A constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling

  • Notes
  • Published:
Journal of Computer Science and Technology Aims and scope Submit manuscript

Abstract

Scheduling activities in concurrent product development process is of great significance to shorten development lead time and minimize the cost. Moreover, it can eliminate the unnecessary redesign periods and giarantee that serial activities can be executed as concurrently as possible. This paper presents a constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling. In the combined approach, the neural network is used to obtain a feasible starting time of all the activities based on sequence constraints, the heuristic algorithm is used to obtain a feasible solution of the scheduling problem based on resource constraints. The feasible scheduling solution is obtained by a gradient optimization function. Simulations have shown that the proposed combined approach is efficient and feasible with respect to concurrent activities scheduling.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Explore related subjects

Discover the latest articles, news and stories from top researchers in related subjects.

References

  1. Hatch M, Badienelli R D. A concurrent optimization methodology for concurrent engineering.IEEE Trans. Eng. Manage., 1999, 46(1): 72–86.

    Article  Google Scholar 

  2. Tappeta V R, Renau E J. A comparison of equality constraints formulation for concurrent design optimization.Concurrent Eng. Res. Appl., 1997, 5: 253–261.

    Article  Google Scholar 

  3. Badiru A B. Scheduling of concurrent manufacturing projects.Concurrent Engineering: Contemporary Issues and Modern Design Tools, Cambridge University Press, 1993, pp.93–109.

  4. Yan J H, Wu C. A scheduling approach for design activities in concurrent engineering.IEEE Trans. SMC, part C, 2001, 31(3): 361–365.

    MathSciNet  Google Scholar 

  5. Foo S Y, Takefuji Y, Szu H. Job-shop scheduling based on modified Tank-Hopfield linear programming networks.Eng. Appl. Artificial Intelligent, 1994, 7: 321–327.

    Article  Google Scholar 

  6. Willems T M, Brandts L E M W. Implementing heuristics as an optimization criterion in neural networks for job-shop scheduling.J. Intell. Manufacturing, 1995, 6: 377–387.

    Article  Google Scholar 

  7. Willems T M. Neural networks for job-shop scheduling.Contr. Eng. Practice, 1994, 2: 31–39.

    Article  Google Scholar 

  8. Yu H B. Research of intelligent production scheduling methods and their applications [Dissertation]. Northeastern University of China, 1997.

  9. Yu H B, Xue J Set al. A production scheduling approach based on neural network.ACTA AUTOMATICA SINGA, 1999, 25: 449–456.

    MathSciNet  Google Scholar 

  10. Yang S X, Wang D W. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling.IEEE Trans. Neural Networks, 2000, 11: 474–486.

    Article  Google Scholar 

  11. Xiong G L, Zhang Y Y, Li B H. The research on collective techniques and executive methods for concurrent engineering.Computer Integrated Manufacturing Systems, 1996, 3: 3–8.

    Google Scholar 

  12. Yan J H. Research on optimal scheduling for concurrent activities. Postdoctoral Research Report, Tsinghua University, August, 2001.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to JiHong Yan.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yan, J., Wu, C. A constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling. J. Comput. Sci. & Technol. 18, 252–257 (2003). https://doi.org/10.1007/BF02948893

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02948893

Keywords

Navigation