Nothing Special   »   [go: up one dir, main page]

Skip to main content

Integrating Portfolio Management and Simulation Concepts in the ERP Project Estimation Practice

  • Conference paper
Requirements Engineering: Foundation for Software Quality (REFSQ 2008)

Part of the book series: Lecture Notes in Computer Science ((LNPSE,volume 5025))

Abstract

This paper presents a two-site case study on requirements-based effort estimation practices in enterprise resource planning projects. Specifically, the case study investigated the question of how to handle qualitative data and highly volatile values of project context characteristics. We counterpart this challenge and expound upon the integration of portfolio management concepts and simulation concepts into a classic effort estimation model (COCOMO II).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Boehm, B.: Software Cost Estimation with COCOMO II. Prentice Hall, Upper Saddle River (2000)

    Google Scholar 

  2. Chulani, S., Boehm, B.W., Steece, B.: Bayesian Analysis of Empirical Software Engineering Cost Models. IEEE Trans. on Software Eng. 25, 573–583 (1999)

    Article  Google Scholar 

  3. Daneva, M., Wieringa, R.: Cost Estimation for Cross-organizational ERP Projects: Research Perspectives. Soft Quality J. 16 (2008)

    Google Scholar 

  4. Daneva, M.: Measuring Reuse of SAP Requirements: a Model-based Approach. In: 5th International Symposium on Software Reusability, pp. 141–150. ACM Press, LA (1999)

    Google Scholar 

  5. Daneva, M.: Approaching the ERP Project Cost Estimation Problem: an Experiment. In: 1st International Symposium on Empirical Software Engineering and Measurement, p. 500. IEEE Press, New York (2007)

    Chapter  Google Scholar 

  6. Hihn, J.: Model-based Estimate. Technical report, JLP NASA (2004)

    Google Scholar 

  7. Jiamthubthugsin, W., Sutivong, D.: Protfolio Management of Software Development Projects Using COCOMO II. In: 34th IEEE International Conference on Software Engineering, pp. 889–892. IEEE Press, New York (2006)

    Google Scholar 

  8. McDonald, P., Giles, S., Strickland, D.: Extensions of Auto-Generated Code and NOSTROMO Methodologies. In: 19th International Forum on COCOMO, LA (2004)

    Google Scholar 

  9. Fewster, R.M., Mendes, E.: Portfolio Management Method for Deadline Planning. In: 9th International Software Metrics Symposium, pp. 325–336. IEEE Press, Los Alamitos (2003)

    Google Scholar 

  10. Stensrud, E.: Alternative Approaches to Effort Prediction of ERP Projects. J. Inf. Soft. Techn. 43, 413–423 (2001)

    Article  Google Scholar 

  11. Yin, R.: Case Study Research, Design & Methods. 3rd edn. Sage, Newbury Park (2002)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Barbara Paech Colette Rolland

Rights and permissions

Reprints and permissions

Copyright information

© 2008 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Daneva, M. (2008). Integrating Portfolio Management and Simulation Concepts in the ERP Project Estimation Practice. In: Paech, B., Rolland, C. (eds) Requirements Engineering: Foundation for Software Quality. REFSQ 2008. Lecture Notes in Computer Science, vol 5025. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-69062-7_15

Download citation

  • DOI: https://doi.org/10.1007/978-3-540-69062-7_15

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-69060-3

  • Online ISBN: 978-3-540-69062-7

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics