A Fast Pareto Approach to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times

  • Conference paper
  • First Online:
Applied Computer Sciences in Engineering (WEA 2020)

Abstract

In the Job-shop scheduling problem minimizing the makespan has been the dominant approach in the literature. The level of the customer service cannot be measured efficiently for this criterion, since it does not consider relevant aspects like the due date of jobs to determine the tardiness. In this paper, we propose an innovate general approach for minimizing regular criteria in the Job-shop Scheduling which adds the conditions of maintenance activities and sequence dependent set-up times considering the Pareto optimization. Our approach makes use of the disjunctive graph model to represent schedules and support the search for an optimal solution using a classical estimation function at reversing a critical arc. The search is performed by two phases: improvement and diversification. In the improvement phase, initially, a random criterion is selected to create improving moves iteratively. When it is not possible to create a move using the selected criterion, it is penalized and a new criterion is selected. The diversification phase considers feasibility conditions to escape from a local optimal. In each move the set of solutions of the front is updated. The efficiency of our approach is illustrated on instances of literature at performing three sets of criteria. The first set considers makespan and maximum tardiness. In the second \( \sum C_{i} \) is considered and in the third the total tardiness. As a contribution of our approach, a benchmark of results is proposed by future research.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Zandieh, M., Khatami, A., Rahmati, S.: Flexible job shop scheduling under condition-based maintenance: improved version of imperialist competitive algorithm. Appl. Soft Comput. J. 58, 449–464 (2017)

    Article  Google Scholar 

  2. Rahmati, S., Ahmadi, A., Govindan, K.: A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach. Ann. Oper. Res. 269(1–2), 583–621 (2018)

    Article  MathSciNet  Google Scholar 

  3. Cassady, C., Kutanoglu, E.: Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans. Reliab. 54(2), 304–309 (2005)

    Article  Google Scholar 

  4. Finke, G., Gara-Ali, A., Espinouse, M., Jost, V., Moncel, J.: Unified matrix approach to solve production-maintenance problems on a single machine. Omega (United Kingdom) 66, 140–146 (2017)

    Google Scholar 

  5. Rebai, M., Kacem, I., Adjallah, K.: Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods. J. Intell. Manuf. 23(4), 1207–1224 (2012)

    Article  Google Scholar 

  6. Lei, D., Liu, M.: An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance. Comput. Ind. Eng. 141, 106320 (2020)

    Article  Google Scholar 

  7. Shen, J., Zhu, Y.: A parallel-machine scheduling problem with periodic maintenance under uncertainty. J. Ambient Intell. Humaniz. Comput. 10(8), 3171–3179 (2018). https://doi.org/10.1007/s12652-018-1032-8

    Article  Google Scholar 

  8. Pérez-González, P., Fernández-Viagas, V., Framinan, J.: Permutation flowshop scheduling with periodic maintenance and makespan objective. Comput. Ind. Eng. 143, 106369 (2020)

    Article  Google Scholar 

  9. Miyata, H., Nagano, M., Gupta, J.: Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Eng. Optim. 51(4), 680–698 (2019)

    Article  MathSciNet  Google Scholar 

  10. Boufellouh, R., Belkaid, F.: Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem. Comput. Oper. Res. 122, 104943 (2020)

    Article  MathSciNet  Google Scholar 

  11. Miyata, H., Nagano, M., Gupta, J.: Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Comput. Ind. Eng. 135, 79–104 (2019)

    Article  Google Scholar 

  12. Naderi, B., Zandieh, M., Fatemi Ghomi, S.: A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. J. Intell. Manuf. 20(6), 683–694 (2009)

    Article  Google Scholar 

  13. Khamseh, A., Jolai, F., Babaei, M.: Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops. Int. J. Adv. Manuf. Technol. 77(1–4), 173–185 (2014)

    Google Scholar 

  14. Ben Ali, M., Sassi, M., Gossa, M., Harrath, Y.: Simultaneous scheduling of production and maintenance tasks in the job shop. Int. J. Prod. Res. 49(13), 3891–3918 (2011)

    Article  Google Scholar 

  15. Naderi, B., Zandieh, M., Fatemi Ghomi, S.: Scheduling sequence-dependent setup time job shops with preventive maintenance. Int. J. Adv. Manuf. Technol. 43(1–2), 170–181 (2009)

    Article  Google Scholar 

  16. Rahmati, S., Ahmadi, A., Karimi, B.: Multi-objective evolutionary simulation based optimization mechanism for a novel stochastic reliability centered maintenance problem. Swarm Evol. Comput. 40, 255–271 (2018)

    Article  Google Scholar 

  17. Vela, C., Varela, R., González, M.: Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times. J. Heuristics 16(2), 139–165 (2010)

    Article  Google Scholar 

  18. Bürgy, R.: A neighborhood for complex job shop scheduling problems with regular objectives. J. Sched. 20(4), 391–422 (2017). https://doi.org/10.1007/s10951-017-0532-2

    Article  MathSciNet  MATH  Google Scholar 

  19. Mati, Y., Dauzère-Pérès, S., Lahlou, C.: A general approach for optimizing regular criteria in the job-shop scheduling problem. Eur. J. Oper. Res. 212(1), 33–42 (2011)

    Article  MathSciNet  Google Scholar 

  20. García-León, A.A., Dauzère-Pérès, S., Mati, Y.: An efficient Pareto approach for solving the multi-objective flexible job-shop scheduling problem with regular criteria. Comput. Oper. Res. 108, 187–200 (2019)

    Article  MathSciNet  Google Scholar 

  21. García-León, A.A., Torres Tapia, W.F.: A general local search pareto approach with regular criteria for solving the job-shop scheduling problem multi-resource resource flexibility with linear routes. In: Figueroa-García, J.C., Duarte-González, M., Jaramillo-Isaza, S., Orjuela-Cañon, A.D., Díaz-Gutierrez, Y. (eds.) WEA 2019. CCIS, vol. 1052, pp. 764–775. Springer, Cham (2019). https://doi.org/10.1007/978-3-030-31019-6_64

    Chapter  Google Scholar 

  22. Singer, M., Pinedo, M.: A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops. IIE Trans. 30(2), 109–118 (1998)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Andrés A. García-León .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

García-León, A.A., Torres Tapia, W.F. (2020). A Fast Pareto Approach to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times. In: Figueroa-García, J.C., Garay-Rairán, F.S., Hernández-Pérez, G.J., Díaz-Gutierrez, Y. (eds) Applied Computer Sciences in Engineering. WEA 2020. Communications in Computer and Information Science, vol 1274. Springer, Cham. https://doi.org/10.1007/978-3-030-61834-6_16

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-61834-6_16

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-61833-9

  • Online ISBN: 978-3-030-61834-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics