Abstract
Dynamic factory simulation has been considered as an effective means to control a factory. However, the large amount of money, time, efforts, and know-how required for conducting a factory simulation study force a factory to pursue the persistent application of the factory simulation model, i.e. the sustainability of the factory simulation model. Therefore, strategies are required to facilitate the rapid establishment of the factory simulation model, to lower the technical requirements of the model, and to reduce the effort and time spent on simulation tasks, thus increasing users’ willingness to continue the application of the model. However, such issues have rarely been discussed. In addition, no method is available for estimating the sustainability of a factory simulation model. To address this problem, short-time evidence was analyzed rather than observing data over a long period. Then, a multi-granularity approach is proposed to estimate the sustainability of a factory simulation model based on these evidences. The proposed methodology has been applied to the simulation of a real semiconductor packaging facility. According to the experimental results, the multi-granularity approach reduced the input space by 89% and maintained a very high estimation accuracy. In addition, it also saved considerable time in building the models for estimating sustainability. Furthermore, without the multi-granularity approach, the sustainability of the factory simulation model could be observed only after a long period.
Similar content being viewed by others
References
Abdul-Rahman H, Wang C, Wood LC, Ebrahimi M (2016) Integrating and ranking sustainability criteria for housing. Proc Inst Civil Eng Eng Sustain 169(1):3–30
Bargiela A, Pedrycz W (2012) Granular computing: an introduction. Springer, Berlin
CBSA-ASFC (2011) Sustainable development strategy. http://www.cbsa-asfc.gc.ca/agency-agence/reports-rapports/sds-sdd/sds-sdd-11-13-eng.pdf
Chen T (2014) Strengthening the competitiveness and sustainability of a semiconductor manufacturer with cloud manufacturing. Sustainability 6:251–268
Chen T, Chiu M-C (2017) Development of a cloud-based factory simulation system for enabling ubiquitous factory simulation. Robot Comput Integr Manuf 45:133–143
Chen T, Romanowski R (2013) Precise and accurate job cycle time forecasting in a wafer fabrication factory with a fuzzy data mining approach. Math Problems Eng, article ID 496826, 1–14
Chen T, Tsai H-R (2017) Ubiquitous manufacturing: current practices, challenges, and opportunities. Robot Comput Integr Manuf 45:126–132
Chen T, Wang Y-C (2012) Long-term load forecasting by the collaborative fuzzy-neural approach. Int J Electr Power Energy Syst 43:454–464
Chen T, Wang Y-C (2016) Estimating simulation workload in cloud manufacturing using a classifying artificial neural network ensemble approach. Robot Comput Integr Manuf 38:42–51
Ciucci D (2016) Orthopairs and granular computing. Granul Comput 1(3):159–170
Environmental Leader (2016) Sustainable strategy and leadership. http://www.environmentalleader.com/category/all/sustainable-strategy-leadership/
Hsieh LY, Huang E, Chen C-H, Zhang S, Chang K-H (2016) Application of multi-fidelity simulation modelling to integrated circuit packaging. Int J Simul Process Model 11(3/4):259–269
Hung YF, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269
Liu H, Gegov A, Cocea M (2016) Rule-based systems: a granular computing perspective. Granul Comput 1(4):259–274
Loia V, D’Aniello G, Gaeta A, Orciuoli F (2016) Enforcing situation awareness with granular computing: a systematic overview and new perspectives. Granul Comput 1(2):127–143
National Semiconductor (1999) Semiconductor packaging assembly technology. http://focus.ti.com/en/download/qlty/SEMICONDUCTOR_PACKAGING_ASSEMBLY_TECHNOLOGY-MISC.pdf
Ranganathan A (2004) The Levenberg–Marquardt algorithm. http://www.scribd.com/doc/10093320/Levenberg-Marquardt-Algorithm
Rogers LL, Dowla FU (1994) Optimization of groundwater remediation using artificial neural networks with parallel solute transport modeling. Water Resour Res 30(2):457–481
Wallman P, Svensson MG, Sverdrup H, Belyazid S (2005) ForSAFE—an integrated process-oriented forest model for long-term sustainability assessments. For Ecol Manag 207(1):19–36
Wein LM (1988) Scheduling semiconductor wafer fabrication. IEEE Trans Semicond Manuf 1(3):115–130
Wu H-C, Chen T (2015) CART–BPN approach for estimating cycle time in wafer fabrication. J Ambient Intell Humaniz Comput 6:57–67
Xiong H, Fan H, Jiang G, Li G (2017) A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints. Eur J Oper Res 257(1):13–24
Yang T, Chou P (2005) Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attribute decision-making method. Math Comput Simul 68(1):9–21
Yao Y (2000) Granular computing: basic issues and possible solutions. In: Proceedings of the 5th joint conference on information sciences, 1, 186–189
Yao Y (2016) A triarchic theory of granular computing. Granul Comput 1(2):145–157
Zadeh LA (1996) Fuzzy sets and information granularity. In: Klir GJ, Yuan B (eds) Advances in fuzzy set theory and applications. World Scientific, Singapore, pp 3–18
Acknowledgement
This study is jointly sponsored by Ministry of Science and Technology and Siliconware Precision Industries Co., Ltd.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Chen, T., Wang, LC. & Chiu, MC. A multi-granularity approach for estimating the sustainability of a factory simulation model: semiconductor packaging as an example. Oper Res Int J 18, 711–729 (2018). https://doi.org/10.1007/s12351-017-0342-5
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12351-017-0342-5