Abstract
Due to two-page limitations for being accepted as a poster paper, the paper can only briefly describe a hybrid fuzzy goal programming approach for solving multiple objectives in fuzzy multi-mode project scheduling. To simplify such complex scheduling, a rule knowledge base for mode assignment combines into fuzzy goal programming, thus a multi-mode scheduling problem is decomposed into a simpler single mode scheduling problem.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2004 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Pan, H., Yeh, CH. (2004). Fuzzy Project Scheduling with Multiple Objectives. In: Zhang, C., W. Guesgen, H., Yeap, WK. (eds) PRICAI 2004: Trends in Artificial Intelligence. PRICAI 2004. Lecture Notes in Computer Science(), vol 3157. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-28633-2_139
Download citation
DOI: https://doi.org/10.1007/978-3-540-28633-2_139
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-22817-2
Online ISBN: 978-3-540-28633-2
eBook Packages: Springer Book Archive