The Use of Fuzzy Numbers in Practical Project Planning and Control

  • Chapter
Fuzzy Optimization

Part of the book series: Studies in Fuzziness and Soft Computing ((STUDFUZZ,volume 254))

  • 1598 Accesses

Abstract

The paper proposes how to use fuzzy numbers in project planning and control in such a way that it would have a chance to be used in practice. The method is destined for all the projects, but especially for those where in the initial phase the knowledge about the project is very incomplete and is made stepwise more precise during the project execution, also for those in which initial assumptions about the project execution are due to later changes.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Cioffi, D.F.: Designing project management: A scientific notation and an improved formalism for earned value calculations. International Journal of Project Management 24(2), 136–144 (2006)

    Article  MathSciNet  Google Scholar 

  2. Chanas, S., Zielinski, P.: Critical path analysis in the network with fuzzy activity times. Fuzzy Sets and Systems 122(2), 195–204 (2001)

    Article  MATH  MathSciNet  Google Scholar 

  3. Dałkowski, T.B., Kuchta, D.: Klasyczna i zmodyfikowana metoda Earned Value w zarządzaniu projektami (Classic and modified Earned Value Method in project management, in Polish). Bad. Oper. Decyz. nb 3-4, pp. 35–52 (2001)

    Google Scholar 

  4. Hardie, N.: The prediction and control of project duration: a recursive model. International Journal of Project Management 19(7), 401–409 (2001)

    Article  Google Scholar 

  5. Kuchta, D.: Fuzzyfication of the earned value method. WSEAS Trans. Syst. 4(12), 2222–2229 (2005)

    Google Scholar 

  6. Li, J., Moselhi, O., Alksass, S.: Forecasting project status by using fuzzy logic. J. Constr. Engrg. and Mgmt. 132(11), 1193–1202 (2006)

    Article  Google Scholar 

  7. Lipke, W., Zwikael, O., Henderson, K., Anbari, F.: Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management (in Press) (Available online April 8, 2008)

    Google Scholar 

  8. Noori, S., Bagherpour, M., Zareei, A.: Applying fuzzy control chart in Earned Value analysis. World Applied Science Journal 3(4), 684–690 (2008)

    Google Scholar 

  9. Vandevoorde, S., Vanhoucke, M.: A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management 24(4), 289–302 (2006)

    Article  Google Scholar 

  10. van de Vonder, S., Ballestín, F., Demeulemeester, E., Herroelen, W.: Heuristic procedures for reactive project scheduling. Computers & Industrial Engineering 52(1), 11–28 (2007)

    Article  Google Scholar 

  11. Zielinski, P.: On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Sets and Systems 150(1), 53–76 (2005)

    Article  MATH  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Kuchta, D. (2010). The Use of Fuzzy Numbers in Practical Project Planning and Control. In: Lodwick, W.A., Kacprzyk, J. (eds) Fuzzy Optimization. Studies in Fuzziness and Soft Computing, vol 254. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-13935-2_15

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-13935-2_15

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-13934-5

  • Online ISBN: 978-3-642-13935-2

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics