Nothing Special   »   [go: up one dir, main page]

Skip to main content

Development of Risk Controlling Mechanism and Tools for Agile Projects in Telecommunications

  • Conference paper
  • First Online:
Internet of Things, Smart Spaces, and Next Generation Networks and Systems (NEW2AN 2020, ruSMART 2020)

Abstract

We developed the mechanism and tools of risk controlling in agile projects for companies in information and communication (ICT) industry. The relevance of this topic is underpinned by (1) the growing number of failures of agile projects due to realization of unique set of risks; and (2) the fact that standard agile practices neglect important risk management steps. The paper fills the research gaps in this area and addresses inefficiencies in explicit agile risk management frameworks. The results include the development of the mechanism’s concept and the block diagram for scrum framework. They also include risk controlling tools: risk-based release planning, system of key risk indicators and agile risk controlling effectiveness evaluation tree. Unlike peers mentioned in existing studies the mechanism provides holistic approach to the agile risk management while keeps the spirit of agile. It addresses risk governance issues, ensures integration and coordination of risk management activities both inside the team and across the company and provides for lightweight but efficient tools. The mechanism can be adapted for other agile frameworks and can be applied by scrum masters and project managers in ICT industry as well as by the researches who are interested in further enhancement in agile risk management practices.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

Notes

  1. 1.

    https://www.vosesoftware.com/products/modelrisk/

References

  1. Albadarneh, A., Albadarneh, I., Qusef, A.: Risk management in agile software development: a comparative study. In: Proceedings of 2015 IEEE Jordan Conference on Applied Electrical Engineering and Computing Technologies, AEECT 2015, IEEE, Amman, Jordan (2015)

    Google Scholar 

  2. Chuna, R., Pereira, C.S., Pinto, J.A.: Agile software project: proposal of a model to manage risks. In: Proceedings of 8th Iberian Conference on Information Systems and Technologies, CISTI, Lisbon, Portugal (2013)

    Google Scholar 

  3. Beaumont, M., Thuriaux-Aleman, B., Prasad, P., Hatton, C.: Using agile approaches for breakthrough product innovation. Strategy Leadersh. 45(6), 19–25 (2017)

    Article  Google Scholar 

  4. Kaczorowska, A.: Traditional and agile project management in public sector and ICT. In: Proceedings of 2015 Federated Conference on Computer Science and Information Systems, FedCSIS, Lodz, Poland, pp. 1521–1531 (2015)

    Google Scholar 

  5. Hossin, E., Ali Babar, M., Paik, H.-Y.: Using scrum in global software development: a systematic literature review. In: Proceedings of 4th IEEE International Conference on Global Software Engineering, ICGSE 2009; IEEE, Ireland, pp. 175–184 (2009)

    Google Scholar 

  6. Boehm, B.: Get ready for agile method with care. Computer 35(1), 64–69 (2002)

    Article  Google Scholar 

  7. Elbanna, A., Sarker, S.: The risks of agile software development: learning from adopters. IEEE Softw. 33(5), 72–79 (2016)

    Article  Google Scholar 

  8. Enterprise Risk Management. Integrating with Strategy and Performance. Committee of Sponsorship Organizations of the Treadway Commission, https://www.coso.org/Pages/default.aspx (2017)

  9. A Guide to The Project Management Body of Knowledge (PMBOK Guides, Sixth Edition). Project Management Institute (2017)

    Google Scholar 

  10. Grishunin, S., Suloeva, S., Nekrasova, T.: Development of the mechanism of risk-adjusted scheduling and cost budgeting of R&D projects in telecommunications. In: Galinina, O., Andreev, S., Balandin, S., Koucheryavy, Y. (eds.) NEW2AN/ruSMART -2018. LNCS, vol. 11118, pp. 456–470. Springer, Cham (2018). https://doi.org/10.1007/978-3-030-01168-0_41

    Chapter  Google Scholar 

  11. Grishunin, S., Mukhanova, N., Suloeva, S.: Development of concept of risk controlling for industrial enterprise. Organizer Prod. 26(1), 45–46 (2018)

    Article  Google Scholar 

  12. Funston, F., Wagner, S.: Surviving and Thriving in Uncertainty: Creating the Risk Intelligent Enterprise. Wiley, New York (2010)

    Google Scholar 

  13. Nyfjord, J., Kajko-Mattsson M.: Commonalities in risk management and agile process models, In: Proceedings of International Conference on Software Engineering Advances (ICSEA 2007), pp. 18–21. Cap Esterel, France (2007)

    Google Scholar 

  14. Paulk, M.: Agile methodologies and process discipline, crossTalk. J. Softw. Defense Eng. 15–18 (2002)

    Google Scholar 

  15. Nelson, Christopher R., Taran, G., de Lascurain Hinojosa, L.: Explicit risk management in agile processes. In: Abrahamsson, P., Baskerville, R., Conboy, K., Fitzgerald, B., Morgan, L., Wang, X. (eds.) XP 2008. LNBIP, vol. 9, pp. 190–201. Springer, Heidelberg (2008). https://doi.org/10.1007/978-3-540-68255-4_20

    Chapter  Google Scholar 

  16. Dhir, S., Kumar, D., Singh, V.B.: Success and failure factors that impact on project implementation using agile software development methodology. In: Hoda, M.N., Chauhan, N., Quadri, S.M.K., Srivastava, P.R. (eds.) Software Engineering. AISC, vol. 731, pp. 647–654. Springer, Singapore (2019). https://doi.org/10.1007/978-981-10-8848-3_62

    Chapter  Google Scholar 

  17. Alberts, C., Dorofee, A.: Risk Management Framework. Technical report CMU/SEI-2010-TR-017 ESC-TR-2010-017 (2010). https://resources.sei.cmu.edu/asset_files/TechnicalReport/2010_005_001_15245.pdf

  18. Glukhov, V., Balashova, E.: Economics and Management in Info-communication: Tutorial. Piter, Saint Petersburg (2012)

    Google Scholar 

  19. Balashova, E., Gromova, E.: Agile Project management in telecommunication industry. Espacios 38(41), 24–30 (2017)

    Google Scholar 

  20. Esbensen, K., Hjartar, K., Pralong, D., Salo, O.: A Tale of Two Agile Path: How a Pair of Operators Set Up Their Organizational Transformation. McKinsey and Company, https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/a-tale-of-two-agile-paths-how-a-pair-of-operators-set-up-their-organizational-transformations (2019)

  21. Cohn, M.: Agile Estimating and Planning. Prentice Hall, New Jersey (2006)

    Google Scholar 

  22. Sutherland, J., Sutherland, J.J.: Scrum: The Art of Doing Twice the Work in Half the Time, 1st edn. Crown Business, New York (2014)

    Google Scholar 

  23. Odzaly, E., Greer, D., Stewart, D.: Lightweight risk management in agile projects. In: Proceedings of 1st EAI International Conference on Computer Science and Engineering, pp 324–345. EAI, Penang, Malaysia (2017)

    Google Scholar 

  24. Beardwood, J.: Shour, M: Risk Management and Agile Software: Optimizing Contractual Design. Comput. Law Rev. Int. 6, 161–170 (2010)

    Google Scholar 

  25. Grishunin, S., Suloeva, S.: Development of project risk rating for Telecommunication company. In: Galinina, O., Balandin, S., Koucheryavy, Y. (eds.) NEW2AN/ruSMART -2016. LNCS, vol. 9870, pp. 752–765. Springer, Cham (2016). https://doi.org/10.1007/978-3-319-46301-8_66

    Chapter  Google Scholar 

  26. COBIT framework. https://www.isaca.org/resources/cobit

  27. Sulaiman, T., Barton, B., Blackburn, T.: Agile EVM – earned value management in scrum projects. In: Proceedings of AGILE 2006 Conference, pp. 7–16. Minneapolis, Minnesota, USA (2006)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Sergei Grishunin , Svetlana Suloeva , Tatyana Nekrasova or Ekaterina Burova .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Grishunin, S., Suloeva, S., Nekrasova, T., Burova, E. (2020). Development of Risk Controlling Mechanism and Tools for Agile Projects in Telecommunications. In: Galinina, O., Andreev, S., Balandin, S., Koucheryavy, Y. (eds) Internet of Things, Smart Spaces, and Next Generation Networks and Systems. NEW2AN ruSMART 2020 2020. Lecture Notes in Computer Science(), vol 12526. Springer, Cham. https://doi.org/10.1007/978-3-030-65729-1_23

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-65729-1_23

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-65728-4

  • Online ISBN: 978-3-030-65729-1

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics