30 four-car trainsets.[6][7] The eight-year framework included an option for three years of maintenance support for the fleet. FNM deliveries are scheduled to begin by May 2020.[6]
From 5 September 2022 the ETR 522s entered service on the Ferrovienord Saronno–Laveno railway line [8]
Design
[edit]The Caravaggio is a high-capacity double-deck EMU for regional traffic, each car is about 27 metres (88 ft 7 in) long.[6] The Caravaggio is of equivalent quality to contemporary high speed trains for passengers and crews.[4] Compared to the trains it is replacing, it provides greater comfort and sustainability and is more accessible for people with reduced mobility. It consumes 30% less energy than the historic fleet, and is more than 95% recyclable.[4] Additional environmentally-friendly measures include regenerative braking and lower noise emissions.[9] In 2018, Maurizio Manfellotto, CEO of Hitachi Rail Italy, claimed the Caravaggio's carbon emissions of 5 grams CO2eq were the lowest for any mass transport mode in Italy.[10]
Each train is powered by a 3 kV DC electric system producing 3,400 kilowatts (4,600 hp) and a maximum speed of 160 kilometres per hour (99 mph).[1] The traction equipment is mostly roof-mounted, optimising the interior space for passenger accommodation. The train's acceleration is greater than 1m/sec², which has been credited with improving punctuality.[4] The train is equipped with side- and front-facing cameras with anomalous behaviour detection.[9] The body is primarily made of lightweight alloys, giving a low weight per passenger and a high passenger capacity per unit length.[4] Passenger capacity varies by operator; in Trentialia's configuration, a five-car set can carry up to 656 people, while an equivalent FNM set can carry 598 seated passengers and 575 standing.[4][6]
The trainset's ergonomic eco-friendly leather seats are designed for comfort.[9] The cabin has air conditioning which is adjusted according to the number of passengers on board, to lower energy consumption. Each 5-car train has ten doors per side and two toilets (one standard and one for people with reduced mobility).[9] The Caravaggio has luggage storage areas and dedicated spaces for bicycles, sockets to charge electric bicycles. The trains have LED lighting, Wi-Fi, USB sockets, a passenger information system, energy meters, and a passenger counter.[9] Staircases above the bogies give access to the upper deck. The doors are fitted with movable steps to cover the gap between the platform and vehicle when the train is stopped; a manually-operated ramp is available for passengers with reduced mobility.[9]
Gallery
[edit]-
A five car trainset on test at Velim Test Track, Cerhenice, Czech Republic
-
Interior of a Trenord ETR.521
References
[edit]- ^ a b "Caravaggio". Hitachi Rail Italy. Archived from the original on 2 July 2020. Retrieved 15 September 2018.
- ^ "Alstom and Hitachi selected for Trenitalia regional train order". Railway Gazette International. 29 June 2016. Retrieved 15 September 2018.
- ^ "Caravaggio by Hitachi Rail Italy, the new star for regional transport." railcolornews.com, 30 June 2016.
- ^ a b c d e f g h "Trenitalia's first Rock rolls". Railway Gazette International. 19 April 2018. Retrieved 15 September 2018.
- ^ Barrow, Keith. "Trenitalia Rock ready to roll." Rail Journal, 14 June 2019.
- ^ a b c d "FNM and Hitachi sign double-deck EMU framework". International Rail Journal. 12 September 2018. Retrieved 15 September 2018.
- ^ "FNM and Hitachi Rail Italy sign Framework Agreement for new High Capacity trains." Hitachi Rail, 12 September 2018.
- ^ "Due treni Caravaggio in servizio sulla Milano Cadorna-Varese-Laveno". Varese Noi (in Italian). 2022-09-05. Retrieved 2023-07-04.
- ^ a b c d e f "Hitachi Caravaggio Double-Deck Regional Train". railway-technology.com. Retrieved 4 September 2019.
- ^ Planinski, Konstantin (13 September 2018). "IT FNM and Hitachi Rail sign framework agreement for Caravaggio EMUs". railcolornews.com.