Nothing Special   »   [go: up one dir, main page]

Skip to main content

Heuristics to Scenario-Based Capacity Expansion Problem of PWB Assembly Systems

  • Conference paper
Data Mining and Knowledge Management (CASDMKM 2004)

Part of the book series: Lecture Notes in Computer Science ((LNAI,volume 3327))

  • 1093 Accesses

Abstract

A model of scenario-based line capacity expansion problem for PWB (Printed Wiring Board) assembly systems at the aggregate level is developed. The model synthesizes BOM (Bill Of Material) of product families and machine operation flexibility, thus it is an attempt of integrating strategic capacity planning, aggregate production planning and MPS (Master Production Scheduling), which is an important research topic of production management. Since the resulting model is a large-scale two-stage stochastic mixed integer programming problem, it can not be solved with standard code. An approximate solution procedure is developed, which first reduces the searching space of capacity expansion decision variables to rough addition sets by heuristics, then the rough addition sets are searched through adaptive genetic algorithms. Numerical experiments are presented to show the financial benefit of the model and the feasibility of our approach.

This research is supported by NSFC (grant number:70172041).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Benjaafar, S., Gupta, D.: Scope versus focus - issues of flexibility, capacity, and number of production facilities. IIE Transactions 30, 413–425 (1998)

    Article  Google Scholar 

  2. Eppen, G.D., Martin, R.K., Schrage, L.: A Scenario Approach to Capacity Planning. Operations Research 37, 517–527 (1989)

    Article  Google Scholar 

  3. Fine, C.H., Freund, R.M.: Optimal Investment in Product-Flexible Manufacturing Capacity. Management Science 36, 449–466 (1990)

    Article  MathSciNet  MATH  Google Scholar 

  4. Gaimon, C.: Subcontracting versus Capacity Expansion and the Impact on Pricing of Services. Naval Research Logistics 41, 875–892 (1994)

    Article  MATH  Google Scholar 

  5. Gaimon, C., Ho, J.C.: Uncertainty and the Acquisition of Capacity - a Competitive Analysis. Computers & Operations Research 21, 1073–1088 (1994)

    Article  MATH  Google Scholar 

  6. Hua, Z.S., Banerjee, P.: Aggregate Line Capacity Design for PWB Assembly Systems. International Journal of Production Research 11, 2417–2441 (2000)

    Article  MATH  Google Scholar 

  7. Jordan, W.C., Graves, S.T.: Principles on the Benefits of Manufacturing Process Flexibility. Management Science 41, 577–594 (1995)

    Article  MATH  Google Scholar 

  8. Li, S., Tirupati, D.: Dynamic capacity expansion problem with multiple products: Technology selection and timing of capacity additions. Operations Research 42, 958–976 (1994)

    Article  MATH  Google Scholar 

  9. Rajagopalan, S.: Capacity Expansion and Equipment Replacement: A Unified Approach. Operations Research 6, 846–857 (1998)

    Article  MATH  Google Scholar 

  10. Van Laarhoven, P., Zijm, W.: Production Preparation and Numerical Control in PCB Assembly. I. J. of Flexible Manufacturing System 5, 187–207 (1993)

    Article  Google Scholar 

  11. Van Mieghem, J.A.: Investment strategies for flexible resources. Management Science 44, 1071–1078 (1998)

    Article  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2004 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Hua, Z., Liang, L. (2004). Heuristics to Scenario-Based Capacity Expansion Problem of PWB Assembly Systems. In: Shi, Y., Xu, W., Chen, Z. (eds) Data Mining and Knowledge Management. CASDMKM 2004. Lecture Notes in Computer Science(), vol 3327. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-30537-8_15

Download citation

  • DOI: https://doi.org/10.1007/978-3-540-30537-8_15

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-23987-1

  • Online ISBN: 978-3-540-30537-8

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics