Abstract
The O-OSCAR software architecture is a problem solving environment for complex scheduling problem that is based on a constraintbasedrep resentation. On top of this core representation a problem solver module and a schedule execution system guarantee a complete support to address a scheduling problem. Furthermore, a rather sophisticated interaction module allows users to maintain control on different phases of schedule management.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
J.C. Beck. Heuristics for Constraint-DirectedS cheduling with Inventory. In Proceedings of the Fifth Int. Conf. on Artificial Intelligence Planning and Scheduling (AIPS-00), 2000.
P. Brucker, A. Drexl, R. Mohring, K. Neumann, and E. Pesch. Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods. European Journal of Operations Research, 1998.
A. Cesta, A. Oddi, and S.F. Smith. Profile Based Algorithms to Solve Multiple CapacitatedM etric Scheduling Problems. In Proceedings of the Fourth Int. Conf. on Artificial Intelligence Planning Systems (AIPS-98), 1998.
A. Cesta, A. Oddi, and S.F. Smith. A Constrained-Based Method for Project Scheduling with Time Windows. Journal of Heuristics, 2002.
A. Cesta, A. Oddi, and A. Susi. O-OSCAR: A Flexible Object-Oriented Architecture for Schedule Management in Space Applications. In Proceedings of the Fifth Int. Symp. on Artificial Intelligence, Robotics and Automation in Space (i-SAIRAS-99), 1999.
A. Cesta and C. Stella. A Time andR esource Problem for Planning Architectures. In Proceedings of the Fourth European Conference on Planning (ECP 97), 1997.
B. De Reyck and W. Herroelen. A Branch-and-Bound Procedure for the Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. European Journal of Operations Research, 111(1):152–174, 1998.
R. Dechter, I. Meiri, and J. Pearl. Temporal constraint networks. Artificial Intelligence, 49:61–95, 1991.
K. Neumann and C. Schwindt. Project Scheduling with Inventory Constraints. Technical Report WIOR-572, Universität Karlsruhe, 1999.
A. Oddi and S.F. Smith. Stochastic Procedures for Generating Feasible Schedules. In Proceedings 14th National Conference on AI (AAAI-97), 1997.
N. Policella. Problemi di scheduling con risorse consumabili, risoluzione con approccio a vincoli in una architettura software orientata agli oggetti. Master’s thesis, Università di Roma “La Sapienza”, March 2001. In Italian.
G. Wolf. Schedule Management: An Object-Oriented Approach. Decision Support Systems, 11:373–388, 1994.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2001 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Cesta, A., Cortellessa, G., Oddi, A., Policella, N., Susi, A. (2001). A Constraint-Based Architecture for Flexible Support to Activity Scheduling. In: Esposito, F. (eds) AI*IA 2001: Advances in Artificial Intelligence. AI*IA 2001. Lecture Notes in Computer Science(), vol 2175. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-45411-X_39
Download citation
DOI: https://doi.org/10.1007/3-540-45411-X_39
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-42601-1
Online ISBN: 978-3-540-45411-3
eBook Packages: Springer Book Archive