Cited By
View all- Bügler MBorrmann A(2016)Simulation Based Construction Project Schedule OptimizationCivil and Environmental Engineering10.4018/978-1-4666-9619-8.ch006(173-195)Online publication date: 2016
- Bügler MBorrmann A(2016)Simulation Based Construction Project Schedule OptimizationHandbook of Research on Computational Simulation and Modeling in Engineering10.4018/978-1-4666-8823-0.ch016(482-507)Online publication date: 2016
- Yalaoui AChehade HYalaoui FAmodeo L(2013)BibliographyOptimization of Logistics10.1002/9781118569597.biblio(273-283)Online publication date: 21-Jan-2013
- Show More Cited By