Abstract
In this paper, we consider an integrated production and outbound delivery scheduling problem. In particular, we address the situation in which the scheduling sequence and the delivery sequence are the same and predefined. A set of jobs are processed on a single machine, and finished jobs are delivered to the customers by a single capacitated vehicle. Each job has a processing time, and transportation times between customers are taken into account. Because the sequence is given, the problem consists in forming batches of jobs and our objective is to minimize the sum of the delivery times or general functions of the delivery times. The NP-hardness of the general problem is established, and a pseudopolynomial time dynamic programming algorithm is given. Some particular cases are treated, for which NP-hardness proofs and polynomial time algorithms are given. Finally, a fixed-parameter tractability result is given.
Similar content being viewed by others
Explore related subjects
Discover the latest articles, news and stories from top researchers in related subjects.References
Agnetis, A., Aloulou, M. A., & Fu, L.-L. (2014). Coordination of production and interstage batch delivery with outsourced distribution. European Journal of Operational Research, 238(1), 130–142.
Agnetis, A., Aloulou, M. A., Fu, L.-L., & Kovalyov, M. Y. (2015). Two faster algorithms for coordination of production and batch delivery: A note. European Journal of Operational Research, 241(3), 927–930.
Armstrong, R., Gao, S., & Lei, L. (2008). A zero-inventory production and distribution problem with a fixed customer sequence. Annals of Operations Research, 159(1), 395–414.
Chang, Y.-C., & Lee, C.-Y. (2004). Machine scheduling with job delivery coordination. European Journal of Operational Research, 158(2):470–487. Methodological Foundations of Multi-Criteria Decision Making.
Chen, B., & Lee, C.-Y. (2008). Logistics scheduling with batching and transportation. European Journal of Operational Research, 189(3), 871–876.
Chen, Z.-L. (2010). Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58(1), 130–148.
Chen, Z.-L., & Pundoor, G. (2006). Order assignment and scheduling in a supply chain. Operations Research, 54(3), 555–572.
Chen, Z.-L., & Vairaktarakis, G. L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51(4), 614–628.
Cheref, A., Agnetis, A., Artigues, C., & Billaut, J.-C. (2017). Complexity results and algorithms for an integrated single machine scheduling and outbound delivery problem with fixed sequence, CNRS, LAAS-CNRS, report no 17126.
Fan, J., Lu, X., & Liu, P. (2015). Integrated scheduling of production and delivery on a single machine with availability constraint. Theoretical Computer Science, 562, 581–589.
Gao, S., Qi, L., & Lei, L. (2015). Integrated batch production and distribution scheduling with limited vehicle capacity. International Journal of Production Economics, 160, 13–25.
Garey, M. R., Tarjan, R. E., & Wilfong, G. T. (1988). One-processor scheduling with symmetric earliness and tardiness penalties. Mathematics of Operations Research, 13(2), 330–348.
Hall, N. G., Lesaoana, M., & Potts, C. N. (2001). Scheduling with fixed delivery dates. Operations Research, 49(1), 134–144.
Hurink, J., & Knust, S. (2001). Makespan minimization for flow-shop problems with transportation times and a single robot. Discrete Applied Mathematics, 112(13):199–216. Combinatorial Optimization Symposium, Selected Papers.
Lee, C.-Y., & Chen, Z.-L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4(1), 3–24.
Lenté, C., & Kergosien, Y. (2014). Problème de livraison a séquence fixée. In 10ème conférence internationale de modélisation, optimisation et simulation (MOSIM’14), Nancy.
Leung, J. Y.-T., & Chen, Z.-L. (2013). Integrated production and distribution with fixed delivery departure dates. Operations Research Letters, 41(3), 290–293.
Li, C.-L., & Ou, J. (2005). Machine scheduling with pickup and delivery. Naval Research Logistics (NRL), 52(7), 617–630.
Li, C.-L., Vairaktarakis, G., & Lee, C.-Y. (2005). Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research, 164(1), 39–51.
Stecke, K. E., & Zhao, X. (2007). Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manufacturing & Service Operations Management, 9(2), 206–224.
Tsirimpas, P., Tatarakis, A., Minis, I., & Kyriakidis, E. (2008). Single vehicle routing with a predefined customer sequence and multiple depot returns. European Journal of Operational Research, 187(2), 483–495.
Viergutz, C., & Knust, S. (2014). Integrated production and distribution scheduling with lifespan constraints. Annals of Operations Research, 213(1), 293–318.
Wang, X., & Cheng, T. (2009). Production scheduling with supply and delivery considerations to minimize the makespan. European Journal of Operational Research, 194(3), 743–752.
Zhong, W., & Chen, Z.-L. (2015). Flowshop scheduling with interstage job transportation. Journal of Scheduling, 18(4), 411–422.
Zhong, W., Chen, Z.-L., & Chen, M. (2010). Integrated production and distribution scheduling with committed delivery dates. Operations Research Letters, 38(2), 133–138.
Acknowledgements
This work was supported by the financial support of the ANR ATHENA Project, Grant ANR-13-BS02-0006 of the French Agence Nationale de la Recherche.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Cheref, A., Agnetis, A., Artigues, C. et al. Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence. J Sched 20, 681–693 (2017). https://doi.org/10.1007/s10951-017-0540-2
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10951-017-0540-2