Abstract
In this paper, we address a parallel machine scheduling problem to minimize the total weighted completion time, where product families are involved. Major setups occur when processing jobs of different families, and sequence dependencies are also taken into account. Considering its high practical relevance, we focus on the special case where all jobs of the same family have identical processing times. In order to avoid redundant setups, batching jobs of the same family can be performed. We first develop a variable neighborhood search algorithm (VNS) to solve the interrelated subproblems in a simultaneous manner. To further reduce computing time, we also propose an iterative scheme which alternates between a specific heuristic to form batches and a VNS scheme to schedule entire batches. Computational experiments are conducted which confirm the benefits of batching. Test results also show that both simultaneous and iterative approach outperform heuristics based on a fixed batch size and list scheduling. Furthermore, the iterative procedure succeeds in balancing solution quality and computing time.
Similar content being viewed by others
Explore related subjects
Discover the latest articles, news and stories from top researchers in related subjects.References
Albers, S., & Brucker, P. (1993). The complexity of one-machine batching problems. Discrete Applied Mathematics, 47, 87–107.
Aldowaisan, T., & Allahverdi, A. (1998). Total flowtime in no-wait flowshops with separated setup times. Computers and Operations Research, 25(9), 757–765.
Allahverdi, A. (2000). Minimizing mean flowtime in a two machine flowshop with sequence independent setup times separated. Computers and Operations Research, 27, 111–127.
Allahverdi, A., & Aldowaisan, T. (1998). Job lateness in flowshops with setup and removal times separated. Journal of the Operational Research Society, 49(9), 1001–1006.
Allahverdi, A., Gupta, J. N. D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega International Journal of Management Science, 27, 219–239.
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187, 985–1032.
Almeder, C., & Mönch, L. (2011). Scheduling jobs with incompatible families on parallel batch machines. Journal of the Operational Resarch Society, 62, 2083–2096.
Barnes, J. W., & Vanston, L. K. (1981). Scheduling jobs with linear delay penalties and sequence dependent setup costs. Operations Research, 29, 146.
Cheng, T. C. E., Chen, Y. L., & Oguz, C. (1994). One-machine batching and sequencing of multiple-type items. Computers and Operations Research, 21, 717–721.
Cheng, T. C. E., Gupta, J. N. D., & Wang, G. (2000). A review of flowshop scheduling research with setup times. Production and Operations Management, 9, 262–282.
Coffman, E. G., Yannakakis, M., Magazine, M. J., & Santos, C. A. (1990). Batch sizing and job sequencing on a single machine. Annals of Operations Research, 26, 135–147.
Driessel, R., & Mönch, L. (2011). Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Computers and Industrial Engineering, 61(2), 336–345.
Franca, P. M., Gupta, J. N. D., Mendes, A. S., Moscato, P., & Veltink, K. J. (2005). Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering, 48, 491–506.
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. Rinnooy. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287–326.
Gupta, J. N. D., & Tunc, E. A. (1994). Scheduling a two-stage hybrid flowshop with separable setup and removal times. European Journal of Operational Research, 77(3), 415–428.
Han, W., & Dejax, P. (1994). An efficient heuristic based on machine workload for the flow shop scheduling problem with setup and removal times. Annals of Operations Research, 50, 263–279.
Hansen, P., & Mladenovic, N. (2001). Variable neighborhood search: principles and applications. European Journal of Operational Research, 130, 449–467.
Hendizadeh, S. H., Faramarzi, H., Mansouri, S. A., Gupta, J. N. D., & Elmekkawy, T. Y. (2008). Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111, 593–605.
Hurink, J. (1998). A tabu search approach for a single-machine batching problem using an efficient method to calculate a best neighbor. Journal of Scheduling, 1, 127–148.
Laguna, M. (1999). A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times. IIE Transactions, 31, 125–134.
Logendran, R., de Szoeke, P., & Barnard, F. (2006). Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102, 66–86.
Mehta, S. V., & Uzsoy, R. (1998). Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions, 30, 165–178.
Mladenovic, N., & Hansen, P. (1997). Variable neighborhood search. Computers and Operations Research, 24, 1097–1100.
Monma, C. L., & Potts, C. N. (1989). On the complexity of scheduling with batch setups. Operations Research, 37, 798–804.
Mosheiov, G., Oron, D., & Ritov, Y. (2004). Flow-shop batching scheduling with identical processing-time jobs. Naval Research Logistics, 51, 783–799.
Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120, 228–249.
Rajendran, C., & Ziegler, H. (1997). Heuristics for scheduling in a flowshop with setup, processing and removal times separated. Production Planning and Control, 8, 568–576.
Reddy, V., & Narendran, T. T. (2003). Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. International Journal of Production Research, 41, 193–206.
Rocha, M. L., Ravetti, M. G., Mateus, G. R., & Pardalos, P. M. (2007). Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search. IMA Journal of Management Mathematics, 18, 101–115.
Shen, L., Mönch, L., & Buscher, U. (2011). An iterative scheme for parallel machine scheduling with sequence dependent family setups. In Proceedings MISTA, 2011, 519–522.
Shen, L., Mönch, L., & Buscher, U. (2012). An iterative approach for the serial batching problem with parallel machines and job families. Working paper, Nr. 164/12, Technische Universitaet Dresden (in press).
Srikar, B. N., & Ghosh, S. (1986). A MILP model for the \(n\)-job, \(m\)-stage flowshop with sequence dependent set-up times. International Journal of Production Research, 24, 1459–1474.
Tahar, D. N., Yalaoui, F., Chu, C., & Amodeo, L. (2006). A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times. International Journal of Production Economics, 99, 63–73.
van Hoesel, S., Wagelmans, A., & Moerman, B. (1994). Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problems and extensions. European Journal of Operational Research, 75, 312–331.
Wang, X., & Tang, L. (2009). A population-based variable neighborhood search for the single machine total weighted tardiness problem. Computers and Operations Research, 68, 2105–2110.
White, C. H., & Wilson, R. C. (1977). Sequence dependent set-up times and job sequencing. International Journal of Production Research, 16, 191.
Yalaoui, F., & Chu, C. (2003). An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times. IIE Transactions, 35, 183–190.
Acknowledgments
The authors would like to thank the anonymous referees for their constructive comments and valuable suggestions.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Shen, L., Mönch, L. & Buscher, U. A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups. J Sched 17, 471–487 (2014). https://doi.org/10.1007/s10951-013-0315-3
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10951-013-0315-3