Nothing Special   »   [go: up one dir, main page]

Skip to main content

A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection

  • Conference paper
  • First Online:
Combinatorial Optimization (ISCO 2014)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 8596))

Included in the following conference series:

Abstract

We consider a job selection problem in a two-stage flow shop. The objective is to select the best job subset with a given cardinality to minimize the makespan. This problem is known to be ordinary \(NP\)-hard and the current state of the art algorithms can solve instances with up to \(3000\) jobs. We introduce a constraint generation approach to the integer linear programming (ILP) formulation of the problem according to which the constraints associated with nearly all potential critical paths are relaxed and then only the ones violated by the relaxed solution are sequentially reinstated. This approach yields a new solution algorithm capable of solving problems with up to \(100000\) jobs or more.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Baptiste, P., Della Croce, F., Grosso, A., Tkindt, V.: Sequencing a single machine with due dates and deadlines: an ILP-based approach to solve very large instances. J. Sched. 13, 39–47 (2010)

    Article  MATH  MathSciNet  Google Scholar 

  2. Ben-Ameur, W., Neto, J.: A constraint generation algorithm for large scale linear programs using multiple-points separation. Math. Program. A 107, 517–537 (2006)

    Article  MATH  MathSciNet  Google Scholar 

  3. Della Croce, F., Gupta, J.N.D., Tadei, R.: Minimizing tardy jobs in a flowshop with common due date. Eur. J. Oper. Res. 120, 375–381 (2000)

    Article  MATH  MathSciNet  Google Scholar 

  4. Johnson, S.: Optimal two and three stage production schedules with set-up time included. Nav. Res. Logist. Q. 1, 61–68 (1954)

    Article  Google Scholar 

  5. Jozefowska, J., Jurisch, B., Kubiak, W.: Scheduling shops to minimize the weighted number of late jobs. Oper. Res. Lett. 16, 277–283 (1994)

    Article  MATH  MathSciNet  Google Scholar 

  6. Junger, M., Reinelt, G., Thienel, S.: Practical problem solving with cutting plane algorithms in combinatorial optimization. In: Cook, W., Lovasz, L., Seymour, P. (eds.) Combinatorial Optimization. DIMACS series in discrete mathematics and theoretical computer science, pp. 111–152. American Mathematical Society, Providence (1995)

    Google Scholar 

  7. Panwalkar, S.S., Koulamas, C.P.: An algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines. Eur. J. Oper. Res. 211, 7–13 (2012)

    Article  MathSciNet  Google Scholar 

  8. Nemhauser, G.L., Wolsey, L.A.: Integer and Combinatorial Optimization. Wiley, New York (1988)

    MATH  Google Scholar 

  9. Shabtay, D., Gaspar, N., Kaspi, M.: A survey on offline scheduling with rejection. J. Sched. 16, 3–28 (2013)

    Article  MathSciNet  Google Scholar 

  10. Tkindt, V., Billaut, J.-C.: Multicriteria Scheduling: Theory, Models and Algorithms. Springer, Heidelberg (2002)

    Book  Google Scholar 

  11. Tkindt, V., Della Croce, F., Bouquard, J.L.: Enumeration of Pareto optima for a flow shop scheduling problem with two criteria. INFORMS J. Comput. 19, 64–72 (2007)

    Article  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Federico Della Croce .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer International Publishing Switzerland

About this paper

Cite this paper

Della Croce, F., Koulamas, C., T’kindt, V. (2014). A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection. In: Fouilhoux, P., Gouveia, L., Mahjoub, A., Paschos, V. (eds) Combinatorial Optimization. ISCO 2014. Lecture Notes in Computer Science(), vol 8596. Springer, Cham. https://doi.org/10.1007/978-3-319-09174-7_17

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-09174-7_17

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-09173-0

  • Online ISBN: 978-3-319-09174-7

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics