Abstract
This study used the fuzzy theory for creating preventive maintenance scheduling of generator (GMS). GMS simulation tool is developed in optimum by the CO2 emission, probabilistic production cost, and reliability criteria LOLE(Loss of load expectation), EENS(Expected energy not served) in the objective functions. GMS has shown in graphical user interface (GUI) for the user-friendliness of the generator. It can be resulted in generator maintenance scheduling, reliability indices of power system, total probabilistic production costs and each power company probabilistic production costs.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Choi, J.S.: A study on the generator maintenance scheduling considering load uncertainty & multi-criterion function. EESRI, Final Report (1995)
Lee, B.Y., Shim, K.B.: A comparative study on optimal generation maintenance scheduling with marginal maintenance cost and levelized risk method. KIEE 41(1), 9–17 (1992) (written in Koeran)
Khatib, H.: Economic Evaluation of Projects in the Electricity Supply Industry. IEEE Power & Energy Series, vol. 44. MPG Books Limited (2003)
Kim, H.S., Moon, S.P., Do, D.H., Choi, J.S., Lee, S.Y., Shin, H.K., Kim, S.H., Kim, Y.S.: Generator maintenance scheduling considering air pollution. In: Proceedings on Autumn Meeting of Western Gyeongnam Area of KIEE, pp. 57–60 (1998) (written in Koeran)
Park, J., Wu, L., Choi, J., Baek, U.-K., Cho, W., Song, K., Cha, J., Lee, K.Y.: Fuzzy set theory based flexible generator maintenance scheduling. In: ISME 2009 (2009)
Park, J., Wu, L., Choi, J., Cha, J., Lee, K.Y.: Fuzzy set theory based on generator maintenance scheduling. In: ISME 2009. Dalian University of Technology, Dalian, China (2009)
Park, J., Wu, L., Choi, J., Baek, U.-K., Cho, W., Song, K., Cha, J., Lee, K.Y.: Fuzzy set theory based flexible generator maintenance scheduling. In: ISME 2009, August 5–7 (2009)
Oh, T., Park, J., Cho, K., Choi, J., Baek, U., El-Keib, A.A.: Generators maintenance scheduling using combined fuzzy set theory and GA. In: ICEE 2010, Paradise Hotel, Busan, Korea (2010)
Hwang, B., Lee, H., Park, K., Shin, Y.: A case study for determining system marginal price in Korea electricity market. In: KIEE 2011, Yongpyong Resort, Korea (2011) (written in Koeran)
Lee, Y., Lim, J., Oh, U., Do, D.P.N., Choi, J.: A study on the various objective functions based optimal generator maintenance scheduling in KOSEP. In: IGSC 2015, October 12–14 (2015)
Choi, J.: Visual system of probabilistic generator maintenance scheduling considering the various objective functions. In: PMAPS 2016, China (2016)
Acknowledgment
This work was supported by the Korean National Research Foundation (NRF) (No.#2012R1A2A2A01012803) and Korea South-East Power Co. (KOEN)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG
About this paper
Cite this paper
Lee, Y., Choi, J., Jung, M., Watada, J. (2018). GUI of GMS Simulation Tool Using Fuzzy Methods. In: Pan, JS., Tsai, PW., Watada, J., Jain, L. (eds) Advances in Intelligent Information Hiding and Multimedia Signal Processing. IIH-MSP 2017. Smart Innovation, Systems and Technologies, vol 82. Springer, Cham. https://doi.org/10.1007/978-3-319-63859-1_42
Download citation
DOI: https://doi.org/10.1007/978-3-319-63859-1_42
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-63858-4
Online ISBN: 978-3-319-63859-1
eBook Packages: EngineeringEngineering (R0)