Abstract
It has been proposed that if replacement time is planned too early prior to failure, a waste of operation cost, i.e., excess costs, would incur because the system might run for an additional period of time to complete critical operations, and if replacement time is too late after failure, a great failure cost, i.e., shortage cost, is incurred due to the delay in time of the carelessly scheduled replacement. In order to make the preventive replacement policies perform in a more general way, the above two variable types of costs are taken into considerations for periodic replacement policies in this paper. We firstly take up a standard model in which the unit is replaced preventively at periodic times. Secondly, the modeling approaches of whichever occurs first and last are applied into periodic and random models, and replacement first and last policies are discussed to find optimum periodic replacement times for a random working time. Furthermore, optimum working numbers are obtained for the extended models. We give analytical discussions of the above replacement policies, and finally, numerical examples are illustrated.
Similar content being viewed by others
References
Arts, J. (2018). Design of multi-component periodic maintenance programs with single-component models. IISE Transactions, 50(606–615), 2018.
Barlow, R. E., & Proschan, F. (1965). Mathematical theory of reliability. Hoboken: Wiley.
Chang, C. C., & Chen, Y. L. (2019). Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance. Communications in Statistics: Theory and Methods, 48, 4261–4277.
Chen, Y. L. (2019). Optimal scheduling replacement policies for a system with multiple random works. Communications in Statistics: Theory and Methods, 48, 676–688.
Chen, M., Zhao, X., & Nakagawa, T. (2019). Replacement policies with general models. Annals of Operations Research, 277, 47–61.
Cheng, C., Zhao, X., Chen, M., & Sun, T. (2014). A failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period. Quality Technology & Quantitative Management, 11, 245–254.
Chien, Y. H. (2019). Optimal periodic replacement policy for a GPP repairable product under the free-repair warranty. Quality Technology & Quantitative Management, 16, 347–354.
Golmakani, H., & Moakedi, H. (2012). Periodic inspection optimisation model for a two-component repairable unit with failure interaction. Computers & Industrial Engineering, 63, 540–545.
Hamidi, M., Szidarovszky, F., & Szidarovszky, M. (2016). New one cycle criteria for optimizing preventive replacement policies. Reliability Engineering and System Safety, 154, 42–48.
Kim, D., Lim, J., & Park, D. (2015). Optimal maintenance level for second-hand product with periodic inspection schedule. Applied Stochastic Models in Business and Industry, 31, 349–359.
Mannai, N., & Gasmi, S. (2018). Optimal design of \(k\)-out-of-\(n\) system under first and last replacement in reliability theory. Operational Research. https://doi.org/10.1007/s12351-018-0375-4.
Nakagawa, T. (2005). Mathematical theory of reliability. Berlin: Springer.
Nakagawa, T. (2008). Advanced reliability models and maintenance policies. London: Springer.
Nakagawa, T. (2014). Random maintenance policies. Berlin: Springer.
Nakagawa, T., & Zhao, X. (2015). Maintenance overtime policies in reliability theory. Berlin: Springer.
Nakagawa, T., Zhao, X., & Yun, W. (2011). Optimal age replacement and inspection policies with random failure and replacement times. International Journal of Reliability, Quality and Safety Engineering, 18, 405–406.
Okamura, H., & Dohi, T. (2017). Moment-based approach for some age-based replacement problems. Journal of Industrial and Production Engineering, 34, 558–567.
Park, M., & Pham, H. (2016). Cost models for age replacement policies and block replacement policies under warranty. Applied Mathematical Modelling, 40, 5689–5702.
Pinedo, M. (2016). Scheduling: Theory, algorithms, and systems. New York: Springer.
Sheu, S. H., Liu, T. H., & Zhang, Z. G. (2019). Extended optimal preventive replacement policies with random working cycle. Reliability Engineering & System Safety, 188, 398–415.
Sheu, S. H., Liu, T. H., Zhang, Z. G., & Tsai, H. N. (2018). The generalized age maintenance policies with random working times. Reliability Engineering & System Safety, 169, 503–514.
Wireman, T. (2004). Total productive maintenance. New York: Industrial Press.
Zhao, X., Al-Khalifa, K., Hamouda, A., & Nakagawa, T. (2015b). First and last triggering event approaches for replacement with minimal repairs. IEEE Transactions on Reliability, 65, 197–207.
Zhao, X., Al-Khalifa, K. N., Hamouda, A. M. S., & Nakagawa, T. (2017a). Age replacement models: A summary with new perspectives and methods. Reliability Engineering and System Safety, 161, 95–105.
Zhao, X., Chen, M., & Nakagawa, T. (2016). Replacement policies for a parallel system with shortage and excess costs. Reliability Engineering and System Safety, 150, 89–95.
Zhao, X., Liu, H., & Nakagawa, T. (2015a). Where does “whichever occurs first” hold for preventive maintenance modelings? Reliability Engineering & System Safety, 142, 203–211.
Zhao, X., Mizutani, S., & Nakagawa, T. (2017b). Replacement policies for age and working numbers with random life cycle. Communications in Statistics: Theory and Methods, 46, 6791–6802.
Zhao, X., & Nakagawa, T. (2012). Optimization problems of replacement first or last in reliability theory. European Journal of Operational Research, 223, 141–149.
Zhao, X., & Nakagawa, T. (2018). Advanced maintenance policies for shock and damage models. Berlin: Springer.
Zhao, X., Qian, C., & Nakagawa, T. (2017c). Comparisons of maintenance policies with periodic times and repair numbers. Reliability Engineering and System Safety, 168, 161–170.
Acknowledgements
This work is supported by National Natural Science Foundation of China (No. 71801126), Natural Science Foundation of Jiangsu Province (No. BK20180412), Aeronautical Science Foundation of China (No. 2018ZG52080), and Ministry of Science and Technology of Taiwan (No. MOST107-2221-E-030-011).
Author information
Authors and Affiliations
Corresponding author
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Appendix
Appendix
A.1. Prove that
increases strictly with K to \(\infty \).
Proof
Noting that for \(0<T<\infty \),
we obtain
which follows that \(Q_1(K,1)\) increases strictly with K to \(\infty \). \(\square \)
A.2. Prove that
increases strictly with K to \(\infty \).
Proof
Noting that for \(0<T<\infty \),
so that it can be proved that \( {\widetilde{Q}}_1(K,1)\) increases strictly with K to \(\infty \).
A.3. Prove that
increases strictly with K to \(\infty \), and when \(G(t)= 1- \mathrm {e}^{-\theta t}\), it increases strictly with N to Q(K) in (6).
Proof
Noting that for \(0<T<\infty \),
we obtain
which follows that \(Q_1(K,N)\) increases strictly with K to \(\infty \).
When \(G(t)= 1- \mathrm {e}^{-\theta t}\), we firstly prove that
increases strictly with j. Forming \(Q(K,j+1)- Q(K,j)\) and letting
i.e.,
On the other hand,
Thus, we obtain
which follows that Q(K, j) increases strictly with j. Thus,
increases strictly with N to Q(K). \(\square \)
A.4. Prove that
increases with K from 1 to \(1/ \int _0^\infty \theta [(\theta t)^N/N!] \mathrm {e}^{-\theta t} {\overline{F}}(t) \mathrm {d}t \), and increases strictly with N to \(1/ {\overline{F}}(KT)\).
Proof
Noting that for \(0<T<\infty \),
Differentiating \(H_1(N,1)\) with respect to T,
which follows that \(H_1(N,1)\) increases strictly with T. Thus, \(H_1(N,K)\) increases strictly with K from 1 to \(1/ \int _0^\infty \theta [(\theta t)^N/N!] \mathrm {e}^{-\theta t} {\overline{F}}(t) \mathrm {d}t \). Next, forming \(H_1(N+1,1)-H_1(N,1)\) and letting
we have \(L(0)=0\) and
which follows that \(L(T)>0\), i.e., \(H_1(N,K)\) increases strictly with N to \(1/{\overline{F}}(KT)\). \(\square \)
A.5. Prove that
increases strictly with K to \(\infty \), and when \(G(t)=1- \mathrm {e}^{-\theta t}\), it increases strictly with N from Q(K) to \(1/{\overline{F}}((K+1)T)\).
Proof
Noting that for \(0<T<\infty \),
so that it can be proved that \( {\widetilde{Q}}_1(K,N)\) increases strictly with K to \(\infty \).
When \(G(t)= 1- \mathrm {e}^{-\theta t}\),
and \({\widetilde{Q}}_1(K,0 )= Q(K)\). From the proof in A.3, it can be proved that \({\widetilde{Q}}_1(K,N)\) increases strictly with N from Q(K). \(\square \)
A.6. Prove that
increases strictly with K from \(1/ \int _0^\infty \theta [(\theta t)^N/N!] \mathrm {e}^{-\theta t} {\overline{F}}(t) \mathrm {d}t \) to \(\infty \) and increases strictly with N from \(1/ \int _0^\infty \theta \mathrm {e}^{-\theta t} {\overline{F}}(t+KT)\mathrm {d}t\) to \(\infty \).
Proof
Noting that
Differentiating \({\widetilde{H}}_1(N,1)\) with respect to T,
which follows that \({\widetilde{H}}_1(N,K)\) increases strictly with K from \(1/ \int _0^\infty \theta [(\theta t)^N/N!] \mathrm {e}^{-\theta t} {\overline{F}}(t) \mathrm {d}t\) to \(\infty \).
Next, forming \({\widetilde{H}}_1(N+1,K)- {\widetilde{H}}_1(N,K)\) and letting
we have \(L(\infty )=0\) and
which follows that \(L(T)>0\), i.e., \({\widetilde{H}}_1(N,K)\) increases strictly with N from \(1/ \int _0^\infty \theta \mathrm {e}^{-\theta t} {\overline{F}}(t+KT)\mathrm {d}t\) to \(\infty \). \(\square \)
Rights and permissions
About this article
Cite this article
Zhao, X., Chen, M. & Nakagawa, T. Periodic replacement policies with shortage and excess costs. Ann Oper Res 311, 469–487 (2022). https://doi.org/10.1007/s10479-020-03566-z
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10479-020-03566-z